Home/Contractors/Health, Education And Research Associates, INC.

Federal Contractor Profile

Health, Education And Research Associates, INC.

Federal contracting record: $15M obligated across 69 awards from 2 agencies, FY 20162025.

$15M
Total Obligated
69
Award Records
2
Agencies Served
1
NAICS Codes

Company Profile

UEI (Unique Entity Identifier)

CNRUY7QK1FN4

CAGE Code

42MH3

Parent Organization

Health, Education And Research Associates, INC.

Address

411 N 10TH ST STE 400, SAINT LOUIS, MO, 631011335

First Federal Award

Nov 18, 2015

Most Recent Award

Apr 28, 2025

Federal Sales Analytics

Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.

Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).

Top Federal Agencies

  • Department of Health and Human Services

    67 awards · 100.1% of total

    $15M
  • Department of Defense

    2 awards · -0.1% of total

    -$12K

Top NAICS Activity

  • 541330

    ENGINEERING SERVICES

    69 awards

    $15M

Recent Federal Awards

DateAgencyNAICSDescriptionAmount
Apr 28, 2025Department of Health and Human ServicesNIH A E CONSTRUCTION541330IGF::OT::IGF - ("OTHER FUNCTIONS") C105883 - DESIGN SERVICES FOR BUILDING 10 CRC SUITE B2-3701 - ELECTRON MICROSCOPY CORE, NHLBI, NIH CAMPUS, BETHESDA, MD - ARCHANA BHASIN THE CONTRACTOR SHALL PROVIDE THE LABOR, MATERIALS, EQUIPMENT, AND SUPERVISION TO ACCOMPLISH THE FOLLOWING: BASE: DESIGN SERVICES FOR BUILDING 10 CRC SUITE B2-3701 - ELECTRON MICROSCOPY CORE, NHLBI, NIH CAMPUS, BETHESDA, MD: BASE: $329,098.22 ACCEPTED OPTIONS: D. CHANGE ORDER REVIEW DURING POST-DESIGN AS PROPOSED BY HERA $1,452.50 AWARDED WITH BASE OPTIONS NOT REQUESTED, AND PROVIDED BY CONTRACTOR: OPTION 1 (ALTERNATE 1) - ADDITIONAL ON-BOARD DESIGN REVIEW. EXPECTED AWARD DATE IS 120 DAYS AFTER ISSUING NTP. $3,496.34 OPTION 2 (ALTERNATE 2) - ADDITIONAL POST-DESIGN CONFERENCE CALLS. EXPECTED EXERCISE DATE IS 330 DAYS AFTER ISSUING NTP. $10,505.86 OPTIONS NOT ACCEPTED: A. COST ESTIMATE AT 65% CONSTRUCTION DOCUMENTS. $9,662.28 B. CREDIT TO 100% CD COST ESTIMATE IF 65% COST ESTIMATE IS ACCEPTED. -$2,690.60 C. COST ESTIMATE AT FINAL CDS. $4,136.98 OPTIONS TO THIS TASK ORDER WILL ONLY BE EXECUTED IF NIH DETERMINES THAT THE WORK IS NEEDED. THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE THE OPTIONS THROUGH A UNILATERAL MODIFICATION AT ITS OWN DISCRETION. POP: WORK TO BE PERFORMED: 08/03/2018 - 11/30/2019 TASK ORDER: 08/03/2018 - 02/28/2020 PRICE: BASE: $329,098.22 OPTION D: $1,452.50 TOTAL: $330,550.72 DELIVER TO: NIH CAMPUS, BLDG. 10, BETHMC PRODUCT SERVICE CODE: C1JZ PRODUCT/SERVICE DESCRIPTION: ARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLAN CAN # 8034167, NHLBI TAS::75 8 0872::TAS 08027220181DA0 DUNS # 176126324 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$4K
Jul 11, 2024Department of Health and Human ServicesNIH A E CONSTRUCTION541330IGF::OT::IGF - ("OTHER FUNCTIONS") C105883 - DESIGN SERVICES FOR BUILDING 10 CRC SUITE B2-3701 - ELECTRON MICROSCOPY CORE, NHLBI, NIH CAMPUS, BETHESDA, MD - ARCHANA BHASIN THE CONTRACTOR SHALL PROVIDE THE LABOR, MATERIALS, EQUIPMENT, AND SUPERVISION TO ACCOMPLISH THE FOLLOWING: BASE: DESIGN SERVICES FOR BUILDING 10 CRC SUITE B2-3701 - ELECTRON MICROSCOPY CORE, NHLBI, NIH CAMPUS, BETHESDA, MD: BASE: $329,098.22 ACCEPTED OPTIONS: D. CHANGE ORDER REVIEW DURING POST-DESIGN AS PROPOSED BY HERA $1,452.50 AWARDED WITH BASE OPTIONS NOT REQUESTED, AND PROVIDED BY CONTRACTOR: OPTION 1 (ALTERNATE 1) - ADDITIONAL ON-BOARD DESIGN REVIEW. EXPECTED AWARD DATE IS 120 DAYS AFTER ISSUING NTP. $3,496.34 OPTION 2 (ALTERNATE 2) - ADDITIONAL POST-DESIGN CONFERENCE CALLS. EXPECTED EXERCISE DATE IS 330 DAYS AFTER ISSUING NTP. $10,505.86 OPTIONS NOT ACCEPTED: A. COST ESTIMATE AT 65% CONSTRUCTION DOCUMENTS. $9,662.28 B. CREDIT TO 100% CD COST ESTIMATE IF 65% COST ESTIMATE IS ACCEPTED. -$2,690.60 C. COST ESTIMATE AT FINAL CDS. $4,136.98 OPTIONS TO THIS TASK ORDER WILL ONLY BE EXECUTED IF NIH DETERMINES THAT THE WORK IS NEEDED. THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE THE OPTIONS THROUGH A UNILATERAL MODIFICATION AT ITS OWN DISCRETION. POP: WORK TO BE PERFORMED: 08/03/2018 - 11/30/2019 TASK ORDER: 08/03/2018 - 02/28/2020 PRICE: BASE: $329,098.22 OPTION D: $1,452.50 TOTAL: $330,550.72 DELIVER TO: NIH CAMPUS, BLDG. 10, BETHMC PRODUCT SERVICE CODE: C1JZ PRODUCT/SERVICE DESCRIPTION: ARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLAN CAN # 8034167, NHLBI TAS::75 8 0872::TAS 08027220181DA0 DUNS # 176126324 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$7K
