Federal Contractor Profile
Gwwo, INC.
$46M obligated·201 awards·3 agencies·2 NAICS
Federal Contracts
Showing contracts 251–297 of 297 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Jul 18, 2017 | Smithsonian InstitutionSMITHSONIAN INSTITUTION | F16CW10483 | 541310 | RENOVATE HOMESTEAD (SELLMAN) HOUSE, SERC IGF::OT::IGF | $19K |
| Jun 16, 2017 | Smithsonian InstitutionSMITHSONIAN INSTITUTION | F17CW10362 | 541310 | FREER SACKLER COLLECTION STORAGE LEAK DETECTION UPGRADE IGF::OT::IGF | $57K |
| May 30, 2017 | Smithsonian InstitutionSMITHSONIAN INSTITUTION | F17CW10297 | 541310 | SIB: MEP SYSTEMS ASSESSMENT&REPAIRS FOR FAILURE RISK MITIGATION. IGF::OT::IGF | $175K |
| May 30, 2017 | Smithsonian InstitutionSMITHSONIAN INSTITUTION | F17CW10328 | 541310 | COMPLETE FACADE ASSESSMENT AND STABILIZATION IMPLEMENTATION PLAN IGF::OT::IGF | $239K |
| May 17, 2017 | Department of the InteriorDSC CONTRACTING SERVICES DIVISION | INP17PD01292 | 541310 | IGF::OT::IGF X:NOGRN THOMAS JEFFERSON MEMORIAL TARGETED ACCESSIBILITY IMPROVEMENT PROGRAM (TAIP) PROJECT TOPOGRAPHIC SURVEY, GEOTECHNICAL INVESTIGATION, PRE-DESIGN, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, AND CONSTRUCTION DOCUMENTS | $424K |
| May 8, 2017 | Smithsonian InstitutionSMITHSONIAN INSTITUTION | F15CW10356 | 541310 | THIS IS WORK ORDER F15CW10356 (WO-02) UNDER OPEN TERM CONTRACT F13CC10380 FOR DESIGN OF MASS NOTIFICATION SYSTEM FOR THE FREER GALLERY OF ART (FGA), THE ARTHUR M. SACKLER GALLERY (AMSG), THE NATIONAL MUSEUM OF AFRICAN AMERICAN ART (NMAFA) WITH FUTURE EXTENSION TO THE QUADRANGLE BUILDING. IGF::OT::IGF | $204K |
| Apr 5, 2017 | Department of the InteriorDSC CONTRACTING SERVICES DIVISION | INP16PD03571 | 541310 | IGF::OT::IGF X:NOGRN COLO 231238 REHABILITATE SWAN TAVERN AND VARIOUS BUILDINGS - ARCHITECTURAL/ENGINEERING (A/E) CONSTRUCTION SERVICES | $3K |
| Apr 4, 2017 | Department of the InteriorDSC CONTRACTING SERVICES DIVISION | INP15PD03829 | 541310 | IGF::OT::IGF, G:EPREF - TITLE III SERVICES FOR CEMETERY REHABILITATION AT POPLAR GROVE NATIONAL CEMETERY, PETERSBURG, VA | $43K |
| Mar 29, 2017 | Department of the InteriorSER SOUTHEAST REGION(50000) | INP17PD00713 | 541310 | IGF::OT::IGF NOXGRN UNDERWATER INSPECTION OF DOCKS FOR THE CUMBERLAND ISLAND NATIONAL SEASHORE IN ST. MARY'S, GA. | $30K |
| Mar 28, 2017 | Department of the InteriorDSC CONTRACTING SERVICES DIVISION | INP16PD01106 | 541310 | IGF::OT::IGF X:NOGRN ASIS 224772, ENVIRONMENTAL ASSESSMENT AND COST ESTIMATE FOR REDESIGN OF OCEANSIDE WALK-IN AND DRIVE-IN CAMPGROUNDS FOR CLIMATE CHANGE SUSTAINABILITY | $33K |
| Mar 23, 2017 | Department of the InteriorSER SOUTHEAST REGION(50000) | INP17PD00788 | 541310 | IGF::OT::IGF NOXGRN, UPDATE COST ESTIMATE FOR DESIGN ON AMPHITHEATRE, CARL | $8K |
