Home/Contractors/Aerojet Rocketdyne, INC./contracts

Federal Contractor Profile

Aerojet Rocketdyne, INC.

$515.4M obligated·16 awards·2 agencies·5 NAICS

Federal Contracts

Showing contracts 51100 of 168 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Sep 7, 2023Department of DefenseFA9300 AFTC PZRFA930021C6002541715NEXT-GENERATION HALL THRUSTER STUDY (NGHTS)$5.4M
Aug 1, 2023National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC021DA020336415CERTIFICATION AND PRODUCTION OF THE ORION MAIN ENGINE (OME)$360K
Jul 25, 2023National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC021DA020336415CERTIFICATION AND PRODUCTION OF THE ORION MAIN ENGINE (OME)$58K
Jun 5, 2023National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTERNNC16CA21C541712IGF::OT::IGF NASA, THROUGH THE SPACE TECHNOLOGY MISSION DIRECTORATE (STMD,) SEEKS TO DEMONSTRATE AN ADVANCED SOLAR ELECTRIC PROPULSION (EP) SYSTEM THAT WILL ENABLE FUTURE DEEP SPACE HUMAN AND ROBOTIC EXPLORATION APPLICABLE TO THE UNITED STATES PRIVATE AND PUBLIC SECTOR SPACE NEEDS. THE PURPOSE OF THE ADVANCED ELECTRIC PROPULSION (EP) SYSTEM (AEPS) CONTRACT IS THE DEVELOPMENT AND DELIVERY OF EP STRING SETS TO SUPPORT AN ADVANCED SEP DEMONSTRATION MISSION. DURING THE CONTRACT BASE PERIOD OF PERFORMANCE, THE CONTRACTOR WILL DEVELOP, TEST, AND DELIVER ENGINEERING DEVELOPMENT END ITEMS THAT WILL REDUCE THE RISK OF DEVELOPING THE FLIGHT END ITEMS. DURING THE OPTION PERIOD OF PERFORMANCE, IF EXERCISED, THE CONTRACTOR WILL DEVELOP, VERIFY, AND DELIVER THE FLIGHT END ITEMS.$3.5M
Jun 5, 2023National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC021DA020336415CERTIFICATION AND PRODUCTION OF THE ORION MAIN ENGINE (OME)$5.7M
May 17, 2023National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC021DA020336415CERTIFICATION AND PRODUCTION OF THE ORION MAIN ENGINE (OME)$17.1M
Apr 28, 2023National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC021DA020336415CERTIFICATION AND PRODUCTION OF THE ORION MAIN ENGINE (OME)$8K
Mar 15, 2023National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTERNNC16CA21C541712IGF::OT::IGF NASA, THROUGH THE SPACE TECHNOLOGY MISSION DIRECTORATE (STMD,) SEEKS TO DEMONSTRATE AN ADVANCED SOLAR ELECTRIC PROPULSION (EP) SYSTEM THAT WILL ENABLE FUTURE DEEP SPACE HUMAN AND ROBOTIC EXPLORATION APPLICABLE TO THE UNITED STATES PRIVATE AND PUBLIC SECTOR SPACE NEEDS. THE PURPOSE OF THE ADVANCED ELECTRIC PROPULSION (EP) SYSTEM (AEPS) CONTRACT IS THE DEVELOPMENT AND DELIVERY OF EP STRING SETS TO SUPPORT AN ADVANCED SEP DEMONSTRATION MISSION. DURING THE CONTRACT BASE PERIOD OF PERFORMANCE, THE CONTRACTOR WILL DEVELOP, TEST, AND DELIVER ENGINEERING DEVELOPMENT END ITEMS THAT WILL REDUCE THE RISK OF DEVELOPING THE FLIGHT END ITEMS. DURING THE OPTION PERIOD OF PERFORMANCE, IF EXERCISED, THE CONTRACTOR WILL DEVELOP, VERIFY, AND DELIVER THE FLIGHT END ITEMS.$5.2M
Mar 8, 2023National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC021DA020336415CERTIFICATION AND PRODUCTION OF THE ORION MAIN ENGINE (OME)$96K
Feb 28, 2023National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTERNNC16CA21C541712IGF::OT::IGF NASA, THROUGH THE SPACE TECHNOLOGY MISSION DIRECTORATE (STMD,) SEEKS TO DEMONSTRATE AN ADVANCED SOLAR ELECTRIC PROPULSION (EP) SYSTEM THAT WILL ENABLE FUTURE DEEP SPACE HUMAN AND ROBOTIC EXPLORATION APPLICABLE TO THE UNITED STATES PRIVATE AND PUBLIC SECTOR SPACE NEEDS. THE PURPOSE OF THE ADVANCED ELECTRIC PROPULSION (EP) SYSTEM (AEPS) CONTRACT IS THE DEVELOPMENT AND DELIVERY OF EP STRING SETS TO SUPPORT AN ADVANCED SEP DEMONSTRATION MISSION. DURING THE CONTRACT BASE PERIOD OF PERFORMANCE, THE CONTRACTOR WILL DEVELOP, TEST, AND DELIVER ENGINEERING DEVELOPMENT END ITEMS THAT WILL REDUCE THE RISK OF DEVELOPING THE FLIGHT END ITEMS. DURING THE OPTION PERIOD OF PERFORMANCE, IF EXERCISED, THE CONTRACTOR WILL DEVELOP, VERIFY, AND DELIVER THE FLIGHT END ITEMS.$3.2M