Apr 12, 2024Department of Health and Human ServicesNIH A E CONSTRUCTION541330IGF::OT::IGF - TAS::75 0838::TAS - C104856 - TASK ORDER - AE SERVICES - DFOM OFFICE RENOVATION, BUILDING 13, SUITES G325, G924, G14, AND BASEMENT; HAKAN BARDAKCI; SEE ATTACHED SOW. THIS PROJECT WILL ACCOMMODATE 2700 SQUARE FEET OF OFFICE SPACE. THIS AREA SHALL BE DESIGNED TO INCLUDE 10 OFFICE SPACES, 1 CONFERENCE ROOM, 1 UNIFORM AND TOOL STORAGE ROOM, 1 OFFICE STORAGE AREA, 1 WAREHOUSE FRONT DESK KIOSK AREA, AND 1 BREAK ROOM. THE FACILITY SHALL BE DESIGNED TO FACILITATE INTERACTION BETWEEN MAINTENANCE AND SUPPORT STAFF. THE FACILITY SHALL EMPLOY SUSTAINABLE DESIGN FEATURES TO ACHIEVE FLEXIBILITY, ENERGY EFFICIENCY, AND QUALITY WORK ENVIRONMENT. THE FACILITY WILL HOUSE SCIENTIFIC EQUIPMENT WITH SPECIAL REQUIREMENTS. 1. REVIEW OF AS-BUILT DRAWINGS. A. BEFORE DESIGN, THE A/E SHALL COMPILE AND REVIEW THE NECESSARY AS-BUILT DRAWINGS. THE A/E SHALL THEN FIELD VERIFY THE EXISTING CONDITIONS. 2. SUBMITTALS AND DELIVERABLE. A. THE A/E SHALL MAKE FIVE (5) DESIGN SUBMITTALS AT THE FOLLOWING STAGES: DRAFT PRELIMINARY REPORT (15%), FINAL PRELIMINARY REPORT (15%), CONSTRUCTION DOCUMENTS (65%), CONSTRUCTION DOCUMENTS (100%) AND CONSTRUCTION DOCUMENTS (FINAL). B. PROVIDE AN UPDATED CONSTRUCTION SCHEDULE WITH EACH SUBMISSION. C. SEE NIH DRM FOR DETAILED REQUIREMENTS. 3. ATTEND PROGRESS/REVIEW/USER MEETINGS. 4. SURVEY ALL EXISTING CONDITIONS NECESSARY TO ACCOMPLISH THE PROJECT. A. THE A/E SHALL PERFORM FIELD SURVEYS THAT IDENTIFY EXISTING CONDITIONS TO ASCERTAIN ITEMS NECESSARY TO ACCOMPLISH THE PROJECT. THIS MAY INCLUDE MEASUREMENTS AND METERING OF THE EXISTING UTILITIES WITHIN THE SCOPE OF WORK PRIOR TO DEMOLITION, TO VERIFY THE DESIGN CONDITIONS WILL BE OBTAINABLE. I. ELECTRICAL METERING (FOR MINIMUM OF 5 DAYS). II. ENGINEERING ANALYSIS. III. CHILLED WATER SUPPLY ANALYSIS. IV. PRE-DEMOLITION READINGS OF SUPPLY AND EXHAUST AIR ARE SPECIFICALLY REQUIRED. 5. PROVIDE AN UPDATED ESTIMATED CONSTRUCTION CONTRACT PRICE PER DESIGN DOCUMENT REVIEW SUBMISSION. 6. PROVIDE POST DESIGN CONSTRUCTION ADMINISTRATIVE SERVICES. A. CONSTRUCTION CONTRACTOR BID WALK ASSISTANCE. B. CONSTRUCTION INSPECTION. C. ATTEND PROGRESS MEETINGS. D. RESPONSES TO REQUEST FOR INFORMATION (RFIS). E. CONSTRUCTION SUBMITTAL REVIEW. F. REVIEW, TRACK, AND MAKE RECOMMENDATION FOR CONSTRUCTION CHANGE ORDERS. G. COMMISSIONING. THE PERIOD OF PERFORMANCE TO COMPLETE THE SCOPE OF WORK IS FROM 04/02/2018 TO 10/24/2019. OPTION 1 AS PROPOSED IS NOT REQUIRED, THEREFORE REJECTED BY THE GOVERNMENT AND WILL NOT BE EXERCISED. OPTION 1: PROVIDE COMMISSIONING SPECIFICATIONS FOR USE BY A THIRD PARTY COMMISSIONING AGENT. DELIVER TO: NIH CAMPUS, BUILDING 13 PRODUCT SERVICE CODE: C1JZ PRODUCT/SERVICE DESCRIPTION: ARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLANEOUS CAN # 8032185, ORF TAS::75 0838::TAS; 08023820185DB0 DUNS # 176126324 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$24K
Sep 13, 2023Department of Health and Human ServicesNIH A E CONSTRUCTION541330C105885 - TASK ORDER - A/E SERVICES- BLDG. 49. - KITCHENETTES, PUBLIC BATHROOMS & OPTIONS, EARL JOHNSON; BETHESDA, MD.$62K
Mar 31, 2023Department of Health and Human ServicesNIH A E CONSTRUCTION541330IGF::OT::IGF - ("OTHER FUNCTIONS") C105883 - DESIGN SERVICES FOR BUILDING 10 CRC SUITE B2-3701 - ELECTRON MICROSCOPY CORE, NHLBI, NIH CAMPUS, BETHESDA, MD - ARCHANA BHASIN THE CONTRACTOR SHALL PROVIDE THE LABOR, MATERIALS, EQUIPMENT, AND SUPERVISION TO ACCOMPLISH THE FOLLOWING: BASE: DESIGN SERVICES FOR BUILDING 10 CRC SUITE B2-3701 - ELECTRON MICROSCOPY CORE, NHLBI, NIH CAMPUS, BETHESDA, MD: BASE: $329,098.22 ACCEPTED OPTIONS: D. CHANGE ORDER REVIEW DURING POST-DESIGN AS PROPOSED BY HERA $1,452.50 AWARDED WITH BASE OPTIONS NOT REQUESTED, AND PROVIDED BY CONTRACTOR: OPTION 1 (ALTERNATE 1) - ADDITIONAL ON-BOARD DESIGN REVIEW. EXPECTED AWARD DATE IS 120 DAYS AFTER ISSUING NTP. $3,496.34 OPTION 2 (ALTERNATE 2) - ADDITIONAL POST-DESIGN CONFERENCE CALLS. EXPECTED EXERCISE DATE IS 330 DAYS AFTER ISSUING NTP. $10,505.86 OPTIONS NOT ACCEPTED: A. COST ESTIMATE AT 65% CONSTRUCTION