Home/Contractors/Defense Systems And Solutions/contracts

Federal Contractor Profile

Defense Systems And Solutions

$3.2B obligated·394 awards·1 agencies·2 NAICS

Federal Contracts

Showing contracts 851900 of 902 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Aug 23, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0495336413THE CONTRACTOR SHALL PROVIDE UH-60M PALLETS.$858K
Aug 23, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0565336413PROVIDE A PLANDETAILING THE REQUIRED PERSONNEL, MATERIALS, FACILITIES, SERVICES, AND SUPPORT TO DEFINE THE EFFORTS TO PROVIDE A SOLUTION TO ELIMINATE THE OBSOLESCENCE ISSUES WITH THE CURRENT ATTITUDE, HEADING REFERENCE SYSTEM FIBER OPTIC GYRO SYSTEM$549K
Aug 22, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0669336413THE EFFORT IS TO INTEGRATE AUTOMATIC DEPENDENT SURVEILLANCE-BROADCAST (ADS-B) OUT ON A TOTAL OF FIVE (5) EACH CBP DASH-8 FIXED WING AIRCRAFT. THE FIVE (5) AIRCRAFT CONSIST OF THREE (3) EACH DHC-8-200 AIRCRAFT AND TWO (2) EACH DHC-8-300 AIRCRAFT.$1.6M
Aug 21, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0547336413THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO REPAIR ARC-231 MULTI-MODE AVIATION RADIO COMPONENTS FOR THE UH-72A LAKOTA HELICOPTER.$795K
Aug 21, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0652336413THIS STATEMENT OF WORK DEFINES THE EFFORT REQUIRED TO PROVIDE ENGINEERING, LOGISTICS, CONFIGURATION MANAGEMENT, FIELDING AND TEST SUPPORT TO THE AVIATION MISSION EQUIPMENT (AME) BLUE FORCE TRACKING ($286K
Aug 14, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0184336413THE CONTRACTOR SHALL PROVIDE MANAGEMENT, ENGINEERING, TECHNICAL, AND ALL NECESSARY SUPPORT TO CONDUCT THE SITE SURVEY AND SITE SPECIFIC EIP FOR THE GROUND-BASED SENSE AND AVOID LIGHTWEIGHT SURVEILLANCE TARGET ACQUISITION RADAR SYSTEM.$309K
Aug 14, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0643336413THE PROTOTYPE INTEGRATION FACILITY (PIF) HAS A REQUIREMENT IN SUPPORT OF THE LITTORAL COMBAT SHIP (LCS) PROGRAM EXECUTIVE OFFICE (PEO) FOR THE PROCUREMENT OF ROLL-ON/ROLL-OF (RO/RO) CONTAINERS TO SUPPORT UH-60 SEAHAWK EMPLOYMENTS ON THE LCS.$183K
Aug 8, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0545336413THE PROTOTYPE INTEGRATION FACILITY (PIF) HAS A REQUIREMENT TO ACCOMPLISH THE NONRECURRING ENGINEERING WARFARE CENTER (NUWC). OPTION 1 DEFINES THE TESTING REQUIREMENTS FOR THE BOURDON TUBE PRESSURE SWITCHES.$559K
Aug 5, 2019Department of DefenseW6QK ACC ANADW911KF19F0140336992VARIOUS SUPPORT SERVICES FOR THE STORAGE OPTIMIZATION TRAINING - 2ND OPT PERIO$125K
Aug 1, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0544336413THE REQUIREMENT FOR VALIDATION INSTALLATIONS ON APACHE AH-64E. THE CONTRACTOR WILL VERIFY THE GFE KIT CONFIGURATIONS, TECHNICAL DATA PACKAGES, DEVELOPMENT SUSTAINMENT OF MODIFICATION WORK ORDER OTHER SUPPORT DOCUMENTS FOR INSTALLATION ACTIVITIES.$1.1M
Jul 29, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0378336413THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE AVIATION GROUND SUPPORT EQUIPMENT (AGSE) IDENTIFIED IN APPENDIX C IN SUPPORT OF FOREIGN MILITARY SALES (FMS) CASES SR-B-ZAG, SI-B-WXP, AND KS-B-ZDF.$7.1M
Jul 29, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0531336413THE CONTRACTOR IS REQUIRED TO PROVIDE CENTER CELL ACCESS PORT.$4.5M
Jul 25, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0499336413THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE TWENTY (20) ALL UP ROUND BALLASTS, GRADE B (AURBB).$6.5M
