Home/Contractors/Defense Systems And Solutions/contracts

Federal Contractor Profile

Defense Systems And Solutions

$3.2B obligated·394 awards·1 agencies·2 NAICS

Federal Contracts

Showing contracts 751800 of 902 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Jun 17, 2020Department of DefenseW6QK ACC-RSAW58RGZ20F0349336413ARMY PALLETIZED FIELD ARTILLERY LAUNCHER (PFAL) SUPPORT$703K
Jun 11, 2020Department of DefenseW6QK ACC-RSAW58RGZ19F0674336413SUPPORT OF THE LITTORAL COMBAT SHIP PROGRAM EXECUTE OFFICE PMS 505 AND THE MISSION PACKAGE SUPPORT FACILITY IN DEPLOYMENT OF HIGH QUALITY HARDWARE ON TIME AND ON BUDGET, ALLOWING INTEGRATION OF THIS HARDWARE INTO A JOINT OPERATIONAL ENVIRONMENT.$1.2M
Jun 10, 2020Department of DefenseW6QK ACC-RSAW58RGZ20F0154336413THE PURPOSE OF THIS PROJECT IS TO PROVIDE ENGINEERING AND MANUFACTURING OF THE WIRELESS AT-PLATFORM TEST SET (WATS) AND ASSOCIATED TEST SUPPORT END OF LINE (EOL) HARDWARE IN SUPPORT OF THE TEST MEASUREMENT DIAGNOSTIC EQUIPMENT (TMDE) PROJECT OFFICE.$285K
Jun 5, 2020Department of DefenseW6QK ACC-RSAW58RGZ20F0208336413APACHE MOBILE TEAM SUPPORT INCLUDED IN THIS EFFORT ARE THE DEPOPULATION OF CRASH DAMAGED AIRCRAFT, ASSESSMENT, TESTING, AND REPAIR OF FIELDED APACHE SYSTEMS AND MOBILE TEAM TRAILERS.$1.4M
Jun 1, 2020Department of DefenseW6QK ACC-RSAW58RGZ19F0632336413THE PURPOSE OF THIS STATEMENT OF WORK (SOW) IS TO DELINEATE IN GENERAL TERMS, THE OVERALL REQUIREMENTS OF THE H-60V MEDEVAC DESIGN AND INTEGRATION, INCLUDING THE INTEGRATION OF A NOSE MOUNTED FORWARD LOOKING INFRARED (FLIR$44K
Jun 1, 2020Department of DefenseW6QK ACC-RSAW58RGZ20F0270336413PROVIDE AN EVALUATION OF TSS AND ITS ANCILLARY EQUIPMENT WITH RESPECT TO OBSOLESCENCE, REPAIR REQUIREMENTS, AND SUPPORTABILITY, AS WELL AS TO REPAIR A SUBSET OF THE EVALUATED COMPONENTS USING RESIDUAL(GFM) INVENTORIES AND RETURN THEM TO SERVICE.$705K
May 29, 2020Department of DefenseW6QK ACC-RSAW58RGZ19F0266336413PROVIDE APACHE SUPPORT KITS FOR FOREIGN MILITARY SALES (FMS) ROYAL NETHERLANDS AIR FORCE, UNITED ARAB EMIRATES AND QATAR.$98K
May 29, 2020Department of DefenseW6QK ACC-RSAW58RGZ19F0360336413THIS STATEMENT OF WORK DEFINES THE EFFORT REQUIRED TO PROVIDE TESTING AND FIELDING SUPPORT FOR PM AIR WARRIORS AIR SOLDIER AND ELECTRONIC DATA MANAGER EDM SYSTEMS.$542K
May 29, 2020Department of DefenseW6QK ACC-RSAW58RGZ19F0674336413SUPPORT OF THE LITTORAL COMBAT SHIP PROGRAM EXECUTE OFFICE PMS 505 AND THE MISSION PACKAGE SUPPORT FACILITY IN DEPLOYMENT OF HIGH QUALITY HARDWARE ON TIME AND ON BUDGET, ALLOWING INTEGRATION OF THIS HARDWARE INTO A JOINT OPERATIONAL ENVIRONMENT.$605K