DOCUMENTS. $9,662.28 B. CREDIT TO 100% CD COST ESTIMATE IF 65% COST ESTIMATE IS ACCEPTED. -$2,690.60 C. COST ESTIMATE AT FINAL CDS. $4,136.98 OPTIONS TO THIS TASK ORDER WILL ONLY BE EXECUTED IF NIH DETERMINES THAT THE WORK IS NEEDED. THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE THE OPTIONS THROUGH A UNILATERAL MODIFICATION AT ITS OWN DISCRETION. POP: WORK TO BE PERFORMED: 08/03/2018 - 11/30/2019 TASK ORDER: 08/03/2018 - 02/28/2020 PRICE: BASE: $329,098.22 OPTION D: $1,452.50 TOTAL: $330,550.72 DELIVER TO: NIH CAMPUS, BLDG. 10, BETHMC PRODUCT SERVICE CODE: C1JZ PRODUCT/SERVICE DESCRIPTION: ARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLAN CAN # 8034167, NHLBI TAS::75 8 0872::TAS 08027220181DA0 DUNS # 176126324 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$45K
Sep 22, 2022Department of Health and Human ServicesNIH A E CONSTRUCTION541330IGF::OT::IGF - TAS::75 0838::TAS - C104673 - TASK ORDER - AE SERVICES - MECHANICAL ROOMS ADDITION/UPGRADE, BUILDING 13, SUITES G2414A, G363A, G327,&B2 BASEMENT; HAKAN BARDAKCI; SEE ATTACHED SOW. BASE - PROVIDE PROFESSIONAL SERVICES FOR ALL ARCHITECTURAL AND ENGINEERING DISCIPLINES, MATERIAL AND LABOR NECESSARY TO PROVIDE A SET OF CONSTRUCTION DOCUMENTS TO FACILITATE THE CONSTRUCTION OF THE SUBJECT PROJECT. THIS PROJECT WILL ACCOMMODATE 4000 SF MECHANICAL ROOM SPACE WHICH WILL SUPPORT GENERAL PURPOSE LABORATORIES, BIO-SAFETY LEVEL LABORATORIES, SHARED ANALYTICAL LABORATORIES, AND SUPPORT SPACES. THE AE TEAM WILL NEED TO REVIEW ALL PROJECT'S HOT WATER, CHILLED WATER, DHW AND OTHER UTILITIES AND AIR DISTRIBUTION REQUIREMENTS AND WILL NEED TO PROPOSE A DESIGN TO ENSURE ALL PROJECT HAVE SUFFICIENT UTILITIES. BASE IS PROPOSED FOR THE TOTAL AMOUNT OF $427,787.99. 1. REVIEW OF AS-BUILT DRAWINGS. A. BEFORE DESIGN, THE A/E SHALL COMPILE AND REVIEW THE NECESSARY AS-BUILT DRAWINGS. THE A/E SHALL THEN FIELD VERIFY THE EXISTING CONDITIONS. 2. SUBMITTALS AND DELIVERABLE. A. THE A/E SHALL MAKE FOUR (5) DESIGN SUBMITTALS AT THE FOLLOWING STAGES: DESIGN DEVELOPMENT (35%), REVISED DESIGN DEVELOPMENT (35%), CONSTRUCTION DOCUMENTS (65%), CONSTRUCTION DOCUMENTS (100%), AND CONSTRUCTION DOCUMENTS (FINAL). B. PROVIDE AN UPDATED CONSTRUCTION SCHEDULE WITH EACH SUBMISSION. C. SEE NIH DRM FOR DETAILED REQUIREMENTS. 3. ATTEND PROGRESS/REVIEW/USER MEETINGS. 4. SURVEY ALL EXISTING CONDITIONS NECESSARY TO ACCOMPLISH THE PROJECT. A. THE A/E SHALL PERFORM FIELD SURVEYS THAT IDENTIFY EXISTING CONDITIONS TO ASCERTAIN ITEMS NECESSARY TO ACCOMPLISH THE PROJECT. THIS MAY INCLUDE MEASUREMENTS AND METERING OF THE EXISTING UTILITIES WITHIN THE SCOPE OF WORK PRIOR TO DEMOLITION, TO VERIFY THE DESIGN CONDITIONS WILL BE OBTAINABLE. THIS SOW SPECIFICALLY INCLUDES MINIMUM OF (5) DAYS OF I. ELECTRICAL METERING. II. ENGINEERING ANALYSIS. III. CHILLED WATER SUPPLY ANALYSIS. IV. PRE-DEMOLITION READINGS OF SUPPLY AND EXHAUST AIR ARE SPECIFICALLY REQUIRED. 5. PROVIDE AN UPDATED ESTIMATED CONSTRUCTION CONTRACT PRICE PER DESIGN DOCUMENT REVIEW SUBMISSION. 6. PROVIDE POST DESIGN CONSTRUCTION ADMINISTRATIVE SERVICES. A. CONSTRUCTION CONTRACTOR BID WALK ASSISTANCE. B. CONSTRUCTION INSPECTION. C. ATTEND PROGRESS MEETINGS. D. RESPONSES TO REQUEST FOR INFORMATION (RFIS). E. CONSTRUCTION SUBMITTAL REVIEW. F. REVIEW, TRACK, AND MAKE RECOMMENDATION FOR CONSTRUCTION CHANGE ORDERS. G. COMMISSIONING. THE PERIOD OF PERFORMANCE TO COMPLETE THE SCOPE OF WORK IS FROM 09/27/2017 TO 03/15/2019. DELIVER TO: NIH CAMPUS, BUILDING 13 PRODUCT SERVICE CODE: C1JZ PRODUCT/SERVICE DESCRIPTION: ARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLANEOUS CAN # 8030643, ORF TAS::75 0838::TAS; 08023820175DB0 DUNS # 176126324 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$260K
Aug 22, 2022Department of Health and Human ServicesNIH A E CONSTRUCTION541330C105044 - AE PROFESSIONAL SERVICES TO SUPPORT NLM PLANNING, ACTIVATION, AND OCCUPANCY, NIH, BETHESDA, MD PERFORMANCE CONSTITUTES ACCEPTANCE.$327K
