Jan 3, 2018Department of Veterans AffairsPCAC NATIONAL ENERGY BUSINESS CENTER (36E776)36E77618N0040561990IGF::OT::IGF COMMISSIONING SERVICES BPA$31K
Jan 3, 2018Department of Veterans AffairsPCAC NATIONAL ENERGY BUSINESS CENTER (36E776)36E77618N0039561990IGF::OT::IGF COMMISSIONING SERVICES BPA$33K
Dec 11, 2017Department of Veterans AffairsOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)VA101F17J2884541330IGF::OT::IGF HE GENERAL SOW WILL CONSIST OF TASKS ASSOCIATED WITH COMMISSIONING PV INSTALLATION PROJECT AT THETUSCALOOSA VAMC. THE AWARD COST FOR THE 1.3 MW-DC PV PROJECT WAS APPROXIMATELY $7.0 MILLION. THE COMMISSIONING WORK WILL INCLUDE A SERIES OF PROJECT DOCUMENTATION REVIEWS, PHYSICAL INSPECTIONS, OPERATIONAL TESTING, AND TASK-LEVEL TECHNICAL ANALYSIS AND REPORTING. THE PV SYSTEM COULD INCLUDE AND ARE NOT LIMITED TO PV PANELS, INVERTERS, METERS, WIRING, AND RELATED CONTROLS, PIECES AND PARTS$2K
Dec 4, 2017Department of Veterans Affairs242-NETWORK CONTRACT OFFICE 02 (36C242)36C24218P0685541620IGF::CL::IGF ASBESTOS ABATEMENT AIR MONITORING FOR SCI AT THE JAMES J. PETERS VAMC, BRONX, NY$24K
Sep 29, 2017Department of Veterans AffairsOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)VA101F14J0315541330IGF::OT::IGF SOLAR AND CHP COMMISSIONING - HOUSTON OBJECTIVES: THE OBJECTIVE OF THIS CONTRACT IS TO PROVIDE TASK-LEVEL COMMISSIONING AGENCY SUPPORT TO THE VA IN THE DESIGN, CONSTRUCTION, AND OPERATION OF CHP AND PV SYSTEM PROJECTS. THIS WILL BE ACCOMPLISHED THROUGH A SERIES OF PROJECT DOCUMENTATION REVIEWS, PHYSICAL INSPECTION, OPERATIONAL TESTING, AND TASK-LEVEL TECHNICAL ANALYSIS AND REPORTING. THE COMMISSIONING TASKS TO BE COMPLETED FOR EACH PROJECT ARE SUMMARIZED AS FOLLOWS: PERFORM AN OFF-SITE PRE-DESIGN PROJECT DOCUMENTATION REVIEW (E.G. FEASIBILITY STUDIES, DESIGN-BUILD CONTRACTS, AND OTHER SUPPORTING PROJECT DOCUMENTATION AS APPROPRIATE). THE RESULTS AND RECOMMENDATIONS OF THIS REVIEW WILL BE REPORTED IN WRITING AND BE USED TO FACILITATE A DESIGN KICKOFF MEETING WITH THE VA PROJECT STAFF AND THE DESIGN-BUILD (D-B) CONTRACTOR. THE POINTS OF DISCUSSION WILL BE REPORTED IN WRITING AND BE USED TO SUPPORT SUBSEQUENT COMMISSIONING ACTIVITIES. PERFORM TWO (2) OFF-SITE DESIGN AND PROJECT MANAGEMENT DOCUMENTATION REVIEWS - THE FIRST AT 50% COMPLETION AND THE SECOND AT 100% COMPLETION. THE RESULTS AND RECOMMENDATIONS OF THESE REVIEWS WILL BE REPORTED IN WRITING AND BE USED TO SUPPORT SUBSEQUENT COMMISSIONING ACTIVITIES. PERFORM ON-SITE PHYSICAL INSPECTIONS AND OPERATIONAL TESTING FOR THE MEASURED AND VERIFIED (M&V) ACCEPTABILITY OF AS-INSTALLED SYSTEM ALONG WITH CONCURRENT AS-BUILT PROJECT DOCUMENTATION REVIEWS. THE RESULTS AND RECOMMENDATIONS OF THESE INSPECTIONS AND REVIEWS WILL BE REPORTED IN WRITING AND BE USED TO SUPPORT SUBSEQUENT, AS-NEEDED COMMISSIONING ACTIVITIES. PROVIDE OTHER AS-NEEDED TECHNICAL SUPPORT TO THE VA FOR THE RESOLUTION OF UNUSUAL OR EXTRAORDINARY ISSUES ENCOUNTERED DURING OR AFTER COMMISSIONING PROCESS$130K
