Federal Contractor Profile
Brasfield & Gorrie LLC
$2.6B obligated·51 awards·7 agencies·2 NAICS
Federal Contracts
Showing contracts 401–450 of 600 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Aug 17, 2020 | General Services AdministrationPBS R7 PROG SUPPORT - CAPITAL AND IDIQ | 47PH0818C0002 | 236220 | EO14042: NEW U.S. COURTHOUSE - SAN ANTONIO, TX THIS MODIFICATION IS ISSUED TO ADD FAR CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021)(DEVIATION) | $7K |
| Aug 12, 2020 | General Services AdministrationPBS R4 AMD CAPITAL/AE BRANCH | 47PE0318C0004 | 236220 | EO14042: COVID-19 2020 FAR CLAUSE 52.223-99 | $1.4M |
| Aug 10, 2020 | General Services AdministrationPBS R7 PROG SUPPORT - CAPITAL AND IDIQ | 47PH0818C0002 | 236220 | EO14042: NEW U.S. COURTHOUSE - SAN ANTONIO, TX THIS MODIFICATION IS ISSUED TO ADD FAR CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021)(DEVIATION) | $149K |
| Aug 7, 2020 | General Services AdministrationPBS R7 PROG SUPPORT - CAPITAL AND IDIQ | 47PH0819C0001 | 236220 | EO14042: COVID-19 SAFETY PROTOCOLS - HEBERT FEDERAL BUILDING, NEW ORLEANS, LA | $46K |
| Aug 3, 2020 | General Services AdministrationPBS R7 PROG SUPPORT - CAPITAL AND IDIQ | 47PH0818C0002 | 236220 | EO14042: NEW U.S. COURTHOUSE - SAN ANTONIO, TX THIS MODIFICATION IS ISSUED TO ADD FAR CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021)(DEVIATION) | $62K |
| Jul 29, 2020 | General Services AdministrationPBS R4 AMD CAPITAL/AE BRANCH | 47PE0317C0004 | 236220 | IGF::OT::IGF NOT INHERENTLY GOVERNMENTAL, CONSTRUCTION MANAGER AS CONSTRUCTOR CONTRACT TO CONSTRUCT THE NEW U.S. COURTHOUSE IN GREENVILLE, SC. | $213K |
| Jul 27, 2020 | General Services AdministrationPBS R7 PROG SUPPORT - CAPITAL AND IDIQ | 47PH0818C0002 | 236220 | EO14042: NEW U.S. COURTHOUSE - SAN ANTONIO, TX THIS MODIFICATION IS ISSUED TO ADD FAR CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021)(DEVIATION) | $153K |
| Jul 24, 2020 | General Services AdministrationPBS R4 AMD CAPITAL/AE BRANCH | 47PE0318C0004 | 236220 | EO14042: COVID-19 2020 FAR CLAUSE 52.223-99 | $481K |
| Jul 21, 2020 | General Services AdministrationPBS R4 AMD CAPITAL/AE BRANCH | 47PE0318C0004 | 236220 | EO14042: COVID-19 2020 FAR CLAUSE 52.223-99 | $108K |
| Jul 16, 2020 | General Services AdministrationPBS R7 PROG SUPPORT - CAPITAL AND IDIQ | 47PH0818C0002 | 236220 | EO14042: NEW U.S. COURTHOUSE - SAN ANTONIO, TX THIS MODIFICATION IS ISSUED TO ADD FAR CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021)(DEVIATION) | $234K |
| Jun 30, 2020 | General Services AdministrationPBS R7 PROG SUPPORT - CAPITAL AND IDIQ | 47PH0819C0001 | 236220 | EO14042: COVID-19 SAFETY PROTOCOLS - HEBERT FEDERAL BUILDING, NEW ORLEANS, LA | $12K |
| Jun 26, 2020 | General Services AdministrationPBS R4 AMD CAPITAL/AE BRANCH | 47PE0318C0004 | 236220 | EO14042: COVID-19 2020 FAR CLAUSE 52.223-99 | $1.4M |
| Jun 25, 2020 | General Services AdministrationPBS R7 PROG SUPPORT - CAPITAL AND IDIQ | 47PH0819C0001 | 236220 | EO14042: COVID-19 SAFETY PROTOCOLS - HEBERT FEDERAL BUILDING, NEW ORLEANS, LA | $4K |
