Home/Contractors/Dcm Architecture & Engineering, LLC/contracts

Federal Contractor Profile

Dcm Architecture & Engineering, LLC

$154M obligated·143 awards·8 agencies·16 NAICS

Federal Contracts

Showing contracts 251300 of 426 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Apr 15, 2019General Services AdministrationPBS R2 NEWARK FIELD OFFICE47PC1019F0010236220THIS IS A DESIGN BUILD PROJECT$299K
Apr 9, 2019General Services AdministrationPBS R3 ACQ MGMT DIV NORTHGS03P17AZC0005236220IGF::OT::IGF SECURITY PROJECT AT THE MATSSC, 300 SPRING GARDEN ST, PHILADELPHIA, PA$74K
Apr 2, 2019General Services AdministrationPBS R2 CAPITAL CONSTRUCTION BRANCH47PC0318F0043236220IGF::OT::IGF CONSTRUCTION SERVICES - USCIS (PETER W. RODINO FOB)$64K
Feb 14, 2019General Services AdministrationPBS R2 NEWARK FIELD OFFICEGS02P16PEC7023236220MARTIN L. KING, JR. FEDERAL COURTHOUSE NEWARK, NJ COURTROOM 3C RENOVATIONS IGF::OT::IGF$6K
Feb 13, 2019General Services AdministrationPBS R3 ACQ MGMT DIV NORTHGS03P17AZC0005236220IGF::OT::IGF SECURITY PROJECT AT THE MATSSC, 300 SPRING GARDEN ST, PHILADELPHIA, PA$46K
Feb 8, 2019General Services AdministrationPBS R2 CAPITAL CONSTRUCTION BRANCH47PC0318F0043236220IGF::OT::IGF CONSTRUCTION SERVICES - USCIS (PETER W. RODINO FOB)$82K
Feb 7, 2019Department of Transportation693JF7 DOT MARITIME ADMINISTRATIONDTMA91C1600013541330DCM ARCHITECT AND ENGINEERING LLC IGF::OT::IGF FOR OTHER FUNCTIONS$35K
Dec 19, 2018General Services AdministrationPBS R2 CAPITAL CONSTRUCTION BRANCH47PC0318F0043236220IGF::OT::IGF CONSTRUCTION SERVICES - USCIS (PETER W. RODINO FOB)$21K
Nov 29, 2018General Services AdministrationPBS R11 BUILDING SERVICES DIVISION CENTER 3GS11P17ZGC0001561210IGF::OT::IGF GENERATOR PREVENTIVE MAINTENANCE SERVICES AT THE HUBERT C. HOOVER BUILDING. BASE AWARD. POP 12/1/2016 - 11/30/2017$106K
Nov 20, 2018General Services AdministrationPBS R2 CAPITAL CONSTRUCTION BRANCH47PC0318F0043236220IGF::OT::IGF CONSTRUCTION SERVICES - USCIS (PETER W. RODINO FOB)$7K
Nov 8, 2018General Services AdministrationPBS R3 ACQ MGMT DIV NORTHGS03P17AZC0005236220IGF::OT::IGF SECURITY PROJECT AT THE MATSSC, 300 SPRING GARDEN ST, PHILADELPHIA, PA$159K
Oct 4, 2018General Services AdministrationPBS R2 NEWARK FIELD OFFICEGSP0217PE0014236220IGF::OT::IGF DESIGN BUILD RENOVATIONS FOR JUDGE WETTRE AT MLK FEDERAL COURTHOUSE, 50 WALNUT STREET, 3RD FLOOR, NEWARK, NJ.$1K
Oct 3, 2018General Services AdministrationPBS R3 ACQ MGMT DIV NORTHGS03P17AZC0005236220IGF::OT::IGF SECURITY PROJECT AT THE MATSSC, 300 SPRING GARDEN ST, PHILADELPHIA, PA$136K
Sep 27, 2018General Services AdministrationPBS R2 NEWARK FIELD OFFICE47PC1018F0056236220REPLACEMENT OF TWO BOILERS AT VA BUILDING IN NEWARK, NJ$900K
Sep 26, 2018General Services AdministrationPBS R11 SPECIAL PROGRAMS DIVISION ACQUISITION REGIONAL SUPPORTGS05P16ZGP7010561210IGF::OT::IGF ON SITE MECHANICAL SUPPORT AT HERBERT C. HOOVER BUILDING 1401 CONSTITUTION AVE, WASHINGTON DC.$159K
