Federal Contractor Profile
Defense Systems And Solutions
$3.2B obligated·394 awards·1 agencies·2 NAICS
Federal Contracts
Showing contracts 851–900 of 902 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Aug 23, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0495 | 336413 | THE CONTRACTOR SHALL PROVIDE UH-60M PALLETS. | $858K |
| Aug 23, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0565 | 336413 | PROVIDE A PLANDETAILING THE REQUIRED PERSONNEL, MATERIALS, FACILITIES, SERVICES, AND SUPPORT TO DEFINE THE EFFORTS TO PROVIDE A SOLUTION TO ELIMINATE THE OBSOLESCENCE ISSUES WITH THE CURRENT ATTITUDE, HEADING REFERENCE SYSTEM FIBER OPTIC GYRO SYSTEM | $549K |
| Aug 22, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0669 | 336413 | THE EFFORT IS TO INTEGRATE AUTOMATIC DEPENDENT SURVEILLANCE-BROADCAST (ADS-B) OUT ON A TOTAL OF FIVE (5) EACH CBP DASH-8 FIXED WING AIRCRAFT. THE FIVE (5) AIRCRAFT CONSIST OF THREE (3) EACH DHC-8-200 AIRCRAFT AND TWO (2) EACH DHC-8-300 AIRCRAFT. | $1.6M |
| Aug 21, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0547 | 336413 | THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO REPAIR ARC-231 MULTI-MODE AVIATION RADIO COMPONENTS FOR THE UH-72A LAKOTA HELICOPTER. | $795K |
| Aug 21, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0652 | 336413 | THIS STATEMENT OF WORK DEFINES THE EFFORT REQUIRED TO PROVIDE ENGINEERING, LOGISTICS, CONFIGURATION MANAGEMENT, FIELDING AND TEST SUPPORT TO THE AVIATION MISSION EQUIPMENT (AME) BLUE FORCE TRACKING ( | $286K |
| Aug 14, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0184 | 336413 | THE CONTRACTOR SHALL PROVIDE MANAGEMENT, ENGINEERING, TECHNICAL, AND ALL NECESSARY SUPPORT TO CONDUCT THE SITE SURVEY AND SITE SPECIFIC EIP FOR THE GROUND-BASED SENSE AND AVOID LIGHTWEIGHT SURVEILLANCE TARGET ACQUISITION RADAR SYSTEM. | $309K |
| Aug 14, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0643 | 336413 | THE PROTOTYPE INTEGRATION FACILITY (PIF) HAS A REQUIREMENT IN SUPPORT OF THE LITTORAL COMBAT SHIP (LCS) PROGRAM EXECUTIVE OFFICE (PEO) FOR THE PROCUREMENT OF ROLL-ON/ROLL-OF (RO/RO) CONTAINERS TO SUPPORT UH-60 SEAHAWK EMPLOYMENTS ON THE LCS. | $183K |
| Aug 8, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0545 | 336413 | THE PROTOTYPE INTEGRATION FACILITY (PIF) HAS A REQUIREMENT TO ACCOMPLISH THE NONRECURRING ENGINEERING WARFARE CENTER (NUWC). OPTION 1 DEFINES THE TESTING REQUIREMENTS FOR THE BOURDON TUBE PRESSURE SWITCHES. | $559K |
| Aug 5, 2019 | Department of DefenseW6QK ACC ANAD | W911KF19F0140 | 336992 | VARIOUS SUPPORT SERVICES FOR THE STORAGE OPTIMIZATION TRAINING - 2ND OPT PERIO | $125K |
| Aug 1, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0544 | 336413 | THE REQUIREMENT FOR VALIDATION INSTALLATIONS ON APACHE AH-64E. THE CONTRACTOR WILL VERIFY THE GFE KIT CONFIGURATIONS, TECHNICAL DATA PACKAGES, DEVELOPMENT SUSTAINMENT OF MODIFICATION WORK ORDER OTHER SUPPORT DOCUMENTS FOR INSTALLATION ACTIVITIES. | $1.1M |
| Jul 29, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0378 | 336413 | THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE AVIATION GROUND SUPPORT EQUIPMENT (AGSE) IDENTIFIED IN APPENDIX C IN SUPPORT OF FOREIGN MILITARY SALES (FMS) CASES SR-B-ZAG, SI-B-WXP, AND KS-B-ZDF. | $7.1M |
| Jul 29, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0531 | 336413 | THE CONTRACTOR IS REQUIRED TO PROVIDE CENTER CELL ACCESS PORT. | $4.5M |
| Jul 25, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0499 | 336413 | THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE TWENTY (20) ALL UP ROUND BALLASTS, GRADE B (AURBB). | $6.5M |