Jun 14, 2022Department of Health and Human ServicesNIH A E CONSTRUCTION541330IGF::OT::IGF - TAS::75 0838::TAS - C100708 - TASK ORDER - AE SERVICES - CHIMNEYS AND EXTERIOR EXVELOPE REPAIR, BUILDING 5; JAMES NG; SEE ATTACHED SOW. THE AE SHALL PROVIDE MATERIAL, LABOR, EQUIPMENT, AND SUPERVISION TO ACCOMPLISH THE FOLLOWING: A. PROVIDE AN ASSESSMENT OF BUILDING 5'S CHIMNEYS AND EXTERIOR ENVELOPE ITEMS SUCH AS GUTTERS, SOFFITS, DORMERS, WALLS, ETC., BUT NOT THE ROOF, TO DETERMINE EXTEND OF DETERIORATION, AND RECOMMEND REPAIR OPTIONS. B. PRODUCE A REPORT (ELECTRONIC AND FIVE HARDCOPIES) FOR THE NIH HISTORICAL PRESERVATION BOARD TO REVIEW, AND APPROVE ANY RECOMMENDED REPAIRS. C. PROVIDE COST ESTIMATES FOR ALL RECOMMENDED REPAIR OPTIONS. D. PROVIDE DESIGN DETAILS ON ALL SELECTED REPAIR OPTIONS. E. DUE TO THE HEIGHTS AT WHICH MOST OF THE DETERIORATION IS FOUND, FALL PROTECTION AND OTHER RELEVANT SAFETY PROCEDURES MUST BE FOLLOWED WHEN ACCESSING THE OUTSIDE HIGH AREAS OF THE BUILDING. A SAFETY PLAN WILL BE REQUIRED TO BE SUBMITTED AND REVIEWED BY THE NIH DIV. OF OCCUPATIONAL HEALTH AND SAFETY PRIOR TO THE ASSESSMENT VENDOR STARTING HIS WORK. F. PROVIDE POST DESIGN CONSTRUCTION SERVICES TO ANSWER ANY RFIS AS WELL AS INSPECT AND DOCUMENT THE REPAIR WORK. PRODUCE A FINAL REPORT (ELECTRONIC AND FIVE HARDCOPIES) AT PROJECT COMPLETION TO SHOW THE RESULTS OF THE REPAIR WORK. G. IF EQUIPMENT SUCH AS AERIAL LIFT IS USED, AND IT OBSTRUCTS TRAFFIC OR ROADWAY DURING THE ASSESSMENT, THIS ACTIVITY MUST BE APPROVED BY THE NIH SITE SELECTION COMMITTEE FOR ANY POTENTIAL ROAD CLOSURE OR PARKING OBSTRUCTION PRIOR TO START OF ASSESSMENT. H. ALL CONTRACTORS OR VENDORS WORKING ON NIH PROPERTY MUST FIRST BE ENROLLED ON THE CONSTRUCTSECURE.COM WEBSITE. THE PERIOD OF PERFORMANCE TO COMPLETE THE SCOPE OF WORK IS FROM 7/3/2017 TO 11/30/2017. DELIVER TO: NIH CAMPUS, BUILDING 5 PRODUCT SERVICE CODE: C1JZ PRODUCT/SERVICE DESCRIPTION: ARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLANEOUS CAN # 8016904, ORF TAS::75 0838::TAS; 08023820145DB0 DUNS # 176126324 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$12K
May 6, 2022Department of Health and Human ServicesNIH A E CONSTRUCTION541330IGF::OT::IGF - TAS::75 0838::TAS - C104856 - TASK ORDER - AE SERVICES - DFOM OFFICE RENOVATION, BUILDING 13, SUITES G325, G924, G14, AND BASEMENT; HAKAN BARDAKCI; SEE ATTACHED SOW. THIS PROJECT WILL ACCOMMODATE 2700 SQUARE FEET OF OFFICE SPACE. THIS AREA SHALL BE DESIGNED TO INCLUDE 10 OFFICE SPACES, 1 CONFERENCE ROOM, 1 UNIFORM AND TOOL STORAGE ROOM, 1 OFFICE STORAGE AREA, 1 WAREHOUSE FRONT DESK KIOSK AREA, AND 1 BREAK ROOM. THE FACILITY SHALL BE DESIGNED TO FACILITATE INTERACTION BETWEEN MAINTENANCE AND SUPPORT STAFF. THE FACILITY SHALL EMPLOY SUSTAINABLE DESIGN FEATURES TO ACHIEVE FLEXIBILITY, ENERGY EFFICIENCY, AND QUALITY WORK ENVIRONMENT. THE FACILITY WILL HOUSE SCIENTIFIC EQUIPMENT WITH SPECIAL REQUIREMENTS. 1. REVIEW OF AS-BUILT DRAWINGS. A. BEFORE DESIGN, THE A/E SHALL COMPILE AND REVIEW THE NECESSARY AS-BUILT DRAWINGS. THE A/E SHALL THEN FIELD VERIFY THE EXISTING CONDITIONS. 2. SUBMITTALS AND DELIVERABLE. A. THE A/E SHALL MAKE FIVE (5) DESIGN SUBMITTALS AT THE FOLLOWING STAGES: DRAFT PRELIMINARY REPORT (15%), FINAL PRELIMINARY REPORT (15%), CONSTRUCTION DOCUMENTS (65%), CONSTRUCTION DOCUMENTS (100%) AND CONSTRUCTION DOCUMENTS (FINAL). B. PROVIDE AN UPDATED CONSTRUCTION SCHEDULE WITH EACH SUBMISSION. C. SEE NIH DRM FOR DETAILED REQUIREMENTS. 3. ATTEND PROGRESS/REVIEW/USER MEETINGS. 4. SURVEY ALL EXISTING CONDITIONS NECESSARY TO ACCOMPLISH THE PROJECT. A. THE A/E SHALL PERFORM FIELD SURVEYS THAT IDENTIFY EXISTING CONDITIONS TO ASCERTAIN ITEMS NECESSARY TO ACCOMPLISH THE PROJECT. THIS MAY INCLUDE MEASUREMENTS AND METERING OF THE EXISTING UTILITIES WITHIN THE SCOPE OF WORK PRIOR TO DEMOLITION, TO VERIFY THE DESIGN CONDITIONS WILL BE OBTAINABLE. I. ELECTRICAL METERING (FOR MINIMUM OF 5 DAYS). II. ENGINEERING ANALYSIS. III. CHILLED WATER SUPPLY ANALYSIS. IV. PRE-DEMOLITION READINGS OF SUPPLY AND EXHAUST AIR ARE SPECIFICALLY REQUIRED. 5. PROVIDE AN UPDATED ESTIMATED CONSTRUCTION CONTRACT PRICE PER DESIGN DOCUMENT REVIEW SUBMISSION. 6. PROVIDE POST DESIGN CONSTRUCTION ADMINISTRATIVE SERVICES. A. CONSTRUCTION CONTRACTOR BID WALK ASSISTANCE. B. CONSTRUCTION INSPECTION. C. ATTEND PROGRESS MEETINGS. D. RESPONSES TO REQUEST FOR INFORMATION (RFIS). E. CONSTRUCTION SUBMITTAL REVIEW. F. REVIEW, TRACK, AND MAKE RECOMMENDATION FOR CONSTRUCTION CHANGE ORDERS. G. COMMISSIONING. THE PERIOD OF PERFORMANCE TO COMPLETE THE SCOPE OF WORK IS FROM 04/02/2018 TO 10/24/2019. OPTION 1 AS PROPOSED IS NOT REQUIRED, THEREFORE REJECTED BY THE GOVERNMENT AND WILL NOT BE EXERCISED. OPTION 1: PROVIDE COMMISSIONING SPECIFICATIONS FOR USE BY A THIRD PARTY COMMISSIONING AGENT. DELIVER TO: NIH CAMPUS, BUILDING 13 PRODUCT SERVICE CODE: C1JZ PRODUCT/SERVICE DESCRIPTION: ARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLANEOUS CAN # 8032185, ORF TAS::75 0838::TAS; 08023820185DB0 DUNS # 176126324 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$48K