Jan 17, 2023National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC021DA020336415CERTIFICATION AND PRODUCTION OF THE ORION MAIN ENGINE (OME)$20.0M
Dec 5, 2022National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTERNNC16CA21C541712IGF::OT::IGF NASA, THROUGH THE SPACE TECHNOLOGY MISSION DIRECTORATE (STMD,) SEEKS TO DEMONSTRATE AN ADVANCED SOLAR ELECTRIC PROPULSION (EP) SYSTEM THAT WILL ENABLE FUTURE DEEP SPACE HUMAN AND ROBOTIC EXPLORATION APPLICABLE TO THE UNITED STATES PRIVATE AND PUBLIC SECTOR SPACE NEEDS. THE PURPOSE OF THE ADVANCED ELECTRIC PROPULSION (EP) SYSTEM (AEPS) CONTRACT IS THE DEVELOPMENT AND DELIVERY OF EP STRING SETS TO SUPPORT AN ADVANCED SEP DEMONSTRATION MISSION. DURING THE CONTRACT BASE PERIOD OF PERFORMANCE, THE CONTRACTOR WILL DEVELOP, TEST, AND DELIVER ENGINEERING DEVELOPMENT END ITEMS THAT WILL REDUCE THE RISK OF DEVELOPING THE FLIGHT END ITEMS. DURING THE OPTION PERIOD OF PERFORMANCE, IF EXERCISED, THE CONTRACTOR WILL DEVELOP, VERIFY, AND DELIVER THE FLIGHT END ITEMS.$2.3M
Sep 28, 2022National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC021DA020336415CERTIFICATION AND PRODUCTION OF THE ORION MAIN ENGINE (OME)$634K
Sep 23, 2022National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTERNNC16CA21C541712IGF::OT::IGF NASA, THROUGH THE SPACE TECHNOLOGY MISSION DIRECTORATE (STMD,) SEEKS TO DEMONSTRATE AN ADVANCED SOLAR ELECTRIC PROPULSION (EP) SYSTEM THAT WILL ENABLE FUTURE DEEP SPACE HUMAN AND ROBOTIC EXPLORATION APPLICABLE TO THE UNITED STATES PRIVATE AND PUBLIC SECTOR SPACE NEEDS. THE PURPOSE OF THE ADVANCED ELECTRIC PROPULSION (EP) SYSTEM (AEPS) CONTRACT IS THE DEVELOPMENT AND DELIVERY OF EP STRING SETS TO SUPPORT AN ADVANCED SEP DEMONSTRATION MISSION. DURING THE CONTRACT BASE PERIOD OF PERFORMANCE, THE CONTRACTOR WILL DEVELOP, TEST, AND DELIVER ENGINEERING DEVELOPMENT END ITEMS THAT WILL REDUCE THE RISK OF DEVELOPING THE FLIGHT END ITEMS. DURING THE OPTION PERIOD OF PERFORMANCE, IF EXERCISED, THE CONTRACTOR WILL DEVELOP, VERIFY, AND DELIVER THE FLIGHT END ITEMS.$2.9M
Sep 12, 2022National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTERNNC16CA21C541712IGF::OT::IGF NASA, THROUGH THE SPACE TECHNOLOGY MISSION DIRECTORATE (STMD,) SEEKS TO DEMONSTRATE AN ADVANCED SOLAR ELECTRIC PROPULSION (EP) SYSTEM THAT WILL ENABLE FUTURE DEEP SPACE HUMAN AND ROBOTIC EXPLORATION APPLICABLE TO THE UNITED STATES PRIVATE AND PUBLIC SECTOR SPACE NEEDS. THE PURPOSE OF THE ADVANCED ELECTRIC PROPULSION (EP) SYSTEM (AEPS) CONTRACT IS THE DEVELOPMENT AND DELIVERY OF EP STRING SETS TO SUPPORT AN ADVANCED SEP DEMONSTRATION MISSION. DURING THE CONTRACT BASE PERIOD OF PERFORMANCE, THE CONTRACTOR WILL DEVELOP, TEST, AND DELIVER ENGINEERING DEVELOPMENT END ITEMS THAT WILL REDUCE THE RISK OF DEVELOPING THE FLIGHT END ITEMS. DURING THE OPTION PERIOD OF PERFORMANCE, IF EXERCISED, THE CONTRACTOR WILL DEVELOP, VERIFY, AND DELIVER THE FLIGHT END ITEMS.$2.4M
Jul 26, 2022National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTERNNC16CA21C541712IGF::OT::IGF NASA, THROUGH THE SPACE TECHNOLOGY MISSION DIRECTORATE (STMD,) SEEKS TO DEMONSTRATE AN ADVANCED SOLAR ELECTRIC PROPULSION (EP) SYSTEM THAT WILL ENABLE FUTURE DEEP SPACE HUMAN AND ROBOTIC EXPLORATION APPLICABLE TO THE UNITED STATES PRIVATE AND PUBLIC SECTOR SPACE NEEDS. THE PURPOSE OF THE ADVANCED ELECTRIC PROPULSION (EP) SYSTEM (AEPS) CONTRACT IS THE DEVELOPMENT AND DELIVERY OF EP STRING SETS TO SUPPORT AN ADVANCED SEP DEMONSTRATION MISSION. DURING THE CONTRACT BASE PERIOD OF PERFORMANCE, THE CONTRACTOR WILL DEVELOP, TEST, AND DELIVER ENGINEERING DEVELOPMENT END ITEMS THAT WILL REDUCE THE RISK OF DEVELOPING THE FLIGHT END ITEMS. DURING THE OPTION PERIOD OF PERFORMANCE, IF EXERCISED, THE CONTRACTOR WILL DEVELOP, VERIFY, AND DELIVER THE FLIGHT END ITEMS.$48K
