Home/Contractors/Association Of Universities For Research In Astronomy, INC./contracts

Federal Contractor Profile

Association Of Universities For Research In Astronomy, INC.

$2.11B obligated·5 awards·1 agencies·4 NAICS

Federal Contracts

Showing contracts 51100 of 229 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Apr 18, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC19C0054541715THIS CONTRACT IS FOR THE PRODUCTS AND SERVICES ASSOCIATED WITH THE DESIGN PHASE OF THE WIDE-FIELD INFRARED SURVEY TELESCOPE (WFIRST) SCIENCE OPERATIONS CENTER (SOC)$6.3M
Mar 27, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERGSFC0198106DNAS526555333314THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT INCLUDE THE FINAL SERVICING MISSION AND SUBSEQUENT OPERATIONS THROUGH END-OF-MISSION. THESE ACTIVITIES INCLUDE: A. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, MANAGEMENT OF THE PROPOSAL SELECTION, TIME ALLOCATION, AND GRANT AWARD COMMITTEE PROCESSES, AND SCIENCE COMMUNITY OUTREACH. B. ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION AND RECEIPT, OBSERVATION PLANNING AND SCHEDULING, UPDATING INSTRUMENT HANDBOOKS, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, ANOMALY INVESTIGATION SUPPORT, USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE AND ENGINEERING OPERATIONS SUPPORT. C. GROUND SYSTEM SUSTAINING ENGINEERING INCLUDING: SCIENCE OPERATION SYSTEM MAINTENANCE, INFRASTRUCTURE ADMINISTRATION AND SUPPORT, AND DOCUMENTATION MAINTENANCE D. SERVICING MISSION SUPPORT INCLUDING: PREPARATION AND EXECUTION OF THE OBSERVATORY VERIFICATION PROGRAM, INSTRUMENT DEVELOPMENT SUPPORT, AND OPTICAL ALIGNMENT TESTING SUPPORT E. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE HSTP F. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH G. SPECIAL PROJECTS INCLUDING ORIGINS FORUM AND INDEPENDENT RESEARCH THIS CONTRACT INCLUDES AN ADDITIONAL TWO-YEAR PERIOD AFTER THE END OF HST'S SCIENCE-MISSION. THIS EXTRA TIME FOLLOWING THE CESSATION OF SCIENTIFIC OBSERVATIONS IS FOR TWO YEARS OF FOLLOW-ON ARCHIVAL RESEARCH. DURING THE FINAL TWO YEARS OF THE CONTRACT, ARCHIVAL OPERATIONS AND MAINTENANCE, AN ARCHIVAL RESEARCH PROPOSAL SELECTION PROCESS AND ASSOCIATED GRANT ADMINISTRATION, AND A PUBLIC OUTREACH PROGRAM WILL CONTINUE. DATA ANALYSIS SOFTWARE WILL ALSO BE MAINTAINED BUT AT A LOWER LEVEL OF SUPPORT SUCH THAT ONLY MODEST ENHANCEMENTS MAY STILL BE MADE. CONTINUING SUPPORT WILL ALSO INCLUDE THE COORDINATION OF DATA ANALYSIS SOFTWARE THAT IS PRODUCED BY THE ASTRONOMICAL COMMUNITY. ORIG PSC AR20$8.0M
Mar 18, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC19C0054541715THIS CONTRACT IS FOR THE PRODUCTS AND SERVICES ASSOCIATED WITH THE DESIGN PHASE OF THE WIDE-FIELD INFRARED SURVEY TELESCOPE (WFIRST) SCIENCE OPERATIONS CENTER (SOC)$2.9M
Mar 7, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERGSFC0198106DNAS526555333314THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT INCLUDE THE FINAL SERVICING MISSION AND SUBSEQUENT OPERATIONS THROUGH END-OF-MISSION. THESE ACTIVITIES INCLUDE: A. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, MANAGEMENT OF THE PROPOSAL SELECTION, TIME ALLOCATION, AND GRANT AWARD COMMITTEE PROCESSES, AND SCIENCE COMMUNITY OUTREACH. B. ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION AND RECEIPT, OBSERVATION PLANNING AND SCHEDULING, UPDATING INSTRUMENT HANDBOOKS, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, ANOMALY INVESTIGATION SUPPORT, USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE AND ENGINEERING OPERATIONS SUPPORT. C. GROUND SYSTEM SUSTAINING ENGINEERING INCLUDING: SCIENCE OPERATION SYSTEM MAINTENANCE, INFRASTRUCTURE ADMINISTRATION AND SUPPORT, AND DOCUMENTATION MAINTENANCE D. SERVICING MISSION SUPPORT INCLUDING: PREPARATION AND EXECUTION OF THE OBSERVATORY VERIFICATION PROGRAM, INSTRUMENT DEVELOPMENT SUPPORT, AND OPTICAL ALIGNMENT TESTING SUPPORT E. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE HSTP F. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH G. SPECIAL PROJECTS INCLUDING ORIGINS FORUM AND INDEPENDENT RESEARCH THIS CONTRACT INCLUDES AN ADDITIONAL TWO-YEAR PERIOD AFTER THE END OF HST'S SCIENCE-MISSION. THIS EXTRA TIME FOLLOWING THE CESSATION OF SCIENTIFIC OBSERVATIONS IS FOR TWO YEARS OF FOLLOW-ON ARCHIVAL RESEARCH. DURING THE FINAL TWO YEARS OF THE CONTRACT, ARCHIVAL OPERATIONS AND MAINTENANCE, AN ARCHIVAL RESEARCH PROPOSAL SELECTION PROCESS AND ASSOCIATED GRANT ADMINISTRATION, AND A PUBLIC OUTREACH PROGRAM WILL CONTINUE. DATA ANALYSIS SOFTWARE WILL ALSO BE MAINTAINED BUT AT A LOWER LEVEL OF SUPPORT SUCH THAT ONLY MODEST ENHANCEMENTS MAY STILL BE MADE. CONTINUING SUPPORT WILL ALSO INCLUDE THE COORDINATION OF DATA ANALYSIS SOFTWARE THAT IS PRODUCED BY THE ASTRONOMICAL COMMUNITY. ORIG PSC AR20$1.3M
Feb 27, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNAS503127541710THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT SPAN THE MAJOR PHASES OF THE MISSION BEGINNING WITH FORMULATION THROUGH DEVELOPMENT AND TESTING, AND ENDING ONE YEAR AFTER LAUNCH WITH THE INITIATION OF THE JAMES WEBB SPACE TELESCOPE (JWST) SCIENCE PROGRAM. THESE MAJOR ACTIVITIES ARE SEPARATED INTO THE BASELINE PROGRAM AND SPECIAL STUDIES. THE BASELINE PROGRAM INCLUDES: A. MISSION REQUIREMENTS ANALYSIS AND OBSERVATORY/MISSION DESIGN SUPPORT INCLUDING: TRADESTUDY GENERATION, SCIENCE AND OPERATIONS IMPACT ANALYSIS, SCIENCE SYSTEMS ENGINEERING SUPPORT, AND DESIGN REFERENCE MISSION ANALYSIS. B. GROUND SEGMENT DEVELOPMENT, TESTING, MAINTENANCE AND OPERATIONS INCLUDING: OPERATIONS SUPPORT OF SI, FGS, ISIM, AND OBSERVATORY INTEGRATION AND TEST (I&T), MISSION SIMULATIONS, AND DOCUMENTATION MAINTENANCE, AS WELL AS LOW COST OPERATIONS CONCEPTS. C. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, PROPOSAL MANAGEMENT AND USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE, SCIENCE COMMUNITY OUTREACH, AND STAFF RESEARCH. D. COMMISSIONING PERIOD AND ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION, OBSERVATION PLANNING AND SCHEDULING, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, AND ENGINEERING OPERATIONS SUPPORT. E. FLIGHT OPERATIONS INCLUDING: SUBSYSTEM (INCLUDING INSTRUMENTS) HEALTH AND SAFETY MONITORING, COMMAND GENERATION AND UPLOAD, SCHEDULE EXECUTION ASSURANCE, TRENDING, AND ANOMALY INVESTIGATION. F. SUPPORT AND EXECUTION OF THE ON-ORBIT COMMISSIONING PROGRAM. G. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE JWST PROJECT. H. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH. EXAMPLES OF SPECIAL PROJECT ACTIVITIES MAY INCLUDE: A. FOLLOW-ON MISSION STUDIES. B. ENGINEERING NECESSARY TO RESPOND TO NEW JWST PROJECT TASKS.$10.0M
Feb 22, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC19C0054541715THIS CONTRACT IS FOR THE PRODUCTS AND SERVICES ASSOCIATED WITH THE DESIGN PHASE OF THE WIDE-FIELD INFRARED SURVEY TELESCOPE (WFIRST) SCIENCE OPERATIONS CENTER (SOC)$2.5M
Feb 15, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERGSFC0198106DNAS526555333314THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT INCLUDE THE FINAL SERVICING MISSION AND SUBSEQUENT OPERATIONS THROUGH END-OF-MISSION. THESE ACTIVITIES INCLUDE: A. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, MANAGEMENT OF THE PROPOSAL SELECTION, TIME ALLOCATION, AND GRANT AWARD COMMITTEE PROCESSES, AND SCIENCE COMMUNITY OUTREACH. B. ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION AND RECEIPT, OBSERVATION PLANNING AND SCHEDULING, UPDATING INSTRUMENT HANDBOOKS, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, ANOMALY INVESTIGATION SUPPORT, USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE AND ENGINEERING OPERATIONS SUPPORT. C. GROUND SYSTEM SUSTAINING ENGINEERING INCLUDING: SCIENCE OPERATION SYSTEM MAINTENANCE, INFRASTRUCTURE ADMINISTRATION AND SUPPORT, AND DOCUMENTATION MAINTENANCE D. SERVICING MISSION SUPPORT INCLUDING: PREPARATION AND EXECUTION OF THE OBSERVATORY VERIFICATION PROGRAM, INSTRUMENT DEVELOPMENT SUPPORT, AND OPTICAL ALIGNMENT TESTING SUPPORT E. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE HSTP F. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH G. SPECIAL PROJECTS INCLUDING ORIGINS FORUM AND INDEPENDENT RESEARCH THIS CONTRACT INCLUDES AN ADDITIONAL TWO-YEAR PERIOD AFTER THE END OF HST'S SCIENCE-MISSION. THIS EXTRA TIME FOLLOWING THE CESSATION OF SCIENTIFIC OBSERVATIONS IS FOR TWO YEARS OF FOLLOW-ON ARCHIVAL RESEARCH. DURING THE FINAL TWO YEARS OF THE CONTRACT, ARCHIVAL OPERATIONS AND MAINTENANCE, AN ARCHIVAL RESEARCH PROPOSAL SELECTION PROCESS AND ASSOCIATED GRANT ADMINISTRATION, AND A PUBLIC OUTREACH PROGRAM WILL CONTINUE. DATA ANALYSIS SOFTWARE WILL ALSO BE MAINTAINED BUT AT A LOWER LEVEL OF SUPPORT SUCH THAT ONLY MODEST ENHANCEMENTS MAY STILL BE MADE. CONTINUING SUPPORT WILL ALSO INCLUDE THE COORDINATION OF DATA ANALYSIS SOFTWARE THAT IS PRODUCED BY THE ASTRONOMICAL COMMUNITY. ORIG PSC AR20$6.8M