Jul 18, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0537336413REQUIRED TO COMPLETE AIRCRAFT MANNED/UNMANNED TEAMING (MUMT) INSTALLS. THE CONTRACTOR SHALL SUPPORT APACHE SENSORS INSTALL REQUIREMENTS.$1.3M
Jul 17, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0241336413B-KIT AIR WORTHINESS QUALIFICATION EFFORTS OF THE UPGRADED EIBF SHEET METAL COMPONENTS PROVIDE ALL TECHNICAL MANUAL CHANGE PAGES, ALL PROVISIONING, AND ALL LOGISTICAL REQUIREMENTS FOR SUSTAINMENT OF THE FULLY QUALIFIED EIBF SYSTEM ARMY SUPPLY SYSTEM.$3.3M
Jul 16, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0488336413PROVIDE TECHNICAL&ENGINEERING SPT OF 3 LOWER TIER PROJECT OFC PATRIOT LAUNCHER STATIONS AND 1 VIRTUAL LAUNCHER STATION; PROVIDE TECHNICAL SUPPORT FOR THE LAUNCHER STATION TEST SET ETHERNET INTERFACE;&SUPPORT MODS&TEST TO PATRIOT FIELDING EQUIPMENT.$154K
Jul 16, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0490336413THE PURPOSE OF THIS STATEMENT OF WORK (SOW) IS TO DEFINE THE EFFORT TO PROVIDE SEVEN (7) UH-60M INTERNAL AUXILLIARY FUEL TANK (IAFTS) KITS AND SEVEN (7) MAVEN HEATER RELOCATION KITS IAW APPROVED DRAWING PACKAGES.$3.7M
Jul 15, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0277336413THE EFFORT REQUIRED FOR THE INSTALLATION OF UPGRADED ENHANCED DIGITAL ENGINE CONTROL UNIT. THE CONTRACTOR WILL VERIFY THE KIT CONFIGURATIONS, TDP, DEVELOPMENT SUSTAINMENT OF MWO&OTHER SUPPORT DOCUMENTS FOR INSTALLATION ACTIVITIES.$357K
Jul 15, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0484336413THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE INTEGRATION OF VERSION IV AH-64E (IMPROVED) MODIFICATION KITS, AIRCRAFT COMPONENTS/HARDWARE, AND INSPECTION/REPAIR OF AIRCRAFT PARTS.$11M
Jul 11, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0236336413THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO CLEAN, REPAIR, TOUCH UP, AND PAINT THE EXTERIOR SURFACE OF EXISTING AMCOM STATIC DISPLAYS. ADDITIONALLY, THIS STATEMENT OF WORK CONTAINS REQUIREMENTS FOR PROGRAM MANAGEMENT AND LOGISTICS SUPPORT.$45K
Jul 11, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0483336413THE STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE MODERNIZATION AND FIELDING OF THE PITOT STATIC TEST SYSTEM (PSTS).$11M
Jul 10, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0462336413THIS STATEMENT OF WORK DEFINES THE EFFORT REQUIRED TO PROVIDE A TACTICAL OPEN GOVERNMENT ARCHITECTURE HANDHELD GROUND CONTROL STATION TOGA H-GCS CONTROLLER KITS FOR PROGRAM MANAGER UNMANNED AERIAL SYSTEMS.$5.2M
Jul 2, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0286336413THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE, KIT, AND SHIP THE H-60M NGB FACILITIES EQUIPMENT.$9.1M
Jul 1, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0491336413THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE MISSION EQUIPMENT SUPPORT TO THE UH-60L AND UH-60M UNITED STATES CUSTOMS AND BORDER PROTECTION (CBP) AIRCRAFT. THE SOW DEFINES THE EFFORT REQUIRED TO PROCURE, FABRICATE, KIT, AND REWORK UH-60M AND UH-60L CUSTOMS AND BORDER PROTECTION (CBP) UNIQUE MISSION SYSTEMS REQUIRED TO MAINTAIN THE 60M AND 60L FIELDED AIRCRAFT.$249K
