Home/Contractors/Healtheon, INC/contracts

Federal Contractor Profile

Healtheon, INC

$576M obligated·124 awards·6 agencies·8 NAICS

Federal Contracts

Showing contracts 151200 of 566 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Feb 5, 2024Department of DefenseW074 ENDIST MOBILEW9127822F0459236220CONSTRUCT REPAIRS TO BARRACKS 6105 AND 6106$41K
Feb 1, 2024Department of DefenseFA2521 45 CONS PKFA252122F0234236220THE CONTRACTOR IS TO PROVIDE ALL MATERIALS, LABOR, AND EQUIPMENT FOR A DESIGN-BUILD REPLACEMENT OF THE EXISTING BUILDING 962 GENERATOR WITH ONE RIGHT-SIZED GENERATOR, BRAND NAME CUMMINS, AT PATRICK SPACE FORCE BASE, FLORIDA.$73K
Feb 1, 2024National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC23F0055236210UTILITY TUNNEL REPAIRS, PHASE 1$78K
Jan 31, 2024National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER80KSC019C0007236210ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB).$96K
Jan 19, 2024Department of DefenseW074 ENDIST MOBILEW9127822F0459236220CONSTRUCT REPAIRS TO BARRACKS 6105 AND 6106$100K
Dec 14, 2023National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER80KSC019C0007236210ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB).$149K
Dec 12, 2023Department of DefenseW074 ENDIST MOBILEW9127822F0456236220BLDG. 433 RENOVATIONS$51K
Dec 12, 2023National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC22F0053236210CONSTRUCTION PROJECT TO UPGRADE THE 22 KV ELECTRICAL DISTRIBUTION SYSTEM. ELECTRICAL INFRASTRUCTURE UPGRADES$19K
Dec 12, 2023National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC22F0053236210CONSTRUCTION PROJECT TO UPGRADE THE 22 KV ELECTRICAL DISTRIBUTION SYSTEM. ELECTRICAL INFRASTRUCTURE UPGRADES$9K
Dec 11, 2023National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER80KSC019C0007236210ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB).$11K
Dec 6, 2023National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC22F0110236210THIS PROJECT REPLACES AND UPDATES MSFC UTILITY CONTROL SYSTEM (UCS), WHICH SUPPORTS SITE-WIDE CAPABILITIES AND OPERATIONS.$28K
Nov 21, 2023National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC22F0053236210CONSTRUCTION PROJECT TO UPGRADE THE 22 KV ELECTRICAL DISTRIBUTION SYSTEM. ELECTRICAL INFRASTRUCTURE UPGRADES$14K
Nov 14, 2023National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC22F0038236210EMERGENCY EGRESS LIGHTING COMPLIANCE UPGRADE. THIS PROJECT WILL REPLACE MSFC EMERGENCY LIGHTING SYSTEMS BRINGING THEM UP TO THE CURRENT NASA AND INDUSTRY CODES AND WILL FOCUS ON MSFC FACILITIES WITH HIGHEST RISK.$36K
Nov 8, 2023National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC22F0110236210THIS PROJECT REPLACES AND UPDATES MSFC UTILITY CONTROL SYSTEM (UCS), WHICH SUPPORTS SITE-WIDE CAPABILITIES AND OPERATIONS.$20K
Oct 30, 2023Department of DefenseFA9101 AEDC PKP PROCRMNT BRFA910119F0107236220REPLACE HYDRAULIC PUMPS - ASTF$600K
Oct 27, 2023Department of DefenseW074 ENDIST MOBILEW9127822F0459236220CONSTRUCT REPAIRS TO BARRACKS 6105 AND 6106$198K
Oct 25, 2023Department of DefenseFA9101 AEDC PKP PROCRMNT BRFA910124FB001236220HIGH PRESSURE AIR ADDITIONAL CAPACITY PHASE II (HPAAC II)$26M
Oct 25, 2023National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER80KSC019C0007236210ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB).$24K
Oct 11, 2023National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC21F0152236210BUILDING 1215 ENVIRONMENTAL TUNNEL CONTROLS$24K
Oct 4, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC21F0155236210REPLACE MEDIUM AND LOW VOLTAGE ELECTRICAL EQUIPMENT, SUCH AS 13.8KV LOADBREAK SWITCHES, PAD-MOUNT SWITCHES, MEDIUM AND LOW VOLTAGE FEEDERS, OIL & DRY TYPE TRANSFORMERS, LOW VOLTAGE DISTRIBUTION EQUIPMENT AND SWITCHBOARDS & PERFORM ARC FLASH STUDIES.$2K
Sep 30, 2023Department of DefenseFA2521 45 CONS PKFA252123F0384236220DBEH 23-1573, RESTRIPE TRIDENT WHARF AT NOTU FAC.79100, CAPE CANAVERAL SPACE FORCE STATION, FL.$227K
Sep 27, 2023National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER80KSC019C0007236210ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB).$13K
Sep 27, 2023Department of DefenseFA2521 45 CONS PKFA252122F0086236220REPAIR UTILITIES, EXTERIOR FINISH & CONSTRUCT ROOF STAIRWELL BLDG 89100 (MOC) CAPE CANAVERAL SPACE FORCE STATION.$1.2M