Jan 23, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNAS503127541710THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT SPAN THE MAJOR PHASES OF THE MISSION BEGINNING WITH FORMULATION THROUGH DEVELOPMENT AND TESTING, AND ENDING ONE YEAR AFTER LAUNCH WITH THE INITIATION OF THE JAMES WEBB SPACE TELESCOPE (JWST) SCIENCE PROGRAM. THESE MAJOR ACTIVITIES ARE SEPARATED INTO THE BASELINE PROGRAM AND SPECIAL STUDIES. THE BASELINE PROGRAM INCLUDES: A. MISSION REQUIREMENTS ANALYSIS AND OBSERVATORY/MISSION DESIGN SUPPORT INCLUDING: TRADESTUDY GENERATION, SCIENCE AND OPERATIONS IMPACT ANALYSIS, SCIENCE SYSTEMS ENGINEERING SUPPORT, AND DESIGN REFERENCE MISSION ANALYSIS. B. GROUND SEGMENT DEVELOPMENT, TESTING, MAINTENANCE AND OPERATIONS INCLUDING: OPERATIONS SUPPORT OF SI, FGS, ISIM, AND OBSERVATORY INTEGRATION AND TEST (I&T), MISSION SIMULATIONS, AND DOCUMENTATION MAINTENANCE, AS WELL AS LOW COST OPERATIONS CONCEPTS. C. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, PROPOSAL MANAGEMENT AND USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE, SCIENCE COMMUNITY OUTREACH, AND STAFF RESEARCH. D. COMMISSIONING PERIOD AND ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION, OBSERVATION PLANNING AND SCHEDULING, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, AND ENGINEERING OPERATIONS SUPPORT. E. FLIGHT OPERATIONS INCLUDING: SUBSYSTEM (INCLUDING INSTRUMENTS) HEALTH AND SAFETY MONITORING, COMMAND GENERATION AND UPLOAD, SCHEDULE EXECUTION ASSURANCE, TRENDING, AND ANOMALY INVESTIGATION. F. SUPPORT AND EXECUTION OF THE ON-ORBIT COMMISSIONING PROGRAM. G. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE JWST PROJECT. H. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH. EXAMPLES OF SPECIAL PROJECT ACTIVITIES MAY INCLUDE: A. FOLLOW-ON MISSION STUDIES. B. ENGINEERING NECESSARY TO RESPOND TO NEW JWST PROJECT TASKS.$25.0M
Jan 22, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC19C0054541715THIS CONTRACT IS FOR THE PRODUCTS AND SERVICES ASSOCIATED WITH THE DESIGN PHASE OF THE WIDE-FIELD INFRARED SURVEY TELESCOPE (WFIRST) SCIENCE OPERATIONS CENTER (SOC)$2.1M
Jan 10, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNAS503127541710THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT SPAN THE MAJOR PHASES OF THE MISSION BEGINNING WITH FORMULATION THROUGH DEVELOPMENT AND TESTING, AND ENDING ONE YEAR AFTER LAUNCH WITH THE INITIATION OF THE JAMES WEBB SPACE TELESCOPE (JWST) SCIENCE PROGRAM. THESE MAJOR ACTIVITIES ARE SEPARATED INTO THE BASELINE PROGRAM AND SPECIAL STUDIES. THE BASELINE PROGRAM INCLUDES: A. MISSION REQUIREMENTS ANALYSIS AND OBSERVATORY/MISSION DESIGN SUPPORT INCLUDING: TRADESTUDY GENERATION, SCIENCE AND OPERATIONS IMPACT ANALYSIS, SCIENCE SYSTEMS ENGINEERING SUPPORT, AND DESIGN REFERENCE MISSION ANALYSIS. B. GROUND SEGMENT DEVELOPMENT, TESTING, MAINTENANCE AND OPERATIONS INCLUDING: OPERATIONS SUPPORT OF SI, FGS, ISIM, AND OBSERVATORY INTEGRATION AND TEST (I&T), MISSION SIMULATIONS, AND DOCUMENTATION MAINTENANCE, AS WELL AS LOW COST OPERATIONS CONCEPTS. C. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, PROPOSAL MANAGEMENT AND USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE, SCIENCE COMMUNITY OUTREACH, AND STAFF RESEARCH. D. COMMISSIONING PERIOD AND ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION, OBSERVATION PLANNING AND SCHEDULING, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, AND ENGINEERING OPERATIONS SUPPORT. E. FLIGHT OPERATIONS INCLUDING: SUBSYSTEM (INCLUDING INSTRUMENTS) HEALTH AND SAFETY MONITORING, COMMAND GENERATION AND UPLOAD, SCHEDULE EXECUTION ASSURANCE, TRENDING, AND ANOMALY INVESTIGATION. F. SUPPORT AND EXECUTION OF THE ON-ORBIT COMMISSIONING PROGRAM. G. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE JWST PROJECT. H. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH. EXAMPLES OF SPECIAL PROJECT ACTIVITIES MAY INCLUDE: A. FOLLOW-ON MISSION STUDIES. B. ENGINEERING NECESSARY TO RESPOND TO NEW JWST PROJECT TASKS.$10K
Dec 20, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERGSFC0198106DNAS526555333314THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT INCLUDE THE FINAL SERVICING MISSION AND SUBSEQUENT OPERATIONS THROUGH END-OF-MISSION. THESE ACTIVITIES INCLUDE: A. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, MANAGEMENT OF THE PROPOSAL SELECTION, TIME ALLOCATION, AND GRANT AWARD COMMITTEE PROCESSES, AND SCIENCE COMMUNITY OUTREACH. B. ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION AND RECEIPT, OBSERVATION PLANNING AND SCHEDULING, UPDATING INSTRUMENT HANDBOOKS, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, ANOMALY INVESTIGATION SUPPORT, USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE AND ENGINEERING OPERATIONS SUPPORT. C. GROUND SYSTEM SUSTAINING ENGINEERING INCLUDING: SCIENCE OPERATION SYSTEM MAINTENANCE, INFRASTRUCTURE ADMINISTRATION AND SUPPORT, AND DOCUMENTATION MAINTENANCE D. SERVICING MISSION SUPPORT INCLUDING: PREPARATION AND EXECUTION OF THE OBSERVATORY VERIFICATION PROGRAM, INSTRUMENT DEVELOPMENT SUPPORT, AND OPTICAL ALIGNMENT TESTING SUPPORT E. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE HSTP F. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH G. SPECIAL PROJECTS INCLUDING ORIGINS FORUM AND INDEPENDENT RESEARCH THIS CONTRACT INCLUDES AN ADDITIONAL TWO-YEAR PERIOD AFTER THE END OF HST'S SCIENCE-MISSION. THIS EXTRA TIME FOLLOWING THE CESSATION OF SCIENTIFIC OBSERVATIONS IS FOR TWO YEARS OF FOLLOW-ON ARCHIVAL RESEARCH. DURING THE FINAL TWO YEARS OF THE CONTRACT, ARCHIVAL OPERATIONS AND MAINTENANCE, AN ARCHIVAL RESEARCH PROPOSAL SELECTION PROCESS AND ASSOCIATED GRANT ADMINISTRATION, AND A PUBLIC OUTREACH PROGRAM WILL CONTINUE. DATA ANALYSIS SOFTWARE WILL ALSO BE MAINTAINED BUT AT A LOWER LEVEL OF SUPPORT SUCH THAT ONLY MODEST ENHANCEMENTS MAY STILL BE MADE. CONTINUING SUPPORT WILL ALSO INCLUDE THE COORDINATION OF DATA ANALYSIS SOFTWARE THAT IS PRODUCED BY THE ASTRONOMICAL COMMUNITY. ORIG PSC AR20$6.9M
Dec 19, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC19C0054541715THIS CONTRACT IS FOR THE PRODUCTS AND SERVICES ASSOCIATED WITH THE DESIGN PHASE OF THE WIDE-FIELD INFRARED SURVEY TELESCOPE (WFIRST) SCIENCE OPERATIONS CENTER (SOC)$1.8M
Nov 20, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERGSFC0198106DNAS526555333314THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT INCLUDE THE FINAL SERVICING MISSION AND SUBSEQUENT OPERATIONS THROUGH END-OF-MISSION. THESE ACTIVITIES INCLUDE: A. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, MANAGEMENT OF THE PROPOSAL SELECTION, TIME ALLOCATION, AND GRANT AWARD COMMITTEE PROCESSES, AND SCIENCE COMMUNITY OUTREACH. B. ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION AND RECEIPT, OBSERVATION PLANNING AND SCHEDULING, UPDATING INSTRUMENT HANDBOOKS, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, ANOMALY INVESTIGATION SUPPORT, USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE AND ENGINEERING OPERATIONS SUPPORT. C. GROUND SYSTEM SUSTAINING ENGINEERING INCLUDING: SCIENCE OPERATION SYSTEM MAINTENANCE, INFRASTRUCTURE ADMINISTRATION AND SUPPORT, AND DOCUMENTATION MAINTENANCE D. SERVICING MISSION SUPPORT INCLUDING: PREPARATION AND EXECUTION OF THE OBSERVATORY VERIFICATION PROGRAM, INSTRUMENT DEVELOPMENT SUPPORT, AND OPTICAL ALIGNMENT TESTING SUPPORT E. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE HSTP F. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH G. SPECIAL PROJECTS INCLUDING ORIGINS FORUM AND INDEPENDENT RESEARCH THIS CONTRACT INCLUDES AN ADDITIONAL TWO-YEAR PERIOD AFTER THE END OF HST'S SCIENCE-MISSION. THIS EXTRA TIME FOLLOWING THE CESSATION OF SCIENTIFIC OBSERVATIONS IS FOR TWO YEARS OF FOLLOW-ON ARCHIVAL RESEARCH. DURING THE FINAL TWO YEARS OF THE CONTRACT, ARCHIVAL OPERATIONS AND MAINTENANCE, AN ARCHIVAL RESEARCH PROPOSAL SELECTION PROCESS AND ASSOCIATED GRANT ADMINISTRATION, AND A PUBLIC OUTREACH PROGRAM WILL CONTINUE. DATA ANALYSIS SOFTWARE WILL ALSO BE MAINTAINED BUT AT A LOWER LEVEL OF SUPPORT SUCH THAT ONLY MODEST ENHANCEMENTS MAY STILL BE MADE. CONTINUING SUPPORT WILL ALSO INCLUDE THE COORDINATION OF DATA ANALYSIS SOFTWARE THAT IS PRODUCED BY THE ASTRONOMICAL COMMUNITY. ORIG PSC AR20$1.4M