Sep 27, 2017Department of Veterans Affairs241-NETWORK CONTRACT OFFICE 01 (36C241)VA24117C0141541330IGF::OT::IGF WRJ UNDERGROUND UTILITY REDESIGN$791K
Sep 9, 2017Department of Veterans AffairsOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)VA101F15J0382541330IGF::OT::IGF HE GENERAL SOW WILL CONSIST OF TASKS ASSOCIATED WITH COMMISSIONING PV INSTALLATION PROJECT AT THE HOUSTON VAMC.$52K
Aug 18, 2017Department of EnergySC OAK RIDGE OFFICEDEDT0013792561990IGF::OT::IGF, ENERGY AND WATER AUDIT OF THE OSTI FACILITY$33K
Jun 19, 2017Department of Veterans Affairs242-NETWORK CONTRACT OFFICE 02 (36C242)VA24217P2652238220IGF::OT::IGF TEST&BALANCE HVAC$20K
Jun 15, 2017Department of Veterans Affairs242-NETWORK CONTRACT OFFICE 02 (36C242)VA24217C0117541620IGF::CL::IGF FISHER HOUSE ENVIRONMENTAL ASSESSMENT AT THE JAMES J. PETERS VA MEDICAL CENTER, PROJECT 526-17-103$13K
Jun 8, 2017Department of Veterans Affairs241-NETWORK CONTRACT OFFICE 01 (36C241)VA24117P1239811219FUME HOOD TESTING, CERTIFICATION AND PM. IGF::OT::IGF$127K
May 19, 2017Department of Veterans AffairsOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)VA101F17J2943541330IGF::OT::IGF THE PURPOSE OF THIS TASK ORDER IS TO PROCURE A BROAD RANGE OF SERVICES ASSOCIATED WITH COMMISSIONING OVERSIGHT FOR THE ECM PROJECTS AT THE SAN JUAN VAMC FACILITY. TASKS COULD BE BASIC FACTORY ACCEPTANCE TO THE FULL RANGE OF COMMISSIONING SUPPORT.$72K
May 19, 2017Department of Veterans AffairsOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)VA101F17J2947541330IGF::OT::IGF THE PURPOSE OF THIS TASK ORDER IS TO PROCURE A BROAD RANGE OF SERVICES ASSOCIATED WITH COMMISSIONING OVERSIGHT FOR THE ECM PROJECTS AT THE ALBUQUERQUE VAMC FACILITY. TASKS COULD BE BASIC FACTORY ACCEPTANCE TO THE FULL RANGE OF COMMISSIONING SUPPORT.$91K
May 19, 2017Department of Veterans AffairsOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)VA101F17J2948541330IGF::OT::IGF THE PURPOSE OF THIS TASK ORDER IS TO PROCURE A BROAD RANGE OF SERVICES ASSOCIATED WITH COMMISSIONING OVERSIGHT FOR THE ECM PROJECTS AT THE PORTLAND VAMC FACILITY. TASKS COULD BE BASIC FACTORY ACCEPTANCE TO THE FULL RANGE OF COMMISSIONING SUPPORT.$91K
May 17, 2017Department of Veterans AffairsOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)VA101F17J2942541330IGF::OT::IGF THE PURPOSE OF THIS TASK ORDER IS TO PROCURE A BROAD RANGE OF SERVICES ASSOCIATED WITH COMMISSIONING OVERSIGHT FOR THE ECM PROJECTS AT THE TAMPA VAMC FACILITY. TASKS COULD BE BASIC FACTORY ACCEPTANCE TO THE FULL RANGE OF COMMISSIONING SUPPORT$116K
Mar 20, 2017Department of Veterans Affairs241-NETWORK CONTRACT OFFICE 01 (36C241)VA523C17044236220MULTIPLE AWARD TASK ORDER CONTRACT FOR BHS FACILITIES, MA$741K
Mar 13, 2017Department of Veterans Affairs250-NETWORK CONTRACT OFFICE 10 (36C250)VA25017P2279541310IGF::OT::IGF CXA SERVICES FOR RENOVATE BOILER PLANT HEAT RECOVERY$55K
