| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Aug 2, 2016 | Department of the InteriorIMR SANTA FE(12100) | INP16PD01786 | 236220 | IGF::OT::IGF THE WORK OF THIS CONTRACT CONSISTS OF SURFACE PREPARATION, CLEANING, AND COATING EXPOSED EXTERIOR OF ONE 200,000 GALLON TANK AT PANTHER JUNCTION AND ONE 25,000 (K BAR TANK) GALLON WELDED STEEL POTABLE WATER STORAGE TANKS AT BIG BEND NATIONAL PARK PER THE ATTACHED SCOPE OF WORK. | $101K |
| Jul 14, 2016 | Department of the InteriorIMR SANTA FE(12100) | INP16PD01944 | 236220 | IGF::OT::IGF REHABILITATE DIABLO EAST RESTROOM #2. THIS PROJECT IS THE COMPANION PROJECT TO REHABILITATE DIABLO EAST RESTROOM #1. RESTROOM #2 IS BASICALLY A DUPLICATE OF RESTROOM #1 WITH NO SIGNIFICANT DIFFERENCES. ALL WORK SHALL BE ACCOMPLISHED UNDER THE SUPERVISION OF A LICENSED CONTRACTOR AND ACCORDING TO THE SCOPE OF WORK, ANY MANUFACTURER'S INSTRUCTIONS, TECHNICAL SPECIFICATIONS AND WARRANTY, AND THE NATIONAL PARK SERVICE'S CONTRACTUAL REQUIREMENTS. | $170K |
| Jul 7, 2016 | Department of the InteriorIMR SANTA FE(12100) | INP16PD01847 | 236220 | IGF::OT::IGF PETR - INSTALL NEW SOLAR PANEL ARRAY | $49K |
| Jun 30, 2016 | Department of the InteriorIMR SANTA FE(12100) | INP16PD01786 | 236220 | IGF::OT::IGF THE WORK OF THIS CONTRACT CONSISTS OF SURFACE PREPARATION, CLEANING, AND COATING EXPOSED EXTERIOR OF ONE 200,000 GALLON TANK AT PANTHER JUNCTION AND ONE 25,000 (K BAR TANK) GALLON WELDED STEEL POTABLE WATER STORAGE TANKS AT BIG BEND NATIONAL PARK PER THE ATTACHED SCOPE OF WORK. | $183K |
| Jun 27, 2016 | Department of the InteriorIMR SANTA FE(12100) | INP16PD01645 | 236220 | G:NONE IGF::OT::IGF CHAMIZAL- REPLACE INFORMATION DESK AND CARPET | $48K |
| Jun 21, 2016 | Department of the InteriorIMR SANTA FE(12100) | INP16PD01189 | 236220 | IGF::OT::IGF SAPU GQ RESIDENCE 12 REHABILITATION | $52K |
| Jun 21, 2016 | Department of the InteriorIMR SANTA FE(12100) | INP16PD01502 | 236220 | IGF::OT::IGF LYJO-REPAIR AND PAINT WITHER&SPAULDING | $24K |
| Jun 8, 2016 | Department of the InteriorIMR SANTA FE(12100) | INP16PD01527 | 236220 | IGF::OT::IGF BIOBA CONSTRUCT AND INSTALL SHADE STRUCTURE AT WACO MAMMOTH NATIONAL MONUMENT. INSTALL A 4 POINT SAIL DESIGN SHADE STRUCTURE TO INCLUDE UNIT, FREIGHT, ENGINEERING AND INSTALLATION INCLUDING FOUNDATIONS PER THE ATTACHED PROPOSAL FROM USA SHADE DATED 4/25/2016. | $40K |