Oct 16, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERGSFC0198106DNAS526555333314THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT INCLUDE THE FINAL SERVICING MISSION AND SUBSEQUENT OPERATIONS THROUGH END-OF-MISSION. THESE ACTIVITIES INCLUDE: A. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, MANAGEMENT OF THE PROPOSAL SELECTION, TIME ALLOCATION, AND GRANT AWARD COMMITTEE PROCESSES, AND SCIENCE COMMUNITY OUTREACH. B. ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION AND RECEIPT, OBSERVATION PLANNING AND SCHEDULING, UPDATING INSTRUMENT HANDBOOKS, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, ANOMALY INVESTIGATION SUPPORT, USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE AND ENGINEERING OPERATIONS SUPPORT. C. GROUND SYSTEM SUSTAINING ENGINEERING INCLUDING: SCIENCE OPERATION SYSTEM MAINTENANCE, INFRASTRUCTURE ADMINISTRATION AND SUPPORT, AND DOCUMENTATION MAINTENANCE D. SERVICING MISSION SUPPORT INCLUDING: PREPARATION AND EXECUTION OF THE OBSERVATORY VERIFICATION PROGRAM, INSTRUMENT DEVELOPMENT SUPPORT, AND OPTICAL ALIGNMENT TESTING SUPPORT E. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE HSTP F. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH G. SPECIAL PROJECTS INCLUDING ORIGINS FORUM AND INDEPENDENT RESEARCH THIS CONTRACT INCLUDES AN ADDITIONAL TWO-YEAR PERIOD AFTER THE END OF HST'S SCIENCE-MISSION. THIS EXTRA TIME FOLLOWING THE CESSATION OF SCIENTIFIC OBSERVATIONS IS FOR TWO YEARS OF FOLLOW-ON ARCHIVAL RESEARCH. DURING THE FINAL TWO YEARS OF THE CONTRACT, ARCHIVAL OPERATIONS AND MAINTENANCE, AN ARCHIVAL RESEARCH PROPOSAL SELECTION PROCESS AND ASSOCIATED GRANT ADMINISTRATION, AND A PUBLIC OUTREACH PROGRAM WILL CONTINUE. DATA ANALYSIS SOFTWARE WILL ALSO BE MAINTAINED BUT AT A LOWER LEVEL OF SUPPORT SUCH THAT ONLY MODEST ENHANCEMENTS MAY STILL BE MADE. CONTINUING SUPPORT WILL ALSO INCLUDE THE COORDINATION OF DATA ANALYSIS SOFTWARE THAT IS PRODUCED BY THE ASTRONOMICAL COMMUNITY. ORIG PSC AR20$14.1M
Sep 28, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERGSFC0198106DNAS526555333314THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT INCLUDE THE FINAL SERVICING MISSION AND SUBSEQUENT OPERATIONS THROUGH END-OF-MISSION. THESE ACTIVITIES INCLUDE: A. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, MANAGEMENT OF THE PROPOSAL SELECTION, TIME ALLOCATION, AND GRANT AWARD COMMITTEE PROCESSES, AND SCIENCE COMMUNITY OUTREACH. B. ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION AND RECEIPT, OBSERVATION PLANNING AND SCHEDULING, UPDATING INSTRUMENT HANDBOOKS, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, ANOMALY INVESTIGATION SUPPORT, USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE AND ENGINEERING OPERATIONS SUPPORT. C. GROUND SYSTEM SUSTAINING ENGINEERING INCLUDING: SCIENCE OPERATION SYSTEM MAINTENANCE, INFRASTRUCTURE ADMINISTRATION AND SUPPORT, AND DOCUMENTATION MAINTENANCE D. SERVICING MISSION SUPPORT INCLUDING: PREPARATION AND EXECUTION OF THE OBSERVATORY VERIFICATION PROGRAM, INSTRUMENT DEVELOPMENT SUPPORT, AND OPTICAL ALIGNMENT TESTING SUPPORT E. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE HSTP F. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH G. SPECIAL PROJECTS INCLUDING ORIGINS FORUM AND INDEPENDENT RESEARCH THIS CONTRACT INCLUDES AN ADDITIONAL TWO-YEAR PERIOD AFTER THE END OF HST'S SCIENCE-MISSION. THIS EXTRA TIME FOLLOWING THE CESSATION OF SCIENTIFIC OBSERVATIONS IS FOR TWO YEARS OF FOLLOW-ON ARCHIVAL RESEARCH. DURING THE FINAL TWO YEARS OF THE CONTRACT, ARCHIVAL OPERATIONS AND MAINTENANCE, AN ARCHIVAL RESEARCH PROPOSAL SELECTION PROCESS AND ASSOCIATED GRANT ADMINISTRATION, AND A PUBLIC OUTREACH PROGRAM WILL CONTINUE. DATA ANALYSIS SOFTWARE WILL ALSO BE MAINTAINED BUT AT A LOWER LEVEL OF SUPPORT SUCH THAT ONLY MODEST ENHANCEMENTS MAY STILL BE MADE. CONTINUING SUPPORT WILL ALSO INCLUDE THE COORDINATION OF DATA ANALYSIS SOFTWARE THAT IS PRODUCED BY THE ASTRONOMICAL COMMUNITY. ORIG PSC AR20$752K
Sep 27, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC19C0054541715THIS CONTRACT IS FOR THE PRODUCTS AND SERVICES ASSOCIATED WITH THE DESIGN PHASE OF THE WIDE-FIELD INFRARED SURVEY TELESCOPE (WFIRST) SCIENCE OPERATIONS CENTER (SOC)$1.4M
Sep 19, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNAS503127541710THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT SPAN THE MAJOR PHASES OF THE MISSION BEGINNING WITH FORMULATION THROUGH DEVELOPMENT AND TESTING, AND ENDING ONE YEAR AFTER LAUNCH WITH THE INITIATION OF THE JAMES WEBB SPACE TELESCOPE (JWST) SCIENCE PROGRAM. THESE MAJOR ACTIVITIES ARE SEPARATED INTO THE BASELINE PROGRAM AND SPECIAL STUDIES. THE BASELINE PROGRAM INCLUDES: A. MISSION REQUIREMENTS ANALYSIS AND OBSERVATORY/MISSION DESIGN SUPPORT INCLUDING: TRADESTUDY GENERATION, SCIENCE AND OPERATIONS IMPACT ANALYSIS, SCIENCE SYSTEMS ENGINEERING SUPPORT, AND DESIGN REFERENCE MISSION ANALYSIS. B. GROUND SEGMENT DEVELOPMENT, TESTING, MAINTENANCE AND OPERATIONS INCLUDING: OPERATIONS SUPPORT OF SI, FGS, ISIM, AND OBSERVATORY INTEGRATION AND TEST (I&T), MISSION SIMULATIONS, AND DOCUMENTATION MAINTENANCE, AS WELL AS LOW COST OPERATIONS CONCEPTS. C. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, PROPOSAL MANAGEMENT AND USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE, SCIENCE COMMUNITY OUTREACH, AND STAFF RESEARCH. D. COMMISSIONING PERIOD AND ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION, OBSERVATION PLANNING AND SCHEDULING, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, AND ENGINEERING OPERATIONS SUPPORT. E. FLIGHT OPERATIONS INCLUDING: SUBSYSTEM (INCLUDING INSTRUMENTS) HEALTH AND SAFETY MONITORING, COMMAND GENERATION AND UPLOAD, SCHEDULE EXECUTION ASSURANCE, TRENDING, AND ANOMALY INVESTIGATION. F. SUPPORT AND EXECUTION OF THE ON-ORBIT COMMISSIONING PROGRAM. G. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE JWST PROJECT. H. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH. EXAMPLES OF SPECIAL PROJECT ACTIVITIES MAY INCLUDE: A. FOLLOW-ON MISSION STUDIES. B. ENGINEERING NECESSARY TO RESPOND TO NEW JWST PROJECT TASKS.$1.0M
Aug 29, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNAS503127541710THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT SPAN THE MAJOR PHASES OF THE MISSION BEGINNING WITH FORMULATION THROUGH DEVELOPMENT AND TESTING, AND ENDING ONE YEAR AFTER LAUNCH WITH THE INITIATION OF THE JAMES WEBB SPACE TELESCOPE (JWST) SCIENCE PROGRAM. THESE MAJOR ACTIVITIES ARE SEPARATED INTO THE BASELINE PROGRAM AND SPECIAL STUDIES. THE BASELINE PROGRAM INCLUDES: A. MISSION REQUIREMENTS ANALYSIS AND OBSERVATORY/MISSION DESIGN SUPPORT INCLUDING: TRADESTUDY GENERATION, SCIENCE AND OPERATIONS IMPACT ANALYSIS, SCIENCE SYSTEMS ENGINEERING SUPPORT, AND DESIGN REFERENCE MISSION ANALYSIS. B. GROUND SEGMENT DEVELOPMENT, TESTING, MAINTENANCE AND OPERATIONS INCLUDING: OPERATIONS SUPPORT OF SI, FGS, ISIM, AND OBSERVATORY INTEGRATION AND TEST (I&T), MISSION SIMULATIONS, AND DOCUMENTATION MAINTENANCE, AS WELL AS LOW COST OPERATIONS CONCEPTS. C. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, PROPOSAL MANAGEMENT AND USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE, SCIENCE COMMUNITY OUTREACH, AND STAFF RESEARCH. D. COMMISSIONING PERIOD AND ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION, OBSERVATION PLANNING AND SCHEDULING, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, AND ENGINEERING OPERATIONS SUPPORT. E. FLIGHT OPERATIONS INCLUDING: SUBSYSTEM (INCLUDING INSTRUMENTS) HEALTH AND SAFETY MONITORING, COMMAND GENERATION AND UPLOAD, SCHEDULE EXECUTION ASSURANCE, TRENDING, AND ANOMALY INVESTIGATION. F. SUPPORT AND EXECUTION OF THE ON-ORBIT COMMISSIONING PROGRAM. G. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE JWST PROJECT. H. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH. EXAMPLES OF SPECIAL PROJECT ACTIVITIES MAY INCLUDE: A. FOLLOW-ON MISSION STUDIES. B. ENGINEERING NECESSARY TO RESPOND TO NEW JWST PROJECT TASKS.$30.0M