Aug 16, 2018General Services AdministrationPBS R3 ACQ MGMT DIV NORTHGS03P17AZC0005236220IGF::OT::IGF SECURITY PROJECT AT THE MATSSC, 300 SPRING GARDEN ST, PHILADELPHIA, PA$24K
Aug 9, 2018General Services AdministrationPBS R2 NEWARK FIELD OFFICE47PC1018F0001236220IGF::OT:IGF US BANKRUPTCY DESIGN BUILD SPACE CONSOLIDATION AT MARTIN LUTHER KING, JR. FEDERAL COURTHOUSE, NEWARK, NJ$16K
Aug 9, 2018General Services AdministrationPBS R3 ACQ MGMT DIV NORTHGS03P17AZC0005236220IGF::OT::IGF SECURITY PROJECT AT THE MATSSC, 300 SPRING GARDEN ST, PHILADELPHIA, PA$12K
Aug 3, 2018Department of DefenseW2SD ENDIST PHILADELPHIAW912BU18C0004238210MNDIF$22K
Jul 30, 2018Department of Transportation6923G2 DOT MARITIME ADMINISTRATION6923G218P000142323111IGF::OT::IGF 24X36 DESIGN RENDERING FOR LOWER ROOSEVELT FIELD PROJECT$350
Jul 26, 2018General Services AdministrationPBS R2 NEWARK FIELD OFFICE47PC1018F0043236220RENOVATION OF 2ND FLR RODINO FEDERAL OFFICE BUILDING FOR RELOCATION OF GSA NEW JERSEY FIELD OFFICE.$791K
Jul 19, 2018Department of Transportation693JF7 DOT MARITIME ADMINISTRATION693JF718C000009541330OLD SAN JUAN CRUISE SHIP AND FERRY PIERS CONDITION ASSESSMENTS OF SELECTED FACILITIES TASK ORDER 003$22K
Jul 19, 2018Department of Transportation693JF7 DOT MARITIME ADMINISTRATION693JF718C000012541330THE USDOT MARITIME ADMINISTRATION (MARAD) IN COOPERATION WITH THE PUERTO RICO PORT AUTHORITY (PRPA) AND FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA), SEEKS TO CONDUCT STRUCTURAL ASSESSMENTS AND ENVIRONMENTAL ANALYSIS RELATED TO IMMEDIATE AND LONG-TERM NEEDS FOR DISASTER RECOVERY IN PUERTO RICO. NAVY FRONTIER WHARF HAVE BEEN IDENTIFIED AS CRITICAL INFRASTRUCTURE NECESSARY TO MAINTAIN COMMERCE AND SUPPORT THE ECONOMY OF PUERTO RICO.$102K
Jul 19, 2018Department of Transportation693JF7 DOT MARITIME ADMINISTRATION693JF718C000021541330FUNDS FOR RA 1850 TASK 002A ARMY TERMINAL$42K
Jul 19, 2018Department of Transportation693JF7 DOT MARITIME ADMINISTRATION693JF718C000030541330RA 1850 TASK ORDER 9 ISLA GRANDE SOUTH PORT EXPANSION NEPA$27K
Jul 19, 2018Department of Transportation693JF7 DOT MARITIME ADMINISTRATION693JF718C000031541330THIS REQUISITION PROVIDES FUNDS IN THE AMOUNT OF $186,525.74 TO DCM ARCHITECTURE&ENGINEERING LLC FOR TASK 012 - FAJARDO FERRY TERMINAL. DCM SHALL PROVIDE PROFESSIONAL MANAGEMENT AND ENGINEERING SERVICES. THE PROJECT SCOPE ENCOMPASSES CONDUCTING STRUCTURAL ASSESSMENTS AND ENVIRONMENTAL ANALYSIS RELATED TO IMMEDIATE AND LONG-TERM NEEDS FOR DISASTER RECOVERY IN PUERTO RICO. THIS WORK HAS BEEN IDENTIFIED AS CRITICAL INFRASTRUCTURE NECESSARY TO MAINTAIN COMMERCE AND SUPPORT THE ECONOMY OF PUERTO RICO.$20K
Jul 16, 2018Department of Transportation693JF7 DOT MARITIME ADMINISTRATION693JF718C000006541330ROOSEVELT ROADS FACILITY ASSESSMENT$83K