| Jun 18, 2020 | General Services AdministrationPBS R7 PROG SUPPORT - CAPITAL AND IDIQ | 47PH0819C0001 | 236220 | EO14042: COVID-19 SAFETY PROTOCOLS - HEBERT FEDERAL BUILDING, NEW ORLEANS, LA | $30K |
| Jun 18, 2020 | General Services AdministrationPBS R7 PROG SUPPORT - CAPITAL AND IDIQ | 47PH0818C0002 | 236220 | EO14042: NEW U.S. COURTHOUSE - SAN ANTONIO, TX THIS MODIFICATION IS ISSUED TO ADD FAR CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021)(DEVIATION) | $274K |
| Jun 10, 2020 | General Services AdministrationPBS R4 AMD CAPITAL/AE BRANCH | 47PE0317C0004 | 236220 | IGF::OT::IGF NOT INHERENTLY GOVERNMENTAL, CONSTRUCTION MANAGER AS CONSTRUCTOR CONTRACT TO CONSTRUCT THE NEW U.S. COURTHOUSE IN GREENVILLE, SC. | $208K |
| Jun 4, 2020 | General Services AdministrationPBS R7 PROG SUPPORT - CAPITAL AND IDIQ | 47PH0818C0002 | 236220 | EO14042: NEW U.S. COURTHOUSE - SAN ANTONIO, TX THIS MODIFICATION IS ISSUED TO ADD FAR CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021)(DEVIATION) | $14K |
| May 21, 2020 | General Services AdministrationPBS R7 PROG SUPPORT - CAPITAL AND IDIQ | 47PH0818C0002 | 236220 | EO14042: NEW U.S. COURTHOUSE - SAN ANTONIO, TX THIS MODIFICATION IS ISSUED TO ADD FAR CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021)(DEVIATION) | $339K |
| May 14, 2020 | General Services AdministrationPBS R7 PROG SUPPORT - CAPITAL AND IDIQ | 47PH0818C0002 | 236220 | EO14042: NEW U.S. COURTHOUSE - SAN ANTONIO, TX THIS MODIFICATION IS ISSUED TO ADD FAR CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021)(DEVIATION) | $14K |
| May 1, 2020 | General Services AdministrationPBS R7 PROG SUPPORT - CAPITAL AND IDIQ | 47PH0818C0002 | 236220 | EO14042: NEW U.S. COURTHOUSE - SAN ANTONIO, TX THIS MODIFICATION IS ISSUED TO ADD FAR CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021)(DEVIATION) | $8K |
| Apr 17, 2020 | General Services AdministrationPBS R7 PROG SUPPORT - CAPITAL AND IDIQ | 47PH0819C0001 | 236220 | EO14042: COVID-19 SAFETY PROTOCOLS - HEBERT FEDERAL BUILDING, NEW ORLEANS, LA | $234K |
| Apr 14, 2020 | General Services AdministrationPBS R4 AMD CAPITAL/AE BRANCH | 47PE0318C0004 | 236220 | EO14042: COVID-19 2020 FAR CLAUSE 52.223-99 | $407K |
| Apr 10, 2020 | General Services AdministrationPBS R7 PROG SUPPORT - CAPITAL AND IDIQ | 47PH0819C0001 | 236220 | EO14042: COVID-19 SAFETY PROTOCOLS - HEBERT FEDERAL BUILDING, NEW ORLEANS, LA | $20K |
| Mar 27, 2020 | General Services AdministrationPBS R7 PROG SUPPORT - CAPITAL AND IDIQ | 47PH0819C0001 | 236220 | EO14042: COVID-19 SAFETY PROTOCOLS - HEBERT FEDERAL BUILDING, NEW ORLEANS, LA | $31K |
| Mar 27, 2020 | General Services AdministrationPBS R4 AMD CAPITAL/AE BRANCH | 47PE0318C0004 | 236220 | EO14042: COVID-19 2020 FAR CLAUSE 52.223-99 | $253K |
| Mar 26, 2020 | General Services AdministrationPBS R7 PROG SUPPORT - CAPITAL AND IDIQ | 47PH0818C0002 | 236220 | EO14042: NEW U.S. COURTHOUSE - SAN ANTONIO, TX THIS MODIFICATION IS ISSUED TO ADD FAR CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021)(DEVIATION) | $75K |