Apr 12, 2022Department of Health and Human ServicesNIH A E CONSTRUCTION541330IGF::OT::IGF - ("OTHER FUNCTIONS") C105883 - DESIGN SERVICES FOR BUILDING 10 CRC SUITE B2-3701 - ELECTRON MICROSCOPY CORE, NHLBI, NIH CAMPUS, BETHESDA, MD - ARCHANA BHASIN THE CONTRACTOR SHALL PROVIDE THE LABOR, MATERIALS, EQUIPMENT, AND SUPERVISION TO ACCOMPLISH THE FOLLOWING: BASE: DESIGN SERVICES FOR BUILDING 10 CRC SUITE B2-3701 - ELECTRON MICROSCOPY CORE, NHLBI, NIH CAMPUS, BETHESDA, MD: BASE: $329,098.22 ACCEPTED OPTIONS: D. CHANGE ORDER REVIEW DURING POST-DESIGN AS PROPOSED BY HERA $1,452.50 AWARDED WITH BASE OPTIONS NOT REQUESTED, AND PROVIDED BY CONTRACTOR: OPTION 1 (ALTERNATE 1) - ADDITIONAL ON-BOARD DESIGN REVIEW. EXPECTED AWARD DATE IS 120 DAYS AFTER ISSUING NTP. $3,496.34 OPTION 2 (ALTERNATE 2) - ADDITIONAL POST-DESIGN CONFERENCE CALLS. EXPECTED EXERCISE DATE IS 330 DAYS AFTER ISSUING NTP. $10,505.86 OPTIONS NOT ACCEPTED: A. COST ESTIMATE AT 65% CONSTRUCTION DOCUMENTS. $9,662.28 B. CREDIT TO 100% CD COST ESTIMATE IF 65% COST ESTIMATE IS ACCEPTED. -$2,690.60 C. COST ESTIMATE AT FINAL CDS. $4,136.98 OPTIONS TO THIS TASK ORDER WILL ONLY BE EXECUTED IF NIH DETERMINES THAT THE WORK IS NEEDED. THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE THE OPTIONS THROUGH A UNILATERAL MODIFICATION AT ITS OWN DISCRETION. POP: WORK TO BE PERFORMED: 08/03/2018 - 11/30/2019 TASK ORDER: 08/03/2018 - 02/28/2020 PRICE: BASE: $329,098.22 OPTION D: $1,452.50 TOTAL: $330,550.72 DELIVER TO: NIH CAMPUS, BLDG. 10, BETHMC PRODUCT SERVICE CODE: C1JZ PRODUCT/SERVICE DESCRIPTION: ARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLAN CAN # 8034167, NHLBI TAS::75 8 0872::TAS 08027220181DA0 DUNS # 176126324 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$5K
Mar 7, 2022Department of Health and Human ServicesNIH A E CONSTRUCTION541330IGF::OT::IGF C104603 COMMISSIONING, QUALIFICATION,&VALIDATION SERVICES (CQV) FOR STERILITY LAB RENOVATION, BLDG. 10; GIAS AHMAD$44K
Jan 13, 2022Department of Health and Human ServicesNIH A E CONSTRUCTION541330IGF::OT::IGF - ("OTHER FUNCTIONS") C105883 - DESIGN SERVICES FOR BUILDING 10 CRC SUITE B2-3701 - ELECTRON MICROSCOPY CORE, NHLBI, NIH CAMPUS, BETHESDA, MD - ARCHANA BHASIN THE CONTRACTOR SHALL PROVIDE THE LABOR, MATERIALS, EQUIPMENT, AND SUPERVISION TO ACCOMPLISH THE FOLLOWING: BASE: DESIGN SERVICES FOR BUILDING 10 CRC SUITE B2-3701 - ELECTRON MICROSCOPY CORE, NHLBI, NIH CAMPUS, BETHESDA, MD: BASE: $329,098.22 ACCEPTED OPTIONS: D. CHANGE ORDER REVIEW DURING POST-DESIGN AS PROPOSED BY HERA $1,452.50 AWARDED WITH BASE OPTIONS NOT REQUESTED, AND PROVIDED BY CONTRACTOR: OPTION 1 (ALTERNATE 1) - ADDITIONAL ON-BOARD DESIGN REVIEW. EXPECTED AWARD DATE IS 120 DAYS AFTER ISSUING NTP. $3,496.34 OPTION 2 (ALTERNATE 2) - ADDITIONAL POST-DESIGN CONFERENCE CALLS. EXPECTED EXERCISE DATE IS 330 DAYS AFTER ISSUING NTP. $10,505.86 OPTIONS NOT ACCEPTED: A. COST ESTIMATE AT 65% CONSTRUCTION DOCUMENTS. $9,662.28 B. CREDIT TO 100% CD COST ESTIMATE IF 65% COST ESTIMATE IS ACCEPTED. -$2,690.60 C. COST ESTIMATE AT FINAL CDS. $4,136.98 OPTIONS TO THIS TASK ORDER WILL ONLY BE EXECUTED IF NIH DETERMINES THAT THE WORK IS NEEDED. THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE THE OPTIONS THROUGH A UNILATERAL MODIFICATION AT ITS OWN DISCRETION. POP: WORK TO BE PERFORMED: 08/03/2018 - 11/30/2019 TASK ORDER: 08/03/2018 - 02/28/2020 PRICE: BASE: $329,098.22 OPTION D: $1,452.50 TOTAL: $330,550.72 DELIVER TO: NIH CAMPUS, BLDG. 10, BETHMC PRODUCT SERVICE CODE: C1JZ PRODUCT/SERVICE DESCRIPTION: ARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLAN CAN # 8034167, NHLBI TAS::75 8 0872::TAS 08027220181DA0 DUNS # 176126324 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$10K
Nov 10, 2021Department of Health and Human ServicesNIH A E CONSTRUCTION541330C105885 - TASK ORDER - A/E SERVICES- BLDG. 49. - KITCHENETTES, PUBLIC BATHROOMS & OPTIONS, EARL JOHNSON; BETHESDA, MD.$33K