Aug 29, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNAS503127541710THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT SPAN THE MAJOR PHASES OF THE MISSION BEGINNING WITH FORMULATION THROUGH DEVELOPMENT AND TESTING, AND ENDING ONE YEAR AFTER LAUNCH WITH THE INITIATION OF THE JAMES WEBB SPACE TELESCOPE (JWST) SCIENCE PROGRAM. THESE MAJOR ACTIVITIES ARE SEPARATED INTO THE BASELINE PROGRAM AND SPECIAL STUDIES. THE BASELINE PROGRAM INCLUDES: A. MISSION REQUIREMENTS ANALYSIS AND OBSERVATORY/MISSION DESIGN SUPPORT INCLUDING: TRADESTUDY GENERATION, SCIENCE AND OPERATIONS IMPACT ANALYSIS, SCIENCE SYSTEMS ENGINEERING SUPPORT, AND DESIGN REFERENCE MISSION ANALYSIS. B. GROUND SEGMENT DEVELOPMENT, TESTING, MAINTENANCE AND OPERATIONS INCLUDING: OPERATIONS SUPPORT OF SI, FGS, ISIM, AND OBSERVATORY INTEGRATION AND TEST (I&T), MISSION SIMULATIONS, AND DOCUMENTATION MAINTENANCE, AS WELL AS LOW COST OPERATIONS CONCEPTS. C. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, PROPOSAL MANAGEMENT AND USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE, SCIENCE COMMUNITY OUTREACH, AND STAFF RESEARCH. D. COMMISSIONING PERIOD AND ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION, OBSERVATION PLANNING AND SCHEDULING, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, AND ENGINEERING OPERATIONS SUPPORT. E. FLIGHT OPERATIONS INCLUDING: SUBSYSTEM (INCLUDING INSTRUMENTS) HEALTH AND SAFETY MONITORING, COMMAND GENERATION AND UPLOAD, SCHEDULE EXECUTION ASSURANCE, TRENDING, AND ANOMALY INVESTIGATION. F. SUPPORT AND EXECUTION OF THE ON-ORBIT COMMISSIONING PROGRAM. G. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE JWST PROJECT. H. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH. EXAMPLES OF SPECIAL PROJECT ACTIVITIES MAY INCLUDE: A. FOLLOW-ON MISSION STUDIES. B. ENGINEERING NECESSARY TO RESPOND TO NEW JWST PROJECT TASKS.$25.0M
Jul 21, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERGSFC0198106DNAS526555333314THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT INCLUDE THE FINAL SERVICING MISSION AND SUBSEQUENT OPERATIONS THROUGH END-OF-MISSION. THESE ACTIVITIES INCLUDE: A. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, MANAGEMENT OF THE PROPOSAL SELECTION, TIME ALLOCATION, AND GRANT AWARD COMMITTEE PROCESSES, AND SCIENCE COMMUNITY OUTREACH. B. ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION AND RECEIPT, OBSERVATION PLANNING AND SCHEDULING, UPDATING INSTRUMENT HANDBOOKS, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, ANOMALY INVESTIGATION SUPPORT, USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE AND ENGINEERING OPERATIONS SUPPORT. C. GROUND SYSTEM SUSTAINING ENGINEERING INCLUDING: SCIENCE OPERATION SYSTEM MAINTENANCE, INFRASTRUCTURE ADMINISTRATION AND SUPPORT, AND DOCUMENTATION MAINTENANCE D. SERVICING MISSION SUPPORT INCLUDING: PREPARATION AND EXECUTION OF THE OBSERVATORY VERIFICATION PROGRAM, INSTRUMENT DEVELOPMENT SUPPORT, AND OPTICAL ALIGNMENT TESTING SUPPORT E. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE HSTP F. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH G. SPECIAL PROJECTS INCLUDING ORIGINS FORUM AND INDEPENDENT RESEARCH THIS CONTRACT INCLUDES AN ADDITIONAL TWO-YEAR PERIOD AFTER THE END OF HST'S SCIENCE-MISSION. THIS EXTRA TIME FOLLOWING THE CESSATION OF SCIENTIFIC OBSERVATIONS IS FOR TWO YEARS OF FOLLOW-ON ARCHIVAL RESEARCH. DURING THE FINAL TWO YEARS OF THE CONTRACT, ARCHIVAL OPERATIONS AND MAINTENANCE, AN ARCHIVAL RESEARCH PROPOSAL SELECTION PROCESS AND ASSOCIATED GRANT ADMINISTRATION, AND A PUBLIC OUTREACH PROGRAM WILL CONTINUE. DATA ANALYSIS SOFTWARE WILL ALSO BE MAINTAINED BUT AT A LOWER LEVEL OF SUPPORT SUCH THAT ONLY MODEST ENHANCEMENTS MAY STILL BE MADE. CONTINUING SUPPORT WILL ALSO INCLUDE THE COORDINATION OF DATA ANALYSIS SOFTWARE THAT IS PRODUCED BY THE ASTRONOMICAL COMMUNITY. ORIG PSC AR20$9.7M
Jul 12, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNAS503127541710THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT SPAN THE MAJOR PHASES OF THE MISSION BEGINNING WITH FORMULATION THROUGH DEVELOPMENT AND TESTING, AND ENDING ONE YEAR AFTER LAUNCH WITH THE INITIATION OF THE JAMES WEBB SPACE TELESCOPE (JWST) SCIENCE PROGRAM. THESE MAJOR ACTIVITIES ARE SEPARATED INTO THE BASELINE PROGRAM AND SPECIAL STUDIES. THE BASELINE PROGRAM INCLUDES: A. MISSION REQUIREMENTS ANALYSIS AND OBSERVATORY/MISSION DESIGN SUPPORT INCLUDING: TRADESTUDY GENERATION, SCIENCE AND OPERATIONS IMPACT ANALYSIS, SCIENCE SYSTEMS ENGINEERING SUPPORT, AND DESIGN REFERENCE MISSION ANALYSIS. B. GROUND SEGMENT DEVELOPMENT, TESTING, MAINTENANCE AND OPERATIONS INCLUDING: OPERATIONS SUPPORT OF SI, FGS, ISIM, AND OBSERVATORY INTEGRATION AND TEST (I&T), MISSION SIMULATIONS, AND DOCUMENTATION MAINTENANCE, AS WELL AS LOW COST OPERATIONS CONCEPTS. C. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, PROPOSAL MANAGEMENT AND USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE, SCIENCE COMMUNITY OUTREACH, AND STAFF RESEARCH. D. COMMISSIONING PERIOD AND ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION, OBSERVATION PLANNING AND SCHEDULING, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, AND ENGINEERING OPERATIONS SUPPORT. E. FLIGHT OPERATIONS INCLUDING: SUBSYSTEM (INCLUDING INSTRUMENTS) HEALTH AND SAFETY MONITORING, COMMAND GENERATION AND UPLOAD, SCHEDULE EXECUTION ASSURANCE, TRENDING, AND ANOMALY INVESTIGATION. F. SUPPORT AND EXECUTION OF THE ON-ORBIT COMMISSIONING PROGRAM. G. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE JWST PROJECT. H. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH. EXAMPLES OF SPECIAL PROJECT ACTIVITIES MAY INCLUDE: A. FOLLOW-ON MISSION STUDIES. B. ENGINEERING NECESSARY TO RESPOND TO NEW JWST PROJECT TASKS.$114K
Jul 7, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNAS503127541710THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT SPAN THE MAJOR PHASES OF THE MISSION BEGINNING WITH FORMULATION THROUGH DEVELOPMENT AND TESTING, AND ENDING ONE YEAR AFTER LAUNCH WITH THE INITIATION OF THE JAMES WEBB SPACE TELESCOPE (JWST) SCIENCE PROGRAM. THESE MAJOR ACTIVITIES ARE SEPARATED INTO THE BASELINE PROGRAM AND SPECIAL STUDIES. THE BASELINE PROGRAM INCLUDES: A. MISSION REQUIREMENTS ANALYSIS AND OBSERVATORY/MISSION DESIGN SUPPORT INCLUDING: TRADESTUDY GENERATION, SCIENCE AND OPERATIONS IMPACT ANALYSIS, SCIENCE SYSTEMS ENGINEERING SUPPORT, AND DESIGN REFERENCE MISSION ANALYSIS. B. GROUND SEGMENT DEVELOPMENT, TESTING, MAINTENANCE AND OPERATIONS INCLUDING: OPERATIONS SUPPORT OF SI, FGS, ISIM, AND OBSERVATORY INTEGRATION AND TEST (I&T), MISSION SIMULATIONS, AND DOCUMENTATION MAINTENANCE, AS WELL AS LOW COST OPERATIONS CONCEPTS. C. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, PROPOSAL MANAGEMENT AND USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE, SCIENCE COMMUNITY OUTREACH, AND STAFF RESEARCH. D. COMMISSIONING PERIOD AND ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION, OBSERVATION PLANNING AND SCHEDULING, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, AND ENGINEERING OPERATIONS SUPPORT. E. FLIGHT OPERATIONS INCLUDING: SUBSYSTEM (INCLUDING INSTRUMENTS) HEALTH AND SAFETY MONITORING, COMMAND GENERATION AND UPLOAD, SCHEDULE EXECUTION ASSURANCE, TRENDING, AND ANOMALY INVESTIGATION. F. SUPPORT AND EXECUTION OF THE ON-ORBIT COMMISSIONING PROGRAM. G. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE JWST PROJECT. H. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH. EXAMPLES OF SPECIAL PROJECT ACTIVITIES MAY INCLUDE: A. FOLLOW-ON MISSION STUDIES. B. ENGINEERING NECESSARY TO RESPOND TO NEW JWST PROJECT TASKS.$132K
May 24, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERGSFC0198106DNAS526555333314THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT INCLUDE THE FINAL SERVICING MISSION AND SUBSEQUENT OPERATIONS THROUGH END-OF-MISSION. THESE ACTIVITIES INCLUDE: A. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, MANAGEMENT OF THE PROPOSAL SELECTION, TIME ALLOCATION, AND GRANT AWARD COMMITTEE PROCESSES, AND SCIENCE COMMUNITY OUTREACH. B. ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION AND RECEIPT, OBSERVATION PLANNING AND SCHEDULING, UPDATING INSTRUMENT HANDBOOKS, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, ANOMALY INVESTIGATION SUPPORT, USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE AND ENGINEERING OPERATIONS SUPPORT. C. GROUND SYSTEM SUSTAINING ENGINEERING INCLUDING: SCIENCE OPERATION SYSTEM MAINTENANCE, INFRASTRUCTURE ADMINISTRATION AND SUPPORT, AND DOCUMENTATION MAINTENANCE D. SERVICING MISSION SUPPORT INCLUDING: PREPARATION AND EXECUTION OF THE OBSERVATORY VERIFICATION PROGRAM, INSTRUMENT DEVELOPMENT SUPPORT, AND OPTICAL ALIGNMENT TESTING SUPPORT E. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE HSTP F. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH G. SPECIAL PROJECTS INCLUDING ORIGINS FORUM AND INDEPENDENT RESEARCH THIS CONTRACT INCLUDES AN ADDITIONAL TWO-YEAR PERIOD AFTER THE END OF HST'S SCIENCE-MISSION. THIS EXTRA TIME FOLLOWING THE CESSATION OF SCIENTIFIC OBSERVATIONS IS FOR TWO YEARS OF FOLLOW-ON ARCHIVAL RESEARCH. DURING THE FINAL TWO YEARS OF THE CONTRACT, ARCHIVAL OPERATIONS AND MAINTENANCE, AN ARCHIVAL RESEARCH PROPOSAL SELECTION PROCESS AND ASSOCIATED GRANT ADMINISTRATION, AND A PUBLIC OUTREACH PROGRAM WILL CONTINUE. DATA ANALYSIS SOFTWARE WILL ALSO BE MAINTAINED BUT AT A LOWER LEVEL OF SUPPORT SUCH THAT ONLY MODEST ENHANCEMENTS MAY STILL BE MADE. CONTINUING SUPPORT WILL ALSO INCLUDE THE COORDINATION OF DATA ANALYSIS SOFTWARE THAT IS PRODUCED BY THE ASTRONOMICAL COMMUNITY. ORIG PSC AR20$114K