| Jul 18, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0537 | 336413 | REQUIRED TO COMPLETE AIRCRAFT MANNED/UNMANNED TEAMING (MUMT) INSTALLS. THE CONTRACTOR SHALL SUPPORT APACHE SENSORS INSTALL REQUIREMENTS. | $1.3M |
| Jul 17, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0241 | 336413 | B-KIT AIR WORTHINESS QUALIFICATION EFFORTS OF THE UPGRADED EIBF SHEET METAL COMPONENTS PROVIDE ALL TECHNICAL MANUAL CHANGE PAGES, ALL PROVISIONING, AND ALL LOGISTICAL REQUIREMENTS FOR SUSTAINMENT OF THE FULLY QUALIFIED EIBF SYSTEM ARMY SUPPLY SYSTEM. | $3.3M |
| Jul 16, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0488 | 336413 | PROVIDE TECHNICAL&ENGINEERING SPT OF 3 LOWER TIER PROJECT OFC PATRIOT LAUNCHER STATIONS AND 1 VIRTUAL LAUNCHER STATION; PROVIDE TECHNICAL SUPPORT FOR THE LAUNCHER STATION TEST SET ETHERNET INTERFACE;&SUPPORT MODS&TEST TO PATRIOT FIELDING EQUIPMENT. | $154K |
| Jul 16, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0490 | 336413 | THE PURPOSE OF THIS STATEMENT OF WORK (SOW) IS TO DEFINE THE EFFORT TO PROVIDE SEVEN (7) UH-60M INTERNAL AUXILLIARY FUEL TANK (IAFTS) KITS AND SEVEN (7) MAVEN HEATER RELOCATION KITS IAW APPROVED DRAWING PACKAGES. | $3.7M |
| Jul 15, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0277 | 336413 | THE EFFORT REQUIRED FOR THE INSTALLATION OF UPGRADED ENHANCED DIGITAL ENGINE CONTROL UNIT. THE CONTRACTOR WILL VERIFY THE KIT CONFIGURATIONS, TDP, DEVELOPMENT SUSTAINMENT OF MWO&OTHER SUPPORT DOCUMENTS FOR INSTALLATION ACTIVITIES. | $357K |
| Jul 15, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0484 | 336413 | THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE INTEGRATION OF VERSION IV AH-64E (IMPROVED) MODIFICATION KITS, AIRCRAFT COMPONENTS/HARDWARE, AND INSPECTION/REPAIR OF AIRCRAFT PARTS. | $11M |
| Jul 11, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0236 | 336413 | THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO CLEAN, REPAIR, TOUCH UP, AND PAINT THE EXTERIOR SURFACE OF EXISTING AMCOM STATIC DISPLAYS. ADDITIONALLY, THIS STATEMENT OF WORK CONTAINS REQUIREMENTS FOR PROGRAM MANAGEMENT AND LOGISTICS SUPPORT. | $45K |
| Jul 11, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0483 | 336413 | THE STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE MODERNIZATION AND FIELDING OF THE PITOT STATIC TEST SYSTEM (PSTS). | $11M |
| Jul 10, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0462 | 336413 | THIS STATEMENT OF WORK DEFINES THE EFFORT REQUIRED TO PROVIDE A TACTICAL OPEN GOVERNMENT ARCHITECTURE HANDHELD GROUND CONTROL STATION TOGA H-GCS CONTROLLER KITS FOR PROGRAM MANAGER UNMANNED AERIAL SYSTEMS. | $5.2M |
| Jul 2, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0286 | 336413 | THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE, KIT, AND SHIP THE H-60M NGB FACILITIES EQUIPMENT. | $9.1M |
| Jul 1, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0491 | 336413 | THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE MISSION EQUIPMENT SUPPORT TO THE UH-60L AND UH-60M UNITED STATES CUSTOMS AND BORDER PROTECTION (CBP) AIRCRAFT. THE SOW DEFINES THE EFFORT REQUIRED TO PROCURE, FABRICATE, KIT, AND REWORK UH-60M AND UH-60L CUSTOMS AND BORDER PROTECTION (CBP) UNIQUE MISSION SYSTEMS REQUIRED TO MAINTAIN THE 60M AND 60L FIELDED AIRCRAFT. | $249K |
| Jul 1, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0527 | 336413 | THIS REQUIREMENT IS FOR THE PROCUREMENT OF TWENTY (20) ALL UP ROUND BALLATS (AURBB), GRADE B, BY THE UNITED STATES GOVERNMENT (USG) PROTOTYPE INTEGRATION FACILITY (PIF) FOR THE VIRGINIA CLASS NEW CONSTRUCTION SUBMARINES. THE CONTRACTOR SHALL PROVIDE AURBBS IN ACCORDANCE WITH DRAWING NUMBER 842695. | $2.1M |