| Jun 7, 2016 | Department of the InteriorIMR INTERMOUNTAIN REGION(1200) | INP16PD01511 | 236220 | IGF::OT::IGF RE-ROOF RESIDENCE #3 AT CAPULIN VOLCANO NATIONAL MONUMENT, NEW MEXICO | $30K |
| Jun 6, 2016 | Department of the InteriorIMR SANTA FE(12100) | INP16PD01502 | 236220 | IGF::OT::IGF LYJO-REPAIR AND PAINT WITHER&SPAULDING | $110K |
| Jun 2, 2016 | Department of the InteriorIMR SANTA FE(12100) | INP16PD00844 | 236220 | IGF::OT::IGF, G-BIOBA. PAIS- PURCHASE AND REPLACEMENT OF EXISTING FLEET FUELING EQUIPMENT. | $29K |
| Jun 1, 2016 | Department of the InteriorIMR SANTA FE(12100) | INP15PD02641 | 236220 | IGF::OT::IGF BIOBA - BIG BEND NATIONAL PARK, REHABILITATE THE CHISOS BASIN WATER SYSTEM PER THE ATTACHED SPECIFICATIONS. | $9K |
| May 24, 2016 | Department of the InteriorIMR SANTA FE(12100) | INP16PD01336 | 236220 | IGF::OT::IGF BIOBA RE-ROOF BUILDING 25 AT CARLSBAD CAVERNS NATIONAL PARK - THE PRIMARY WORK OF THIS PROJECT INCLUDES, BUT NOT LIMITED TO, THE REMOVAL OF EXISTING SPRAY-ON ROOFING AND FOAM INSULATION SYSTEM AND INSTALLING A NEW SINGLE-PLY ROOFING SYSTEM ON BUILDING 25 CONSISTING OF APPROXIMATELY 5000 SQUARE FEET OF GROSS ROOF AREA. THIS CONTRACT ALSO INCLUDES REPAIR AND/OR REPLACE EXISTING CANALS/ROOF SCUPPERS. | $211K |
| May 10, 2016 | Department of the InteriorIMR SANTA FE(12100) | INP16PD01235 | 236220 | IGF::OT::IGF ELMA-VISITOR CENTER WALL PAINTING-EXHIBIT ROOM LESS DISPLAY WALLS ($18,526.41) AND RESTROOMS ONLY ($6,105.64) TOTAL COST $24,632.05. | $25K |
| May 6, 2016 | Department of the InteriorIMR SANTA FE(12100) | INP16PD01197 | 236220 | IGF::OT::IGF BIOBA CARLSBAD CAVERNS NATIONAL PARK - REPAIR VISITOR CENTER ROOF - PRIMARY WORK OF THIS CONTRACT INCLUDES, BUT IS NOT LIMITED TO, THE REPAIR OF THE EXISTING SINGLE-PLY MEMBRANE ROOF, APPROXIMATELY 8,000 SQUARE FEET, TO CORRECT ALL DEFICIENCIES EVIDENCED BY PAST ROOF LEAKS, SUCH AS AT FLASHING, TERMINATIONS, PENETRATIONS, SEAMS, PER THE ATTACHED SCOPE OF WORK AND YOUR PROPOSAL, ALL BECOME PART OF THIS CONTRACT. | $157K |
| May 3, 2016 | Department of the InteriorIMR SANTA FE(12100) | INP16PD00834 | 236220 | IGF::OT::IGF BIOBA REHABILITATE DIABLO EAST RESTROOM #1 AT AMISTAD NATIONAL RECREATION AREA PER THE ATTACHED SCOPE OF WORK AND YOUR PROPOSAL RECEIVED 3/29/2016. THE WORK CONSISTS OF ALL LABOR, MATERIALS, INCLUDING GOVERNMENT FURNISHED MATERIALS, AND EQUIPMENT TO REHABILITATE THE DIABLO EAST RESTROOM #1. THE WORK INCLUDES, BUT IS NOT LIMITED