Jul 21, 2022National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTERNNC16CA21C541712IGF::OT::IGF NASA, THROUGH THE SPACE TECHNOLOGY MISSION DIRECTORATE (STMD,) SEEKS TO DEMONSTRATE AN ADVANCED SOLAR ELECTRIC PROPULSION (EP) SYSTEM THAT WILL ENABLE FUTURE DEEP SPACE HUMAN AND ROBOTIC EXPLORATION APPLICABLE TO THE UNITED STATES PRIVATE AND PUBLIC SECTOR SPACE NEEDS. THE PURPOSE OF THE ADVANCED ELECTRIC PROPULSION (EP) SYSTEM (AEPS) CONTRACT IS THE DEVELOPMENT AND DELIVERY OF EP STRING SETS TO SUPPORT AN ADVANCED SEP DEMONSTRATION MISSION. DURING THE CONTRACT BASE PERIOD OF PERFORMANCE, THE CONTRACTOR WILL DEVELOP, TEST, AND DELIVER ENGINEERING DEVELOPMENT END ITEMS THAT WILL REDUCE THE RISK OF DEVELOPING THE FLIGHT END ITEMS. DURING THE OPTION PERIOD OF PERFORMANCE, IF EXERCISED, THE CONTRACTOR WILL DEVELOP, VERIFY, AND DELIVER THE FLIGHT END ITEMS.$2.5M
Jun 15, 2022National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTERNNC16CA21C541712IGF::OT::IGF NASA, THROUGH THE SPACE TECHNOLOGY MISSION DIRECTORATE (STMD,) SEEKS TO DEMONSTRATE AN ADVANCED SOLAR ELECTRIC PROPULSION (EP) SYSTEM THAT WILL ENABLE FUTURE DEEP SPACE HUMAN AND ROBOTIC EXPLORATION APPLICABLE TO THE UNITED STATES PRIVATE AND PUBLIC SECTOR SPACE NEEDS. THE PURPOSE OF THE ADVANCED ELECTRIC PROPULSION (EP) SYSTEM (AEPS) CONTRACT IS THE DEVELOPMENT AND DELIVERY OF EP STRING SETS TO SUPPORT AN ADVANCED SEP DEMONSTRATION MISSION. DURING THE CONTRACT BASE PERIOD OF PERFORMANCE, THE CONTRACTOR WILL DEVELOP, TEST, AND DELIVER ENGINEERING DEVELOPMENT END ITEMS THAT WILL REDUCE THE RISK OF DEVELOPING THE FLIGHT END ITEMS. DURING THE OPTION PERIOD OF PERFORMANCE, IF EXERCISED, THE CONTRACTOR WILL DEVELOP, VERIFY, AND DELIVER THE FLIGHT END ITEMS.$2.2M
Jun 9, 2022National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC021DA020336415CERTIFICATION AND PRODUCTION OF THE ORION MAIN ENGINE (OME)$8.6M
Jun 9, 2022National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC021DA020336415CERTIFICATION AND PRODUCTION OF THE ORION MAIN ENGINE (OME)$11.4M
May 9, 2022National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC021DA020336415CERTIFICATION AND PRODUCTION OF THE ORION MAIN ENGINE (OME)$3.8M
Mar 23, 2022National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC021DA020336415CERTIFICATION AND PRODUCTION OF THE ORION MAIN ENGINE (OME)$1.6M
Mar 15, 2022National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC021DA020336415CERTIFICATION AND PRODUCTION OF THE ORION MAIN ENGINE (OME)$3.8M
Jan 31, 2022Department of DefenseFA9300 AFTC PZRFA930021C6002541715NEXT-GENERATION HALL THRUSTER STUDY (NGHTS)$4.7M
Jan 31, 2022National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC021DA020336415CERTIFICATION AND PRODUCTION OF THE ORION MAIN ENGINE (OME)$2.7M
Jan 27, 2022National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTERNNC16CA21C541712IGF::OT::IGF NASA, THROUGH THE SPACE TECHNOLOGY MISSION DIRECTORATE (STMD,) SEEKS TO DEMONSTRATE AN ADVANCED SOLAR ELECTRIC PROPULSION (EP) SYSTEM THAT WILL ENABLE FUTURE DEEP SPACE HUMAN AND ROBOTIC EXPLORATION APPLICABLE TO THE UNITED STATES PRIVATE AND PUBLIC SECTOR SPACE NEEDS. THE PURPOSE OF THE ADVANCED ELECTRIC PROPULSION (EP) SYSTEM (AEPS) CONTRACT IS THE DEVELOPMENT AND DELIVERY OF EP STRING SETS TO SUPPORT AN ADVANCED SEP DEMONSTRATION MISSION. DURING THE CONTRACT BASE PERIOD OF PERFORMANCE, THE CONTRACTOR WILL DEVELOP, TEST, AND DELIVER ENGINEERING DEVELOPMENT END ITEMS THAT WILL REDUCE THE RISK OF DEVELOPING THE FLIGHT END ITEMS. DURING THE OPTION PERIOD OF PERFORMANCE, IF EXERCISED, THE CONTRACTOR WILL DEVELOP, VERIFY, AND DELIVER THE FLIGHT END ITEMS.$16.0M