| Mar 2, 2017 | Smithsonian InstitutionSMITHSONIAN INSTITUTION | F17CW10199 | 541310 | SIB: PROTECTION PLAN FOR BUILDING ACCESS. IGF::OT::IGF | $49K |
| Mar 1, 2017 | Department of the InteriorSER SOUTHEAST REGION(50000) | INP16PD02153 | 541310 | IGF::CT::IGF SCHEMATIC DESIGN FOR WATERFRONT DOCK REHAB FOR THE FORT SUMTER NATIONAL MONUMENT IN CHARLESTON HARBOR, SC. SERVICES, NO GREEN. | $66K |
| Feb 7, 2017 | Department of the InteriorDSC CONTRACTING SERVICES DIVISION | INP16PD02925 | 541310 | GWWO A/E - NAMA 216036, RESTORE JEFF MEMORIAL ROOF AND PORTICO IGF::OT::IGF G:CPGRE BIOBA | $37K |
| Jan 12, 2017 | Department of the InteriorSER SOUTHEAST REGION(50000) | INP14PC00056 | 541310 | IGF::OT::IGF MULTIPLE AWARD INDEFINITE DELIVERY/INDEFINITE QUANTITY CONTRACT FOR A/E SERVICES THROUGH OUT THE SOUTHEAST REGION. SERVICES, NO GREEN. | $3K |
| Dec 20, 2016 | Department of the InteriorNORTHEAST REGIONAL CONTRACTING | INP17PD00271 | 541310 | IGF::OT::IGF PRE DESIGN SERVICES FOR CHINCOTEAGUE BEACH VISITOR USE IMPROVEMENT | $267K |
| Oct 31, 2016 | Smithsonian InstitutionSMITHSONIAN INSTITUTION | F16CW10262 | 541310 | THIS IS WORK ORDER CONTRACT F16CW10262 (WO-05) UNDER ID/IQ CONTRACT F13CC10380 FOR PROVIDING ARCHITECT ENGINEERING SERVICES FOR THE POWER SYSTEMS DEFINITION AND UPGRADE PROJECT AT THE SMITHSONIAN INSTITUTION'S NATIONAL MUSEUM OF THE AMERICAN INDIAN (NMAI), WASHINGTON, DC IGF::OT::IGF | $65K |
| Sep 19, 2016 | Department of the InteriorDSC CONTRACTING SERVICES DIVISION | INP16PD03571 | 541310 | IGF::OT::IGF X:NOGRN COLO 231238 REHABILITATE SWAN TAVERN AND VARIOUS BUILDINGS - ARCHITECTURAL/ENGINEERING (A/E) CONSTRUCTION SERVICES | $10K |
| Sep 16, 2016 | Department of the InteriorNORTHEAST REGIONAL CONTRACTING | INP16PD03393 | 541310 | IGF::OT::IGF X::NOGRN AE DESIGN SERVICES FOR WISLER HOUSE. PMIS 163072. | $90K |
| Sep 15, 2016 | Department of the InteriorSER SOUTHEAST REGION(50000) | INP16PD03517 | 541310 | IGF::OT::IGF NOXGRN PROVIDE TITLE II AE SERVICES TO REPLACE ABA ELEVATOR AT FORT SUMTER, BATTERY HUGER FOR THE FORT SUMTER NATIONAL MONUMENT ON SULLIVAN'S ISLAND, SC. | $78K |
| Sep 15, 2016 | Department of the InteriorDSC CONTRACTING SERVICES DIVISION | INP16PD02925 | 541310 | GWWO A/E - NAMA 216036, RESTORE JEFF MEMORIAL ROOF AND PORTICO IGF::OT::IGF G:CPGRE BIOBA | $575K |
| Sep 9, 2016 | Department of the InteriorSER SOUTHEAST REGION(50000) | INP16PD03284 | 541310 | IGF::OT::IGF, NO GREEN, WASTE WATER DESIGN FOR MINE 18, BISO | $125K |
| Sep 1, 2016 | Smithsonian InstitutionSMITHSONIAN INSTITUTION | F16CW10579 | 541310 | IGF::OT::IGF MULTI: SMITHSONIAN EDUCATION SPACE STUDY | $645K |
| Aug 23, 2016 | Smithsonian InstitutionSMITHSONIAN INSTITUTION | F16CW10388 | 541310 | IGF::OT::IGF NMNH FIX FIRE SHOP FLOOR | $15K |
