DateAgencyPIIDNAICSDescriptionAmount
Apr 14, 2021Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS697DCK19C00127238220HVAC CONTROLS AND EQUIPMENT REPLACEMENT AT NEW ORLEANS INTERNATIONAL AIRPORT (MSY ATCT)$20K
Mar 22, 2021Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 71240LS21P0018484210COMPLETE MOVE OF THE CONTENTS OF THE EXISTING DIXIE NATIONAL FOREST SUPERVISORS/DISTRICT OFFICE LOCATED AT 1789 N WEDGEWOOD LANE IN CEDAR CITY UTAH PRIMARILY TO THE NEW OFFICE LOCATED AT 820 N MAIN STREET IN CEDAR CITY UTAH, WHICH IS 1.5 MILES AWAY.$17K
Mar 10, 2021Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 81240LT21P0014238990STOCKMORE DWELLING REMODEL PROJECT IS AWARDED IN ACCORDANCE WITH THE ATTACHED TERMS AND CONDITIONS.$25K
Dec 2, 2020Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS697DCK21C000232362201402670 REPLACE ALL EXTERIOR ENTRANCE DOORS TO THE BASE BUILDING ELP$67K
Nov 12, 2020Department of the InteriorMWR MIDWEST REGION(60000)140P6020C0009238990SERVICE, TRUMAN HOME DRIVEWAY PROJECT, HSTR$4K
Oct 29, 2020Department of DefenseW075 ENDIST SACRAMENTOW9123819C0034236220REPLACE WATER LINE, SEWER LINE AND STORM DRAIN$16K
Sep 30, 2020Department of DefenseW071 ENDIST SEATTLEW912DW20C0019238910ELECTRONIC ENTRY CONTROL SYSTEMS$815K
Sep 18, 2020Department of the InteriorMWR MIDWEST REGION(60000)140P6020C0009238990SERVICE, TRUMAN HOME DRIVEWAY PROJECT, HSTR$38K
Sep 18, 2020Department of DefenseFA4877 355 CONS PKFA487720C0040236220PKA REPAIR BUILDING 5423 FOR ALQ-188 POD CRF$2.4M
Sep 9, 2020Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS697DCK19C00127238220HVAC CONTROLS AND EQUIPMENT REPLACEMENT AT NEW ORLEANS INTERNATIONAL AIRPORT (MSY ATCT)$3K
Sep 3, 2020Department of DefenseW075 ENDIST SACRAMENTOW9123819C0034236220REPLACE WATER LINE, SEWER LINE AND STORM DRAIN$7K
Aug 26, 2020Department of DefenseW075 ENDIST SACRAMENTOW9123819C0034236220REPLACE WATER LINE, SEWER LINE AND STORM DRAIN$7K
Aug 13, 2020Department of the InteriorPWR LAME(81000)140P8120P0079238320EXTERIOR PAINTING OF 3 MODULAR BUILDINGS AT LAKE MEAD NRA$20K
Jul 30, 2020Department of AgricultureUSDA FOREST SERVICE1284N819C0003236220IGF::OT::IGF FLAMING GORGE RD OFFICE ADDITION - BASE BID PLUS OPTION A THIS PROJECT CONSISTS OF CONSTRUCTING AN OFFICE ADDITION OF APPROXIMATELY 3,225 SQUARE FEET TO THE EXISTING FLAMING GORGE RANGER DISTRICT OFFICE. THE FACILITY IS LOCATED IN MANILA, UTAH ON PROPERTY OWNED BY THE ASHLEY NATIONAL FOREST. THE PROJECT INCLUDES SOME SITE DEMOLITION, DISPOSAL AND PREPARATION FOR NEW CONSTRUCTION. THE CONTRACT INCLUDES THE CONSTRUCTION OF AN ADDITION THAT WILL BE CONNECTED BY A BREEZEWAY BETWEEN THE EXISTING BUILDING AND BUILDING ADDITION. CONTRACT PERIOD OF PERFORMANCE IS 270 CALENDAR DAYS FROM DATE OF ISSUANCE OF THE NOTICE TO PROCEED. AWARD IS FOR THE BASE BID ITEMS AND OPTION A ITEMS. OPTION B ITEMS ARE NOT AWARDED AT THIS TIME, BUT MAY BE EXERCISED DURING THE LIFE OF THIS CONTRACT. AWARD IS AS FOLLOWS: BASE AWARD ITEMS: MOBILIZATION AND BONDING $23,993.00 DIVISION 01: GENERAL CONDITIONS $236,711.00 DIVISION 02: EXISTING CONDITIONS $18,732.00 DIVISION 03: CONCRETE $57,693.00 DIVISION 05: METALS $28,795.00 DIVISION 06: WOOD, PLASTICS AND COMPOSITES $143,730.00 DIVISION 07: THERMAL AND MOISTURE PROTECTION $131,866.00 DIVISION 08: OPENINGS $55,857.00 DIVISION 09: FINISHES $104,723.00 DIVISION 10: SPECIALTIES $30,634.00 DIVISION 11 AND 12: EQUIPMENT AND FURNISHINGS $10,794.00 DIVISION 22: PLUMBING $44,400.00 DIVISION 23: HEATING, VENTILATION AND AIR CONDITIONING $56,890.00 DIVISION 26, 27, 28: ELECTRICAL, COMMUNICATIONS AND SECURITY $83,950.00 DIVISION 31 AND 32: EARTHWORK AND EXTERIOR IMPROVEMENTS $170,914.00 STEEL PLANTER BOXES ADJACENT TO BLDG $10,835.00 ELECTRICAL SERVICE AND FEEDER TO PANEL D $7,930.00 ELECTRICAL PARKING LOT LIGHTING AND DAMAGED COM CABLE $5,400.00 TOTAL BASE AWARD ITEMS: $1,223,747.00* ($100.00 DIFFERENCE IN TOTAL. AMOUNT OF $1,223,747.00 CONFIRMED CORRECT BY SAMMY LEE) BID OPTION A ITEMS: SITE FURNISHINGS: PICNIC TABLES $1,450.00 SITE FURNISHINGS: BIKE RACK $650.00 LANDSCAPE IRRIGATION SYSTEM $14,500.00 EXTERIOR PLANTS, PLANTING MEDIA, INSTALLATION OF GOVERNMENT FURNISHED BOULDERS $23,500.00 LANDSCAPE STONE, WEED BARRIER, STEEL EDGING $34,500.00 TOTAL OPTION A ITEMS: $74,600.00 TOTAL AWARD AMOUNT: $1,298,347.00 GOVERNMENT POINT OF CONTACT: LANCE VALENTINE PHONE: 435.781.5113$4K
Jul 1, 2020Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS697DCK19C00127238220HVAC CONTROLS AND EQUIPMENT REPLACEMENT AT NEW ORLEANS INTERNATIONAL AIRPORT (MSY ATCT)$112K
May 29, 2020Department of DefenseW075 ENDIST SACRAMENTOW9123819C0034236220REPLACE WATER LINE, SEWER LINE AND STORM DRAIN$19K
May 13, 2020Department of DefenseW075 ENDIST SACRAMENTOW9123819C0034236220REPLACE WATER LINE, SEWER LINE AND STORM DRAIN$96K
Apr 27, 2020Department of AgricultureUSDA FOREST SERVICE1284N819C0003236220IGF::OT::IGF FLAMING GORGE RD OFFICE ADDITION - BASE BID PLUS OPTION A THIS PROJECT CONSISTS OF CONSTRUCTING AN OFFICE ADDITION OF APPROXIMATELY 3,225 SQUARE FEET TO THE EXISTING FLAMING GORGE RANGER DISTRICT OFFICE. THE FACILITY IS LOCATED IN MANILA, UTAH ON PROPERTY OWNED BY THE ASHLEY NATIONAL FOREST. THE PROJECT INCLUDES SOME SITE DEMOLITION, DISPOSAL AND PREPARATION FOR NEW CONSTRUCTION. THE CONTRACT INCLUDES THE CONSTRUCTION OF AN ADDITION THAT WILL BE CONNECTED BY A BREEZEWAY BETWEEN THE EXISTING BUILDING AND BUILDING ADDITION. CONTRACT PERIOD OF PERFORMANCE IS 270 CALENDAR DAYS FROM DATE OF ISSUANCE OF THE NOTICE TO PROCEED. AWARD IS FOR THE BASE BID ITEMS AND OPTION A ITEMS. OPTION B ITEMS ARE NOT AWARDED AT THIS TIME, BUT MAY BE EXERCISED DURING THE LIFE OF THIS CONTRACT. AWARD IS AS FOLLOWS: BASE AWARD ITEMS: MOBILIZATION AND BONDING $23,993.00 DIVISION 01: GENERAL CONDITIONS $236,711.00 DIVISION 02: EXISTING CONDITIONS $18,732.00 DIVISION 03: CONCRETE $57,693.00 DIVISION 05: METALS $28,795.00 DIVISION 06: WOOD, PLASTICS AND COMPOSITES $143,730.00 DIVISION 07: THERMAL AND MOISTURE PROTECTION $131,866.00 DIVISION 08: OPENINGS $55,857.00 DIVISION 09: FINISHES $104,723.00 DIVISION 10: SPECIALTIES $30,634.00 DIVISION 11 AND 12: EQUIPMENT AND FURNISHINGS $10,794.00 DIVISION 22: PLUMBING $44,400.00 DIVISION 23: HEATING, VENTILATION AND AIR CONDITIONING $56,890.00 DIVISION 26, 27, 28: ELECTRICAL, COMMUNICATIONS AND SECURITY $83,950.00 DIVISION 31 AND 32: EARTHWORK AND EXTERIOR IMPROVEMENTS $170,914.00 STEEL PLANTER BOXES ADJACENT TO BLDG $10,835.00 ELECTRICAL SERVICE AND FEEDER TO PANEL D $7,930.00 ELECTRICAL PARKING LOT LIGHTING AND DAMAGED COM CABLE $5,400.00 TOTAL BASE AWARD ITEMS: $1,223,747.00* ($100.00 DIFFERENCE IN TOTAL. AMOUNT OF $1,223,747.00 CONFIRMED CORRECT BY SAMMY LEE) BID OPTION A ITEMS: SITE FURNISHINGS: PICNIC TABLES $1,450.00 SITE FURNISHINGS: BIKE RACK $650.00 LANDSCAPE IRRIGATION SYSTEM $14,500.00 EXTERIOR PLANTS, PLANTING MEDIA, INSTALLATION OF GOVERNMENT FURNISHED BOULDERS $23,500.00 LANDSCAPE STONE, WEED BARRIER, STEEL EDGING $34,500.00 TOTAL OPTION A ITEMS: $74,600.00 TOTAL AWARD AMOUNT: $1,298,347.00 GOVERNMENT POINT OF CONTACT: LANCE VALENTINE PHONE: 435.781.5113$2K