Mar 10, 2017Department of Veterans Affairs250-NETWORK CONTRACT OFFICE 10 (36C250)VA25017P2229541330IGF::OT::IGF CXA SERVICES FOR UPGRADE EMERGENCY FUEL OIL TRANSFER SYSTEM$32K
Jan 27, 2017Department of Veterans AffairsOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)VA101F17J2884541330IGF::OT::IGF HE GENERAL SOW WILL CONSIST OF TASKS ASSOCIATED WITH COMMISSIONING PV INSTALLATION PROJECT AT THETUSCALOOSA VAMC. THE AWARD COST FOR THE 1.3 MW-DC PV PROJECT WAS APPROXIMATELY $7.0 MILLION. THE COMMISSIONING WORK WILL INCLUDE A SERIES OF PROJECT DOCUMENTATION REVIEWS, PHYSICAL INSPECTIONS, OPERATIONAL TESTING, AND TASK-LEVEL TECHNICAL ANALYSIS AND REPORTING. THE PV SYSTEM COULD INCLUDE AND ARE NOT LIMITED TO PV PANELS, INVERTERS, METERS, WIRING, AND RELATED CONTROLS, PIECES AND PARTS$39K
Jan 27, 2017Department of Veterans AffairsOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)VA101F17J2883541330IGF::OT::IGF HE GENERAL SOW WILL CONSIST OF TASKS ASSOCIATED WITH COMMISSIONING PV INSTALLATION PROJECT AT THETUSCALOOSA VAMC. THE AWARD COST FOR THE 1.3 MW-DC PV PROJECT WAS APPROXIMATELY $7.0 MILLION. THE COMMISSIONING WORK WILL INCLUDE A SERIES OF PROJECT DOCUMENTATION REVIEWS, PHYSICAL INSPECTIONS, OPERATIONAL TESTING, AND TASK-LEVEL TECHNICAL ANALYSIS AND REPORTING. THE PV SYSTEM COULD INCLUDE AND ARE NOT LIMITED TO PV PANELS, INVERTERS, METERS, WIRING, AND RELATED CONTROLS, PIECES AND PARTS$39K
Dec 20, 2016Department of Veterans AffairsPCAC NATIONAL ENERGY BUSINESS CENTER (36E776)VA70116F0046561990IGF::OT::IGF VISN 17 RETRO - COMMISSIONING$814
Dec 14, 2016Department of Veterans Affairs241-NETWORK CONTRACT OFFICE 01 (36C241)VA24112J0968236220FIRE ALARM REPLACEMENT, VAMC BROCKTON, MA$5K
Sep 30, 2016Department of Veterans AffairsOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)VA101F14F0225541330IGF::OT::IGF SOLAR AND CHP COMMISSIONING - HOUSTON OBJECTIVES: THE OBJECTIVE OF THIS CONTRACT IS TO PROVIDE TASK-LEVEL COMMISSIONING AGENCY SUPPORT TO THE VA IN THE DESIGN, CONSTRUCTION, AND OPERATION OF CHP AND PV SYSTEM PROJECTS. THIS WILL BE ACCOMPLISHED THROUGH A SERIES OF PROJECT DOCUMENTATION REVIEWS, PHYSICAL INSPECTION, OPERATIONAL TESTING, AND TASK-LEVEL TECHNICAL ANALYSIS AND REPORTING. THE COMMISSIONING TASKS TO BE COMPLETED FOR EACH PROJECT ARE SUMMARIZED AS FOLLOWS: PERFORM AN OFF-SITE PRE-DESIGN PROJECT DOCUMENTATION REVIEW (E.G. FEASIBILITY STUDIES, DESIGN-BUILD CONTRACTS, AND OTHER SUPPORTING PROJECT DOCUMENTATION AS APPROPRIATE). THE RESULTS AND RECOMMENDATIONS OF THIS REVIEW WILL BE REPORTED IN WRITING AND BE USED TO FACILITATE A DESIGN KICKOFF MEETING WITH THE VA PROJECT STAFF AND THE DESIGN-BUILD (D-B) CONTRACTOR. THE POINTS OF DISCUSSION WILL BE REPORTED IN WRITING AND BE USED TO SUPPORT SUBSEQUENT COMMISSIONING ACTIVITIES. PERFORM TWO (2) OFF-SITE DESIGN AND PROJECT MANAGEMENT DOCUMENTATION REVIEWS - THE FIRST AT 50% COMPLETION AND THE SECOND AT 100% COMPLETION. THE