| Aug 22, 2016 | Smithsonian InstitutionSMITHSONIAN INSTITUTION | F15CW10439 | 541310 | THIS IS WORK ORDER CONTRACT F15CW10439 (WO-03) FOR PROVIDING ARCHITECT ENGINEERING SERVICES TO PERFORM A FEASIBILITY STUDY FOR RENOVATION OF THE BAIRD AUDITORIUM AT THE NATIONAL MUSEUM OF NATURAL HISTORY (NMNH), WASHINGTON, DC IGF::OT::IGF | $322K |
| Aug 17, 2016 | Department of the InteriorSER SOUTHEAST REGION(50000) | INP14PD03334 | 541310 | IGF::OT::IGF A/E SERVICES TO REHABILITATE LEATHERWOOD LOW WATER BRIDGE IN BIG SOUTH FORK NRRA - (NOT GREEN). | $31K |
| Aug 5, 2016 | Department of the InteriorDSC CONTRACTING SERVICES DIVISION | INP16PD02353 | 541310 | IGF::OT::IGF X:NOGRN GETTYSBURG NATIONAL MILITARY PARK NORTHEAST REGION, STABILIZE THE HISTORIC BENNER BARN, DESIGN DEVELOPMENT AND CONSTRUCTION DOCUMENT SERVICES, GETT 163043 | $85K |
| Jul 29, 2016 | Department of the InteriorSER SOUTHEAST REGION(50000) | INP16PD02153 | 541310 | IGF::CT::IGF SCHEMATIC DESIGN FOR WATERFRONT DOCK REHAB FOR THE FORT SUMTER NATIONAL MONUMENT IN CHARLESTON HARBOR, SC. SERVICES, NO GREEN. | $83K |
| Jul 25, 2016 | Department of the InteriorDSC CONTRACTING SERVICES DIVISION | INP15PD02069 | 541310 | IGF::OT::IGF "NOT GREEN" COLO - 176311&217809, REPLACE UTILITY&FIRE DETECTION SYSTEM AND REPAIR FINISHES AT SWAN TAVERN, DESIGN SERVICES FOR SCHEMATIC DESIGN AND CONSTRUCTION DOCUMENTS AND MISC. NEEDS, COLONIAL NATIONAL HISTORIC PARK, YORKTOWN, YORK COUNTY, VIRGINIA | $5K |
| Jul 21, 2016 | Smithsonian InstitutionSMITHSONIAN INSTITUTION | F16CW10483 | 541310 | RENOVATE HOMESTEAD (SELLMAN) HOUSE, SERC IGF::OT::IGF | $584K |
| Jul 11, 2016 | Department of the InteriorDSC CONTRACTING SERVICES DIVISION | INP16PD00948 | 541310 | IGF::OT::IGF NOT GREEN, AE DD/CD&SUPP. SERVICES, GWMP 216010 REHAB ARLINGTON HOUSE MANSION | $23K |
| Jun 13, 2016 | Department of the InteriorSER SOUTHEAST REGION(50000) | INP16PD01553 | 541310 | IGF::CT::IGF, DESIGN VENTILATION SYSTEM FOR MAIN HOUSE, CARL | $73K |
| Jun 10, 2016 | Smithsonian InstitutionSMITHSONIAN INSTITUTION | F16CW10388 | 541310 | IGF::OT::IGF NMNH FIX FIRE SHOP FLOOR | $98K |
| May 17, 2016 | Department of the InteriorSER SOUTHEAST REGION(50000) | INP15PD03485 | 541310 | IGF::CT::IGF A/E SERVICES FOR THE ROOF REPLACEMENT AT COWPENS NATIONAL BATTLEFIELD IN GAFFNEY, SC. SERVICES, NO GREEN. | $6K |
| Apr 28, 2016 | Department of the InteriorSER SOUTHEAST REGION(50000) | INP16PD00203 | 541310 | IGF::CT::IGF FORT MATANZAS CONDITION ASSESSMENT. SERVICES, NO GREEN. | $8K |
| Apr 28, 2016 | Department of the InteriorDSC CONTRACTING SERVICES DIVISION | INP16PD01106 | 541310 | IGF::OT::IGF X:NOGRN ASIS 224772, ENVIRONMENTAL ASSESSMENT AND COST ESTIMATE FOR REDESIGN OF OCEANSIDE WALK-IN AND DRIVE-IN CAMPGROUNDS FOR CLIMATE CHANGE SUSTAINABILITY | $257K |