Apr 9, 2020Department of AgricultureUSDA FOREST SERVICE1284N819C0003236220IGF::OT::IGF FLAMING GORGE RD OFFICE ADDITION - BASE BID PLUS OPTION A THIS PROJECT CONSISTS OF CONSTRUCTING AN OFFICE ADDITION OF APPROXIMATELY 3,225 SQUARE FEET TO THE EXISTING FLAMING GORGE RANGER DISTRICT OFFICE. THE FACILITY IS LOCATED IN MANILA, UTAH ON PROPERTY OWNED BY THE ASHLEY NATIONAL FOREST. THE PROJECT INCLUDES SOME SITE DEMOLITION, DISPOSAL AND PREPARATION FOR NEW CONSTRUCTION. THE CONTRACT INCLUDES THE CONSTRUCTION OF AN ADDITION THAT WILL BE CONNECTED BY A BREEZEWAY BETWEEN THE EXISTING BUILDING AND BUILDING ADDITION. CONTRACT PERIOD OF PERFORMANCE IS 270 CALENDAR DAYS FROM DATE OF ISSUANCE OF THE NOTICE TO PROCEED. AWARD IS FOR THE BASE BID ITEMS AND OPTION A ITEMS. OPTION B ITEMS ARE NOT AWARDED AT THIS TIME, BUT MAY BE EXERCISED DURING THE LIFE OF THIS CONTRACT. AWARD IS AS FOLLOWS: BASE AWARD ITEMS: MOBILIZATION AND BONDING $23,993.00 DIVISION 01: GENERAL CONDITIONS $236,711.00 DIVISION 02: EXISTING CONDITIONS $18,732.00 DIVISION 03: CONCRETE $57,693.00 DIVISION 05: METALS $28,795.00 DIVISION 06: WOOD, PLASTICS AND COMPOSITES $143,730.00 DIVISION 07: THERMAL AND MOISTURE PROTECTION $131,866.00 DIVISION 08: OPENINGS $55,857.00 DIVISION 09: FINISHES $104,723.00 DIVISION 10: SPECIALTIES $30,634.00 DIVISION 11 AND 12: EQUIPMENT AND FURNISHINGS $10,794.00 DIVISION 22: PLUMBING $44,400.00 DIVISION 23: HEATING, VENTILATION AND AIR CONDITIONING $56,890.00 DIVISION 26, 27, 28: ELECTRICAL, COMMUNICATIONS AND SECURITY $83,950.00 DIVISION 31 AND 32: EARTHWORK AND EXTERIOR IMPROVEMENTS $170,914.00 STEEL PLANTER BOXES ADJACENT TO BLDG $10,835.00 ELECTRICAL SERVICE AND FEEDER TO PANEL D $7,930.00 ELECTRICAL PARKING LOT LIGHTING AND DAMAGED COM CABLE $5,400.00 TOTAL BASE AWARD ITEMS: $1,223,747.00* ($100.00 DIFFERENCE IN TOTAL. AMOUNT OF $1,223,747.00 CONFIRMED CORRECT BY SAMMY LEE) BID OPTION A ITEMS: SITE FURNISHINGS: PICNIC TABLES $1,450.00 SITE FURNISHINGS: BIKE RACK $650.00 LANDSCAPE IRRIGATION SYSTEM $14,500.00 EXTERIOR PLANTS, PLANTING MEDIA, INSTALLATION OF GOVERNMENT FURNISHED BOULDERS $23,500.00 LANDSCAPE STONE, WEED BARRIER, STEEL EDGING $34,500.00 TOTAL OPTION A ITEMS: $74,600.00 TOTAL AWARD AMOUNT: $1,298,347.00 GOVERNMENT POINT OF CONTACT: LANCE VALENTINE PHONE: 435.781.5113$2K
Feb 26, 2020Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS697DCK19C00087238220REFURBISH AIR HANDLER UNITS (AHUS) AT THE DENVER AIR ROUTE TRAFFIC CONTROL CENTER IN LONGMONT, COLORADO.$1K
Jan 30, 2020Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS697DCK19C00155236220AWARD - REMOVE AND REPLACE 4 AHUS IN THE FIRST FLOOR AUTOMATION WING$13K
Jan 24, 2020Department of AgricultureUSDA FOREST SERVICE1284N819C0003236220IGF::OT::IGF FLAMING GORGE RD OFFICE ADDITION - BASE BID PLUS OPTION A THIS PROJECT CONSISTS OF CONSTRUCTING AN OFFICE ADDITION OF APPROXIMATELY 3,225 SQUARE FEET TO THE EXISTING FLAMING GORGE RANGER DISTRICT OFFICE. THE FACILITY IS LOCATED IN MANILA, UTAH ON PROPERTY OWNED BY THE ASHLEY NATIONAL FOREST. THE PROJECT INCLUDES SOME SITE DEMOLITION, DISPOSAL AND PREPARATION FOR NEW CONSTRUCTION. THE CONTRACT INCLUDES THE CONSTRUCTION OF AN ADDITION THAT WILL BE CONNECTED BY A BREEZEWAY BETWEEN THE EXISTING BUILDING AND BUILDING ADDITION. CONTRACT PERIOD OF PERFORMANCE IS 270 CALENDAR DAYS FROM DATE OF ISSUANCE OF THE NOTICE TO PROCEED. AWARD IS FOR THE BASE BID ITEMS AND OPTION A ITEMS. OPTION B ITEMS ARE NOT AWARDED AT THIS TIME, BUT MAY BE EXERCISED DURING THE LIFE OF THIS CONTRACT. AWARD IS AS FOLLOWS: BASE AWARD ITEMS: MOBILIZATION AND BONDING $23,993.00 DIVISION 01: GENERAL CONDITIONS $236,711.00 DIVISION 02: EXISTING CONDITIONS $18,732.00 DIVISION 03: CONCRETE $57,693.00 DIVISION 05: METALS $28,795.00 DIVISION 06: WOOD, PLASTICS AND COMPOSITES $143,730.00 DIVISION 07: THERMAL AND MOISTURE PROTECTION $131,866.00 