Dec 2, 2021National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTERNNC16CA21C541712IGF::OT::IGF NASA, THROUGH THE SPACE TECHNOLOGY MISSION DIRECTORATE (STMD,) SEEKS TO DEMONSTRATE AN ADVANCED SOLAR ELECTRIC PROPULSION (EP) SYSTEM THAT WILL ENABLE FUTURE DEEP SPACE HUMAN AND ROBOTIC EXPLORATION APPLICABLE TO THE UNITED STATES PRIVATE AND PUBLIC SECTOR SPACE NEEDS. THE PURPOSE OF THE ADVANCED ELECTRIC PROPULSION (EP) SYSTEM (AEPS) CONTRACT IS THE DEVELOPMENT AND DELIVERY OF EP STRING SETS TO SUPPORT AN ADVANCED SEP DEMONSTRATION MISSION. DURING THE CONTRACT BASE PERIOD OF PERFORMANCE, THE CONTRACTOR WILL DEVELOP, TEST, AND DELIVER ENGINEERING DEVELOPMENT END ITEMS THAT WILL REDUCE THE RISK OF DEVELOPING THE FLIGHT END ITEMS. DURING THE OPTION PERIOD OF PERFORMANCE, IF EXERCISED, THE CONTRACTOR WILL DEVELOP, VERIFY, AND DELIVER THE FLIGHT END ITEMS.$8.4M
Oct 26, 2021National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC021DA020336415CERTIFICATION AND PRODUCTION OF THE ORION MAIN ENGINE (OME)$2.1M
Sep 21, 2021National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC021DA020336415CERTIFICATION AND PRODUCTION OF THE ORION MAIN ENGINE (OME)$3.0M
Sep 21, 2021National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTERNNC16CA21C541712IGF::OT::IGF NASA, THROUGH THE SPACE TECHNOLOGY MISSION DIRECTORATE (STMD,) SEEKS TO DEMONSTRATE AN ADVANCED SOLAR ELECTRIC PROPULSION (EP) SYSTEM THAT WILL ENABLE FUTURE DEEP SPACE HUMAN AND ROBOTIC EXPLORATION APPLICABLE TO THE UNITED STATES PRIVATE AND PUBLIC SECTOR SPACE NEEDS. THE PURPOSE OF THE ADVANCED ELECTRIC PROPULSION (EP) SYSTEM (AEPS) CONTRACT IS THE DEVELOPMENT AND DELIVERY OF EP STRING SETS TO SUPPORT AN ADVANCED SEP DEMONSTRATION MISSION. DURING THE CONTRACT BASE PERIOD OF PERFORMANCE, THE CONTRACTOR WILL DEVELOP, TEST, AND DELIVER ENGINEERING DEVELOPMENT END ITEMS THAT WILL REDUCE THE RISK OF DEVELOPING THE FLIGHT END ITEMS. DURING THE OPTION PERIOD OF PERFORMANCE, IF EXERCISED, THE CONTRACTOR WILL DEVELOP, VERIFY, AND DELIVER THE FLIGHT END ITEMS.$3.0M
Aug 20, 2021Department of DefenseFA9300 AFTC PZRFA930021C6029541715LIQUID APOGEE ENGINE DEMONSTRATION$2.0M
Aug 12, 2021National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTERNNC16CA21C541712IGF::OT::IGF NASA, THROUGH THE SPACE TECHNOLOGY MISSION DIRECTORATE (STMD,) SEEKS TO DEMONSTRATE AN ADVANCED SOLAR ELECTRIC PROPULSION (EP) SYSTEM THAT WILL ENABLE FUTURE DEEP SPACE HUMAN AND ROBOTIC EXPLORATION APPLICABLE TO THE UNITED STATES PRIVATE AND PUBLIC SECTOR SPACE NEEDS. THE PURPOSE OF THE ADVANCED ELECTRIC PROPULSION (EP) SYSTEM (AEPS) CONTRACT IS THE DEVELOPMENT AND DELIVERY OF EP STRING SETS TO SUPPORT AN ADVANCED SEP DEMONSTRATION MISSION. DURING THE CONTRACT BASE PERIOD OF PERFORMANCE, THE CONTRACTOR WILL DEVELOP, TEST, AND DELIVER ENGINEERING DEVELOPMENT END ITEMS THAT WILL REDUCE THE RISK OF DEVELOPING THE FLIGHT END ITEMS. DURING THE OPTION PERIOD OF PERFORMANCE, IF EXERCISED, THE CONTRACTOR WILL DEVELOP, VERIFY, AND DELIVER THE FLIGHT END ITEMS.$9.5M
Jul 27, 2021National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTERNNC16CA21C541712IGF::OT::IGF NASA, THROUGH THE SPACE TECHNOLOGY MISSION DIRECTORATE (STMD,) SEEKS TO DEMONSTRATE AN ADVANCED SOLAR ELECTRIC PROPULSION (EP) SYSTEM THAT WILL ENABLE FUTURE DEEP SPACE HUMAN AND ROBOTIC EXPLORATION APPLICABLE TO THE UNITED STATES PRIVATE AND PUBLIC SECTOR SPACE NEEDS. THE PURPOSE OF THE ADVANCED ELECTRIC PROPULSION (EP) SYSTEM (AEPS) CONTRACT IS THE DEVELOPMENT AND DELIVERY OF EP STRING SETS TO SUPPORT AN ADVANCED SEP DEMONSTRATION MISSION. DURING THE CONTRACT BASE PERIOD OF PERFORMANCE, THE CONTRACTOR WILL DEVELOP, TEST, AND DELIVER ENGINEERING DEVELOPMENT END ITEMS THAT WILL REDUCE THE RISK OF DEVELOPING THE FLIGHT END ITEMS. DURING THE OPTION PERIOD OF PERFORMANCE, IF EXERCISED, THE CONTRACTOR WILL DEVELOP, VERIFY, AND DELIVER THE FLIGHT END ITEMS.$251K
Jul 26, 2021Department of DefenseFA8808 MIL SATELLITE COM SYS PKT LAFA880820C0043336415LIQUID APOGEE ENGINE CAPABILITY STUDY$147K