RESULTS AND RECOMMENDATIONS OF THESE REVIEWS WILL BE REPORTED IN WRITING AND BE USED TO SUPPORT SUBSEQUENT COMMISSIONING ACTIVITIES. PERFORM ON-SITE PHYSICAL INSPECTIONS AND OPERATIONAL TESTING FOR THE MEASURED AND VERIFIED (M&V) ACCEPTABILITY OF AS-INSTALLED SYSTEM ALONG WITH CONCURRENT AS-BUILT PROJECT DOCUMENTATION REVIEWS. THE RESULTS AND RECOMMENDATIONS OF THESE INSPECTIONS AND REVIEWS WILL BE REPORTED IN WRITING AND BE USED TO SUPPORT SUBSEQUENT, AS-NEEDED COMMISSIONING ACTIVITIES. PROVIDE OTHER AS-NEEDED TECHNICAL SUPPORT TO THE VA FOR THE RESOLUTION OF UNUSUAL OR EXTRAORDINARY ISSUES ENCOUNTERED DURING OR AFTER COMMISSIONING PROCESS$10K
Sep 30, 2016Department of Veterans AffairsOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)VA101F16J2793541330IGF::OT::IGF HE GENERAL SOW WILL CONSIST OF TASKS ASSOCIATED WITH COMMISSIONING PV INSTALLATION PROJECT AT THETUSCALOOSA VAMC. THE AWARD COST FOR THE 1.3 MW-DC PV PROJECT WAS APPROXIMATELY $7.0 MILLION. THE COMMISSIONING WORK WILL INCLUDE A SERIES OF PROJECT DOCUMENTATION REVIEWS, PHYSICAL INSPECTIONS, OPERATIONAL TESTING, AND TASK-LEVEL TECHNICAL ANALYSIS AND REPORTING. THE PV SYSTEM COULD INCLUDE AND ARE NOT LIMITED TO PV PANELS, INVERTERS, METERS, WIRING, AND RELATED CONTROLS, PIECES AND PARTS$186K
Sep 30, 2016Department of Veterans AffairsOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)VA101F14J0315541330IGF::OT::IGF SOLAR AND CHP COMMISSIONING - HOUSTON OBJECTIVES: THE OBJECTIVE OF THIS CONTRACT IS TO PROVIDE TASK-LEVEL COMMISSIONING AGENCY SUPPORT TO THE VA IN THE DESIGN, CONSTRUCTION, AND OPERATION OF CHP AND PV SYSTEM PROJECTS. THIS WILL BE ACCOMPLISHED THROUGH A SERIES OF PROJECT DOCUMENTATION REVIEWS, PHYSICAL INSPECTION, OPERATIONAL TESTING, AND TASK-LEVEL TECHNICAL ANALYSIS AND REPORTING. THE COMMISSIONING TASKS TO BE COMPLETED FOR EACH PROJECT ARE SUMMARIZED AS FOLLOWS: PERFORM AN OFF-SITE PRE-DESIGN PROJECT DOCUMENTATION REVIEW (E.G. FEASIBILITY STUDIES, DESIGN-BUILD CONTRACTS, AND OTHER SUPPORTING PROJECT DOCUMENTATION AS APPROPRIATE). THE RESULTS AND RECOMMENDATIONS OF THIS REVIEW WILL BE REPORTED IN WRITING AND BE USED TO FACILITATE A DESIGN KICKOFF MEETING WITH THE VA PROJECT STAFF AND THE DESIGN-BUILD (D-B) CONTRACTOR. THE POINTS OF DISCUSSION WILL BE REPORTED IN WRITING AND BE USED TO SUPPORT SUBSEQUENT COMMISSIONING ACTIVITIES. PERFORM TWO (2) OFF-SITE DESIGN AND PROJECT MANAGEMENT DOCUMENTATION REVIEWS - THE FIRST AT 50% COMPLETION AND THE SECOND AT 100% COMPLETION. THE RESULTS AND RECOMMENDATIONS OF THESE REVIEWS WILL BE REPORTED IN WRITING AND BE USED TO SUPPORT SUBSEQUENT COMMISSIONING ACTIVITIES. PERFORM ON-SITE PHYSICAL INSPECTIONS AND OPERATIONAL TESTING FOR THE MEASURED AND VERIFIED (M&V) ACCEPTABILITY OF AS-INSTALLED SYSTEM ALONG WITH CONCURRENT AS-BUILT PROJECT DOCUMENTATION REVIEWS. THE RESULTS AND RECOMMENDATIONS OF THESE INSPECTIONS AND REVIEWS WILL BE REPORTED IN WRITING AND BE USED TO SUPPORT SUBSEQUENT, AS-NEEDED COMMISSIONING ACTIVITIES. PROVIDE OTHER AS-NEEDED TECHNICAL SUPPORT TO THE VA FOR THE RESOLUTION OF UNUSUAL OR EXTRAORDINARY ISSUES ENCOUNTERED DURING OR AFTER COMMISSIONING PROCESS$79K