DIVISION 08: OPENINGS $55,857.00 DIVISION 09: FINISHES $104,723.00 DIVISION 10: SPECIALTIES $30,634.00 DIVISION 11 AND 12: EQUIPMENT AND FURNISHINGS $10,794.00 DIVISION 22: PLUMBING $44,400.00 DIVISION 23: HEATING, VENTILATION AND AIR CONDITIONING $56,890.00 DIVISION 26, 27, 28: ELECTRICAL, COMMUNICATIONS AND SECURITY $83,950.00 DIVISION 31 AND 32: EARTHWORK AND EXTERIOR IMPROVEMENTS $170,914.00 STEEL PLANTER BOXES ADJACENT TO BLDG $10,835.00 ELECTRICAL SERVICE AND FEEDER TO PANEL D $7,930.00 ELECTRICAL PARKING LOT LIGHTING AND DAMAGED COM CABLE $5,400.00 TOTAL BASE AWARD ITEMS: $1,223,747.00* ($100.00 DIFFERENCE IN TOTAL. AMOUNT OF $1,223,747.00 CONFIRMED CORRECT BY SAMMY LEE) BID OPTION A ITEMS: SITE FURNISHINGS: PICNIC TABLES $1,450.00 SITE FURNISHINGS: BIKE RACK $650.00 LANDSCAPE IRRIGATION SYSTEM $14,500.00 EXTERIOR PLANTS, PLANTING MEDIA, INSTALLATION OF GOVERNMENT FURNISHED BOULDERS $23,500.00 LANDSCAPE STONE, WEED BARRIER, STEEL EDGING $34,500.00 TOTAL OPTION A ITEMS: $74,600.00 TOTAL AWARD AMOUNT: $1,298,347.00 GOVERNMENT POINT OF CONTACT: LANCE VALENTINE PHONE: 435.781.5113$11K
Jan 24, 2020Department of AgricultureUSDA FOREST SERVICE1284N819C0003236220IGF::OT::IGF FLAMING GORGE RD OFFICE ADDITION - BASE BID PLUS OPTION A THIS PROJECT CONSISTS OF CONSTRUCTING AN OFFICE ADDITION OF APPROXIMATELY 3,225 SQUARE FEET TO THE EXISTING FLAMING GORGE RANGER DISTRICT OFFICE. THE FACILITY IS LOCATED IN MANILA, UTAH ON PROPERTY OWNED BY THE ASHLEY NATIONAL FOREST. THE PROJECT INCLUDES SOME SITE DEMOLITION, DISPOSAL AND PREPARATION FOR NEW CONSTRUCTION. THE CONTRACT INCLUDES THE CONSTRUCTION OF AN ADDITION THAT WILL BE CONNECTED BY A BREEZEWAY BETWEEN THE EXISTING BUILDING AND BUILDING ADDITION. CONTRACT PERIOD OF PERFORMANCE IS 270 CALENDAR DAYS FROM DATE OF ISSUANCE OF THE NOTICE TO PROCEED. AWARD IS FOR THE BASE BID ITEMS AND OPTION A ITEMS. OPTION B ITEMS ARE NOT AWARDED AT THIS TIME, BUT MAY BE EXERCISED DURING THE LIFE OF THIS CONTRACT. AWARD IS AS FOLLOWS: BASE AWARD ITEMS: MOBILIZATION AND BONDING $23,993.00 DIVISION 01: GENERAL CONDITIONS $236,711.00 DIVISION 02: EXISTING CONDITIONS $18,732.00 DIVISION 03: CONCRETE $57,693.00 DIVISION 05: METALS $28,795.00 DIVISION 06: WOOD, PLASTICS AND COMPOSITES $143,730.00 DIVISION 07: THERMAL AND MOISTURE PROTECTION $131,866.00 DIVISION 08: OPENINGS $55,857.00 DIVISION 09: FINISHES $104,723.00 DIVISION 10: SPECIALTIES $30,634.00 DIVISION 11 AND 12: EQUIPMENT AND FURNISHINGS $10,794.00 DIVISION 22: PLUMBING $44,400.00 DIVISION 23: HEATING, VENTILATION AND AIR CONDITIONING $56,890.00 DIVISION 26, 27, 28: ELECTRICAL, COMMUNICATIONS AND SECURITY $83,950.00 DIVISION 31 AND 32: EARTHWORK AND EXTERIOR IMPROVEMENTS $170,914.00 STEEL PLANTER BOXES ADJACENT TO BLDG $10,835.00 ELECTRICAL SERVICE AND FEEDER TO PANEL D $7,930.00 ELECTRICAL PARKING LOT LIGHTING AND DAMAGED COM CABLE $5,400.00 TOTAL BASE AWARD ITEMS: $1,223,747.00* ($100.00 DIFFERENCE IN TOTAL. AMOUNT OF $1,223,747.00 CONFIRMED CORRECT BY SAMMY LEE) BID OPTION A ITEMS: SITE FURNISHINGS: PICNIC TABLES $1,450.00 SITE FURNISHINGS: BIKE RACK $650.00 LANDSCAPE IRRIGATION SYSTEM $14,500.00 EXTERIOR PLANTS, PLANTING MEDIA, INSTALLATION OF GOVERNMENT FURNISHED BOULDERS $23,500.00 LANDSCAPE STONE, WEED BARRIER, STEEL EDGING $34,500.00 TOTAL OPTION A ITEMS: $74,600.00 TOTAL AWARD AMOUNT: $1,298,347.00 GOVERNMENT POINT OF CONTACT: LANCE VALENTINE PHONE: 435.781.5113$5K