Jun 28, 2021National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC21CA005336415ROMAN SPACE TELESCOPE DELTA V 22 NEWTON THRUSTERS$962K
Jun 14, 2021National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC21CA005336415ROMAN SPACE TELESCOPE DELTA V 22 NEWTON THRUSTERS$1.9M
Apr 21, 2021Department of DefenseFA9300 AFTC PZRFA930021C6002541715NEXT-GENERATION HALL THRUSTER STUDY (NGHTS)$12.6M
Mar 18, 2021National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTERNNC16CA21C541712IGF::OT::IGF NASA, THROUGH THE SPACE TECHNOLOGY MISSION DIRECTORATE (STMD,) SEEKS TO DEMONSTRATE AN ADVANCED SOLAR ELECTRIC PROPULSION (EP) SYSTEM THAT WILL ENABLE FUTURE DEEP SPACE HUMAN AND ROBOTIC EXPLORATION APPLICABLE TO THE UNITED STATES PRIVATE AND PUBLIC SECTOR SPACE NEEDS. THE PURPOSE OF THE ADVANCED ELECTRIC PROPULSION (EP) SYSTEM (AEPS) CONTRACT IS THE DEVELOPMENT AND DELIVERY OF EP STRING SETS TO SUPPORT AN ADVANCED SEP DEMONSTRATION MISSION. DURING THE CONTRACT BASE PERIOD OF PERFORMANCE, THE CONTRACTOR WILL DEVELOP, TEST, AND DELIVER ENGINEERING DEVELOPMENT END ITEMS THAT WILL REDUCE THE RISK OF DEVELOPING THE FLIGHT END ITEMS. DURING THE OPTION PERIOD OF PERFORMANCE, IF EXERCISED, THE CONTRACTOR WILL DEVELOP, VERIFY, AND DELIVER THE FLIGHT END ITEMS.$12.1M
Feb 16, 2021National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTERNNC15CA07C541712IGF::OT::IGF 1.1 BACKGROUND THE NEXT ION PROPULSION TECHNOLOGY HAS BEEN IN DEVELOPMENT BY THE NASA IN-SPACE PROPULSION TECHNOLOGY PROJECT, WITHIN THE SCIENCE MISSION DIRECTORATE (SMD), FOR USE IN A WIDE ARRAY OF ROBOTIC SCIENCE MISSIONS. A NEXT ION PROPULSION SYSTEM TYPICALLY CONSISTS OF GRIDDED ION THRUSTERS, POWER PROCESSING UNITS (PPUS), THRUSTER GIMBALS, A XENON PROPELLANT FEED SYSTEM, AND A CONTROL INTERFACE FUNCTIONALITY CAPTURED EITHER IN A DEDICATED UNIT OR DISTRIBUTED BETWEEN THE ION PROPULSION SYSTEM AND THE SPACECRAFT. NEXT IS APPLICABLE TO A BROAD ARRAY OF PLANETARY SCIENCE MISSIONS, INCLUDING DISCOVERY, NEW FRONTIERS AND FLAGSHIP MISSIONS AND ALSO HAS APPLICATION TO MULTIPLE CONCEPTUAL ASTROPHYSICS SCIENCE MISSIONS. 1.2 BASIS FOR PROCUREMENT THE NASA SMD PLANETARY SCIENCE DIVISION IS OFFERING NEXT FLIGHT HARDWARE, SPECIFICALLY TWO THRUSTERS AND TWO PPUS, AS GOVERNMENT-FURNISHED EQUIPMENT (GFE) FOR THE NEXT DISCOVERY MISSION ANNOUNCEMENT OF OPPORTUNITY (AO). THE DISCOVERY AO IS TARGETED FOR RELEASE IN OCTOBER 2014. REFER TO NASA SOLICITATION NUMBER NNH14ZDA009J FOR FURTHER INFORMATION REGARDING THE DISCOVERY AO AND TARGET SCHEDULES. NASA DESIRES FOR THE NEXT SYSTEM TO BE AVAILABLE TO FUTURE USERS AS A COMMERCIAL PRODUCT. NASA ENCOURAGES AND WILL CONSIDER MODIFICATIONS OR ALTERNATIVES TO THE EXISTING DESIGN, PARTICULARLY THE PPU DESIGN, TO FACILITATE MORE CONSISTENT USE IN NON-NASA APPLICATIONS. THEREFORE, THE FRAMEWORK FOR THIS PROCUREMENT AND THE FOLLOWING STATEMENT OF WORK IS FOR COST-SHARED DEVELOPMENT WHICH RESULTS IN PRODUCT USE FOR BOTH NASA AND NON-NASA MISSIONS. THE NASA PROJECT TO PROVIDE THIS GFE HARDWARE IS REFERRED TO AS THE NEXT-C PROJECT THROUGHOUT THIS DOCUMENT.$242K
Sep 24, 2020National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTERNNC16CA21C541712IGF::OT::IGF NASA, THROUGH THE SPACE TECHNOLOGY MISSION DIRECTORATE (STMD,) SEEKS TO DEMONSTRATE AN ADVANCED SOLAR ELECTRIC PROPULSION (EP) SYSTEM THAT WILL ENABLE FUTURE DEEP SPACE HUMAN AND ROBOTIC EXPLORATION APPLICABLE TO THE UNITED STATES PRIVATE AND PUBLIC SECTOR SPACE NEEDS. THE PURPOSE OF THE ADVANCED ELECTRIC PROPULSION (EP) SYSTEM (AEPS) CONTRACT IS THE DEVELOPMENT AND DELIVERY OF EP STRING SETS TO SUPPORT AN ADVANCED SEP DEMONSTRATION MISSION. DURING THE CONTRACT BASE PERIOD OF PERFORMANCE, THE CONTRACTOR WILL DEVELOP, TEST, AND DELIVER ENGINEERING DEVELOPMENT END ITEMS THAT WILL REDUCE THE RISK OF DEVELOPING THE FLIGHT END ITEMS. DURING THE OPTION PERIOD OF PERFORMANCE, IF EXERCISED, THE CONTRACTOR WILL DEVELOP, VERIFY, AND DELIVER THE FLIGHT END ITEMS.$19.0M