Sep 29, 2021Department of Health and Human ServicesNIH A E CONSTRUCTION541330IGF::OT::IGF - TAS::75 0838::TAS - HHSN292201400002I - HHSN29200016 - C102855 - TASK ORDER - AE SERVICES - COMMISSIONING SERVICES, ENVIRONMENTAL SURVEY, AND TAB REPORT - NINDS AIM LAB RENOVATION, ROOMS G800&G803, BUILDING 13; HAKAN BARDAKCI; SEE ATTACHED SOW&APPENDIXES. BASE - PROVIDE COMMISSIONING SERVICES. BASE IS PROPOSED FOR THE TOTAL AMOUNT OF $44,001.73. OPTION 1 - PROVIDE ENVIRONMENTAL SURVEY. OPTION 1 IS PROPOSED FOR THE TOTAL AMOUNT OF $8,541.50. OPTION 2 - PROVIDED TAB REPORT. OPTION 2 IS PROPOSED FOR THE TOTAL AMOUNT OF $6,160.00. OPTIONS ONE (1)&TWO (2) WILL BE EXERCISED AND AWARDED WITH BASE SCOPE OF SERVICES. TOTAL FOR BASE AND TWO OPTION ITEMS IS $58,703.23. THE PERIOD OF PERFORMANCE TO COMPLETE THE SCOPE OF WORK IS FROM 08/22/2016 TO 05/15/2017. DELIVER TO: NIH CAMPUS, ROOM G800&G803, BUILDING 13 PRODUCT SERVICE CODE: C1JZ PRODUCT/SERVICE DESCRIPTION: ARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLANEOUS CAN # 8024361, ORF TAS::75 0838::TAS; 08023820165DB0 DUNS # 176126324 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$45K
Sep 23, 2021Department of Health and Human ServicesNIH A E CONSTRUCTION541330C106586 - EXISTING AIR COMPRESSORS RECOMMISSIONING AND NEW COMPRESSOR COMMISSIONING, BLDG 10, GABOR KONKOLY-THEGE[21-004314]$41K
Sep 15, 2021Department of Health and Human ServicesNIH A E CONSTRUCTION541330IGF::OT::IGF - ("OTHER FUNCTIONS") C105883 - DESIGN SERVICES FOR BUILDING 10 CRC SUITE B2-3701 - ELECTRON MICROSCOPY CORE, NHLBI, NIH CAMPUS, BETHESDA, MD - ARCHANA BHASIN THE CONTRACTOR SHALL PROVIDE THE LABOR, MATERIALS, EQUIPMENT, AND SUPERVISION TO ACCOMPLISH THE FOLLOWING: BASE: DESIGN SERVICES FOR BUILDING 10 CRC SUITE B2-3701 - ELECTRON MICROSCOPY CORE, NHLBI, NIH CAMPUS, BETHESDA, MD: BASE: $329,098.22 ACCEPTED OPTIONS: D. CHANGE ORDER REVIEW DURING POST-DESIGN AS PROPOSED BY HERA $1,452.50 AWARDED WITH BASE OPTIONS NOT REQUESTED, AND PROVIDED BY CONTRACTOR: OPTION 1 (ALTERNATE 1) - ADDITIONAL ON-BOARD DESIGN REVIEW. EXPECTED AWARD DATE IS 120 DAYS AFTER ISSUING NTP. $3,496.34 OPTION 2 (ALTERNATE 2) - ADDITIONAL POST-DESIGN CONFERENCE CALLS. EXPECTED EXERCISE DATE IS 330 DAYS AFTER ISSUING NTP. $10,505.86 OPTIONS NOT ACCEPTED: A. COST ESTIMATE AT 65% CONSTRUCTION DOCUMENTS. $9,662.28 B. CREDIT TO 100% CD COST ESTIMATE IF 65% COST ESTIMATE IS ACCEPTED. -$2,690.60 C. COST ESTIMATE AT FINAL CDS. $4,136.98 OPTIONS TO THIS TASK ORDER WILL ONLY BE EXECUTED IF NIH DETERMINES THAT THE WORK IS NEEDED. THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE THE OPTIONS THROUGH A UNILATERAL MODIFICATION AT ITS OWN DISCRETION. POP: WORK TO BE PERFORMED: 08/03/2018 - 11/30/2019 TASK ORDER: 08/03/2018 - 02/28/2020 PRICE: BASE: $329,098.22 OPTION D: $1,452.50 TOTAL: $330,550.72 DELIVER TO: NIH CAMPUS, BLDG. 10, BETHMC PRODUCT SERVICE CODE: C1JZ PRODUCT/SERVICE DESCRIPTION: ARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLAN CAN # 8034167, NHLBI TAS::75 8 0872::TAS 08027220181DA0 DUNS # 176126324 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$4K
Sep 13, 2021Department of Health and Human ServicesNIH A E CONSTRUCTION541330IGF::OT::IGF - ("OTHER FUNCTIONS") C106278 - DESIGN SERVICES FOR BUILDING 50, NHLBI TARASKA LAB RENOVATION, THIRD FLOOR ROOMS 3305A-3412, NIH CAMPUS, BETHESDA, MD.- GRETCHEN COWMAN THE CONTRACTOR SHALL PROVIDE THE LABOR, MATERIALS, EQUIPMENT, AND SUPERVISION TO ACCOMPLISH THE FOLLOWING: BASE: DESIGN SERVICES FOR BUILDING 50, NHLBI TARASKA LAB RENOVATION, THIRD FLOOR ROOMS 3305A-3412, NIH CAMPUS, BETHESDA, MD. $183,732.93 OPTION 1 (3) MEETINGS: $3,379.67 THIS OPTION WILL NOT BE EXERCISED WITH TASK ORDER. OPTION 2 ESTIMATING (2) SUBMISSIONS: $15,370.16 THIS OPTION WILL NOT BE EXERCISED WITH TASK ORDER. OPTION 3 STRUCTURAL DESIGN: $14,384.21 THIS OPTION WILL NOT BE EXERCISED WITH TASK ORDER. OPTION 4 DESIGN NEW ELECTRICAL PANEL: $9,471.65 THIS OPTION WILL NOT BE EXERCISED WITH TASK ORDER. OPTIONS TO THIS TASK ORDER WILL ONLY BE EXECUTED IF NIH DETERMINES THAT THE WORK IS NEEDED. THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE THE OPTIONS THROUGH A UNILATERAL MODIFICATION AT ITS OWN DISCRETION. POP: WORK TO BE PERFORMED: 09/14/2018 - 10/31/2019 TASK ORDER: 09/14/2018 - 12/31/2019 PRICE: BASE TASK ORDER: $183,732.93 DELIVER TO: NIH CAMPUS, BLDG. 50 PRODUCT SERVICE CODE: C219 PRODUCT/SERVICE DESCRIPTION: ARCHITECT AND ENGINEERING- GENERAL: OTHER CAN # 8035045, NHLBI TAS::75 8 0872::TAS 08027220181DA0 DUNS # 176126324 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$11K