Jan 24, 2020Department of AgricultureUSDA FOREST SERVICE1284N819C0003236220IGF::OT::IGF FLAMING GORGE RD OFFICE ADDITION - BASE BID PLUS OPTION A THIS PROJECT CONSISTS OF CONSTRUCTING AN OFFICE ADDITION OF APPROXIMATELY 3,225 SQUARE FEET TO THE EXISTING FLAMING GORGE RANGER DISTRICT OFFICE. THE FACILITY IS LOCATED IN MANILA, UTAH ON PROPERTY OWNED BY THE ASHLEY NATIONAL FOREST. THE PROJECT INCLUDES SOME SITE DEMOLITION, DISPOSAL AND PREPARATION FOR NEW CONSTRUCTION. THE CONTRACT INCLUDES THE CONSTRUCTION OF AN ADDITION THAT WILL BE CONNECTED BY A BREEZEWAY BETWEEN THE EXISTING BUILDING AND BUILDING ADDITION. CONTRACT PERIOD OF PERFORMANCE IS 270 CALENDAR DAYS FROM DATE OF ISSUANCE OF THE NOTICE TO PROCEED. AWARD IS FOR THE BASE BID ITEMS AND OPTION A ITEMS. OPTION B ITEMS ARE NOT AWARDED AT THIS TIME, BUT MAY BE EXERCISED DURING THE LIFE OF THIS CONTRACT. AWARD IS AS FOLLOWS: BASE AWARD ITEMS: MOBILIZATION AND BONDING $23,993.00 DIVISION 01: GENERAL CONDITIONS $236,711.00 DIVISION 02: EXISTING CONDITIONS $18,732.00 DIVISION 03: CONCRETE $57,693.00 DIVISION 05: METALS $28,795.00 DIVISION 06: WOOD, PLASTICS AND COMPOSITES $143,730.00 DIVISION 07: THERMAL AND MOISTURE PROTECTION $131,866.00 DIVISION 08: OPENINGS $55,857.00 DIVISION 09: FINISHES $104,723.00 DIVISION 10: SPECIALTIES $30,634.00 DIVISION 11 AND 12: EQUIPMENT AND FURNISHINGS $10,794.00 DIVISION 22: PLUMBING $44,400.00 DIVISION 23: HEATING, VENTILATION AND AIR CONDITIONING $56,890.00 DIVISION 26, 27, 28: ELECTRICAL, COMMUNICATIONS AND SECURITY $83,950.00 DIVISION 31 AND 32: EARTHWORK AND EXTERIOR IMPROVEMENTS $170,914.00 STEEL PLANTER BOXES ADJACENT TO BLDG $10,835.00 ELECTRICAL SERVICE AND FEEDER TO PANEL D $7,930.00 ELECTRICAL PARKING LOT LIGHTING AND DAMAGED COM CABLE $5,400.00 TOTAL BASE AWARD ITEMS: $1,223,747.00* ($100.00 DIFFERENCE IN TOTAL. AMOUNT OF $1,223,747.00 CONFIRMED CORRECT BY SAMMY LEE) BID OPTION A ITEMS: SITE FURNISHINGS: PICNIC TABLES $1,450.00 SITE FURNISHINGS: BIKE RACK $650.00 LANDSCAPE IRRIGATION SYSTEM $14,500.00 EXTERIOR PLANTS, PLANTING MEDIA, INSTALLATION OF GOVERNMENT FURNISHED BOULDERS $23,500.00 LANDSCAPE STONE, WEED BARRIER, STEEL EDGING $34,500.00 TOTAL OPTION A ITEMS: $74,600.00 TOTAL AWARD AMOUNT: $1,298,347.00 GOVERNMENT POINT OF CONTACT: LANCE VALENTINE PHONE: 435.781.5113$1K
Jan 24, 2020Department of AgricultureUSDA FOREST SERVICE1284N819C0003236220IGF::OT::IGF FLAMING GORGE RD OFFICE ADDITION - BASE BID PLUS OPTION A THIS PROJECT CONSISTS OF CONSTRUCTING AN OFFICE ADDITION OF APPROXIMATELY 3,225 SQUARE FEET TO THE EXISTING FLAMING GORGE RANGER DISTRICT OFFICE. THE FACILITY IS LOCATED IN MANILA, UTAH ON PROPERTY OWNED BY THE ASHLEY NATIONAL FOREST. THE PROJECT INCLUDES SOME SITE DEMOLITION, DISPOSAL AND PREPARATION FOR NEW CONSTRUCTION. THE CONTRACT INCLUDES THE CONSTRUCTION OF AN ADDITION THAT WILL BE CONNECTED BY A BREEZEWAY BETWEEN THE EXISTING BUILDING AND BUILDING ADDITION. CONTRACT PERIOD OF PERFORMANCE IS 270 CALENDAR DAYS FROM DATE OF ISSUANCE OF THE NOTICE TO PROCEED. AWARD IS FOR THE BASE BID ITEMS AND OPTION A ITEMS. OPTION B ITEMS ARE NOT AWARDED AT THIS TIME, BUT MAY BE EXERCISED DURING THE LIFE OF THIS CONTRACT. AWARD IS AS FOLLOWS: BASE AWARD ITEMS: MOBILIZATION AND BONDING $23,993.00 DIVISION 01: GENERAL CONDITIONS $236,711.00 DIVISION 02: EXISTING CONDITIONS $18,732.00 DIVISION 03: CONCRETE $57,693.00 DIVISION 05: METALS $28,795.00 DIVISION 06: WOOD, PLASTICS AND COMPOSITES $143,730.00 DIVISION 07: THERMAL AND MOISTURE PROTECTION $131,866.00 DIVISION 08: OPENINGS $55,857.00 DIVISION 09: FINISHES $104,723.00 DIVISION 10: SPECIALTIES $30,634.00 DIVISION 11 AND 12: EQUIPMENT AND FURNISHINGS $10,794.00 DIVISION 22: PLUMBING $44,400.00 DIVISION 23: HEATING, VENTILATION AND AIR CONDITIONING $56,890.00 DIVISION 26, 27, 28: ELECTRICAL, COMMUNICATIONS AND SECURITY $83,950.00 DIVISION 31 AND 32: EARTHWORK AND EXTERIOR IMPROVEMENTS $170,914.00 STEEL PLANTER BOXES ADJACENT TO BLDG $10,835.00 ELECTRICAL SERVICE AND FEEDER TO PANEL D $7,930.00 ELECTRICAL PARKING LOT LIGHTING AND DAMAGED COM CABLE $5,400.00 TOTAL BASE AWARD ITEMS: $1,223,747.00* ($100.00 DIFFERENCE IN TOTAL. AMOUNT OF $1,223,747.00 CONFIRMED CORRECT BY SAMMY LEE) BID OPTION A ITEMS: SITE FURNISHINGS: PICNIC TABLES $1,450.00 SITE FURNISHINGS: BIKE RACK $650.00 LANDSCAPE IRRIGATION SYSTEM $14,500.00 EXTERIOR PLANTS, PLANTING MEDIA, INSTALLATION OF GOVERNMENT FURNISHED BOULDERS $23,500.00 LANDSCAPE STONE, WEED BARRIER, STEEL EDGING $34,500.00 TOTAL OPTION A ITEMS: $74,600.00 TOTAL AWARD AMOUNT: $1,298,347.00 GOVERNMENT POINT OF CONTACT: LANCE VALENTINE PHONE: 435.781.5113$33K
Sep 26, 2019Department of DefenseFA8201 AFSC OL H PZIOFA820116C0025236220IGF::OT::IGF CONSTRUCTION GOLF COUSE CLUBHOUSE$201K
Sep 17, 2019Department of DefenseW075 ENDIST SACRAMENTOW9123819C0034236220REPLACE WATER LINE, SEWER LINE AND STORM DRAIN$865K
Aug 8, 2019Department of DefenseW7N3 USPFO ACTIVITY UT ARNGW911YP18C2300238220IGF::OT::IGF REPAIR FIRE SUPPRESSION SYSTEM$35K
Aug 6, 2019Department of AgricultureUSDA FOREST SERVICE1284N819C0005238990LUCERNE MARINA FLOATING SANITATION FACILITIES- PER SPECIFICATIONS, TECHNICAL PROPOSAL AND PRICING.$310K
Jul 22, 2019Department of AgricultureUSDA FOREST SERVICE1284N819C0003236220IGF::OT::IGF FLAMING GORGE RD OFFICE ADDITION - BASE BID PLUS OPTION A THIS PROJECT CONSISTS OF CONSTRUCTING AN OFFICE ADDITION OF APPROXIMATELY 3,225 SQUARE FEET TO THE EXISTING FLAMING GORGE RANGER DISTRICT OFFICE. THE FACILITY IS LOCATED IN MANILA, UTAH ON PROPERTY OWNED BY THE ASHLEY NATIONAL FOREST. THE PROJECT INCLUDES SOME SITE DEMOLITION, DISPOSAL AND PREPARATION FOR NEW CONSTRUCTION. THE CONTRACT INCLUDES THE CONSTRUCTION OF AN ADDITION THAT WILL BE CONNECTED BY A BREEZEWAY BETWEEN THE EXISTING BUILDING AND BUILDING ADDITION. CONTRACT PERIOD OF PERFORMANCE IS 270 CALENDAR DAYS FROM DATE OF ISSUANCE OF THE NOTICE TO PROCEED. AWARD IS FOR THE BASE BID ITEMS AND OPTION A ITEMS. OPTION B ITEMS ARE NOT AWARDED AT THIS TIME, BUT MAY BE EXERCISED DURING THE LIFE OF THIS CONTRACT. AWARD IS AS FOLLOWS: BASE AWARD ITEMS: MOBILIZATION AND BONDING $23,993.00 DIVISION 01: GENERAL CONDITIONS $236,711.00 DIVISION 02: EXISTING CONDITIONS $18,732.00 DIVISION 03: CONCRETE $57,693.00 DIVISION 05: METALS $28,795.00 DIVISION 06: WOOD, PLASTICS AND COMPOSITES $143,730.00 DIVISION 07: THERMAL AND MOISTURE PROTECTION $131,866.00 DIVISION 08: OPENINGS $55,857.00 DIVISION 09: FINISHES $104,723.00 DIVISION 10: SPECIALTIES $30,634.00 DIVISION 11 AND 12: EQUIPMENT AND FURNISHINGS $10,794.00 DIVISION 22: PLUMBING $44,400.00 DIVISION 23: HEATING, VENTILATION AND AIR CONDITIONING $56,890.00 DIVISION 26, 27, 28: ELECTRICAL, COMMUNICATIONS AND SECURITY $83,950.00 DIVISION 31 AND 32: EARTHWORK AND EXTERIOR IMPROVEMENTS $170,914.00 STEEL PLANTER BOXES ADJACENT TO BLDG $10,835.00 ELECTRICAL SERVICE AND FEEDER TO PANEL D $7,930.00 ELECTRICAL PARKING LOT LIGHTING AND DAMAGED COM CABLE $5,400.00 TOTAL BASE AWARD ITEMS: $1,223,747.00* ($100.00 DIFFERENCE IN TOTAL. AMOUNT OF $1,223,747.00 CONFIRMED CORRECT BY SAMMY LEE) BID OPTION A ITEMS: SITE FURNISHINGS: PICNIC TABLES $1,450.00 SITE FURNISHINGS: BIKE RACK $650.00 LANDSCAPE IRRIGATION SYSTEM $14,500.00 EXTERIOR PLANTS, PLANTING MEDIA, INSTALLATION OF GOVERNMENT FURNISHED BOULDERS $23,500.00 LANDSCAPE STONE, WEED BARRIER, STEEL EDGING $34,500.00 TOTAL OPTION A ITEMS: $74,600.00 TOTAL AWARD AMOUNT: $1,298,347.00 GOVERNMENT POINT OF CONTACT: LANCE VALENTINE PHONE: 435.781.5113$1K
Jun 3, 2019Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS697DCK19C00155236220AWARD - REMOVE AND REPLACE 4 AHUS IN THE FIRST FLOOR AUTOMATION WING$243K