Jul 13, 2018General Services AdministrationPBS R2 CAPITAL CONSTRUCTION BRANCH47PC0318F0043236220IGF::OT::IGF CONSTRUCTION SERVICES - USCIS (PETER W. RODINO FOB)$3.2M
Jul 13, 2018General Services AdministrationPBS R11 CONSTRUCTION SERVICES DIVSION CENTER 4GS11P16YTC7173236220IGF::OT::IGF DESIGN-BUILD HOT WATER LOOP AT THE NAC$5K
Jul 11, 2018Department of Transportation693JF7 DOT MARITIME ADMINISTRATION693JF718C000039541330THIS IS TO REDESIGN SAMUELS HALL 100% DESIGN ACCORDING TO CHANGES DIRECTED BY DAVE MOSKOFF AND JOHN DEMERS.$74K
Jul 2, 2018Department of Transportation693JF7 DOT MARITIME ADMINISTRATION693JF718C000027541330VEQUES FERRY TERMINAL CONDITION ASSESSMENTS OF SELECTED FACILITIES$52K
Jun 29, 2018Department of Transportation693JF7 DOT MARITIME ADMINISTRATION693JF718C000039541330THIS IS TO REDESIGN SAMUELS HALL 100% DESIGN ACCORDING TO CHANGES DIRECTED BY DAVE MOSKOFF AND JOHN DEMERS.$8K
Jun 28, 2018Department of Transportation6923G2 DOT MARITIME ADMINISTRATION6923G218P000142323111IGF::OT::IGF 24X36 DESIGN RENDERING FOR LOWER ROOSEVELT FIELD PROJECT$7K
Jun 25, 2018General Services AdministrationPBS R2 NEWARK FIELD OFFICEGSP0217PE0014236220IGF::OT::IGF DESIGN BUILD RENOVATIONS FOR JUDGE WETTRE AT MLK FEDERAL COURTHOUSE, 50 WALNUT STREET, 3RD FLOOR, NEWARK, NJ.$4K
Jun 14, 2018Department of AgricultureUSDA, OPPM/POD ACQ MGMT BRANCH WDC12314218C0012238220USDA HEADQUARTERS COMPLEX SUB CENTRAL PLANT REPLACEMENT OF CHILLER NO. 2$600K
Jun 11, 2018General Services AdministrationPBS R11 CONSTRUCTION SERVICES DIVSION CENTER 4GS11P16YTC7173236220IGF::OT::IGF DESIGN-BUILD HOT WATER LOOP AT THE NAC$663K
Jun 8, 2018General Services AdministrationPBS R3 ACQ MGMT DIV NORTHGS03P17AZC0005236220IGF::OT::IGF SECURITY PROJECT AT THE MATSSC, 300 SPRING GARDEN ST, PHILADELPHIA, PA$57K
May 21, 2018General Services AdministrationPBS R2 NEWARK FIELD OFFICE47PC1018F0001236220IGF::OT:IGF US BANKRUPTCY DESIGN BUILD SPACE CONSOLIDATION AT MARTIN LUTHER KING, JR. FEDERAL COURTHOUSE, NEWARK, NJ$14K
May 8, 2018General Services AdministrationPBS R3 ACQ MGMT DIV NORTHGS03P17AZC0005236220IGF::OT::IGF SECURITY PROJECT AT THE MATSSC, 300 SPRING GARDEN ST, PHILADELPHIA, PA$95K
Apr 30, 2018General Services AdministrationPBS R11 BUILDING SERVICES DIVISION CENTER 147PM0517C0018236220IGF::OT::IGF REPLACE SOFFITS&SILO LADDERS AT OWFN$73K
Apr 26, 2018Department of AgricultureUSDA ARS EBSC ACQUISTION BRANCHAG32SCC150078236220ARBOR HOUSE RENOVATION, USNA IGF::OT::IGF$7K
Apr 26, 2018General Services AdministrationPBS R11 CONSTRUCTION SERVICES DIVSION CENTER 4GS11P16YTC7173236220IGF::OT::IGF DESIGN-BUILD HOT WATER LOOP AT THE NAC$102K
Apr 12, 2018Department of Transportation693JF7 DOT MARITIME ADMINISTRATIONDTMA91C1600038541310DCM ARCHITECTURE&ENGINEERING LLC IGF::OT::IGF FOR OTHER FUNCTIONS$180K