Sep 10, 2020National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTERNNC16CA21C541712IGF::OT::IGF NASA, THROUGH THE SPACE TECHNOLOGY MISSION DIRECTORATE (STMD,) SEEKS TO DEMONSTRATE AN ADVANCED SOLAR ELECTRIC PROPULSION (EP) SYSTEM THAT WILL ENABLE FUTURE DEEP SPACE HUMAN AND ROBOTIC EXPLORATION APPLICABLE TO THE UNITED STATES PRIVATE AND PUBLIC SECTOR SPACE NEEDS. THE PURPOSE OF THE ADVANCED ELECTRIC PROPULSION (EP) SYSTEM (AEPS) CONTRACT IS THE DEVELOPMENT AND DELIVERY OF EP STRING SETS TO SUPPORT AN ADVANCED SEP DEMONSTRATION MISSION. DURING THE CONTRACT BASE PERIOD OF PERFORMANCE, THE CONTRACTOR WILL DEVELOP, TEST, AND DELIVER ENGINEERING DEVELOPMENT END ITEMS THAT WILL REDUCE THE RISK OF DEVELOPING THE FLIGHT END ITEMS. DURING THE OPTION PERIOD OF PERFORMANCE, IF EXERCISED, THE CONTRACTOR WILL DEVELOP, VERIFY, AND DELIVER THE FLIGHT END ITEMS.$3.2M
Sep 3, 2020National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTERNNC15CA07C541712IGF::OT::IGF 1.1 BACKGROUND THE NEXT ION PROPULSION TECHNOLOGY HAS BEEN IN DEVELOPMENT BY THE NASA IN-SPACE PROPULSION TECHNOLOGY PROJECT, WITHIN THE SCIENCE MISSION DIRECTORATE (SMD), FOR USE IN A WIDE ARRAY OF ROBOTIC SCIENCE MISSIONS. A NEXT ION PROPULSION SYSTEM TYPICALLY CONSISTS OF GRIDDED ION THRUSTERS, POWER PROCESSING UNITS (PPUS), THRUSTER GIMBALS, A XENON PROPELLANT FEED SYSTEM, AND A CONTROL INTERFACE FUNCTIONALITY CAPTURED EITHER IN A DEDICATED UNIT OR DISTRIBUTED BETWEEN THE ION PROPULSION SYSTEM AND THE SPACECRAFT. NEXT IS APPLICABLE TO A BROAD ARRAY OF PLANETARY SCIENCE MISSIONS, INCLUDING DISCOVERY, NEW FRONTIERS AND FLAGSHIP MISSIONS AND ALSO HAS APPLICATION TO MULTIPLE CONCEPTUAL ASTROPHYSICS SCIENCE MISSIONS. 1.2 BASIS FOR PROCUREMENT THE NASA SMD PLANETARY SCIENCE DIVISION IS OFFERING NEXT FLIGHT HARDWARE, SPECIFICALLY TWO THRUSTERS AND TWO PPUS, AS GOVERNMENT-FURNISHED EQUIPMENT (GFE) FOR THE NEXT DISCOVERY MISSION ANNOUNCEMENT OF OPPORTUNITY (AO). THE DISCOVERY AO IS TARGETED FOR RELEASE IN OCTOBER 2014. REFER TO NASA SOLICITATION NUMBER NNH14ZDA009J FOR FURTHER INFORMATION REGARDING THE DISCOVERY AO AND TARGET SCHEDULES. NASA DESIRES FOR THE NEXT SYSTEM TO BE AVAILABLE TO FUTURE USERS AS A COMMERCIAL PRODUCT. NASA ENCOURAGES AND WILL CONSIDER MODIFICATIONS OR ALTERNATIVES TO THE EXISTING DESIGN, PARTICULARLY THE PPU DESIGN, TO FACILITATE MORE CONSISTENT USE IN NON-NASA APPLICATIONS. THEREFORE, THE FRAMEWORK FOR THIS PROCUREMENT AND THE FOLLOWING STATEMENT OF WORK IS FOR COST-SHARED DEVELOPMENT WHICH RESULTS IN PRODUCT USE FOR BOTH NASA AND NON-NASA MISSIONS. THE NASA PROJECT TO PROVIDE THIS GFE HARDWARE IS REFERRED TO AS THE NEXT-C PROJECT THROUGHOUT THIS DOCUMENT.$66K
Jul 30, 2020National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTERNNC15CA07C541712IGF::OT::IGF 1.1 BACKGROUND THE NEXT ION PROPULSION TECHNOLOGY HAS BEEN IN DEVELOPMENT BY THE NASA IN-SPACE PROPULSION TECHNOLOGY PROJECT, WITHIN THE SCIENCE MISSION DIRECTORATE (SMD), FOR USE IN A WIDE ARRAY OF ROBOTIC SCIENCE MISSIONS. A NEXT ION PROPULSION SYSTEM TYPICALLY CONSISTS OF GRIDDED ION THRUSTERS, POWER PROCESSING UNITS (PPUS), THRUSTER GIMBALS, A XENON PROPELLANT FEED SYSTEM, AND A CONTROL INTERFACE FUNCTIONALITY CAPTURED EITHER IN A DEDICATED UNIT OR DISTRIBUTED BETWEEN THE ION PROPULSION SYSTEM AND THE SPACECRAFT. NEXT IS APPLICABLE TO A BROAD ARRAY OF PLANETARY SCIENCE MISSIONS, INCLUDING DISCOVERY, NEW FRONTIERS AND FLAGSHIP MISSIONS AND ALSO HAS APPLICATION TO MULTIPLE CONCEPTUAL ASTROPHYSICS SCIENCE MISSIONS. 