May 14, 2019Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS697DCK19C00127238220HVAC CONTROLS AND EQUIPMENT REPLACEMENT AT NEW ORLEANS INTERNATIONAL AIRPORT (MSY ATCT)$858K
Apr 15, 2019Department of AgricultureUSDA FOREST SERVICE1284N819C0003236220IGF::OT::IGF FLAMING GORGE RD OFFICE ADDITION - BASE BID PLUS OPTION A THIS PROJECT CONSISTS OF CONSTRUCTING AN OFFICE ADDITION OF APPROXIMATELY 3,225 SQUARE FEET TO THE EXISTING FLAMING GORGE RANGER DISTRICT OFFICE. THE FACILITY IS LOCATED IN MANILA, UTAH ON PROPERTY OWNED BY THE ASHLEY NATIONAL FOREST. THE PROJECT INCLUDES SOME SITE DEMOLITION, DISPOSAL AND PREPARATION FOR NEW CONSTRUCTION. THE CONTRACT INCLUDES THE CONSTRUCTION OF AN ADDITION THAT WILL BE CONNECTED BY A BREEZEWAY BETWEEN THE EXISTING BUILDING AND BUILDING ADDITION. CONTRACT PERIOD OF PERFORMANCE IS 270 CALENDAR DAYS FROM DATE OF ISSUANCE OF THE NOTICE TO PROCEED. AWARD IS FOR THE BASE BID ITEMS AND OPTION A ITEMS. OPTION B ITEMS ARE NOT AWARDED AT THIS TIME, BUT MAY BE EXERCISED DURING THE LIFE OF THIS CONTRACT. AWARD IS AS FOLLOWS: BASE AWARD ITEMS: MOBILIZATION AND BONDING $23,993.00 DIVISION 01: GENERAL CONDITIONS $236,711.00 DIVISION 02: EXISTING CONDITIONS $18,732.00 DIVISION 03: CONCRETE $57,693.00 DIVISION 05: METALS $28,795.00 DIVISION 06: WOOD, PLASTICS AND COMPOSITES $143,730.00 DIVISION 07: THERMAL AND MOISTURE PROTECTION $131,866.00 DIVISION 08: OPENINGS $55,857.00 DIVISION 09: FINISHES $104,723.00 DIVISION 10: SPECIALTIES $30,634.00 DIVISION 11 AND 12: EQUIPMENT AND FURNISHINGS $10,794.00 DIVISION 22: PLUMBING $44,400.00 DIVISION 23: HEATING, VENTILATION AND AIR CONDITIONING $56,890.00 DIVISION 26, 27, 28: ELECTRICAL, COMMUNICATIONS AND SECURITY $83,950.00 DIVISION 31 AND 32: EARTHWORK AND EXTERIOR IMPROVEMENTS $170,914.00 STEEL PLANTER BOXES ADJACENT TO BLDG $10,835.00 ELECTRICAL SERVICE AND FEEDER TO PANEL D $7,930.00 ELECTRICAL PARKING LOT LIGHTING AND DAMAGED COM CABLE $5,400.00 TOTAL BASE AWARD ITEMS: $1,223,747.00* ($100.00 DIFFERENCE IN TOTAL. AMOUNT OF $1,223,747.00 CONFIRMED CORRECT BY SAMMY LEE) BID OPTION A ITEMS: SITE FURNISHINGS: PICNIC TABLES $1,450.00 SITE FURNISHINGS: BIKE RACK $650.00 LANDSCAPE IRRIGATION SYSTEM $14,500.00 EXTERIOR PLANTS, PLANTING MEDIA, INSTALLATION OF GOVERNMENT FURNISHED BOULDERS $23,500.00 LANDSCAPE STONE, WEED BARRIER, STEEL EDGING $34,500.00 TOTAL OPTION A ITEMS: $74,600.00 TOTAL AWARD AMOUNT: $1,298,347.00 GOVERNMENT POINT OF CONTACT: LANCE VALENTINE PHONE: 435.781.5113$97K
Mar 29, 2019Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS697DCK19C00087238220REFURBISH AIR HANDLER UNITS (AHUS) AT THE DENVER AIR ROUTE TRAFFIC CONTROL CENTER IN LONGMONT, COLORADO.$383K
Mar 26, 2019Department of AgricultureUSDA FOREST SERVICE1284N819C0003236220IGF::OT::IGF FLAMING GORGE RD OFFICE ADDITION - BASE BID PLUS OPTION A THIS PROJECT CONSISTS OF CONSTRUCTING AN OFFICE ADDITION OF APPROXIMATELY 3,225 SQUARE FEET TO THE EXISTING FLAMING GORGE RANGER DISTRICT OFFICE. THE FACILITY IS LOCATED IN MANILA, UTAH ON PROPERTY OWNED BY THE ASHLEY NATIONAL FOREST. THE PROJECT INCLUDES SOME SITE DEMOLITION, DISPOSAL AND PREPARATION FOR NEW CONSTRUCTION. THE CONTRACT INCLUDES THE CONSTRUCTION OF AN ADDITION THAT WILL BE CONNECTED BY A BREEZEWAY BETWEEN THE EXISTING BUILDING AND BUILDING ADDITION. CONTRACT PERIOD OF PERFORMANCE IS 270 CALENDAR DAYS FROM DATE OF ISSUANCE OF THE NOTICE TO PROCEED. AWARD IS FOR THE BASE BID ITEMS AND OPTION A ITEMS. OPTION B ITEMS ARE NOT AWARDED AT THIS TIME, BUT MAY BE EXERCISED DURING THE LIFE OF THIS CONTRACT. AWARD IS AS FOLLOWS: BASE AWARD ITEMS: MOBILIZATION AND BONDING $23,993.00 DIVISION 01: GENERAL CONDITIONS $236,711.00 DIVISION 02: EXISTING CONDITIONS $18,732.00 DIVISION 03: CONCRETE $57,693.00 DIVISION 05: METALS $28,795.00 DIVISION 06: WOOD, PLASTICS AND COMPOSITES $143,730.00 DIVISION 07: THERMAL AND MOISTURE PROTECTION $131,866.00 DIVISION 08: OPENINGS $55,857.00 DIVISION 09: FINISHES $104,723.00 DIVISION 10: SPECIALTIES $30,634.00 DIVISION 11 AND 12: EQUIPMENT AND FURNISHINGS $10,794.00 DIVISION 22: PLUMBING $44,400.00 DIVISION 23: HEATING, VENTILATION AND AIR CONDITIONING $56,890.00 DIVISION 26, 27, 28: ELECTRICAL, COMMUNICATIONS AND SECURITY $83,950.00 DIVISION 31 AND 32: EARTHWORK AND EXTERIOR IMPROVEMENTS $170,914.00 STEEL PLANTER BOXES ADJACENT TO BLDG $10,835.00 ELECTRICAL SERVICE AND FEEDER TO PANEL D $7,930.00 ELECTRICAL PARKING LOT LIGHTING AND DAMAGED COM CABLE $5,400.00 TOTAL BASE AWARD ITEMS: $1,223,747.00* ($100.00 DIFFERENCE IN TOTAL. AMOUNT OF $1,223,747.00 CONFIRMED CORRECT BY SAMMY LEE) BID OPTION A ITEMS: SITE FURNISHINGS: PICNIC TABLES $1,450.00 SITE FURNISHINGS: BIKE RACK $650.00 LANDSCAPE IRRIGATION SYSTEM $14,500.00 EXTERIOR PLANTS, PLANTING MEDIA, INSTALLATION OF GOVERNMENT FURNISHED BOULDERS $23,500.00 LANDSCAPE STONE, WEED BARRIER, STEEL EDGING $34,500.00 TOTAL OPTION A ITEMS: $74,600.00 TOTAL AWARD AMOUNT: $1,298,347.00 GOVERNMENT POINT OF CONTACT: LANCE VALENTINE PHONE: 435.781.5113$1.3M
Nov 14, 2018Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS697DCK18C00316238160IGF::CT::IGF CHICAGO MIDWAY ATCT/BASE BUILDING ROOF REPLACEMENT$54K
Oct 29, 2018Department of DefenseFA8201 AFSC OL H PZIOFA820116C0025236220IGF::OT::IGF CONSTRUCTION GOLF COUSE CLUBHOUSE$114K
Sep 29, 2018Department of DefenseW7N3 USPFO ACTIVITY UT ARNGW911YP18C2300238220IGF::OT::IGF REPAIR FIRE SUPPRESSION SYSTEM$429K
Aug 28, 2018Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS697DCK18C00316238160IGF::CT::IGF CHICAGO MIDWAY ATCT/BASE BUILDING ROOF REPLACEMENT$405K
Jul 30, 2018Department of DefenseFA8201 AFSC OL H PZIOFA820116C0025236220IGF::OT::IGF CONSTRUCTION GOLF COUSE CLUBHOUSE$808K
May 31, 2018Department of DefenseDLA DISTRIBUTIONSP330017C0018238210IGF::OT::IGF!8504783339!REMOVE AND REPLA$32K
Mar 14, 2018Department of Transportation697DCC SOUTHWEST REGION, LOGISTICSDTFASA17C00661238220IGF::OT::IGF REPLACE HVAC UNITS AT THE KALAMAZOO ASR FACILITY, KALAMAZOO/BATTLE CREEK INT'L AIRPORT, KALAMAZOO, MICHIGAN$29K
Feb 28, 2018Department of Transportation697DCC SOUTHWEST REGION, LOGISTICSDTFASA17C00661238220IGF::OT::IGF REPLACE HVAC UNITS AT THE KALAMAZOO ASR FACILITY, KALAMAZOO/BATTLE CREEK INT'L AIRPORT, KALAMAZOO, MICHIGAN$1K
Jan 22, 2018Department of DefenseDLA DISTRIBUTIONSP330017C0018238210IGF::OT::IGF!8504783339!REMOVE AND REPLA$13K
Oct 31, 2017Department of Transportation6973FK MIKE MONRONEY AERO CNTRDTFAAC17C00054238170IGF::OT::IGF$6K
Oct 25, 2017Department of Transportation697DCC SOUTHWEST REGION, LOGISTICSDTFASA17C00661238220IGF::OT::IGF REPLACE HVAC UNITS AT THE KALAMAZOO ASR FACILITY, KALAMAZOO/BATTLE CREEK INT'L AIRPORT, KALAMAZOO, MICHIGAN$24K
Sep 28, 2017Department of AgricultureUSDA ARS WBSC ACQUISITION BRANCHAG32SDC170102238160IGF::OT::IGF REPLACE ROOF SYSTEM ON BUILDINGS 1-5. INSTALL HIGH DENSITY POLYSOCYANURATE FOAM INSULATING BOARD&60 MIL SINGLE PLY TPO MEMBRANE.$338K
Sep 27, 2017Department of DefenseFA8201 AFSC OL H PZIOFA820116C0026238210IGF::OT::IGF INSTALL FIRE ALARMS FOR ALL OF B238$5K
Sep 25, 2017Department of DefenseDLA DISTRIBUTIONSP330017C0018238210IGF::OT::IGF!8504783339!REMOVE AND REPLA$237K
Sep 8, 2017Department of Transportation6973FK MIKE MONRONEY AERO CNTRDTFAAC17C00054238170IGF::OT::IGF$120K