| Apr 21, 2016 | Department of the InteriorDSC CONTRACTING SERVICES DIVISION | INP15PD00701 | 541310 | IGF::OT::IGF OTHER ARCHITECTURAL&ENGINEERING PREDESIGN&SCHEMATIC DESIGN SERVICES ASSOCIATED WITH REHABILITATION OF THE ARLINGTON HOUSE AT GEORGE WASHINGTON MEMORIAL PARKWAY; SOS P8 | $3K |
| Apr 20, 2016 | Department of the InteriorDSC CONTRACTING SERVICES DIVISION | INP16PD00948 | 541310 | IGF::OT::IGF NOT GREEN, AE DD/CD&SUPP. SERVICES, GWMP 216010 REHAB ARLINGTON HOUSE MANSION | $572K |
| Apr 18, 2016 | Smithsonian InstitutionSMITHSONIAN INSTITUTION | F16CW10262 | 541310 | THIS IS WORK ORDER CONTRACT F16CW10262 (WO-05) UNDER ID/IQ CONTRACT F13CC10380 FOR PROVIDING ARCHITECT ENGINEERING SERVICES FOR THE POWER SYSTEMS DEFINITION AND UPGRADE PROJECT AT THE SMITHSONIAN INSTITUTION'S NATIONAL MUSEUM OF THE AMERICAN INDIAN (NMAI), WASHINGTON, DC IGF::OT::IGF | $216K |
| Apr 1, 2016 | Department of the InteriorSER EAST MABO(51000) | INP15PD03485 | 541310 | IGF::CT::IGF A/E SERVICES FOR THE ROOF REPLACEMENT AT COWPENS NATIONAL BATTLEFIELD IN GAFFNEY, SC. SERVICES, NO GREEN. | $26K |
| Mar 23, 2016 | Department of the InteriorSER EAST MABO | INP14PD03334 | 541310 | IGF::OT::IGF A/E SERVICES TO REHABILITATE LEATHERWOOD LOW WATER BRIDGE IN BIG SOUTH FORK NRRA - (NOT GREEN). | $12K |
| Mar 22, 2016 | Smithsonian InstitutionSMITHSONIAN INSTITUTION | F15CW10531 | 541310 | IGF::OT::IGF GARBER - UPGRADE FIRE PROTECTION MULTIPLE BUILDINGS, OFEO PROJECT # 1545505 | $5K |
| Mar 17, 2016 | Smithsonian InstitutionSMITHSONIAN INSTITUTION | F08CW10394 | — | DESIGN OF MANSION RUINS STABILIZATION - SERC | $51K |
| Feb 24, 2016 | Smithsonian InstitutionSMITHSONIAN INSTITUTION | F15CW10356 | 541310 | THIS IS WORK ORDER F15CW10356 (WO-02) UNDER OPEN TERM CONTRACT F13CC10380 FOR DESIGN OF MASS NOTIFICATION SYSTEM FOR THE FREER GALLERY OF ART (FGA), THE ARTHUR M. SACKLER GALLERY (AMSG), THE NATIONAL MUSEUM OF AFRICAN AMERICAN ART (NMAFA) WITH FUTURE EXTENSION TO THE QUADRANGLE BUILDING. IGF::OT::IGF | $126K |
| Dec 18, 2015 | Department of the InteriorSER SOUTH MABO | INP16PD00231 | 541310 | IGF::CT::IGF, X:NOGRN, FINAL CONSTRUCTION DOCUMENTS FOR DESIGN PLAN FOR THE GRANGE HOUSE AT CUIS. | $88K |
| Dec 14, 2015 | Department of the InteriorSER EAST MABO | INP16PD00203 | 541310 | IGF::CT::IGF FORT MATANZAS CONDITION ASSESSMENT. SERVICES, NO GREEN. | $73K |
| Nov 20, 2015 | Department of the InteriorSER EAST MABO | INP14PC00056 | 541310 | IGF::OT::IGF MULTIPLE AWARD INDEFINITE DELIVERY/INDEFINITE QUANTITY CONTRACT FOR A/E SERVICES THROUGH OUT THE SOUTHEAST REGION. SERVICES, NO GREEN. | $3K |
Get Alerted Before Gwwo, INC.'s Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free