| Mar 12, 2020 | General Services AdministrationPBS R4 AMD CAPITAL/AE BRANCH | 47PE0317C0004 | 236220 | IGF::OT::IGF NOT INHERENTLY GOVERNMENTAL, CONSTRUCTION MANAGER AS CONSTRUCTOR CONTRACT TO CONSTRUCT THE NEW U.S. COURTHOUSE IN GREENVILLE, SC. | $253K |
| Mar 10, 2020 | General Services AdministrationPBS R7 PROG SUPPORT - CAPITAL AND IDIQ | 47PH0818C0002 | 236220 | EO14042: NEW U.S. COURTHOUSE - SAN ANTONIO, TX THIS MODIFICATION IS ISSUED TO ADD FAR CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021)(DEVIATION) | $17K |
| Mar 4, 2020 | General Services AdministrationPBS R7 PROG SUPPORT - CAPITAL AND IDIQ | 47PH0818C0002 | 236220 | EO14042: NEW U.S. COURTHOUSE - SAN ANTONIO, TX THIS MODIFICATION IS ISSUED TO ADD FAR CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021)(DEVIATION) | $467K |
| Feb 27, 2020 | General Services AdministrationPBS R7 PROG SUPPORT - CAPITAL AND IDIQ | 47PH0818C0002 | 236220 | EO14042: NEW U.S. COURTHOUSE - SAN ANTONIO, TX THIS MODIFICATION IS ISSUED TO ADD FAR CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021)(DEVIATION) | $124K |
| Jan 16, 2020 | General Services AdministrationPBS R4 AMD CAPITAL/AE BRANCH | 47PE0317C0004 | 236220 | IGF::OT::IGF NOT INHERENTLY GOVERNMENTAL, CONSTRUCTION MANAGER AS CONSTRUCTOR CONTRACT TO CONSTRUCT THE NEW U.S. COURTHOUSE IN GREENVILLE, SC. | $396K |
| Dec 31, 2019 | General Services AdministrationPBS R4 AMD CAPITAL/AE BRANCH | 47PE0317C0004 | 236220 | IGF::OT::IGF NOT INHERENTLY GOVERNMENTAL, CONSTRUCTION MANAGER AS CONSTRUCTOR CONTRACT TO CONSTRUCT THE NEW U.S. COURTHOUSE IN GREENVILLE, SC. | $493K |
| Dec 23, 2019 | General Services AdministrationPBS R7 - PROG SUPPORT BRANCH SPEC | 47PH0120D0002 | 236220 | IDIQ TO PROVIDE CONSTRUCTION SERVICES TO INCLUDE BUT NOT LIMITED TO NEW CONSTRUCTION/DESIGN-BUILD SERVICES. PERIOD OF PERFORMANCE: ONE YEAR BASE WITH 4 ONE YEAR OPTION YEARS. PLACE OF PERFORMANCE IS THE CONTINENTAL US. | $1K |
| Dec 16, 2019 | General Services AdministrationPBS R7 PROG SUPPORT - CAPITAL AND IDIQ | 47PH0818C0002 | 236220 | EO14042: NEW U.S. COURTHOUSE - SAN ANTONIO, TX THIS MODIFICATION IS ISSUED TO ADD FAR CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021)(DEVIATION) | $68K |
| Dec 11, 2019 | General Services AdministrationPBS R7 PROG SUPPORT - CAPITAL AND IDIQ | 47PH0818C0002 | 236220 | EO14042: NEW U.S. COURTHOUSE - SAN ANTONIO, TX THIS MODIFICATION IS ISSUED TO ADD FAR CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021)(DEVIATION) | $35K |
| Nov 26, 2019 | General Services AdministrationPBS R7 PROG SUPPORT - CAPITAL AND IDIQ | 47PH0818C0002 | 236220 | EO14042: NEW U.S. COURTHOUSE - SAN ANTONIO, TX THIS MODIFICATION IS ISSUED TO ADD FAR CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021)(DEVIATION) | $11K |
| Nov 19, 2019 | General Services AdministrationPBS R4 AMD CAPITAL/AE BRANCH | 47PE0318C0004 | 236220 | EO14042: COVID-19 2020 FAR CLAUSE 52.223-99 | $854K |