| Jun 19, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0503 | 336413 | THE CONTRACTOR IS REQUIRED TO INSTALL NEW AVIONICS CAPABLE OF AUTOMATIC DEPENDENT SURVEILLANCE - BROADCAST (ADS-B) OUT OPERATIONS WITH THE AID OF THE LATEST TRAFFIC COLLISION AVOIDANCE SYSTEM (TCAS) UPGRADES INTEGRATED WITH THE EXISTING WIDE AREA AUGMENTATION SYSTEM (WAAS) LOCALIZER PERFORMANCE WITH VERTICAL GUIDANCE (LPV) CAPABLE FMS. | $7.6M |
| Jun 7, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0311 | 336413 | THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE PROCUREMENT, FABRICATION, INTEGRATION, KITTING, AND DELIVERY OF TWENTY-TWO (22) AH-1Z COBRA MISSION GRIP MOUNT SETS. EACH SET CONSISTS OF A PILOT AND CO-PILOT MOUNT. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS. | $80K |
| Jun 5, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0242 | 336413 | UH-60L/M ELECTRONIC STANDBY INSTRUMENT SYSTEM KIT FABRICATION | $5.3M |
| May 30, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0187 | 336413 | THE PURPOSE OF THIS STATEMENT OF WORK (SOW) IS TO DEFINE THE EFFORT TO PROVIDE TWO (2) EACH HH-60L MODIFICATION KITS IAW DRAWING PACKAGE 1063667, AND PROVIDE INSTALLATION OF PROVIDED KITS ON TWO (2) EACH HH-60L AIRCRAFT. | $17M |
| May 29, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0212 | 336413 | THIS SOW DEFINES THE EFFORT REQUIRED TO ESTABLISH A PREVENTIVE MAINTENANCE SCHEDULE FOR ON-SITE MANUFACTURING EQUIPMENT SPECIFIED BY THE GOVERNMENT FURNISHED EQUIPMENT (GFE) LIST ALONG WITH PURCHASING, MAINTAINING SPARE PARTS AND FLUIDS FOR A SAFE AND EFFECTIVE OPERATION TO MINIMIZE LOST TIME DUE TO REPAIRS. THIS IS A COST PLUS FIXED FEE COMPLETION EFFORT NOT TO EXCEED 12 MONTHS, WITH 4 ADDITIONAL 12 MONTH OPTIONS. | $469K |
| May 28, 2019 | Department of DefenseW6QK ACC ANAD | W911KF19F0096 | 336992 | REPAIR OF 100 RADIATORS. | $271K |
| May 23, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0485 | 336413 | THE CONTRACTOR IS REQUIRED TO PROVIDE REPLACEMENT BUSHINGS AND REPAIR INBOARD EDGES ON H-60M OUTBOARD STABILATORS. | $474K |
| May 22, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0360 | 336413 | THIS STATEMENT OF WORK DEFINES THE EFFORT REQUIRED TO PROVIDE TESTING AND FIELDING SUPPORT FOR PM AIR WARRIORS AIR SOLDIER AND ELECTRONIC DATA MANAGER EDM SYSTEMS. | $295K |
| Apr 30, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0284 | 336413 | THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT TO INTEGRATE AND DELIVER FOURTEEN (14) HIMARS ARMOR STORAGE CONTAINERS. IN AN EARLIER PHASE OF THIS PROGRAM TWO HIMARS ARMOR STORAGE CONTAINERS WERE DEVELOPED AS PROTOTYPES/DEMONSTRATORS. | $871K |
| Apr 23, 2019 | Department of DefenseW6QK ACC ANAD | W911KF19F0031 | 336992 | VARIOUS SUPPORT SERVICES - 1ST OPT PERIO | $1.6M |
| Apr 15, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0363 | 336413 | THIS SOW DEFINES THE EFFORT TO PROVIDE THE NAVAL UNDERSEA WARFARE CENTER (NUWC) WITH THE PROTOTYPE STRUCTURALLY INTEGRATED ENCLOSURES (SIE) FOR PMS397 MANAGED WEAPONS PLATFORMS. | $230K |
| Apr 4, 2019 | Department of DefenseW6QK ACC ANAD | W911KF19F0063 | 336992 | OTHER DIRECT COST - 1ST OPT PERIOD | $131K |
| Apr 2, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0163 | 336413 | THIS EFFORT IS TO PROVIDE PRODUCTION-REPRESENTATIVE HARDWARE KITS AND CORRESPONDING PRODUCTION SUPPORT FOR THE UH-60V PROGRAM. | $77M |