Apr 11, 2018Department of Transportation693JF7 DOT MARITIME ADMINISTRATION693JF718C000039541330THIS IS TO REDESIGN SAMUELS HALL 100% DESIGN ACCORDING TO CHANGES DIRECTED BY DAVE MOSKOFF AND JOHN DEMERS.$178K
Apr 5, 2018Department of Transportation693JF7 DOT MARITIME ADMINISTRATION693JF717C00003541330DCM ARCHITECTURE&ENGINEERING LLC IGF::OT::IGF FOR OTHER FUNCTIONS$20K
Apr 2, 2018Department of Transportation693JF7 DOT MARITIME ADMINISTRATION693JF718C000006541330ROOSEVELT ROADS FACILITY ASSESSMENT$219K
Mar 23, 2018General Services AdministrationPBS R2 NEWARK FIELD OFFICE47PC1018F0001236220IGF::OT:IGF US BANKRUPTCY DESIGN BUILD SPACE CONSOLIDATION AT MARTIN LUTHER KING, JR. FEDERAL COURTHOUSE, NEWARK, NJ$10K
Mar 22, 2018Department of Transportation693JF7 DOT MARITIME ADMINISTRATION693JF718C000029541330RA 1850 TASK ORDER 2 PUERTO NUEVO TASK 002.1 STRUCTURAL ASSESSMENT - THE WHARF IS SUPPORTED BY A COMBINATION OF SHEET-PILE BULKHEAD WITH TIE-RODS IN FRONT OF CELLULAR COFFERDAMS, PILE SUPPORTED STRUCTURE AND . UNDERWATER AND ABOVE WATER ROUTINE AND STRUCTURAL INSPECTION AND ASSESSMENT OF DOCKS A TO O, INCLUDING THE BULKHEAD TIE-RODS DISCOVERY AND ITS ATTACHMENT TO LAND INCLUDING VISUAL OBSERVATION, MEASURING, PHOTOGRAPHING, PROBING AND SAMPLING, FIELD AND LABORATORY TESTING, ENGINEERING ANALYSES, RECORD KEEPING, DOCUMENTATION, AND REPORT PREPARATION HAVING CONCLUSIONS AND RECOMMENDATIONS FOR REPAIR AS NEEDED FOR STRUCTURAL COMPONENTS. THE WORK INCLUDES: - CONDITION ASSESSMENT OF THE UTILITIES AND DRAWINGS WITH CONCLUSIONS REGARDING THEIR SUITABILITY FOR THE INTENDED PURPOSE. DEFICIENCIES AND CODE VIOLATIONS WILL BE NOTED, INCLUDING RECOMMENDATIONS FOR REPAIR, IF NEEDED. - PREPARE AN ITEMIZED BUDGET COST ESTIMATE TO BRING THE PIER BACK INTO FULLY OPERATIONAL AND STRUCTURALLY SOUND CONDITION, INCLUDING DEMOLITION OF DERELICT STRUCTURES. - ENSURE THAT ALL WORK MEETS BOTH FEDERAL AND PUERTO RICO ENVIRONMENTAL REQUIREMENTS BOTH IN WATER AND ON ADJACENT LANDS.$704K
Mar 22, 2018Department of Transportation693JF7 DOT MARITIME ADMINISTRATION693JF718C000030541330RA 1850 TASK ORDER 9 ISLA GRANDE SOUTH PORT EXPANSION NEPA$232K
Mar 22, 2018Department of Transportation693JF7 DOT MARITIME ADMINISTRATION693JF718C000031541330THIS REQUISITION PROVIDES FUNDS IN THE AMOUNT OF $186,525.74 TO DCM ARCHITECTURE&ENGINEERING LLC FOR TASK 012 - FAJARDO FERRY TERMINAL. DCM SHALL PROVIDE PROFESSIONAL MANAGEMENT AND ENGINEERING SERVICES. THE PROJECT SCOPE ENCOMPASSES CONDUCTING STRUCTURAL ASSESSMENTS AND ENVIRONMENTAL ANALYSIS RELATED TO IMMEDIATE AND LONG-TERM NEEDS FOR DISASTER RECOVERY IN PUERTO RICO. THIS WORK HAS BEEN IDENTIFIED AS CRITICAL INFRASTRUCTURE NECESSARY TO MAINTAIN COMMERCE AND SUPPORT THE ECONOMY OF PUERTO RICO.$187K

Get Alerted Before Dcm Architecture & Engineering, LLC's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free