May 24, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNAS503127541710THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT SPAN THE MAJOR PHASES OF THE MISSION BEGINNING WITH FORMULATION THROUGH DEVELOPMENT AND TESTING, AND ENDING ONE YEAR AFTER LAUNCH WITH THE INITIATION OF THE JAMES WEBB SPACE TELESCOPE (JWST) SCIENCE PROGRAM. THESE MAJOR ACTIVITIES ARE SEPARATED INTO THE BASELINE PROGRAM AND SPECIAL STUDIES. THE BASELINE PROGRAM INCLUDES: A. MISSION REQUIREMENTS ANALYSIS AND OBSERVATORY/MISSION DESIGN SUPPORT INCLUDING: TRADESTUDY GENERATION, SCIENCE AND OPERATIONS IMPACT ANALYSIS, SCIENCE SYSTEMS ENGINEERING SUPPORT, AND DESIGN REFERENCE MISSION ANALYSIS. B. GROUND SEGMENT DEVELOPMENT, TESTING, MAINTENANCE AND OPERATIONS INCLUDING: OPERATIONS SUPPORT OF SI, FGS, ISIM, AND OBSERVATORY INTEGRATION AND TEST (I&T), MISSION SIMULATIONS, AND DOCUMENTATION MAINTENANCE, AS WELL AS LOW COST OPERATIONS CONCEPTS. C. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, PROPOSAL MANAGEMENT AND USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE, SCIENCE COMMUNITY OUTREACH, AND STAFF RESEARCH. D. COMMISSIONING PERIOD AND ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION, OBSERVATION PLANNING AND SCHEDULING, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, AND ENGINEERING OPERATIONS SUPPORT. E. FLIGHT OPERATIONS INCLUDING: SUBSYSTEM (INCLUDING INSTRUMENTS) HEALTH AND SAFETY MONITORING, COMMAND GENERATION AND UPLOAD, SCHEDULE EXECUTION ASSURANCE, TRENDING, AND ANOMALY INVESTIGATION. F. SUPPORT AND EXECUTION OF THE ON-ORBIT COMMISSIONING PROGRAM. G. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE JWST PROJECT. H. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH. EXAMPLES OF SPECIAL PROJECT ACTIVITIES MAY INCLUDE: A. FOLLOW-ON MISSION STUDIES. B. ENGINEERING NECESSARY TO RESPOND TO NEW JWST PROJECT TASKS.$23.0M
May 19, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC19C0054541715THIS CONTRACT IS FOR THE PRODUCTS AND SERVICES ASSOCIATED WITH THE DESIGN PHASE OF THE WIDE-FIELD INFRARED SURVEY TELESCOPE (WFIRST) SCIENCE OPERATIONS CENTER (SOC)$14.6M
Apr 14, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC19C0054541715THIS CONTRACT IS FOR THE PRODUCTS AND SERVICES ASSOCIATED WITH THE DESIGN PHASE OF THE WIDE-FIELD INFRARED SURVEY TELESCOPE (WFIRST) SCIENCE OPERATIONS CENTER (SOC)$2.4M
Mar 31, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC19C0054541715THIS CONTRACT IS FOR THE PRODUCTS AND SERVICES ASSOCIATED WITH THE DESIGN PHASE OF THE WIDE-FIELD INFRARED SURVEY TELESCOPE (WFIRST) SCIENCE OPERATIONS CENTER (SOC)$1.7M
Mar 30, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERGSFC0198106DNAS526555333314THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT INCLUDE THE FINAL SERVICING MISSION AND SUBSEQUENT OPERATIONS THROUGH END-OF-MISSION. THESE ACTIVITIES INCLUDE: A. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, MANAGEMENT OF THE PROPOSAL SELECTION, TIME ALLOCATION, AND GRANT AWARD COMMITTEE PROCESSES, AND SCIENCE COMMUNITY OUTREACH. B. ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION AND RECEIPT, OBSERVATION PLANNING AND SCHEDULING, UPDATING INSTRUMENT HANDBOOKS, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, ANOMALY INVESTIGATION SUPPORT, USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE AND ENGINEERING OPERATIONS SUPPORT. C. GROUND SYSTEM SUSTAINING ENGINEERING INCLUDING: SCIENCE OPERATION SYSTEM MAINTENANCE, INFRASTRUCTURE ADMINISTRATION AND SUPPORT, AND DOCUMENTATION MAINTENANCE D. SERVICING MISSION SUPPORT INCLUDING: PREPARATION AND EXECUTION OF THE OBSERVATORY VERIFICATION PROGRAM, INSTRUMENT DEVELOPMENT SUPPORT, AND OPTICAL ALIGNMENT TESTING SUPPORT E. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE HSTP F. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH G. SPECIAL PROJECTS INCLUDING ORIGINS FORUM AND INDEPENDENT RESEARCH THIS CONTRACT INCLUDES AN ADDITIONAL TWO-YEAR PERIOD AFTER THE END OF HST'S SCIENCE-MISSION. THIS EXTRA TIME FOLLOWING THE CESSATION OF SCIENTIFIC OBSERVATIONS IS FOR TWO YEARS OF FOLLOW-ON ARCHIVAL RESEARCH. DURING THE FINAL TWO YEARS OF THE CONTRACT, ARCHIVAL OPERATIONS AND MAINTENANCE, AN ARCHIVAL RESEARCH PROPOSAL SELECTION PROCESS AND ASSOCIATED GRANT ADMINISTRATION, AND A PUBLIC OUTREACH PROGRAM WILL CONTINUE. DATA ANALYSIS SOFTWARE WILL ALSO BE MAINTAINED BUT AT A LOWER LEVEL OF SUPPORT SUCH THAT ONLY MODEST ENHANCEMENTS MAY STILL BE MADE. CONTINUING SUPPORT WILL ALSO INCLUDE THE COORDINATION OF DATA ANALYSIS SOFTWARE THAT IS PRODUCED BY THE ASTRONOMICAL COMMUNITY. ORIG PSC AR20$1.9M
Mar 14, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC19C0054541715THIS CONTRACT IS FOR THE PRODUCTS AND SERVICES ASSOCIATED WITH THE DESIGN PHASE OF THE WIDE-FIELD INFRARED SURVEY TELESCOPE (WFIRST) SCIENCE OPERATIONS CENTER (SOC)$897K
Mar 2, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNAS503127541710THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT SPAN THE MAJOR PHASES OF THE MISSION BEGINNING WITH FORMULATION THROUGH DEVELOPMENT AND TESTING, AND ENDING ONE YEAR AFTER LAUNCH WITH THE INITIATION OF THE JAMES WEBB SPACE TELESCOPE (JWST) SCIENCE PROGRAM. THESE MAJOR ACTIVITIES ARE SEPARATED INTO THE BASELINE PROGRAM AND SPECIAL STUDIES. THE BASELINE PROGRAM INCLUDES: A. MISSION REQUIREMENTS ANALYSIS AND OBSERVATORY/MISSION DESIGN SUPPORT INCLUDING: TRADESTUDY GENERATION, SCIENCE AND OPERATIONS IMPACT ANALYSIS, SCIENCE SYSTEMS ENGINEERING SUPPORT, AND DESIGN REFERENCE MISSION ANALYSIS. B. GROUND SEGMENT DEVELOPMENT, TESTING, MAINTENANCE AND OPERATIONS INCLUDING: OPERATIONS SUPPORT OF SI, FGS, ISIM, AND OBSERVATORY INTEGRATION AND TEST (I&T), MISSION SIMULATIONS, AND DOCUMENTATION MAINTENANCE, AS WELL AS LOW COST OPERATIONS CONCEPTS. C. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, PROPOSAL MANAGEMENT AND USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE, SCIENCE COMMUNITY OUTREACH, AND STAFF RESEARCH. D. COMMISSIONING PERIOD AND ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION, OBSERVATION PLANNING AND SCHEDULING, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, AND ENGINEERING OPERATIONS SUPPORT. E. FLIGHT OPERATIONS INCLUDING: SUBSYSTEM (INCLUDING INSTRUMENTS) HEALTH AND SAFETY MONITORING, COMMAND GENERATION AND UPLOAD, SCHEDULE EXECUTION ASSURANCE, TRENDING, AND ANOMALY INVESTIGATION. F. SUPPORT AND EXECUTION OF THE ON-ORBIT COMMISSIONING PROGRAM. G. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE JWST PROJECT. H. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH. EXAMPLES OF SPECIAL PROJECT ACTIVITIES MAY INCLUDE: A. FOLLOW-ON MISSION STUDIES. B. ENGINEERING NECESSARY TO RESPOND TO NEW JWST PROJECT TASKS.$25.0M
Feb 27, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC19C0054541715THIS CONTRACT IS FOR THE PRODUCTS AND SERVICES ASSOCIATED WITH THE DESIGN PHASE OF THE WIDE-FIELD INFRARED SURVEY TELESCOPE (WFIRST) SCIENCE OPERATIONS CENTER (SOC)$1.0M
Feb 14, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC19C0054541715THIS CONTRACT IS FOR THE PRODUCTS AND SERVICES ASSOCIATED WITH THE DESIGN PHASE OF THE WIDE-FIELD INFRARED SURVEY TELESCOPE (WFIRST) SCIENCE OPERATIONS CENTER (SOC)$1.4M
Feb 1, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERGSFC0198106DNAS526555333314THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT INCLUDE THE FINAL SERVICING MISSION AND SUBSEQUENT OPERATIONS THROUGH END-OF-MISSION. THESE ACTIVITIES INCLUDE: A. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, MANAGEMENT OF THE PROPOSAL SELECTION, TIME ALLOCATION, AND GRANT AWARD COMMITTEE PROCESSES, AND SCIENCE COMMUNITY OUTREACH. B. ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION AND RECEIPT, OBSERVATION PLANNING AND SCHEDULING, UPDATING INSTRUMENT HANDBOOKS, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, ANOMALY INVESTIGATION SUPPORT, USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE AND ENGINEERING OPERATIONS SUPPORT. C. GROUND SYSTEM SUSTAINING ENGINEERING INCLUDING: SCIENCE OPERATION SYSTEM MAINTENANCE, INFRASTRUCTURE ADMINISTRATION AND SUPPORT, AND DOCUMENTATION MAINTENANCE D. SERVICING MISSION SUPPORT INCLUDING: PREPARATION AND EXECUTION OF THE OBSERVATORY VERIFICATION PROGRAM, INSTRUMENT DEVELOPMENT SUPPORT, AND OPTICAL ALIGNMENT TESTING SUPPORT E. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE HSTP F. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH G. SPECIAL PROJECTS INCLUDING ORIGINS FORUM AND INDEPENDENT RESEARCH THIS CONTRACT INCLUDES AN ADDITIONAL TWO-YEAR PERIOD AFTER THE END OF HST'S SCIENCE-MISSION. THIS EXTRA TIME FOLLOWING THE CESSATION OF SCIENTIFIC OBSERVATIONS IS FOR TWO YEARS OF FOLLOW-ON ARCHIVAL RESEARCH. DURING THE FINAL TWO YEARS OF THE CONTRACT, ARCHIVAL OPERATIONS AND MAINTENANCE, AN ARCHIVAL RESEARCH PROPOSAL SELECTION PROCESS AND ASSOCIATED GRANT ADMINISTRATION, AND A PUBLIC OUTREACH PROGRAM WILL CONTINUE. DATA ANALYSIS SOFTWARE WILL ALSO BE MAINTAINED BUT AT A LOWER LEVEL OF SUPPORT SUCH THAT ONLY MODEST ENHANCEMENTS MAY STILL BE MADE. CONTINUING SUPPORT WILL ALSO INCLUDE THE COORDINATION OF DATA ANALYSIS SOFTWARE THAT IS PRODUCED BY THE ASTRONOMICAL COMMUNITY. ORIG PSC AR20$36.4M