TO THE DEMOLITION AND REPLACEMENT OF ALL EXISTING PLUMBING FIXTURES (URINALS AND TOILETS), SINKS, FAUCETS AND MIRRORS. ALSO TO INCLUDE, VENT AND WASTEWATER LINES IN THE CENTRAL PIPE CHASE, WALL AND FLOOR TILE, BATHROOM PARTITIONS, TOILET PAPER HOLDERS, AND SOAP DISPENSERS THE SCOPE SHALL ALSO COVER REPLACEMENT OF HAND DRIERS, DOORS, INTERIOR AND EXTERIOR LIGHTING, BATHROOM CEILINGS, WINDOWS, ROOF, FASCIA AND SOFFIT, GUTTERS AND DOWNSPOUTS, PRIVACY SCREENS, EXTERIOR POSTS/COLUMNS, AND RESTROOM RELATED ADA MATERIALS AND COMPONENTS. OTHER REQUIRED WORK INCLUDES REMOVAL OF THE TWO EXISTING SKYLIGHTS INCLUDING CLOSING UP THE EXTERIOR OPENING AS PART OF THE ROOF REPLACEMENT AND CLOSING UP THE INTERIOR OPENING AS PART OF THE CEILING REPLACEMENT, INSTALLING BABY CHANGING STATIONS, ADDING/RE-INSTALLING A LIGHT ABOVE THE FEE MACHINE, REFINISHING/SEALING/PAINTING EXPOSED CMU BLOCK WALLS ON THE INTERIOR, AND STUCCO EXTERIOR COMPONENTS OF THE BUILDING. | $8K |
| May 3, 2016 | Department of the InteriorIMR SANTA FE(12100) | INP16PD00757 | 236220 | IGF::OT::IGF, G-BIOBA, PAIS: REMOVE OLD FENCING AND REPLACE WITH 930' OF 8' HIGH CHAIN LINK MESH FENCING | $75K |
| Apr 29, 2016 | Department of the InteriorIMR SANTA FE(12100) | INP16PD01126 | 236220 | IGF::OT::IGF PECO RE-STUCCO VISITOR CENTER | $103K |
| Apr 27, 2016 | Department of the InteriorIMR SANTA FE(12100) | INP16PD00853 | 236220 | IGF::OT::IGF PECO-CASITA PORCH ROOF | $11K |
| Apr 18, 2016 | Department of the InteriorIMR SANTA FE(12100) | INP16PD00991 | 236220 | IGF::OT::IGF X:NOGRN LAKE MEREDITH NATIONAL RECREATION AREA - UPGRADE ELECTRICAL PANEL | $13K |
| Apr 7, 2016 | Department of the InteriorIMR SANTA FE(12100) | INP16PD00707 | 236220 | IGF::OT::IGF SAPU REPLACE ROOF MEMBRANE&STUCCO WITH HVAC GQVC | $99K |
| Mar 29, 2016 | Department of the InteriorIMR SANTA FE MABO | INP16PD00834 | 236220 | IGF::OT::IGF BIOBA REHABILITATE DIABLO EAST RESTROOM #1 AT AMISTAD NATIONAL RECREATION AREA PER THE ATTACHED SCOPE OF WORK AND YOUR PROPOSAL RECEIVED 3/29/2016. THE WORK CONSISTS OF ALL LABOR, MATERIALS, INCLUDING GOVERNMENT FURNISHED MATERIALS, AND EQUIPMENT TO REHABILITATE THE DIABLO EAST RESTROOM #1. THE WORK INCLUDES, BUT IS NOT LIMITED TO THE DEMOLITION AND REPLACEMENT OF ALL EXISTING PLUMBING FIXTURES (URINALS AND TOILETS), SINKS, FAUCETS AND MIRRORS. ALSO TO INCLUDE, VENT AND WASTEWATER LINES IN THE CENTRAL PIPE CHASE, WALL