Aug 24, 2021Department of Health and Human ServicesNIH A E CONSTRUCTION541330IGF::OT::IGF C104603 COMMISSIONING, QUALIFICATION,&VALIDATION SERVICES (CQV) FOR STERILITY LAB RENOVATION, BLDG. 10; GIAS AHMAD$37K
Jul 30, 2021Department of Health and Human ServicesNIH A E CONSTRUCTION541330IGF::OT::IGF C105112 - AE SERVICES - BLDG. 35 - REPLACE WATER PIPING, BETHESDA, MD.$33K
Jul 26, 2021Department of Health and Human ServicesNIH A E CONSTRUCTION541330C105044 - AE PROFESSIONAL SERVICES TO SUPPORT NLM PLANNING, ACTIVATION, AND OCCUPANCY, NIH, BETHESDA, MD PERFORMANCE CONSTITUTES ACCEPTANCE.$365K
Jul 23, 2021Department of Health and Human ServicesNIH A E CONSTRUCTION541330IGF::OT::IGF - ("OTHER FUNCTIONS") C105883 - DESIGN SERVICES FOR BUILDING 10 CRC SUITE B2-3701 - ELECTRON MICROSCOPY CORE, NHLBI, NIH CAMPUS, BETHESDA, MD - ARCHANA BHASIN THE CONTRACTOR SHALL PROVIDE THE LABOR, MATERIALS, EQUIPMENT, AND SUPERVISION TO ACCOMPLISH THE FOLLOWING: BASE: DESIGN SERVICES FOR BUILDING 10 CRC SUITE B2-3701 - ELECTRON MICROSCOPY CORE, NHLBI, NIH CAMPUS, BETHESDA, MD: BASE: $329,098.22 ACCEPTED OPTIONS: D. CHANGE ORDER REVIEW DURING POST-DESIGN AS PROPOSED BY HERA $1,452.50 AWARDED WITH BASE OPTIONS NOT REQUESTED, AND PROVIDED BY CONTRACTOR: OPTION 1 (ALTERNATE 1) - ADDITIONAL ON-BOARD DESIGN REVIEW. EXPECTED AWARD DATE IS 120 DAYS AFTER ISSUING NTP. $3,496.34 OPTION 2 (ALTERNATE 2) - ADDITIONAL POST-DESIGN CONFERENCE CALLS. EXPECTED EXERCISE DATE IS 330 DAYS AFTER ISSUING NTP. $10,505.86 OPTIONS NOT ACCEPTED: A. COST ESTIMATE AT 65% CONSTRUCTION DOCUMENTS. $9,662.28 B. CREDIT TO 100% CD COST ESTIMATE IF 65% COST ESTIMATE IS ACCEPTED. -$2,690.60 C. COST ESTIMATE AT FINAL CDS. $4,136.98 OPTIONS TO THIS TASK ORDER WILL ONLY BE EXECUTED IF NIH DETERMINES THAT THE WORK IS NEEDED. THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE THE OPTIONS THROUGH A UNILATERAL MODIFICATION AT ITS OWN DISCRETION. POP: WORK TO BE PERFORMED: 08/03/2018 - 11/30/2019 TASK ORDER: 08/03/2018 - 02/28/2020 PRICE: BASE: $329,098.22 OPTION D: $1,452.50 TOTAL: $330,550.72 DELIVER TO: NIH CAMPUS, BLDG. 10, BETHMC PRODUCT SERVICE CODE: C1JZ PRODUCT/SERVICE DESCRIPTION: ARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLAN CAN # 8034167, NHLBI TAS::75 8 0872::TAS 08027220181DA0 DUNS # 176126324 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$39K
Jul 15, 2021Department of Health and Human ServicesNIH A E CONSTRUCTION541330IGF::OT::IGF C105112 - AE SERVICES - BLDG. 35 - REPLACE WATER PIPING, BETHESDA, MD.$24K
Jul 1, 2021Department of Health and Human ServicesNIH A E CONSTRUCTION541330IGF::OT::IGF - TAS::75 0838::TAS - C104673 - TASK ORDER - AE SERVICES - MECHANICAL ROOMS ADDITION/UPGRADE, BUILDING 13, SUITES G2414A, G363A, G327,&B2 BASEMENT; HAKAN BARDAKCI; SEE ATTACHED SOW. BASE - PROVIDE PROFESSIONAL SERVICES FOR ALL ARCHITECTURAL AND ENGINEERING DISCIPLINES, MATERIAL AND LABOR NECESSARY TO PROVIDE A SET OF CONSTRUCTION DOCUMENTS TO FACILITATE THE CONSTRUCTION OF THE SUBJECT PROJECT. THIS PROJECT WILL ACCOMMODATE 4000 SF MECHANICAL ROOM SPACE WHICH WILL SUPPORT GENERAL PURPOSE LABORATORIES, BIO-SAFETY LEVEL LABORATORIES, SHARED ANALYTICAL LABORATORIES, AND SUPPORT SPACES. THE AE TEAM WILL NEED TO REVIEW ALL PROJECT'S HOT WATER, CHILLED WATER, DHW AND OTHER UTILITIES AND AIR DISTRIBUTION REQUIREMENTS AND WILL NEED TO PROPOSE A DESIGN TO ENSURE ALL PROJECT HAVE SUFFICIENT UTILITIES. BASE IS PROPOSED FOR THE TOTAL AMOUNT OF $427,787.99. 1. REVIEW OF AS-BUILT DRAWINGS. A. BEFORE DESIGN, THE A/E SHALL COMPILE AND REVIEW THE NECESSARY AS-BUILT DRAWINGS. THE A/E SHALL THEN FIELD VERIFY THE EXISTING CONDITIONS. 2. SUBMITTALS AND DELIVERABLE. A. THE A/E SHALL MAKE FOUR (5) DESIGN SUBMITTALS AT THE FOLLOWING STAGES: DESIGN DEVELOPMENT (35%), REVISED DESIGN DEVELOPMENT (35%), CONSTRUCTION DOCUMENTS (65%), CONSTRUCTION DOCUMENTS (100%), AND CONSTRUCTION DOCUMENTS (FINAL). B. PROVIDE AN UPDATED CONSTRUCTION SCHEDULE WITH EACH SUBMISSION. C. SEE NIH DRM FOR DETAILED REQUIREMENTS. 3. ATTEND PROGRESS/REVIEW/USER MEETINGS. 