1.2 BASIS FOR PROCUREMENT THE NASA SMD PLANETARY SCIENCE DIVISION IS OFFERING NEXT FLIGHT HARDWARE, SPECIFICALLY TWO THRUSTERS AND TWO PPUS, AS GOVERNMENT-FURNISHED EQUIPMENT (GFE) FOR THE NEXT DISCOVERY MISSION ANNOUNCEMENT OF OPPORTUNITY (AO). THE DISCOVERY AO IS TARGETED FOR RELEASE IN OCTOBER 2014. REFER TO NASA SOLICITATION NUMBER NNH14ZDA009J FOR FURTHER INFORMATION REGARDING THE DISCOVERY AO AND TARGET SCHEDULES. NASA DESIRES FOR THE NEXT SYSTEM TO BE AVAILABLE TO FUTURE USERS AS A COMMERCIAL PRODUCT. NASA ENCOURAGES AND WILL CONSIDER MODIFICATIONS OR ALTERNATIVES TO THE EXISTING DESIGN, PARTICULARLY THE PPU DESIGN, TO FACILITATE MORE CONSISTENT USE IN NON-NASA APPLICATIONS. THEREFORE, THE FRAMEWORK FOR THIS PROCUREMENT AND THE FOLLOWING STATEMENT OF WORK IS FOR COST-SHARED DEVELOPMENT WHICH RESULTS IN PRODUCT USE FOR BOTH NASA AND NON-NASA MISSIONS. THE NASA PROJECT TO PROVIDE THIS GFE HARDWARE IS REFERRED TO AS THE NEXT-C PROJECT THROUGHOUT THIS DOCUMENT.$72K
Jul 10, 2020National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTERNNC15CA07C541712IGF::OT::IGF 1.1 BACKGROUND THE NEXT ION PROPULSION TECHNOLOGY HAS BEEN IN DEVELOPMENT BY THE NASA IN-SPACE PROPULSION TECHNOLOGY PROJECT, WITHIN THE SCIENCE MISSION DIRECTORATE (SMD), FOR USE IN A WIDE ARRAY OF ROBOTIC SCIENCE MISSIONS. A NEXT ION PROPULSION SYSTEM TYPICALLY CONSISTS OF GRIDDED ION THRUSTERS, POWER PROCESSING UNITS (PPUS), THRUSTER GIMBALS, A XENON PROPELLANT FEED SYSTEM, AND A CONTROL INTERFACE FUNCTIONALITY CAPTURED EITHER IN A DEDICATED UNIT OR DISTRIBUTED BETWEEN THE ION PROPULSION SYSTEM AND THE SPACECRAFT. NEXT IS APPLICABLE TO A BROAD ARRAY OF PLANETARY SCIENCE MISSIONS, INCLUDING DISCOVERY, NEW FRONTIERS AND FLAGSHIP MISSIONS AND ALSO HAS APPLICATION TO MULTIPLE CONCEPTUAL ASTROPHYSICS SCIENCE MISSIONS. 1.2 BASIS FOR PROCUREMENT THE NASA SMD PLANETARY SCIENCE DIVISION IS OFFERING NEXT FLIGHT HARDWARE, SPECIFICALLY TWO THRUSTERS AND TWO PPUS, AS GOVERNMENT-FURNISHED EQUIPMENT (GFE) FOR THE NEXT DISCOVERY MISSION ANNOUNCEMENT OF OPPORTUNITY (AO). THE DISCOVERY AO IS TARGETED FOR RELEASE IN OCTOBER 2014. REFER TO NASA SOLICITATION NUMBER NNH14ZDA009J FOR FURTHER INFORMATION REGARDING THE DISCOVERY AO AND TARGET SCHEDULES. NASA DESIRES FOR THE NEXT SYSTEM TO BE AVAILABLE TO FUTURE USERS AS A COMMERCIAL PRODUCT. NASA ENCOURAGES AND WILL CONSIDER MODIFICATIONS OR ALTERNATIVES TO THE EXISTING DESIGN, PARTICULARLY THE PPU DESIGN, TO FACILITATE MORE CONSISTENT USE IN NON-NASA APPLICATIONS. THEREFORE, THE FRAMEWORK FOR THIS PROCUREMENT AND THE FOLLOWING STATEMENT OF WORK IS FOR COST-SHARED DEVELOPMENT WHICH RESULTS IN PRODUCT USE FOR BOTH NASA AND NON-NASA MISSIONS. THE NASA PROJECT TO PROVIDE THIS GFE HARDWARE IS REFERRED TO AS THE NEXT-C PROJECT THROUGHOUT THIS DOCUMENT.$95K
Jun 9, 2020Department of DefenseDCSO PHILADELPHIASP470119C0018541715ENGINE PERFORMANCE USING REFINED MONOPROPELLANT FUEL IGF OT IGF$85K
May 21, 2020National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTERNNC16CA21C541712IGF::OT::IGF NASA, THROUGH THE SPACE TECHNOLOGY MISSION DIRECTORATE (STMD,) SEEKS TO DEMONSTRATE AN ADVANCED SOLAR ELECTRIC PROPULSION (EP) SYSTEM THAT WILL ENABLE FUTURE DEEP SPACE HUMAN AND ROBOTIC EXPLORATION APPLICABLE TO THE UNITED STATES PRIVATE AND PUBLIC SECTOR SPACE NEEDS. THE PURPOSE OF THE ADVANCED ELECTRIC PROPULSION (EP) SYSTEM (AEPS) CONTRACT IS THE DEVELOPMENT AND DELIVERY OF EP STRING SETS TO SUPPORT AN ADVANCED SEP DEMONSTRATION MISSION. DURING THE CONTRACT BASE PERIOD OF PERFORMANCE, THE CONTRACTOR WILL DEVELOP, TEST, AND DELIVER ENGINEERING DEVELOPMENT END ITEMS THAT WILL REDUCE THE RISK OF DEVELOPING THE FLIGHT END ITEMS. DURING THE OPTION PERIOD OF PERFORMANCE, IF EXERCISED, THE CONTRACTOR WILL DEVELOP, VERIFY, AND DELIVER THE FLIGHT END ITEMS.$3.0M