May 29, 2020Department of DefenseW6QK ACC-RSAW58RGZ20F0260336413THIS SOW DEFINES THE EFFORT REQUIRED FOR THE PROCUREMENT, MANUFACTURING, INTEGRATION, KIT, AND DELIVERY OF APACHE COMMON MISSILE WARNING SYSTEM (CMWS) KITS. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS.$2.5M
May 28, 2020Department of DefenseW6QK ACC-RSAW58RGZ20F0330336413INSTALL THREE (3) EACH HH-60L MODIFICATION KITS IAW DRAWING PACKAGE 1063667$10M
May 20, 2020Department of DefenseW6QK ACC-RSAW58RGZ19F0247336413COMNAVAIRSYSCOM PROGRAM MANAGER AIR (PMA) -275 HAS A REQUIREMENT FOR THE PROTOTYPE INTEGRATION FACILITY (PIF) TO DEVELOP A V-22 COMMERCIAL MAINTENANCE CAPABILITY TO HELP SOLVE THE UNDER REQUIREMENT NEEDS FOR THE V-22 FLEET READINESS. UNDER THE PLANNED MAINTENANCE INTERVAL (PMI) SPECIFICATION THE AIRCRAFT IS REQUIRED EVERY 1,740 HOURS TO COMPLETELY INSPECT FOR THE STRUCTURE, MECHANICAL/DRIVETRAIN AND AVIONIC DAMAGES. THE WORKS INCLUDE V-22 AIRCRAFT INDUCTION, PLANNED MAINTENANCE INTERVAL (PMI) INSPECTION, DISCREPANCY CORRECTION, SCHEDULED MAINTENANCE AND TECHNICAL DIRECTIVE COMPLIANCE. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS.$1.8M
May 18, 2020Department of DefenseW6QK ACC-RSAW58RGZ19F0163336413THIS EFFORT IS TO PROVIDE PRODUCTION-REPRESENTATIVE HARDWARE KITS AND CORRESPONDING PRODUCTION SUPPORT FOR THE UH-60V PROGRAM.$622K
May 18, 2020Department of DefenseW6QK ACC-RSAW58RGZ19F0488336413PROVIDE TECHNICAL&ENGINEERING SPT OF 3 LOWER TIER PROJECT OFC PATRIOT LAUNCHER STATIONS AND 1 VIRTUAL LAUNCHER STATION; PROVIDE TECHNICAL SUPPORT FOR THE LAUNCHER STATION TEST SET ETHERNET INTERFACE;&SUPPORT MODS&TEST TO PATRIOT FIELDING EQUIPMENT.$123K
May 15, 2020Department of DefenseW6QK ACC-RSAW58RGZ19F0311336413THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE PROCUREMENT, FABRICATION, INTEGRATION, KITTING, AND DELIVERY OF TWENTY-TWO (22) AH-1Z COBRA MISSION GRIP MOUNT SETS. EACH SET CONSISTS OF A PILOT AND CO-PILOT MOUNT. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS.$16K
May 14, 2020Department of DefenseW6QK ACC-RSAW58RGZ20F0410336413THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT TO INTEGRATE AND DELIVER SIX (6) MK105 MOD 3 HARPOON TEST SETS FOR THE REPUBLIC OF KOREA, FMS CASE KS-P-LQJ-04.$999K
May 13, 2020Department of DefenseW6QK ACC-RSAW58RGZ20F011233641360K IMPROVED ENVIRONMENTAL CONTROL UNIT (IECU) BLOCK II$358K