Jul 1, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0527336413THIS REQUIREMENT IS FOR THE PROCUREMENT OF TWENTY (20) ALL UP ROUND BALLATS (AURBB), GRADE B, BY THE UNITED STATES GOVERNMENT (USG) PROTOTYPE INTEGRATION FACILITY (PIF) FOR THE VIRGINIA CLASS NEW CONSTRUCTION SUBMARINES. THE CONTRACTOR SHALL PROVIDE AURBBS IN ACCORDANCE WITH DRAWING NUMBER 842695.$2.1M
Jun 19, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0503336413THE CONTRACTOR IS REQUIRED TO INSTALL NEW AVIONICS CAPABLE OF AUTOMATIC DEPENDENT SURVEILLANCE - BROADCAST (ADS-B) OUT OPERATIONS WITH THE AID OF THE LATEST TRAFFIC COLLISION AVOIDANCE SYSTEM (TCAS) UPGRADES INTEGRATED WITH THE EXISTING WIDE AREA AUGMENTATION SYSTEM (WAAS) LOCALIZER PERFORMANCE WITH VERTICAL GUIDANCE (LPV) CAPABLE FMS.$7.6M
Jun 7, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0311336413THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE PROCUREMENT, FABRICATION, INTEGRATION, KITTING, AND DELIVERY OF TWENTY-TWO (22) AH-1Z COBRA MISSION GRIP MOUNT SETS. EACH SET CONSISTS OF A PILOT AND CO-PILOT MOUNT. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS.$80K
Jun 5, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0242336413UH-60L/M ELECTRONIC STANDBY INSTRUMENT SYSTEM KIT FABRICATION$5.3M
May 30, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0187336413THE PURPOSE OF THIS STATEMENT OF WORK (SOW) IS TO DEFINE THE EFFORT TO PROVIDE TWO (2) EACH HH-60L MODIFICATION KITS IAW DRAWING PACKAGE 1063667, AND PROVIDE INSTALLATION OF PROVIDED KITS ON TWO (2) EACH HH-60L AIRCRAFT.$17M
May 29, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0212336413THIS SOW DEFINES THE EFFORT REQUIRED TO ESTABLISH A PREVENTIVE MAINTENANCE SCHEDULE FOR ON-SITE MANUFACTURING EQUIPMENT SPECIFIED BY THE GOVERNMENT FURNISHED EQUIPMENT (GFE) LIST ALONG WITH PURCHASING, MAINTAINING SPARE PARTS AND FLUIDS FOR A SAFE AND EFFECTIVE OPERATION TO MINIMIZE LOST TIME DUE TO REPAIRS. THIS IS A COST PLUS FIXED FEE COMPLETION EFFORT NOT TO EXCEED 12 MONTHS, WITH 4 ADDITIONAL 12 MONTH OPTIONS.$469K
May 28, 2019Department of DefenseW6QK ACC ANADW911KF19F0096336992REPAIR OF 100 RADIATORS.$271K
May 23, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0485336413THE CONTRACTOR IS REQUIRED TO PROVIDE REPLACEMENT BUSHINGS AND REPAIR INBOARD EDGES ON H-60M OUTBOARD STABILATORS.$474K
May 22, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0360336413THIS STATEMENT OF WORK DEFINES THE EFFORT REQUIRED TO PROVIDE TESTING AND FIELDING SUPPORT FOR PM AIR WARRIORS AIR SOLDIER AND ELECTRONIC DATA MANAGER EDM SYSTEMS.$295K
Apr 30, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0284336413THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT TO INTEGRATE AND DELIVER FOURTEEN (14) HIMARS ARMOR STORAGE CONTAINERS. IN AN EARLIER PHASE OF THIS PROGRAM TWO HIMARS ARMOR STORAGE CONTAINERS WERE DEVELOPED AS PROTOTYPES/DEMONSTRATORS.$871K
Apr 23, 2019Department of DefenseW6QK ACC ANADW911KF19F0031336992VARIOUS SUPPORT SERVICES - 1ST OPT PERIO$1.6M
Apr 15, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0363336413THIS SOW DEFINES THE EFFORT TO PROVIDE THE NAVAL UNDERSEA WARFARE CENTER (NUWC) WITH THE PROTOTYPE STRUCTURALLY INTEGRATED ENCLOSURES (SIE) FOR PMS397 MANAGED WEAPONS PLATFORMS.$230K
Apr 4, 2019Department of DefenseW6QK ACC ANADW911KF19F0063336992OTHER DIRECT COST - 1ST OPT PERIOD$131K
Apr 2, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0163336413THIS EFFORT IS TO PROVIDE PRODUCTION-REPRESENTATIVE HARDWARE KITS AND CORRESPONDING PRODUCTION SUPPORT FOR THE UH-60V PROGRAM.$77M