May 21, 2020National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTERNNC15CA07C541712IGF::OT::IGF 1.1 BACKGROUND THE NEXT ION PROPULSION TECHNOLOGY HAS BEEN IN DEVELOPMENT BY THE NASA IN-SPACE PROPULSION TECHNOLOGY PROJECT, WITHIN THE SCIENCE MISSION DIRECTORATE (SMD), FOR USE IN A WIDE ARRAY OF ROBOTIC SCIENCE MISSIONS. A NEXT ION PROPULSION SYSTEM TYPICALLY CONSISTS OF GRIDDED ION THRUSTERS, POWER PROCESSING UNITS (PPUS), THRUSTER GIMBALS, A XENON PROPELLANT FEED SYSTEM, AND A CONTROL INTERFACE FUNCTIONALITY CAPTURED EITHER IN A DEDICATED UNIT OR DISTRIBUTED BETWEEN THE ION PROPULSION SYSTEM AND THE SPACECRAFT. NEXT IS APPLICABLE TO A BROAD ARRAY OF PLANETARY SCIENCE MISSIONS, INCLUDING DISCOVERY, NEW FRONTIERS AND FLAGSHIP MISSIONS AND ALSO HAS APPLICATION TO MULTIPLE CONCEPTUAL ASTROPHYSICS SCIENCE MISSIONS. 1.2 BASIS FOR PROCUREMENT THE NASA SMD PLANETARY SCIENCE DIVISION IS OFFERING NEXT FLIGHT HARDWARE, SPECIFICALLY TWO THRUSTERS AND TWO PPUS, AS GOVERNMENT-FURNISHED EQUIPMENT (GFE) FOR THE NEXT DISCOVERY MISSION ANNOUNCEMENT OF OPPORTUNITY (AO). THE DISCOVERY AO IS TARGETED FOR RELEASE IN OCTOBER 2014. REFER TO NASA SOLICITATION NUMBER NNH14ZDA009J FOR FURTHER INFORMATION REGARDING THE DISCOVERY AO AND TARGET SCHEDULES. NASA DESIRES FOR THE NEXT SYSTEM TO BE AVAILABLE TO FUTURE USERS AS A COMMERCIAL PRODUCT. NASA ENCOURAGES AND WILL CONSIDER MODIFICATIONS OR ALTERNATIVES TO THE EXISTING DESIGN, PARTICULARLY THE PPU DESIGN, TO FACILITATE MORE CONSISTENT USE IN NON-NASA APPLICATIONS. THEREFORE, THE FRAMEWORK FOR THIS PROCUREMENT AND THE FOLLOWING STATEMENT OF WORK IS FOR COST-SHARED DEVELOPMENT WHICH RESULTS IN PRODUCT USE FOR BOTH NASA AND NON-NASA MISSIONS. THE NASA PROJECT TO PROVIDE THIS GFE HARDWARE IS REFERRED TO AS THE NEXT-C PROJECT THROUGHOUT THIS DOCUMENT.$402K
May 5, 2020Department of DefenseDCSO PHILADELPHIASP470119C0018541715ENGINE PERFORMANCE USING REFINED MONOPROPELLANT FUEL IGF OT IGF$10K
Apr 22, 2020Department of DefenseFA8808 MIL SATELLITE COM SYS PKT LAFA880820C0043336415LIQUID APOGEE ENGINE CAPABILITY STUDY$2.3M
Apr 6, 2020National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTERNNC15CA07C541712IGF::OT::IGF 1.1 BACKGROUND THE NEXT ION PROPULSION TECHNOLOGY HAS BEEN IN DEVELOPMENT BY THE NASA IN-SPACE PROPULSION TECHNOLOGY PROJECT, WITHIN THE SCIENCE MISSION DIRECTORATE (SMD), FOR USE IN A WIDE ARRAY OF ROBOTIC SCIENCE MISSIONS. A NEXT ION PROPULSION SYSTEM TYPICALLY CONSISTS OF GRIDDED ION THRUSTERS, POWER PROCESSING UNITS (PPUS), THRUSTER GIMBALS, A XENON PROPELLANT FEED SYSTEM, AND A CONTROL INTERFACE FUNCTIONALITY CAPTURED EITHER IN A DEDICATED UNIT OR DISTRIBUTED BETWEEN THE ION PROPULSION SYSTEM AND THE SPACECRAFT. NEXT IS APPLICABLE TO A BROAD ARRAY OF PLANETARY SCIENCE MISSIONS, INCLUDING DISCOVERY, NEW FRONTIERS AND FLAGSHIP MISSIONS AND ALSO HAS APPLICATION TO MULTIPLE CONCEPTUAL ASTROPHYSICS SCIENCE MISSIONS. 1.2 BASIS FOR PROCUREMENT THE NASA SMD PLANETARY SCIENCE DIVISION IS OFFERING NEXT FLIGHT HARDWARE, SPECIFICALLY TWO THRUSTERS AND TWO PPUS, AS GOVERNMENT-FURNISHED EQUIPMENT (GFE) FOR THE NEXT DISCOVERY MISSION ANNOUNCEMENT OF OPPORTUNITY (AO). THE DISCOVERY AO IS TARGETED FOR RELEASE IN OCTOBER 2014. REFER TO NASA SOLICITATION NUMBER NNH14ZDA009J FOR FURTHER INFORMATION REGARDING THE DISCOVERY AO AND TARGET SCHEDULES. NASA DESIRES FOR THE NEXT SYSTEM TO BE AVAILABLE TO FUTURE USERS AS A COMMERCIAL PRODUCT. NASA ENCOURAGES AND WILL CONSIDER MODIFICATIONS OR ALTERNATIVES TO THE EXISTING DESIGN, PARTICULARLY THE PPU DESIGN, TO FACILITATE MORE CONSISTENT USE IN NON-NASA APPLICATIONS. THEREFORE, THE FRAMEWORK FOR THIS PROCUREMENT AND THE FOLLOWING STATEMENT OF WORK IS FOR COST-SHARED DEVELOPMENT WHICH RESULTS IN PRODUCT USE FOR BOTH NASA AND NON-NASA MISSIONS. THE NASA PROJECT TO PROVIDE THIS GFE HARDWARE IS REFERRED TO AS THE NEXT-C PROJECT THROUGHOUT THIS DOCUMENT.$457K

Get Alerted Before Aerojet Rocketdyne, INC.'s Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free