AND FLOOR TILE, BATHROOM PARTITIONS, TOILET PAPER HOLDERS, AND SOAP DISPENSERS THE SCOPE SHALL ALSO COVER REPLACEMENT OF HAND DRIERS, DOORS, INTERIOR AND EXTERIOR LIGHTING, BATHROOM CEILINGS, WINDOWS, ROOF, FASCIA AND SOFFIT, GUTTERS AND DOWNSPOUTS, PRIVACY SCREENS, EXTERIOR POSTS/COLUMNS, AND RESTROOM RELATED ADA MATERIALS AND COMPONENTS. OTHER REQUIRED WORK INCLUDES REMOVAL OF THE TWO EXISTING SKYLIGHTS INCLUDING CLOSING UP THE EXTERIOR OPENING AS PART OF THE ROOF REPLACEMENT AND CLOSING UP THE INTERIOR OPENING AS PART OF THE CEILING REPLACEMENT, INSTALLING BABY CHANGING STATIONS, ADDING/RE-INSTALLING A LIGHT ABOVE THE FEE MACHINE, REFINISHING/SEALING/PAINTING EXPOSED CMU BLOCK WALLS ON THE INTERIOR, AND STUCCO EXTERIOR COMPONENTS OF THE BUILDING. | $148K |
| Mar 29, 2016 | Department of the InteriorIMR SANTA FE MABO | INP15PD02641 | 236220 | IGF::OT::IGF BIOBA - BIG BEND NATIONAL PARK, REHABILITATE THE CHISOS BASIN WATER SYSTEM PER THE ATTACHED SPECIFICATIONS. | $49K |
| Mar 24, 2016 | Department of the InteriorIMR SANTA FE MABO | INP16PD00794 | 236220 | IGF::OT::IGF BIOBA BIBE -FIRE SPRINKLER REPAIRS AND CORRECTIONS AT BIG BEND NATIONAL PER THE ATTACHED SCOPE OF WORK. DURING THE ANNUAL FIRE SPRINKLER INSPECTION THESE ITEMS WERE LISTED AS DEFICIENT. BUILD AND INSTALL 7 RESIDENTIAL RISERS TO INCLUDE BACK FLOW PREVENTION 1. PANTHER JUNCTION: Q 202, Q204, Q206, Q207, Q209 2. RGV: Q403, Q404 Q209- RELOCATE SPRINKLER HEAD MASTER BEDROOM CASTOLON LATRINE FOUR HEADS NEED EXTENDED THROUGH CEILING RELOCATE SPRINKLER PIPE IN PANTHER JUNCTION AUTO SHOP SO VEHICLE LIFT WILL OPERATE REPLACE PIPE AND PAINTED HEAD AT PANTHER JUNCTION HEADQUARTERS ALL WORK MUST BE PERFORMED BY A LICENSED FIRE SPRINKLER CONTRACTOR IN GOOD STANDING WITHIN THE STATE OF TEXAS. AUTOMATIC RESIDENTIAL SPRINKLER SYSTEM REPAIRS AND MODIFICATIONS MUST BE COMPLETED IN ACCORDANCE WITH NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), NFPA 13D - INSTALLATION OF RESIDENTIAL SPRINKLER CONTRACTORS MATERIAL AND TEST CERTIFICATES UPON COMPLETION OF REQUIRED TESTING THE CONTRACTOR SHALL SUBMIT COMPLETED AND SIGNED MATERIAL AND TEST CERTIFICATES FOR BACKFLOW PREVENTION DEVICES CERTIFYING SYSTEM MEETS OR EXCEEDS THE SPECIFIED REQUIREMENTS: EQUIPMENT AND MATERIALS SHALL BE APPROVED FOR THEIR DESIGNED USE AND PERFORMANCE. THE TERM APPROVED SHALL MEAN UNDERWRITERS LABORATORIES (UL) LISTED AND ACCEPTABLE TO THE APPROVAL