Mar 27, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0276336413THIS STATEMENT OF WORK (SOW) IDENTIFIES REQUIREMENTS TO BE ACCOMPLISHED BY THE CONTRACTOR IN SUPPORT OF THE PROTOTYPE INTEGRATION FACILITY (PIF) PALLETIZED FIELD ARTILLERY LAUNCHER (PFAL) DEVELOPMENT.$997K
Mar 15, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0265336413REQUIRED TO PROVIDE AIRCRAFT TECHNICIAN ADVISORY SUPPORT. THE CONTRACTOR SHALL PROVIDE ONE SHEET METAL ARTISAN ADVISER AND ONE AVIONICS ELECTRICIAN ARTISAN ADVISER.$86K
Mar 12, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0280336413THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE DEVELOPMENT, FABRICATION, INTEGRATION, TEST AND QUALIFICATION OF TACTICAL AND GROUND SUPPORT SYSTEMS, SUBSYSTEMS AND COMPONENTS FOR THE LOWER TIER PROJECT OFFICE (LTPO). THE LTPO REQUIRES THE MAINTENANCE AND UPGRADE TO THE PATRIOT MISSILE SYSTEM TEST EQUIPMENT AND COMPONENTS.$504K
Mar 1, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0247336413COMNAVAIRSYSCOM PROGRAM MANAGER AIR (PMA) -275 HAS A REQUIREMENT FOR THE PROTOTYPE INTEGRATION FACILITY (PIF) TO DEVELOP A V-22 COMMERCIAL MAINTENANCE CAPABILITY TO HELP SOLVE THE UNDER REQUIREMENT NEEDS FOR THE V-22 FLEET READINESS. UNDER THE PLANNED MAINTENANCE INTERVAL (PMI) SPECIFICATION THE AIRCRAFT IS REQUIRED EVERY 1,740 HOURS TO COMPLETELY INSPECT FOR THE STRUCTURE, MECHANICAL/DRIVETRAIN AND AVIONIC DAMAGES. THE WORKS INCLUDE V-22 AIRCRAFT INDUCTION, PLANNED MAINTENANCE INTERVAL (PMI) INSPECTION, DISCREPANCY CORRECTION, SCHEDULED MAINTENANCE AND TECHNICAL DIRECTIVE COMPLIANCE. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS.$3.9M
Feb 12, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0246336413THE CONTRACTOR SHALL FABRICATE, ASSEMBLE, PACKAGE, AND SHIP AH-64D BFT-2 KITS.$378K
Jan 17, 2019Department of DefenseW6QK ACC-RSAW58RGZ19F0171336413THIS STATEMENT OF WORK (SOW) DETAILS THE CONTRACTOR LOGISTICS SUPPORT (CLS) TASKS NECESSARY FOR OPERATIONAL FIELD SUPPORT AND OTHER SUSTAINMENT SUPPORT ACTIVITIES FOR THE AAQ-24 LARGE AIRCRAFT INFRARED COUNTERMEASURES (LAIRCM) SYSTEM WITH ADVANCED THREAT WARNING (ATW) SENSORS$6.0M
Jan 11, 2019Department of DefenseW6QK ACC ANADW911KF19F0031336992VARIOUS SUPPORT SERVICES - 1ST OPT PERIO$427K
Jan 2, 2019Department of DefenseW6QK ACC ANADW911KF19F0029336992OTHER DIRECT COST - 1ST OPT PERIOD$68K
Dec 21, 2018Department of DefenseW6QK ACC-RSAW58RGZ19F0172336413THE CONTRACTOR SHALL PROVIDE 107 FANS INSTALLATION KITS IN ACCORDANCE WITH THE GOVERNMENT FURNISHED DRAWINGS PACKAGE 1068784. INSTALLATION KITS SHALL CONTAIN A-KIT, AND THE B-KITS SHALL BE DELIVERED SEPARATELY. THE CONTRACTOR SHALL PROVIDE NINE SPARE FANS B-KITS. THE CONTRACTOR SHALL PROVIDE 29 NAVIGATIONAL DATABASE LOADERS. THE CONTRACTOR SHALL PROVIDE TWO YEARS OF MONTHLY NAVIGATIONAL DATABASE UPDATES FOR EACH FANS B-KIT DELIVERED AS PART OF THIS EFFORT. THE DATABASE UPDATES SHALL BE ACTIVATED UPON INSTALLATION INTO THE AIRCRAFT.$10M
Dec 20, 2018Department of DefenseW6QK ACC-RSAW58RGZ19F0162336413UH-60V A-KITS FOR LOW RATE INITIAL PRODUCTION FOR DIGITAL COCKPITS.$19M
Sep 19, 2018Department of DefenseW6QK ACC ANADW911KF18F0082336992OTHER DIRECT COST - 1ST OPT PERIOD$132K
Jul 30, 2018Department of DefenseW6QK ACC ANADW911KF18F0050336992SUPPORT SERVICES TO FABRICATE RECOIL PISTON RODS.$48K

Get Alerted Before Defense Systems And Solutions's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free