Sep 26, 2023National Aeronautics and Space AdministrationNASA STENNIS SPACE CENTER80SSC020F0003236210A-COMPLEX HIGH PRESSURE INDUSTRIAL WATER (HPIW) REFURBISHMENT$379K
Sep 20, 2023Department of DefenseFA9101 AEDC PKP PROCRMNT BRFA910119F0115236220AIR MAKEUP UNIT 1 (AMU 1) RETURN TO SERVICE$206K
Sep 13, 2023National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER80KSC019C0007236210ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB).$181K
Sep 12, 2023National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC23F0137236210PROJECT TITLE: MSFC UTILITY CONTROL SYSTEM RISK REDUCTION PHASE 2$6.1M
Sep 11, 2023National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC023F0118236210AVIATION LOGISTICS OPERATIONS FACILITY (ALOF) DESIGN-BUILD$21M
Sep 7, 2023National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC22F0053236210CONSTRUCTION PROJECT TO UPGRADE THE 22 KV ELECTRICAL DISTRIBUTION SYSTEM. ELECTRICAL INFRASTRUCTURE UPGRADES$937K
Sep 7, 2023Department of DefenseW074 ENDIST MOBILEW9127822F0459236220CONSTRUCT REPAIRS TO BARRACKS 6105 AND 6106$41K
Sep 5, 2023Department of DefenseW074 ENDIST MOBILEW9127822F0459236220CONSTRUCT REPAIRS TO BARRACKS 6105 AND 6106$10K
Sep 1, 2023National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER80KSC019C0007236210ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB).$3K
Aug 31, 2023National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC22F0053236210CONSTRUCTION PROJECT TO UPGRADE THE 22 KV ELECTRICAL DISTRIBUTION SYSTEM. ELECTRICAL INFRASTRUCTURE UPGRADES$95K
Aug 31, 2023Department of DefenseW074 ENDIST MOBILEW9127822F0459236220CONSTRUCT REPAIRS TO BARRACKS 6105 AND 6106$10K
Aug 28, 2023Department of DefenseW074 ENDIST MOBILEW9127822F0175236220FIRE STATION #4, TYNDALL$74K
Aug 25, 2023National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER80KSC019C0007236210ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB).$9K
Aug 17, 2023Department of DefenseFA2521 45 CONS PKFA252122F0234236220THE CONTRACTOR IS TO PROVIDE ALL MATERIALS, LABOR, AND EQUIPMENT FOR A DESIGN-BUILD REPLACEMENT OF THE EXISTING BUILDING 962 GENERATOR WITH ONE RIGHT-SIZED GENERATOR, BRAND NAME CUMMINS, AT PATRICK SPACE FORCE BASE, FLORIDA.$7K
Aug 9, 2023National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC23F0055236210UTILITY TUNNEL REPAIRS, PHASE 1$7.8M
Aug 7, 2023National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER80KSC019C0007236210ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB).$15K
Aug 3, 2023National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER80KSC019C0007236210ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB).$46K
Aug 2, 2023National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC22F0038236210EMERGENCY EGRESS LIGHTING COMPLIANCE UPGRADE. THIS PROJECT WILL REPLACE MSFC EMERGENCY LIGHTING SYSTEMS BRINGING THEM UP TO THE CURRENT NASA AND INDUSTRY CODES AND WILL FOCUS ON MSFC FACILITIES WITH HIGHEST RISK.$218K
Aug 2, 2023Department of DefenseW074 ENDIST MOBILEW9127822F0352236220REPAIR BLDG 4511$53K
Jul 19, 2023Department of DefenseW074 ENDIST MOBILEW9127822F0352236220REPAIR BLDG 4511$66K
Jul 14, 2023Department of DefenseW074 ENDIST MOBILEW9127822F0352236220REPAIR BLDG 4511$34K
Jul 6, 2023National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER80KSC019C0007236210ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB).$32K
Jun 28, 2023National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER80KSC019C0007236210ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB).$116K
Jun 22, 2023National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER80KSC019C0007236210ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB).$8K
Jun 12, 2023National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER80KSC019C0007236210ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB).$46K
Jun 8, 2023National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC22F0053236210CONSTRUCTION PROJECT TO UPGRADE THE 22 KV ELECTRICAL DISTRIBUTION SYSTEM. ELECTRICAL INFRASTRUCTURE UPGRADES$53K
Jun 5, 2023National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC22F0053236210CONSTRUCTION PROJECT TO UPGRADE THE 22 KV ELECTRICAL DISTRIBUTION SYSTEM. ELECTRICAL INFRASTRUCTURE UPGRADES$62K

Get Alerted Before Healtheon, INC's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free