AUTHORITIES. LEAKS IN PIPING SHALL BE IMMEDIATELY CORRECTED. ON THREADED PIPING, TIGHTEN JOINTS. IF NECESSARY, DISMANTLE AND REPLACE SECTION. CAULKING, OR STOP-LEAK COMPOUNDS WILL NOT BE PERMITTED. THE BACKFLOW PREVENTION ASSEMBLY SHALL BE FORWARD FLOW TESTED TO ENSURE PROPER OPERATION. THE MINIMUM FLOW RATE SHALL BE THE SYSTEM DEMAND, INCLUDING HOSE STREAM ALLOWANCE WHERE APPLICABLE. | $16K |
| Mar 11, 2016 | Department of the InteriorIMR SANTA FE MABO | INP15PD03068 | 236220 | IGF::OT::IGF VISITOR CENTER UPGRADES - CHCU | $97K |
| Mar 9, 2016 | Department of the InteriorIMR SANTA FE MABO | INP16PD00670 | 236220 | IGF::OT::IGF BIOBA RE-ROOF PROJECTS AT LYNDON B. JOHNSON NATIONAL HISTORICAL PARK, TO INCLUDE THE RE-ROOF OF THE LBJ BOYHOOD HOME, RE-ROOF THE STUCCO BUILDING AND REPAIR TEXAS WHITE HOUSE ROOF AT CHIMNEY. THE RE-ROOF OF THE BOYHOOD HOME CONSISTS OF REMOVAL AND REPLACEMENT OF THE EXISTING CEDAR SHINGLE ROOF PER THE ATTACHED SCOPE OF WORK. RE-ROOF THE STUCCO BUILDING INCLUDES REMOVAL AND REPLACEMENT OF EXISTING STUCCO BUILDING ROOF AND STRUCTURAL REPAIRS AS PER THE ATTACHED SCOPE OF WORK. THE REPAIR OF THE TEXAS WHITE HOUSE ROOF AT CHIMNEY INCLUDES ASSOCIATED ROOFING REPAIRS TO LARGE CHIMNEY AREA AT THE WESTERN PART OF THE TEXAS WHITE HOUSE PER THE ATTACHED SCOPE OF WORK. | $100K |
| Mar 7, 2016 | Department of the InteriorIMR SANTA FE MABO | INP16PD00653 | 236220 | IGF::OT::IGF ELMA - EMERGENCY MAC WALL REPAIRS | $6K |
| Feb 29, 2016 | Department of the InteriorIMR SANTA FE MABO | INP15PD03318 | 236220 | IGF::OT::IGF VISITOR CENTER ADDITION - PECO PROJECT COR GARY ZBEL, (505-757-7230) GARY_ZBEL@NPS.GOV | $3K |
| Feb 24, 2016 | Department of the InteriorIMR SANTA FE MABO | INP16PD00569 | 236220 | IGF::OT::IGF BIOBA THIS PROJECT CONSISTS OF WORK AT THE HISTORIC K-BAR RANCH HOUSE BUILDING 129 WHICH IS CURRENTLY USED TO HOUSE RESEARCHERS IN THE PARK. THE HOUSE IS AN ADOBE HOUSE (900 SQUARE FEET) BUILT IN 1921 WITH A STUCCO FINISH. THE HOUSE HAS 8 WINDOWS AND 4 EXTERIOR DOORS. BUILDING 129 RANCH HOUSE THE REPAIRS/REHABILITATION OF THIS PROJECT INCLUDE REPLACEMENT OF WOOD WINDOWS(8)- SINGLE HUNG, 6 OVER 6 WITH SINGLE STRENGTH GLASS REPLACE WINDOW SCREENS WITH METAL SCREEN MATERIALS ON WOOD FRAMES REPAIR AND INSTALLATION OF STUCCO/SHOTCRETE TO MATCH EXISTING REPAIR/REPLACEMENT OF WOODEN TRIM AROUND DOORS AND WINDOWS REPAIR/REPLACE WOOD FASCIA BOARD SCRAPE, PRIME AND