Jan 27, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC19C0054541715THIS CONTRACT IS FOR THE PRODUCTS AND SERVICES ASSOCIATED WITH THE DESIGN PHASE OF THE WIDE-FIELD INFRARED SURVEY TELESCOPE (WFIRST) SCIENCE OPERATIONS CENTER (SOC)$1.1M
Dec 13, 2022National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC19C0054541715THIS CONTRACT IS FOR THE PRODUCTS AND SERVICES ASSOCIATED WITH THE DESIGN PHASE OF THE WIDE-FIELD INFRARED SURVEY TELESCOPE (WFIRST) SCIENCE OPERATIONS CENTER (SOC)$2.4M
Oct 26, 2022National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERGSFC0198106DNAS526555333314THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT INCLUDE THE FINAL SERVICING MISSION AND SUBSEQUENT OPERATIONS THROUGH END-OF-MISSION. THESE ACTIVITIES INCLUDE: A. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, MANAGEMENT OF THE PROPOSAL SELECTION, TIME ALLOCATION, AND GRANT AWARD COMMITTEE PROCESSES, AND SCIENCE COMMUNITY OUTREACH. B. ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION AND RECEIPT, OBSERVATION PLANNING AND SCHEDULING, UPDATING INSTRUMENT HANDBOOKS, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, ANOMALY INVESTIGATION SUPPORT, USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE AND ENGINEERING OPERATIONS SUPPORT. C. GROUND SYSTEM SUSTAINING ENGINEERING INCLUDING: SCIENCE OPERATION SYSTEM MAINTENANCE, INFRASTRUCTURE ADMINISTRATION AND SUPPORT, AND DOCUMENTATION MAINTENANCE D. SERVICING MISSION SUPPORT INCLUDING: PREPARATION AND EXECUTION OF THE OBSERVATORY VERIFICATION PROGRAM, INSTRUMENT DEVELOPMENT SUPPORT, AND OPTICAL ALIGNMENT TESTING SUPPORT E. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE HSTP F. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH G. SPECIAL PROJECTS INCLUDING ORIGINS FORUM AND INDEPENDENT RESEARCH THIS CONTRACT INCLUDES AN ADDITIONAL TWO-YEAR PERIOD AFTER THE END OF HST'S SCIENCE-MISSION. THIS EXTRA TIME FOLLOWING THE CESSATION OF SCIENTIFIC OBSERVATIONS IS FOR TWO YEARS OF FOLLOW-ON ARCHIVAL RESEARCH. DURING THE FINAL TWO YEARS OF THE CONTRACT, ARCHIVAL OPERATIONS AND MAINTENANCE, AN ARCHIVAL RESEARCH PROPOSAL SELECTION PROCESS AND ASSOCIATED GRANT ADMINISTRATION, AND A PUBLIC OUTREACH PROGRAM WILL CONTINUE. DATA ANALYSIS SOFTWARE WILL ALSO BE MAINTAINED BUT AT A LOWER LEVEL OF SUPPORT SUCH THAT ONLY MODEST ENHANCEMENTS MAY STILL BE MADE. CONTINUING SUPPORT WILL ALSO INCLUDE THE COORDINATION OF DATA ANALYSIS SOFTWARE THAT IS PRODUCED BY THE ASTRONOMICAL COMMUNITY. ORIG PSC AR20$16.6M
Sep 28, 2022National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERGSFC0198106DNAS526555333314THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT INCLUDE THE FINAL SERVICING MISSION AND SUBSEQUENT OPERATIONS THROUGH END-OF-MISSION. THESE ACTIVITIES INCLUDE: A. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, MANAGEMENT OF THE PROPOSAL SELECTION, TIME ALLOCATION, AND GRANT AWARD COMMITTEE PROCESSES, AND SCIENCE COMMUNITY OUTREACH. B. ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION AND RECEIPT, OBSERVATION PLANNING AND SCHEDULING, UPDATING INSTRUMENT HANDBOOKS, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, ANOMALY INVESTIGATION SUPPORT, USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE AND ENGINEERING OPERATIONS SUPPORT. C. GROUND SYSTEM SUSTAINING ENGINEERING INCLUDING: SCIENCE OPERATION SYSTEM MAINTENANCE, INFRASTRUCTURE ADMINISTRATION AND SUPPORT, AND DOCUMENTATION MAINTENANCE D. SERVICING MISSION SUPPORT INCLUDING: PREPARATION AND EXECUTION OF THE OBSERVATORY VERIFICATION PROGRAM, INSTRUMENT DEVELOPMENT SUPPORT, AND OPTICAL ALIGNMENT TESTING SUPPORT E. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE HSTP F. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH G. SPECIAL PROJECTS INCLUDING ORIGINS FORUM AND INDEPENDENT RESEARCH THIS CONTRACT INCLUDES AN ADDITIONAL TWO-YEAR PERIOD AFTER THE END OF HST'S SCIENCE-MISSION. THIS EXTRA TIME FOLLOWING THE CESSATION OF SCIENTIFIC OBSERVATIONS IS FOR TWO YEARS OF FOLLOW-ON ARCHIVAL RESEARCH. DURING THE FINAL TWO YEARS OF THE CONTRACT, ARCHIVAL OPERATIONS AND MAINTENANCE, AN ARCHIVAL RESEARCH PROPOSAL SELECTION PROCESS AND ASSOCIATED GRANT ADMINISTRATION, AND A PUBLIC OUTREACH PROGRAM WILL CONTINUE. DATA ANALYSIS SOFTWARE WILL ALSO BE MAINTAINED BUT AT A LOWER LEVEL OF SUPPORT SUCH THAT ONLY MODEST ENHANCEMENTS MAY STILL BE MADE. CONTINUING SUPPORT WILL ALSO INCLUDE THE COORDINATION OF DATA ANALYSIS SOFTWARE THAT IS PRODUCED BY THE ASTRONOMICAL COMMUNITY. ORIG PSC AR20$1.5M
Sep 23, 2022National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNAS503127541710THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT SPAN THE MAJOR PHASES OF THE MISSION BEGINNING WITH FORMULATION THROUGH DEVELOPMENT AND TESTING, AND ENDING ONE YEAR AFTER LAUNCH WITH THE INITIATION OF THE JAMES WEBB SPACE TELESCOPE (JWST) SCIENCE PROGRAM. THESE MAJOR ACTIVITIES ARE SEPARATED INTO THE BASELINE PROGRAM AND SPECIAL STUDIES. THE BASELINE PROGRAM INCLUDES: A. MISSION REQUIREMENTS ANALYSIS AND OBSERVATORY/MISSION DESIGN SUPPORT INCLUDING: TRADESTUDY GENERATION, SCIENCE AND OPERATIONS IMPACT ANALYSIS, SCIENCE SYSTEMS ENGINEERING SUPPORT, AND DESIGN REFERENCE MISSION ANALYSIS. B. GROUND SEGMENT DEVELOPMENT, TESTING, MAINTENANCE AND OPERATIONS INCLUDING: OPERATIONS SUPPORT OF SI, FGS, ISIM, AND OBSERVATORY INTEGRATION AND TEST (I&T), MISSION SIMULATIONS, AND DOCUMENTATION MAINTENANCE, AS WELL AS LOW COST OPERATIONS CONCEPTS. C. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, PROPOSAL MANAGEMENT AND USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE, SCIENCE COMMUNITY OUTREACH, AND STAFF RESEARCH. D. COMMISSIONING PERIOD AND ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION, OBSERVATION PLANNING AND SCHEDULING, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, AND ENGINEERING OPERATIONS SUPPORT. E. FLIGHT OPERATIONS INCLUDING: SUBSYSTEM (INCLUDING INSTRUMENTS) HEALTH AND SAFETY MONITORING, COMMAND GENERATION AND UPLOAD, SCHEDULE EXECUTION ASSURANCE, TRENDING, AND ANOMALY INVESTIGATION. F. SUPPORT AND EXECUTION OF THE ON-ORBIT COMMISSIONING PROGRAM. G. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE JWST PROJECT. H. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH. EXAMPLES OF SPECIAL PROJECT ACTIVITIES MAY INCLUDE: A. FOLLOW-ON MISSION STUDIES. B. ENGINEERING NECESSARY TO RESPOND TO NEW JWST PROJECT TASKS.$39.0M
Sep 16, 2022National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERGSFC0198106DNAS526555333314THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT INCLUDE THE FINAL SERVICING MISSION AND SUBSEQUENT OPERATIONS THROUGH END-OF-MISSION. THESE ACTIVITIES INCLUDE: A. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, MANAGEMENT OF THE PROPOSAL SELECTION, TIME ALLOCATION, AND GRANT AWARD COMMITTEE PROCESSES, AND SCIENCE COMMUNITY OUTREACH. B. ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION AND RECEIPT, OBSERVATION PLANNING AND SCHEDULING, UPDATING INSTRUMENT HANDBOOKS, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, ANOMALY INVESTIGATION SUPPORT, USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE AND ENGINEERING OPERATIONS SUPPORT. C. GROUND SYSTEM SUSTAINING ENGINEERING INCLUDING: SCIENCE OPERATION SYSTEM MAINTENANCE, INFRASTRUCTURE ADMINISTRATION AND SUPPORT, AND DOCUMENTATION MAINTENANCE D. SERVICING MISSION SUPPORT INCLUDING: PREPARATION AND EXECUTION OF THE OBSERVATORY VERIFICATION PROGRAM, INSTRUMENT DEVELOPMENT SUPPORT, AND OPTICAL ALIGNMENT TESTING SUPPORT E. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE HSTP F. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH G. SPECIAL PROJECTS INCLUDING ORIGINS FORUM AND INDEPENDENT RESEARCH THIS CONTRACT INCLUDES AN ADDITIONAL TWO-YEAR PERIOD AFTER THE END OF HST'S SCIENCE-MISSION. THIS EXTRA TIME FOLLOWING THE CESSATION OF SCIENTIFIC OBSERVATIONS IS FOR TWO YEARS OF FOLLOW-ON ARCHIVAL RESEARCH. DURING THE FINAL TWO YEARS OF THE CONTRACT, ARCHIVAL OPERATIONS AND MAINTENANCE, AN ARCHIVAL RESEARCH PROPOSAL SELECTION PROCESS AND ASSOCIATED GRANT ADMINISTRATION, AND A PUBLIC OUTREACH PROGRAM WILL CONTINUE. DATA ANALYSIS SOFTWARE WILL ALSO BE MAINTAINED BUT AT A LOWER LEVEL OF SUPPORT SUCH THAT ONLY MODEST ENHANCEMENTS MAY STILL BE MADE. CONTINUING SUPPORT WILL ALSO INCLUDE THE COORDINATION OF DATA ANALYSIS SOFTWARE THAT IS PRODUCED BY THE ASTRONOMICAL COMMUNITY. ORIG PSC AR20$11.5M