Sep 29, 2016Department of Veterans AffairsPCAC NATIONAL ENERGY BUSINESS CENTER (36E776)VA70116F0046561990IGF::OT::IGF VISN 17 RETRO - COMMISSIONING$1.2M
Sep 2, 2016Department of Veterans Affairs247-NETWORK CONTRACT OFFICE 7 (36C247)VA24716F3007561990IGF::OT::IGF AE COMMISSIONING SERVICES CONTRACT$43K
May 19, 2016Department of Veterans AffairsOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)VA101F16J2637541330IGF::OT::IGF HE GENERAL SOW WILL CONSIST OF TASKS ASSOCIATED WITH COMMISSIONING PV INSTALLATION PROJECT AT THETUSCALOOSA VAMC. THE AWARD COST FOR THE 1.3 MW-DC PV PROJECT WAS APPROXIMATELY $7.0 MILLION. THE COMMISSIONING WORK WILL INCLUDE A SERIES OF PROJECT DOCUMENTATION REVIEWS, PHYSICAL INSPECTIONS, OPERATIONAL TESTING, AND TASK-LEVEL TECHNICAL ANALYSIS AND REPORTING. THE PV SYSTEM COULD INCLUDE AND ARE NOT LIMITED TO PV PANELS, INVERTERS, METERS, WIRING, AND RELATED CONTROLS, PIECES AND PARTS$47K
Apr 28, 2016Department of Veterans Affairs241-NETWORK CONTRACT OFFICE 01 (36C241)VA24116C0037236220ICU IGF::OT::IGF$7.8M
Apr 5, 2016Department of Veterans Affairs241-NETWORK CONTRACT OFFICE 01 (36C241)VA24116P1016236220IGF::OT::IGF FEES$4K
Mar 18, 2016Department of Veterans Affairs523-BOSTONVA24116P0933236220VAMC BROCKTON POOL REAIR CONCRETE SLAB IGF::OT::IGF$28K
Mar 9, 2016Department of Veterans AffairsOFFICE OF CONSTRUCTION & FACILITIES MANAGEMENTVA101F16J2561541330IGF::OT::IGF THE GENERAL SOW WILL CONSIST OF TASKS ASSOCIATED WITH COMMISSIONING CX SERVICES FOR THE NEW PM&RS AND PROSTHETICS CENTER COMPRISING OF APPROXIMATELY 20,000 SQUARE FEET, THAT WILL PROVIDE PHYSICAL THERAPY, OCCUPATIONAL THERAPY, SPEECH LANGUAGE PATHOLOGY, PHYSIATRY, AND PROSTHETICS SERVICES$128K
Mar 1, 2016Department of Veterans AffairsOFFICE OF CONSTRUCTION & FACILITIES MANAGEMENTVA101F15J0420541330IGF::OT::IGF HE GENERAL SOW WILL CONSIST OF TASKS ASSOCIATED WITH COMMISSIONING PV INSTALLATION PROJECT AT THETUSCALOOSA VAMC. THE AWARD COST FOR THE 1.3 MW-DC PV PROJECT WAS APPROXIMATELY $7.0 MILLION. THE COMMISSIONING WORK WILL INCLUDE A SERIES OF PROJECT DOCUMENTATION REVIEWS, PHYSICAL INSPECTIONS, OPERATIONAL TESTING, AND TASK-LEVEL TECHNICAL ANALYSIS AND REPORTING. THE PV SYSTEM COULD INCLUDE AND ARE NOT LIMITED TO PV PANELS, INVERTERS, METERS, WIRING, AND RELATED CONTROLS, PIECES AND PARTS$40K
Feb 8, 2016Department of Veterans AffairsOFFICE OF CONSTRUCTION & FACILITIES MANAGEMENTVA101F16J2524541330IGF::OT::IGF THE GENERAL SOW WILL CONSIST OF TASKS ASSOCIATED WITH COMMISSIONING CX SERVICES FOR THE NEW PM&RS AND PROSTHETICS CENTER COMPRISING OF APPROXIMATELY 20,000 SQUARE FEET, THAT WILL PROVIDE PHYSICAL THERAPY, OCCUPATIONAL THERAPY, SPEECH LANGUAGE PATHOLOGY, PHYSIATRY, AND PROSTHETICS SERVICES$42K