PAINT TRIM: FASCIA, WINDOW, DOORS, PORCH POST REPLACEMENT OF SEPTIC TANK INCLUDING LATERAL LINES INSTALLED 1997 (SEPARATE OPTION LINE) BUILDING 130 RANCH GARAGE THE REPAIRS/REHABILITATION OF THIS PROJECT INCLUDE REPLACEMENT OF WOOD WINDOWS (2) SINGLE HUNG, 6 OVER 6 WITH SINGLE STRENGTH GLASS REPLACE WINDOW SCREENS WITH METAL SCREEN MATERIALS ON WOOD FRAMES REPAIR AND INSTALLATION OF STUCCO/SHOTCRETE TO MATCH EXISTING REPAIR/REPLACEMENT OF WOODEN TRIM AROUND DOORS AND WINDOWS REPAIR/REPLACE WOOD FASCIA BOARD SCRAPE AND PAINT TRIM: FASCIA, WINDOW, DOORS, PORCH POST TWEAK SLIDING GARAGE DOOR TO OPEN AND CLOSE WORK NEEDS TO BE COORDINATED WITH HOUSING SCHEDULE TO ENSURE THE HOUSE IS EMPTY | $86K |
| Feb 19, 2016 | Department of the InteriorIMR SANTA FE MABO | INP15PD02641 | 236220 | IGF::OT::IGF BIOBA - BIG BEND NATIONAL PARK, REHABILITATE THE CHISOS BASIN WATER SYSTEM PER THE ATTACHED SPECIFICATIONS. | $10K |
| Jan 25, 2016 | Department of the InteriorIMR SANTA FE MABO | INP16PD00409 | 236220 | IGF::OT::IGF BIOBA INSTALL NEW SIDEWALK AT SANFORD YAKE COMFORT STATION, LAKE MEREDITH NRA PER THE ATTACHED SCOPE OF WORK. | $15K |
| Dec 31, 2015 | Department of the InteriorIMR SANTA FE MABO | INP16PD00315 | 236220 | IGF::OT::IGF X:NOGRN, CONSTRUCTION, UPGRADE AUTOMATIC GATE ACCESS SYSTEM, BANDELIER NATIONAL MONUMENT. | $41K |
| Dec 8, 2015 | Department of the InteriorIMR SANTA FE MABO | INP16PD00071 | 236220 | IGF::OT::IGF BIBE-REPLACE 5 COMFORT STATION ROOFS. | $55K |
| Dec 2, 2015 | Department of the InteriorIMR SANTA FE MABO | INP16PD00151 | 236220 | IGF::OT::IGF X:NOGRN, LAKE MEREDITH NATIONAL RECREATION AREA - REPAIR/REPLACE GUARDRAIL AT FRITCH FORTRESS | $13K |
| Dec 1, 2015 | Department of the InteriorIMR SANTA FE MABO | INP16PD00143 | 236220 | IGF::OT::IGF BIOBA THIS PROJECT CONSISTS OF POURING NEW CONCRETE 3000PSI OR BETTER, SIDEWALKS AROUND THE NEW FF COMFORT STATION AND JOINING INTO EXISTING SIDEWALK SYSTEM. SIDEWALKS MUST BE A MINIMUM OF 5' WIDE. ALL DOOR APPROACHES AND ALL INCLINE MUST BE ADA COMPLIANT. SPECIAL CARE MUST BE EXERCISED WHEN BUILDING FORMS TO MAKE SURE STORM WATER DRAINS AWAY FROM BUILDING. | $13K |
| Nov 20, 2015 | Department of the InteriorIMR SANTA FE MABO | INP16PD00115 | 236220 | IGF::OT::IGF REPAIRS TO UPPER STORY PARAPET WALLS - OSTB | $10K |
Get Alerted Before All-rite Construction, INC.'s Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free