May 12, 2020Department of DefenseW6QK ACC-RSAW58RGZ19F0212336413THIS SOW DEFINES THE EFFORT REQUIRED TO ESTABLISH A PREVENTIVE MAINTENANCE SCHEDULE FOR ON-SITE MANUFACTURING EQUIPMENT SPECIFIED BY THE GOVERNMENT FURNISHED EQUIPMENT (GFE) LIST ALONG WITH PURCHASING, MAINTAINING SPARE PARTS AND FLUIDS FOR A SAFE AND EFFECTIVE OPERATION TO MINIMIZE LOST TIME DUE TO REPAIRS. THIS IS A COST PLUS FIXED FEE COMPLETION EFFORT NOT TO EXCEED 12 MONTHS, WITH 4 ADDITIONAL 12 MONTH OPTIONS.$405K
Apr 30, 2020Department of DefenseW6QK ACC-RSAW58RGZ19F0247336413COMNAVAIRSYSCOM PROGRAM MANAGER AIR (PMA) -275 HAS A REQUIREMENT FOR THE PROTOTYPE INTEGRATION FACILITY (PIF) TO DEVELOP A V-22 COMMERCIAL MAINTENANCE CAPABILITY TO HELP SOLVE THE UNDER REQUIREMENT NEEDS FOR THE V-22 FLEET READINESS. UNDER THE PLANNED MAINTENANCE INTERVAL (PMI) SPECIFICATION THE AIRCRAFT IS REQUIRED EVERY 1,740 HOURS TO COMPLETELY INSPECT FOR THE STRUCTURE, MECHANICAL/DRIVETRAIN AND AVIONIC DAMAGES. THE WORKS INCLUDE V-22 AIRCRAFT INDUCTION, PLANNED MAINTENANCE INTERVAL (PMI) INSPECTION, DISCREPANCY CORRECTION, SCHEDULED MAINTENANCE AND TECHNICAL DIRECTIVE COMPLIANCE. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS.$2.6M
Apr 30, 2020Department of DefenseW6QK ACC-RSAW58RGZ20F0327336413IT PROVIDES THE NAVAL UNDERSEA WARFARE CENTER (NUWC) WITH A 2-7-9 BAY PROTOTYPE STRUCTURALLY INTEGRATED ENCLOSURE (SIE) FOR PMS397 MANAGED WEAPONS PLATFORMS.$770K
Apr 28, 2020Department of DefenseW6QK ACC-RSAW58RGZ20F0363336413THE PURPOSE OF THIS STATEMENT OF WORK (SOW) IS TO DEFINE THE EFFORT REQUIRED TO MODIFY AND DELIVER ONE (1) HH-60L AIRCRAFT FOR THE UNITED STATES DEPARTMENT OF STATE (DOS).$2.1M
Apr 23, 2020Department of DefenseW6QK ACC-RSAW58RGZ20F0293336413H-53 MODIFICATIONS/INSTALLS$3.2M
Apr 23, 2020Department of DefenseW6QK ACC-RSAW58RGZ20F0349336413ARMY PALLETIZED FIELD ARTILLERY LAUNCHER (PFAL) SUPPORT$280K
Apr 21, 2020Department of DefenseW6QK ACC-RSAW58RGZ20F0276336413THE NAVY IS DEVELOPING A PROTOTYPE HAMMERHEAD LAUNCH SYSTEM FOR UNDERWATER NAVAL MINES AND HAS ASKED THE PIF TO PROVIDE PROTOTYPE COMPONENTS$200K
Apr 16, 2020Department of DefenseW6QK ACC-RSAW58RGZ20F0271336413THE PURPOSE OF THIS STATEMENT OF WORK (SOW) IS TO DEFINE THE EFFORT REQUIRED TO INTEGRATE THE TAC-V ON (106) UH-72A AIRCRAFT.$3.1M
Apr 15, 2020Department of DefenseW6QK ACC-RSAW58RGZ20F0157336413THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE, KIT, AND SHIP THE H-60M KITS TO SUPPORT THE FY20 INITIAL FIELDING EFFORTS.$13M
Apr 14, 2020Department of DefenseW6QK ACC-RSAW58RGZ20F0247336413PROGRAM MANAGEMENT OFFICE UTILITY HAS A REQUIREMENT TO PROVIDE COMMON INFRARED COUNTERMEASURE (CIRCM) AND FEDERATED AIR NAVIGATION SYSTEM (FANS) AND DECONFLICT KITS$658K
Apr 14, 2020Department of DefenseW6QK ACC ANADW911KF20F0087336992STAGING OPTIMIZATION IMPLEMENTATION FOR ANAD BLDGS. 129 AND 132$738K