Sep 14, 2022National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC19C0054541715THIS CONTRACT IS FOR THE PRODUCTS AND SERVICES ASSOCIATED WITH THE DESIGN PHASE OF THE WIDE-FIELD INFRARED SURVEY TELESCOPE (WFIRST) SCIENCE OPERATIONS CENTER (SOC)$2.6M
Sep 14, 2022National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNAS503127541710THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT SPAN THE MAJOR PHASES OF THE MISSION BEGINNING WITH FORMULATION THROUGH DEVELOPMENT AND TESTING, AND ENDING ONE YEAR AFTER LAUNCH WITH THE INITIATION OF THE JAMES WEBB SPACE TELESCOPE (JWST) SCIENCE PROGRAM. THESE MAJOR ACTIVITIES ARE SEPARATED INTO THE BASELINE PROGRAM AND SPECIAL STUDIES. THE BASELINE PROGRAM INCLUDES: A. MISSION REQUIREMENTS ANALYSIS AND OBSERVATORY/MISSION DESIGN SUPPORT INCLUDING: TRADESTUDY GENERATION, SCIENCE AND OPERATIONS IMPACT ANALYSIS, SCIENCE SYSTEMS ENGINEERING SUPPORT, AND DESIGN REFERENCE MISSION ANALYSIS. B. GROUND SEGMENT DEVELOPMENT, TESTING, MAINTENANCE AND OPERATIONS INCLUDING: OPERATIONS SUPPORT OF SI, FGS, ISIM, AND OBSERVATORY INTEGRATION AND TEST (I&T), MISSION SIMULATIONS, AND DOCUMENTATION MAINTENANCE, AS WELL AS LOW COST OPERATIONS CONCEPTS. C. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, PROPOSAL MANAGEMENT AND USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE, SCIENCE COMMUNITY OUTREACH, AND STAFF RESEARCH. D. COMMISSIONING PERIOD AND ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION, OBSERVATION PLANNING AND SCHEDULING, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, AND ENGINEERING OPERATIONS SUPPORT. E. FLIGHT OPERATIONS INCLUDING: SUBSYSTEM (INCLUDING INSTRUMENTS) HEALTH AND SAFETY MONITORING, COMMAND GENERATION AND UPLOAD, SCHEDULE EXECUTION ASSURANCE, TRENDING, AND ANOMALY INVESTIGATION. F. SUPPORT AND EXECUTION OF THE ON-ORBIT COMMISSIONING PROGRAM. G. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE JWST PROJECT. H. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH. EXAMPLES OF SPECIAL PROJECT ACTIVITIES MAY INCLUDE: A. FOLLOW-ON MISSION STUDIES. B. ENGINEERING NECESSARY TO RESPOND TO NEW JWST PROJECT TASKS.$25.0M
Jul 27, 2022National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERGSFC0198106DNAS526555333314THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT INCLUDE THE FINAL SERVICING MISSION AND SUBSEQUENT OPERATIONS THROUGH END-OF-MISSION. THESE ACTIVITIES INCLUDE: A. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, MANAGEMENT OF THE PROPOSAL SELECTION, TIME ALLOCATION, AND GRANT AWARD COMMITTEE PROCESSES, AND SCIENCE COMMUNITY OUTREACH. B. ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION AND RECEIPT, OBSERVATION PLANNING AND SCHEDULING, UPDATING INSTRUMENT HANDBOOKS, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, ANOMALY INVESTIGATION SUPPORT, USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE AND ENGINEERING OPERATIONS SUPPORT. C. GROUND SYSTEM SUSTAINING ENGINEERING INCLUDING: SCIENCE OPERATION SYSTEM MAINTENANCE, INFRASTRUCTURE ADMINISTRATION AND SUPPORT, AND DOCUMENTATION MAINTENANCE D. SERVICING MISSION SUPPORT INCLUDING: PREPARATION AND EXECUTION OF THE OBSERVATORY VERIFICATION PROGRAM, INSTRUMENT DEVELOPMENT SUPPORT, AND OPTICAL ALIGNMENT TESTING SUPPORT E. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE HSTP F. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH G. SPECIAL PROJECTS INCLUDING ORIGINS FORUM AND INDEPENDENT RESEARCH THIS CONTRACT INCLUDES AN ADDITIONAL TWO-YEAR PERIOD AFTER THE END OF HST'S SCIENCE-MISSION. THIS EXTRA TIME FOLLOWING THE CESSATION OF SCIENTIFIC OBSERVATIONS IS FOR TWO YEARS OF FOLLOW-ON ARCHIVAL RESEARCH. DURING THE FINAL TWO YEARS OF THE CONTRACT, ARCHIVAL OPERATIONS AND MAINTENANCE, AN ARCHIVAL RESEARCH PROPOSAL SELECTION PROCESS AND ASSOCIATED GRANT ADMINISTRATION, AND A PUBLIC OUTREACH PROGRAM WILL CONTINUE. DATA ANALYSIS SOFTWARE WILL ALSO BE MAINTAINED BUT AT A LOWER LEVEL OF SUPPORT SUCH THAT ONLY MODEST ENHANCEMENTS MAY STILL BE MADE. CONTINUING SUPPORT WILL ALSO INCLUDE THE COORDINATION OF DATA ANALYSIS SOFTWARE THAT IS PRODUCED BY THE ASTRONOMICAL COMMUNITY. ORIG PSC AR20$15K
Jul 21, 2022National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNAS503127541710THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT SPAN THE MAJOR PHASES OF THE MISSION BEGINNING WITH FORMULATION THROUGH DEVELOPMENT AND TESTING, AND ENDING ONE YEAR AFTER LAUNCH WITH THE INITIATION OF THE JAMES WEBB SPACE TELESCOPE (JWST) SCIENCE PROGRAM. THESE MAJOR ACTIVITIES ARE SEPARATED INTO THE BASELINE PROGRAM AND SPECIAL STUDIES. THE BASELINE PROGRAM INCLUDES: A. MISSION REQUIREMENTS ANALYSIS AND OBSERVATORY/MISSION DESIGN SUPPORT INCLUDING: TRADESTUDY GENERATION, SCIENCE AND OPERATIONS IMPACT ANALYSIS, SCIENCE SYSTEMS ENGINEERING SUPPORT, AND DESIGN REFERENCE MISSION ANALYSIS. B. GROUND SEGMENT DEVELOPMENT, TESTING, MAINTENANCE AND OPERATIONS INCLUDING: OPERATIONS SUPPORT OF SI, FGS, ISIM, AND OBSERVATORY INTEGRATION AND TEST (I&T), MISSION SIMULATIONS, AND DOCUMENTATION MAINTENANCE, AS WELL AS LOW COST OPERATIONS CONCEPTS. C. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, PROPOSAL MANAGEMENT AND USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE, SCIENCE COMMUNITY OUTREACH, AND STAFF RESEARCH. D. COMMISSIONING PERIOD AND ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION, OBSERVATION PLANNING AND SCHEDULING, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, AND ENGINEERING OPERATIONS SUPPORT. E. FLIGHT OPERATIONS INCLUDING: SUBSYSTEM (INCLUDING INSTRUMENTS) HEALTH AND SAFETY MONITORING, COMMAND GENERATION AND UPLOAD, SCHEDULE EXECUTION ASSURANCE, TRENDING, AND ANOMALY INVESTIGATION. F. SUPPORT AND EXECUTION OF THE ON-ORBIT COMMISSIONING PROGRAM. G. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE JWST PROJECT. H. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH. EXAMPLES OF SPECIAL PROJECT ACTIVITIES MAY INCLUDE: A. FOLLOW-ON MISSION STUDIES. B. ENGINEERING NECESSARY TO RESPOND TO NEW JWST PROJECT TASKS.$15.0M
Jul 1, 2022National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC19C0054541715THIS CONTRACT IS FOR THE PRODUCTS AND SERVICES ASSOCIATED WITH THE DESIGN PHASE OF THE WIDE-FIELD INFRARED SURVEY TELESCOPE (WFIRST) SCIENCE OPERATIONS CENTER (SOC)$4.7M
Jun 30, 2022National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNAS503127541710THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT SPAN THE MAJOR PHASES OF THE MISSION BEGINNING WITH FORMULATION THROUGH DEVELOPMENT AND TESTING, AND ENDING ONE YEAR AFTER LAUNCH WITH THE INITIATION OF THE JAMES WEBB SPACE TELESCOPE (JWST) SCIENCE PROGRAM. THESE MAJOR ACTIVITIES ARE SEPARATED INTO THE BASELINE PROGRAM AND SPECIAL STUDIES. THE BASELINE PROGRAM INCLUDES: A. MISSION REQUIREMENTS ANALYSIS AND OBSERVATORY/MISSION DESIGN SUPPORT INCLUDING: TRADESTUDY GENERATION, SCIENCE AND OPERATIONS IMPACT ANALYSIS, SCIENCE SYSTEMS ENGINEERING SUPPORT, AND DESIGN REFERENCE MISSION ANALYSIS. B. GROUND SEGMENT DEVELOPMENT, TESTING, MAINTENANCE AND OPERATIONS INCLUDING: OPERATIONS SUPPORT OF SI, FGS, ISIM, AND OBSERVATORY INTEGRATION AND TEST (I&T), MISSION SIMULATIONS, AND DOCUMENTATION MAINTENANCE, AS WELL AS LOW COST OPERATIONS CONCEPTS. C. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, PROPOSAL MANAGEMENT AND USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE, SCIENCE COMMUNITY OUTREACH, AND STAFF RESEARCH. D. COMMISSIONING PERIOD AND ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION, OBSERVATION PLANNING AND SCHEDULING, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, AND ENGINEERING OPERATIONS SUPPORT. E. FLIGHT OPERATIONS INCLUDING: SUBSYSTEM (INCLUDING INSTRUMENTS) HEALTH AND SAFETY MONITORING, COMMAND GENERATION AND UPLOAD, SCHEDULE EXECUTION ASSURANCE, TRENDING, AND ANOMALY INVESTIGATION. F. SUPPORT AND EXECUTION OF THE ON-ORBIT COMMISSIONING PROGRAM. G. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE JWST PROJECT. H. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH. EXAMPLES OF SPECIAL PROJECT ACTIVITIES MAY INCLUDE: A. FOLLOW-ON MISSION STUDIES. B. ENGINEERING NECESSARY TO RESPOND TO NEW JWST PROJECT TASKS.$20.0M