| Nov 13, 2019 | General Services AdministrationPBS R4 AMD CAPITAL/AE BRANCH | 47PE0317C0004 | 236220 | IGF::OT::IGF NOT INHERENTLY GOVERNMENTAL, CONSTRUCTION MANAGER AS CONSTRUCTOR CONTRACT TO CONSTRUCT THE NEW U.S. COURTHOUSE IN GREENVILLE, SC. | $421K |
| Nov 12, 2019 | General Services AdministrationPBS R7 PROG SUPPORT - CAPITAL AND IDIQ | 47PH0818C0002 | 236220 | EO14042: NEW U.S. COURTHOUSE - SAN ANTONIO, TX THIS MODIFICATION IS ISSUED TO ADD FAR CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021)(DEVIATION) | $48K |
| Nov 4, 2019 | General Services AdministrationPBS R7 PROG SUPPORT - CAPITAL AND IDIQ | GS07P15HHC7001 | 236220 | IGF::OT::IGF CONSTRUCTION SERVICES, LAREDO 1&2 PORTS OF ENTRY, LAREDO, TEXAS AWARD OF THE BASE WORK WHICH IS FOR JUAREZ-LINCOLN, BRIDGE 2. | $554K |
| Oct 28, 2019 | General Services AdministrationPBS R7 PROG SUPPORT - CAPITAL AND IDIQ | 47PH0818C0002 | 236220 | EO14042: NEW U.S. COURTHOUSE - SAN ANTONIO, TX THIS MODIFICATION IS ISSUED TO ADD FAR CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021)(DEVIATION) | $15K |
| Oct 25, 2019 | Department of DefenseW074 ENDIST SAVANNAH | W912HN20F3000 | 236220 | TO FOR MINIMUM GUARANTEE | $3K |
| Oct 21, 2019 | General Services AdministrationPBS R7 PROG SUPPORT - CAPITAL AND IDIQ | 47PH0818C0002 | 236220 | EO14042: NEW U.S. COURTHOUSE - SAN ANTONIO, TX THIS MODIFICATION IS ISSUED TO ADD FAR CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021)(DEVIATION) | $27K |
| Oct 17, 2019 | General Services AdministrationPBS R4 AMD CAPITAL/AE BRANCH | 47PE0318C0004 | 236220 | EO14042: COVID-19 2020 FAR CLAUSE 52.223-99 | $188K |
| Oct 10, 2019 | General Services AdministrationPBS R7 PROG SUPPORT - CAPITAL AND IDIQ | 47PH0818C0002 | 236220 | EO14042: NEW U.S. COURTHOUSE - SAN ANTONIO, TX THIS MODIFICATION IS ISSUED TO ADD FAR CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021)(DEVIATION) | $407K |
| Sep 30, 2019 | Department of JusticeFBI-JEH | 15F06719F002682 | 236220 | REGIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT, REGION 1, MINIMUM GUARANTEE | $5K |
| Sep 24, 2019 | General Services AdministrationPBS R7 PROG SUPPORT - CAPITAL AND IDIQ | 47PH0818C0002 | 236220 | EO14042: NEW U.S. COURTHOUSE - SAN ANTONIO, TX THIS MODIFICATION IS ISSUED TO ADD FAR CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021)(DEVIATION) | $15K |
| Sep 16, 2019 | General Services AdministrationPBS R7 PROG SUPPORT - CAPITAL AND IDIQ | 47PH0818C0002 | 236220 | EO14042: NEW U.S. COURTHOUSE - SAN ANTONIO, TX THIS MODIFICATION IS ISSUED TO ADD FAR CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021)(DEVIATION) | $441K |
| Sep 10, 2019 | General Services AdministrationPBS R7 PROG SUPPORT - CAPITAL AND IDIQ | 47PH0818C0002 | 236220 | EO14042: NEW U.S. COURTHOUSE - SAN ANTONIO, TX THIS MODIFICATION IS ISSUED TO ADD FAR CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021)(DEVIATION) | $95K |
| Aug 21, 2019 | General Services AdministrationPBS R4 AMD CAPITAL/AE BRANCH | 47PE0318C0004 | 236220 | EO14042: COVID-19 2020 FAR CLAUSE 52.223-99 | $307K |
Get Alerted Before Brasfield & Gorrie LLC's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.