Apr 9, 2020Department of DefenseW6QK ACC-RSAW58RGZ20F0338336413SOW DEFINES THE EFFORT REQUIRED TO PROVIDE, KIT, AND SHIP THE H-60 UATK AND H-60M KITS TO SUPPORT AIRCRAFT REALIGNMENT FIELDING EFFORTS TO INCLUDE THE NGB ARMY AVIATION SUPPORT FACILITIES, NGB MATERIAL FIELDINGS, AND (UHPO)REQUIREMENTS.$8.6M
Apr 8, 2020Department of DefenseW6QK ACC-RSAW58RGZ20F0346336413THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE AVR-2A AFT SENSOR MOUNTS PN 4290363-501/(LEFT) AVR-2A AFT SENSOR MOUNTS PN 4290363-502/(RIGHT) AND AH-64D AVR-2B BRACKET KITS WITH ASSOCIATED HARDWARE.$467K
Apr 7, 2020Department of DefenseW6QK ACC-RSAW58RGZ20F0213336413REQUIRED TO PROVIDE MK112 RACK MOUNTED ASSEMBLY KITS$1.4M
Apr 7, 2020Department of DefenseW6QK ACC-RSAW58RGZ20F0261336413THE PURPOSE OF THIS EFFORT IS TO PROVIDE ENGINEERING, DESIGN AND MANUFACTURING OF THE NATIONAL GUARD VEHICLE DIAGNOSTIC TEST SET (VDTS).$9.6M
Apr 7, 2020Department of DefenseW6QK ACC ANADW911KF19F0031336992VARIOUS SUPPORT SERVICES - 1ST OPT PERIO$1.6M
Mar 30, 2020Department of DefenseW6QK ACC ANADW911KF20F0076336992UPGRADE OF THE 1790 ENGINE TEST CELLS IN BLDGS 410 AND 474.$4.5M
Mar 25, 2020Department of DefenseW6QK ACC-RSAW58RGZ19F0669336413THE EFFORT IS TO INTEGRATE AUTOMATIC DEPENDENT SURVEILLANCE-BROADCAST (ADS-B) OUT ON A TOTAL OF FIVE (5) EACH CBP DASH-8 FIXED WING AIRCRAFT. THE FIVE (5) AIRCRAFT CONSIST OF THREE (3) EACH DHC-8-200 AIRCRAFT AND TWO (2) EACH DHC-8-300 AIRCRAFT.$377K
Mar 20, 2020Department of DefenseW6QK ACC-RSAW58RGZ20F0215336413EFFORT REQUIRED FOR THE REPAIR OF AH-64 APACHE TAIL ROTOR BLADES (TRB) FOR THE UNITED KINGDOM (UK).$330K
Mar 19, 2020Department of DefenseW6QK ACC-RSAW58RGZ20F0274336413THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE KITTING, INSPECTION, AND DELIVERY OF VARIOUS COMMON AVIATION TOOL SYSTEM (CATS) TO SUPPORT THE ARMY LOGISTICS CENTER (ALC).$2.6M
Mar 19, 2020Department of DefenseW6QK ACC-RSAW58RGZ20F0291336413MANUFACTURE AND KIT 68 MK-3164/VRC INSTALLATION KITS, 78 AN/UYK-128(V) 3 RADIO INSTALLATION KITS, 17 BASIC ISSUE ITEMS (BII) KITS, AND 41 COMPONENTS OF END ITEM (COEI) KITS.$980K
Mar 17, 2020Department of DefenseW6QK ACC-RSAW58RGZ20F0217336413TERMINAL HIGH ALTITUDE AREA DEFENSE REMOTE LAUNCHER KIT COMMUNICATION PACKAGE.$1.5M
Mar 16, 2020Department of DefenseW6QK ACC-RSAW58RGZ20F0216336413PROVIDE AN ASSESSMENT OF THE COMPONENT SERVICE SHOPS FOR FIELDED RSAF SE LOCATED WITHIN THE KSA AT KHAMIS (KING KHALID AIR BASE (AB) KKAB), DHAHRAN (KING ABDULAZIZ AB KAAB), TAIF (KING FAHAD AB KSAB) AND TABUK (KING FAISAL AB KFAB).$30M