May 25, 2022National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERGSFC0198106DNAS526555333314THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT INCLUDE THE FINAL SERVICING MISSION AND SUBSEQUENT OPERATIONS THROUGH END-OF-MISSION. THESE ACTIVITIES INCLUDE: A. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, MANAGEMENT OF THE PROPOSAL SELECTION, TIME ALLOCATION, AND GRANT AWARD COMMITTEE PROCESSES, AND SCIENCE COMMUNITY OUTREACH. B. ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION AND RECEIPT, OBSERVATION PLANNING AND SCHEDULING, UPDATING INSTRUMENT HANDBOOKS, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, ANOMALY INVESTIGATION SUPPORT, USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE AND ENGINEERING OPERATIONS SUPPORT. C. GROUND SYSTEM SUSTAINING ENGINEERING INCLUDING: SCIENCE OPERATION SYSTEM MAINTENANCE, INFRASTRUCTURE ADMINISTRATION AND SUPPORT, AND DOCUMENTATION MAINTENANCE D. SERVICING MISSION SUPPORT INCLUDING: PREPARATION AND EXECUTION OF THE OBSERVATORY VERIFICATION PROGRAM, INSTRUMENT DEVELOPMENT SUPPORT, AND OPTICAL ALIGNMENT TESTING SUPPORT E. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE HSTP F. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH G. SPECIAL PROJECTS INCLUDING ORIGINS FORUM AND INDEPENDENT RESEARCH THIS CONTRACT INCLUDES AN ADDITIONAL TWO-YEAR PERIOD AFTER THE END OF HST'S SCIENCE-MISSION. THIS EXTRA TIME FOLLOWING THE CESSATION OF SCIENTIFIC OBSERVATIONS IS FOR TWO YEARS OF FOLLOW-ON ARCHIVAL RESEARCH. DURING THE FINAL TWO YEARS OF THE CONTRACT, ARCHIVAL OPERATIONS AND MAINTENANCE, AN ARCHIVAL RESEARCH PROPOSAL SELECTION PROCESS AND ASSOCIATED GRANT ADMINISTRATION, AND A PUBLIC OUTREACH PROGRAM WILL CONTINUE. DATA ANALYSIS SOFTWARE WILL ALSO BE MAINTAINED BUT AT A LOWER LEVEL OF SUPPORT SUCH THAT ONLY MODEST ENHANCEMENTS MAY STILL BE MADE. CONTINUING SUPPORT WILL ALSO INCLUDE THE COORDINATION OF DATA ANALYSIS SOFTWARE THAT IS PRODUCED BY THE ASTRONOMICAL COMMUNITY. ORIG PSC AR20$2.4M
May 16, 2022National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNAS503127541710THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT SPAN THE MAJOR PHASES OF THE MISSION BEGINNING WITH FORMULATION THROUGH DEVELOPMENT AND TESTING, AND ENDING ONE YEAR AFTER LAUNCH WITH THE INITIATION OF THE JAMES WEBB SPACE TELESCOPE (JWST) SCIENCE PROGRAM. THESE MAJOR ACTIVITIES ARE SEPARATED INTO THE BASELINE PROGRAM AND SPECIAL STUDIES. THE BASELINE PROGRAM INCLUDES: A. MISSION REQUIREMENTS ANALYSIS AND OBSERVATORY/MISSION DESIGN SUPPORT INCLUDING: TRADESTUDY GENERATION, SCIENCE AND OPERATIONS IMPACT ANALYSIS, SCIENCE SYSTEMS ENGINEERING SUPPORT, AND DESIGN REFERENCE MISSION ANALYSIS. B. GROUND SEGMENT DEVELOPMENT, TESTING, MAINTENANCE AND OPERATIONS INCLUDING: OPERATIONS SUPPORT OF SI, FGS, ISIM, AND OBSERVATORY INTEGRATION AND TEST (I&T), MISSION SIMULATIONS, AND DOCUMENTATION MAINTENANCE, AS WELL AS LOW COST OPERATIONS CONCEPTS. C. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, PROPOSAL MANAGEMENT AND USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE, SCIENCE COMMUNITY OUTREACH, AND STAFF RESEARCH. D. COMMISSIONING PERIOD AND ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION, OBSERVATION PLANNING AND SCHEDULING, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, AND ENGINEERING OPERATIONS SUPPORT. E. FLIGHT OPERATIONS INCLUDING: SUBSYSTEM (INCLUDING INSTRUMENTS) HEALTH AND SAFETY MONITORING, COMMAND GENERATION AND UPLOAD, SCHEDULE EXECUTION ASSURANCE, TRENDING, AND ANOMALY INVESTIGATION. F. SUPPORT AND EXECUTION OF THE ON-ORBIT COMMISSIONING PROGRAM. G. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE JWST PROJECT. H. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH. EXAMPLES OF SPECIAL PROJECT ACTIVITIES MAY INCLUDE: A. FOLLOW-ON MISSION STUDIES. B. ENGINEERING NECESSARY TO RESPOND TO NEW JWST PROJECT TASKS.$21.5M
Apr 29, 2022National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERGSFC0198106DNAS526555333314THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT INCLUDE THE FINAL SERVICING MISSION AND SUBSEQUENT OPERATIONS THROUGH END-OF-MISSION. THESE ACTIVITIES INCLUDE: A. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, MANAGEMENT OF THE PROPOSAL SELECTION, TIME ALLOCATION, AND GRANT AWARD COMMITTEE PROCESSES, AND SCIENCE COMMUNITY OUTREACH. B. ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION AND RECEIPT, OBSERVATION PLANNING AND SCHEDULING, UPDATING INSTRUMENT HANDBOOKS, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, ANOMALY INVESTIGATION SUPPORT, USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE AND ENGINEERING OPERATIONS SUPPORT. C. GROUND SYSTEM SUSTAINING ENGINEERING INCLUDING: SCIENCE OPERATION SYSTEM MAINTENANCE, INFRASTRUCTURE ADMINISTRATION AND SUPPORT, AND DOCUMENTATION MAINTENANCE D. SERVICING MISSION SUPPORT INCLUDING: PREPARATION AND EXECUTION OF THE OBSERVATORY VERIFICATION PROGRAM, INSTRUMENT DEVELOPMENT SUPPORT, AND OPTICAL ALIGNMENT TESTING SUPPORT E. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE HSTP F. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH G. SPECIAL PROJECTS INCLUDING ORIGINS FORUM AND INDEPENDENT RESEARCH THIS CONTRACT INCLUDES AN ADDITIONAL TWO-YEAR PERIOD AFTER THE END OF HST'S SCIENCE-MISSION. THIS EXTRA TIME FOLLOWING THE CESSATION OF SCIENTIFIC OBSERVATIONS IS FOR TWO YEARS OF FOLLOW-ON ARCHIVAL RESEARCH. DURING THE FINAL TWO YEARS OF THE CONTRACT, ARCHIVAL OPERATIONS AND MAINTENANCE, AN ARCHIVAL RESEARCH PROPOSAL SELECTION PROCESS AND ASSOCIATED GRANT ADMINISTRATION, AND A PUBLIC OUTREACH PROGRAM WILL CONTINUE. DATA ANALYSIS SOFTWARE WILL ALSO BE MAINTAINED BUT AT A LOWER LEVEL OF SUPPORT SUCH THAT ONLY MODEST ENHANCEMENTS MAY STILL BE MADE. CONTINUING SUPPORT WILL ALSO INCLUDE THE COORDINATION OF DATA ANALYSIS SOFTWARE THAT IS PRODUCED BY THE ASTRONOMICAL COMMUNITY. ORIG PSC AR20$32.0M
Mar 29, 2022National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERGSFC0198106DNAS526555333314THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT INCLUDE THE FINAL SERVICING MISSION AND SUBSEQUENT OPERATIONS THROUGH END-OF-MISSION. THESE ACTIVITIES INCLUDE: A. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, MANAGEMENT OF THE PROPOSAL SELECTION, TIME ALLOCATION, AND GRANT AWARD COMMITTEE PROCESSES, AND SCIENCE COMMUNITY OUTREACH. B. ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION AND RECEIPT, OBSERVATION PLANNING AND SCHEDULING, UPDATING INSTRUMENT HANDBOOKS, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, ANOMALY INVESTIGATION SUPPORT, USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE AND ENGINEERING OPERATIONS SUPPORT. C. GROUND SYSTEM SUSTAINING ENGINEERING INCLUDING: SCIENCE OPERATION SYSTEM MAINTENANCE, INFRASTRUCTURE ADMINISTRATION AND SUPPORT, AND DOCUMENTATION MAINTENANCE D. SERVICING MISSION SUPPORT INCLUDING: PREPARATION AND EXECUTION OF THE OBSERVATORY VERIFICATION PROGRAM, INSTRUMENT DEVELOPMENT SUPPORT, AND OPTICAL ALIGNMENT TESTING SUPPORT E. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE HSTP F. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH G. SPECIAL PROJECTS INCLUDING ORIGINS FORUM AND INDEPENDENT RESEARCH THIS CONTRACT INCLUDES AN ADDITIONAL TWO-YEAR PERIOD AFTER THE END OF HST'S SCIENCE-MISSION. THIS EXTRA TIME FOLLOWING THE CESSATION OF SCIENTIFIC OBSERVATIONS IS FOR TWO YEARS OF FOLLOW-ON ARCHIVAL RESEARCH. DURING THE FINAL TWO YEARS OF THE CONTRACT, ARCHIVAL OPERATIONS AND MAINTENANCE, AN ARCHIVAL RESEARCH PROPOSAL SELECTION PROCESS AND ASSOCIATED GRANT ADMINISTRATION, AND A PUBLIC OUTREACH PROGRAM WILL CONTINUE. DATA ANALYSIS SOFTWARE WILL ALSO BE MAINTAINED BUT AT A LOWER LEVEL OF SUPPORT SUCH THAT ONLY MODEST ENHANCEMENTS MAY STILL BE MADE. CONTINUING SUPPORT WILL ALSO INCLUDE THE COORDINATION OF DATA ANALYSIS SOFTWARE THAT IS PRODUCED BY THE ASTRONOMICAL COMMUNITY. ORIG PSC AR20$2.9M
Mar 23, 2022National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC19C0054541715THIS CONTRACT IS FOR THE PRODUCTS AND SERVICES ASSOCIATED WITH THE DESIGN PHASE OF THE WIDE-FIELD INFRARED SURVEY TELESCOPE (WFIRST) SCIENCE OPERATIONS CENTER (SOC)$5.4M

Get Alerted Before Association Of Universities For Research In Astronomy, INC.'s Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free