DateAgencyPIIDNAICSDescriptionAmount
Aug 16, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$1000K
Aug 3, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$821K
Aug 3, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$4K
Aug 2, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$476K
Jul 28, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$777K
Jul 28, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$12K
Jul 22, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$11K
Jul 20, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$8K
Jul 15, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$2.0M
Jul 9, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$7K
Jul 7, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$1.8M
Jun 10, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$3K
Jun 3, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$23K
Jun 2, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$4.3M
May 25, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$57K
May 19, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$28K
May 10, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$17K
May 5, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$130K
May 5, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$31K
May 5, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$45K
May 4, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$1.1M
Apr 9, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$20K
Apr 8, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$115K
Mar 4, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$53K
Feb 17, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$50K
Feb 12, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$861K
Feb 5, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$248K
Feb 4, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$3K
Feb 3, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$568K
Feb 3, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$206K
Feb 2, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$5K
Feb 1, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$527K
Feb 1, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$445K
Jan 29, 2021Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$305K
Dec 10, 2020Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$72K
Dec 7, 2020Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$458K
Nov 11, 2020Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$3.1M
Nov 2, 2020Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$157K
Oct 29, 2020Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$441K
Oct 29, 2020Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$10K
Oct 16, 2020Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$330K
Sep 30, 2020Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$526K
Sep 28, 2020Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$47K
Sep 22, 2020Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$51K
Sep 22, 2020Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$11K
Sep 10, 2020Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$489K
Sep 4, 2020Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$319K
Aug 24, 2020Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$1.3M
Aug 17, 2020Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$10K
Aug 14, 2020Department of DefenseW075 ENDIST SACRAMENTOW9123817C0025237990IGF::CT::IGF ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00$26K