4. SURVEY ALL EXISTING CONDITIONS NECESSARY TO ACCOMPLISH THE PROJECT. A. THE A/E SHALL PERFORM FIELD SURVEYS THAT IDENTIFY EXISTING CONDITIONS TO ASCERTAIN ITEMS NECESSARY TO ACCOMPLISH THE PROJECT. THIS MAY INCLUDE MEASUREMENTS AND METERING OF THE EXISTING UTILITIES WITHIN THE SCOPE OF WORK PRIOR TO DEMOLITION, TO VERIFY THE DESIGN CONDITIONS WILL BE OBTAINABLE. THIS SOW SPECIFICALLY INCLUDES MINIMUM OF (5) DAYS OF I. ELECTRICAL METERING. II. ENGINEERING ANALYSIS. III. CHILLED WATER SUPPLY ANALYSIS. IV. PRE-DEMOLITION READINGS OF SUPPLY AND EXHAUST AIR ARE SPECIFICALLY REQUIRED. 5. PROVIDE AN UPDATED ESTIMATED CONSTRUCTION CONTRACT PRICE PER DESIGN DOCUMENT REVIEW SUBMISSION. 6. PROVIDE POST DESIGN CONSTRUCTION ADMINISTRATIVE SERVICES. A. CONSTRUCTION CONTRACTOR BID WALK ASSISTANCE. B. CONSTRUCTION INSPECTION. C. ATTEND PROGRESS MEETINGS. D. RESPONSES TO REQUEST FOR INFORMATION (RFIS). E. CONSTRUCTION SUBMITTAL REVIEW. F. REVIEW, TRACK, AND MAKE RECOMMENDATION FOR CONSTRUCTION CHANGE ORDERS. G. COMMISSIONING. THE PERIOD OF PERFORMANCE TO COMPLETE THE SCOPE OF WORK IS FROM 09/27/2017 TO 03/15/2019. DELIVER TO: NIH CAMPUS, BUILDING 13 PRODUCT SERVICE CODE: C1JZ PRODUCT/SERVICE DESCRIPTION: ARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLANEOUS CAN # 8030643, ORF TAS::75 0838::TAS; 08023820175DB0 DUNS # 176126324 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$322K
Jun 28, 2021Department of Health and Human ServicesNIH A E CONSTRUCTION541330IGF::OT::IGF - TAS::75 0838::TAS - C100708 - TASK ORDER - AE SERVICES - CHIMNEYS AND EXTERIOR EXVELOPE REPAIR, BUILDING 5; JAMES NG; SEE ATTACHED SOW. THE AE SHALL PROVIDE MATERIAL, LABOR, EQUIPMENT, AND SUPERVISION TO ACCOMPLISH THE FOLLOWING: A. PROVIDE AN ASSESSMENT OF BUILDING 5'S CHIMNEYS AND EXTERIOR ENVELOPE ITEMS SUCH AS GUTTERS, SOFFITS, DORMERS, WALLS, ETC., BUT NOT THE ROOF, TO DETERMINE EXTEND OF DETERIORATION, AND RECOMMEND REPAIR OPTIONS. B. PRODUCE A REPORT (ELECTRONIC AND FIVE HARDCOPIES) FOR THE NIH HISTORICAL PRESERVATION BOARD TO REVIEW, AND APPROVE ANY RECOMMENDED REPAIRS. C. PROVIDE COST ESTIMATES FOR ALL RECOMMENDED REPAIR OPTIONS. D. PROVIDE DESIGN DETAILS ON ALL SELECTED REPAIR OPTIONS. E. DUE TO THE HEIGHTS AT WHICH MOST OF THE DETERIORATION IS FOUND, FALL PROTECTION AND OTHER RELEVANT SAFETY PROCEDURES MUST BE FOLLOWED WHEN ACCESSING THE OUTSIDE HIGH AREAS OF THE BUILDING. A SAFETY PLAN WILL BE REQUIRED TO BE SUBMITTED AND REVIEWED BY THE NIH DIV. OF OCCUPATIONAL HEALTH AND SAFETY PRIOR TO THE ASSESSMENT VENDOR STARTING HIS WORK. F. PROVIDE POST DESIGN CONSTRUCTION SERVICES TO ANSWER ANY RFIS AS WELL AS INSPECT AND DOCUMENT THE REPAIR WORK. PRODUCE A FINAL REPORT (ELECTRONIC AND FIVE HARDCOPIES) AT PROJECT COMPLETION TO SHOW THE RESULTS OF THE REPAIR WORK. G. IF EQUIPMENT SUCH AS AERIAL LIFT IS USED, AND IT OBSTRUCTS TRAFFIC OR ROADWAY DURING THE ASSESSMENT, THIS ACTIVITY MUST BE APPROVED BY THE NIH SITE SELECTION COMMITTEE FOR ANY POTENTIAL ROAD CLOSURE OR PARKING OBSTRUCTION PRIOR TO START OF ASSESSMENT. H. ALL CONTRACTORS OR VENDORS WORKING ON NIH PROPERTY MUST FIRST BE ENROLLED ON THE CONSTRUCTSECURE.COM WEBSITE. THE PERIOD OF PERFORMANCE TO COMPLETE THE SCOPE OF WORK IS FROM 7/3/2017 TO 11/30/2017. DELIVER TO: NIH CAMPUS, BUILDING 5 PRODUCT SERVICE CODE: C1JZ PRODUCT/SERVICE DESCRIPTION: ARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLANEOUS CAN # 8016904, ORF TAS::75 0838::TAS; 08023820145DB0 DUNS # 176126324 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$35K
Apr 6, 2021Department of Health and Human ServicesNIH A E CONSTRUCTION541330IGF::OT::IGF C104603 COMMISSIONING, QUALIFICATION,&VALIDATION SERVICES (CQV) FOR STERILITY LAB RENOVATION, BLDG. 10; GIAS AHMAD$83K

Subawards Received

Health, Education And Research Associates, INC. also receives subaward dollars from other prime contractors. Aggregated from USAspending sub-award reporting (FY2016-FY2026).

$1.9M
Total Received
5
Sub Awards
3
Distinct Primes

Top 3 Primes Paying Health, Education And Research Associates, INC.

Related Contractors

Other companies active in NAICS 541330ENGINEERING SERVICES.

Track Health, Education And Research Associates, INC. Recompetes Before They Post

Mindy monitors Health, Education And Research Associates, INC.'s active contracts and alerts you 12 months before they expire — so you can position to compete on recompete.

Get Free Recompete Alerts