Mar 13, 2020Department of DefenseW6QK ACC-RSAW58RGZ19F0162336413UH-60V A-KITS FOR LOW RATE INITIAL PRODUCTION FOR DIGITAL COCKPITS.$8.5M
Mar 11, 2020Department of DefenseW6QK ACC-RSAW58RGZ19F0247336413COMNAVAIRSYSCOM PROGRAM MANAGER AIR (PMA) -275 HAS A REQUIREMENT FOR THE PROTOTYPE INTEGRATION FACILITY (PIF) TO DEVELOP A V-22 COMMERCIAL MAINTENANCE CAPABILITY TO HELP SOLVE THE UNDER REQUIREMENT NEEDS FOR THE V-22 FLEET READINESS. UNDER THE PLANNED MAINTENANCE INTERVAL (PMI) SPECIFICATION THE AIRCRAFT IS REQUIRED EVERY 1,740 HOURS TO COMPLETELY INSPECT FOR THE STRUCTURE, MECHANICAL/DRIVETRAIN AND AVIONIC DAMAGES. THE WORKS INCLUDE V-22 AIRCRAFT INDUCTION, PLANNED MAINTENANCE INTERVAL (PMI) INSPECTION, DISCREPANCY CORRECTION, SCHEDULED MAINTENANCE AND TECHNICAL DIRECTIVE COMPLIANCE. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS.$24K
Mar 10, 2020Department of DefenseW6QK ACC-RSAW58RGZ19F0163336413THIS EFFORT IS TO PROVIDE PRODUCTION-REPRESENTATIVE HARDWARE KITS AND CORRESPONDING PRODUCTION SUPPORT FOR THE UH-60V PROGRAM.$15M
Mar 6, 2020Department of DefenseW6QK ACC-RSAW58RGZ19F0378336413THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE AVIATION GROUND SUPPORT EQUIPMENT (AGSE) IDENTIFIED IN APPENDIX C IN SUPPORT OF FOREIGN MILITARY SALES (FMS) CASES SR-B-ZAG, SI-B-WXP, AND KS-B-ZDF.$402K
Mar 2, 2020Department of DefenseW6QK ACC-RSAW58RGZ20F0156336413THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE H-60 INFRARED SEARCHLIGHT SYSTEM INTENSITY DECREASE/INCREASE FUNCTION KITS$3.6M
Feb 27, 2020Department of DefenseW6QK ACC-RSAW58RGZ20F0276336413THE NAVY IS DEVELOPING A PROTOTYPE HAMMERHEAD LAUNCH SYSTEM FOR UNDERWATER NAVAL MINES AND HAS ASKED THE PIF TO PROVIDE PROTOTYPE COMPONENTS$470K
Feb 26, 2020Department of DefenseW6QK ACC-RSAW58RGZ20F0220336413IN 2007, THE NAVAL AIR SYSTEMS COMMAND (NAVAIR) PARTNERED WITH THE AMRDEC PROTOTYPE INTEGRATION FACILITY (PIF) TO BUILD A LIMITED QUANTITY OF TOPOGRAPHIC SUPPORT SET (TSS) SYSTEMS FOR THEIR SPECIAL FORCES.$308K
Feb 25, 2020Department of DefenseW6QK ACC-RSAW58RGZ20F0263336413THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PERFORM FABRICATION, ONSITE INTEGRATION AND FUNCTIONAL TESTING NECESSARY TO EQUIP THE SAUDI ARABIAN$1.1M
Feb 13, 2020Department of DefenseW6QK ACC-RSAW58RGZ20F0210336413PROVIDE BLUE FORCE TRACKING (BFT-2) UH-60L:V SUPPLEMENTAL KITS$169K
Jan 30, 2020Department of DefenseW6QK ACC ANADW911KF20F0041336992REPAIR 80 M113 RADIATORS, P/N 11669369.$216K

Get Alerted Before Defense Systems And Solutions's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free