| Mar 27, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0276 | 336413 | THIS STATEMENT OF WORK (SOW) IDENTIFIES REQUIREMENTS TO BE ACCOMPLISHED BY THE CONTRACTOR IN SUPPORT OF THE PROTOTYPE INTEGRATION FACILITY (PIF) PALLETIZED FIELD ARTILLERY LAUNCHER (PFAL) DEVELOPMENT. | $997K |
| Mar 15, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0265 | 336413 | REQUIRED TO PROVIDE AIRCRAFT TECHNICIAN ADVISORY SUPPORT. THE CONTRACTOR SHALL PROVIDE ONE SHEET METAL ARTISAN ADVISER AND ONE AVIONICS ELECTRICIAN ARTISAN ADVISER. | $86K |
| Mar 12, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0280 | 336413 | THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE DEVELOPMENT, FABRICATION, INTEGRATION, TEST AND QUALIFICATION OF TACTICAL AND GROUND SUPPORT SYSTEMS, SUBSYSTEMS AND COMPONENTS FOR THE LOWER TIER PROJECT OFFICE (LTPO). THE LTPO REQUIRES THE MAINTENANCE AND UPGRADE TO THE PATRIOT MISSILE SYSTEM TEST EQUIPMENT AND COMPONENTS. | $504K |
| Mar 1, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0247 | 336413 | COMNAVAIRSYSCOM PROGRAM MANAGER AIR (PMA) -275 HAS A REQUIREMENT FOR THE PROTOTYPE INTEGRATION FACILITY (PIF) TO DEVELOP A V-22 COMMERCIAL MAINTENANCE CAPABILITY TO HELP SOLVE THE UNDER REQUIREMENT NEEDS FOR THE V-22 FLEET READINESS. UNDER THE PLANNED MAINTENANCE INTERVAL (PMI) SPECIFICATION THE AIRCRAFT IS REQUIRED EVERY 1,740 HOURS TO COMPLETELY INSPECT FOR THE STRUCTURE, MECHANICAL/DRIVETRAIN AND AVIONIC DAMAGES. THE WORKS INCLUDE V-22 AIRCRAFT INDUCTION, PLANNED MAINTENANCE INTERVAL (PMI) INSPECTION, DISCREPANCY CORRECTION, SCHEDULED MAINTENANCE AND TECHNICAL DIRECTIVE COMPLIANCE. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS. | $3.9M |
| Feb 12, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0246 | 336413 | THE CONTRACTOR SHALL FABRICATE, ASSEMBLE, PACKAGE, AND SHIP AH-64D BFT-2 KITS. | $378K |
| Jan 17, 2019 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0171 | 336413 | THIS STATEMENT OF WORK (SOW) DETAILS THE CONTRACTOR LOGISTICS SUPPORT (CLS) TASKS NECESSARY FOR OPERATIONAL FIELD SUPPORT AND OTHER SUSTAINMENT SUPPORT ACTIVITIES FOR THE AAQ-24 LARGE AIRCRAFT INFRARED COUNTERMEASURES (LAIRCM) SYSTEM WITH ADVANCED THREAT WARNING (ATW) SENSORS | $6.0M |
| Jan 11, 2019 | Department of DefenseW6QK ACC ANAD | W911KF19F0031 | 336992 | VARIOUS SUPPORT SERVICES - 1ST OPT PERIO | $427K |
| Jan 2, 2019 | Department of DefenseW6QK ACC ANAD | W911KF19F0029 | 336992 | OTHER DIRECT COST - 1ST OPT PERIOD | $68K |
| Dec 21, 2018 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0172 | 336413 | THE CONTRACTOR SHALL PROVIDE 107 FANS INSTALLATION KITS IN ACCORDANCE WITH THE GOVERNMENT FURNISHED DRAWINGS PACKAGE 1068784. INSTALLATION KITS SHALL CONTAIN A-KIT, AND THE B-KITS SHALL BE DELIVERED SEPARATELY. THE CONTRACTOR SHALL PROVIDE NINE SPARE FANS B-KITS. THE CONTRACTOR SHALL PROVIDE 29 NAVIGATIONAL DATABASE LOADERS. THE CONTRACTOR SHALL PROVIDE TWO YEARS OF MONTHLY NAVIGATIONAL DATABASE UPDATES FOR EACH FANS B-KIT DELIVERED AS PART OF THIS EFFORT. THE DATABASE UPDATES SHALL BE ACTIVATED UPON INSTALLATION INTO THE AIRCRAFT. | $10M |
| Dec 20, 2018 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0162 | 336413 | UH-60V A-KITS FOR LOW RATE INITIAL PRODUCTION FOR DIGITAL COCKPITS. | $19M |
| Sep 19, 2018 | Department of DefenseW6QK ACC ANAD | W911KF18F0082 | 336992 | OTHER DIRECT COST - 1ST OPT PERIOD | $132K |
| Jul 30, 2018 | Department of DefenseW6QK ACC ANAD | W911KF18F0050 | 336992 | SUPPORT SERVICES TO FABRICATE RECOIL PISTON RODS. | $48K |
Get Alerted Before Defense Systems And Solutions's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free