Home/Contractors/Honu'apo I, LLC/contracts

Federal Contractor Profile

Honu'apo I, LLC

$113M obligated·302 awards·4 agencies·12 NAICS

Federal Contracts

Showing contracts 101150 of 377 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Jan 9, 2019Department of DefenseNAVFACSYSCOM WASHINGTONN4008019F4016236220IGF::OT::IGF X002 WOLF AIRFIELD STORMWATER&GRADING REPAIR$1.1M
Nov 30, 2018Department of DefenseNAVFACSYSCOM WASHINGTONN4008019F4069236220BASE YEAR 8(A)MACC GENERAL CONSTRUCTION$2.1M
Nov 23, 2018Department of DefenseNAVFACSYSCOM WASHINGTONN4008019F4059531190IGF::OT::IGF X010 BRIDGE EXTENSION 6 MONTHS FROM 24 NOV 18 - 23 MAY 19$138K
Oct 30, 2018Department of DefenseNAVFACSYSCOM WASHINGTONN4008019F4023531120IGF::OT::IGF X007 PURCHASE LR 144 BUILDING 4033$496K
Sep 30, 2018Department of DefenseNAVFACSYSCOM WASHINGTONN4008018C3006236220IGF::OT::IGF B503 REMODEL BLDG FOR SCIF LEVEL MODS AT NAS PATUXENT RIVER, MD$442K
Sep 30, 2018Department of DefenseNAVFACSYSCOM WASHINGTONN4008018F4906236220IGF::OT::IGF THE INTENT OF THIS TASK ORDER IS COMPLETE REPAIRS TO JBAB 520 SECURE SPACE OFFICE.$155K
Sep 30, 2018Department of DefenseNAVFACSYSCOM WASHINGTONN4008018F5225236220IGF::OT::IGF X011 NRL 71 NIKE CHILLER$3.3M
Sep 30, 2018Department of DefenseNAVFACSYSCOM WASHINGTONN4008018F5238236220IGF::OT::IGF X012 NRL-A59 E-LINE UPGRADE ROOMS 19A1-22A1 FOR HYPE$1.3M
Sep 29, 2018Department of DefenseNAVFACSYSCOM WASHINGTONN4008018F4984236220IGF::OT::IGF REPLACE CHILLERS, B.2033 HOCHMUTH HALL$281K
Sep 28, 2018Department of DefenseNAVFACSYSCOM WASHINGTONN4008018F5104236220IGF::OT::IGF NRL-A59, REPLACE CHILLED WATER LINES$665K
Sep 28, 2018Department of DefenseNAVFACSYSCOM WASHINGTONN4008018F5175236220IGF::OT::IGF CBD: REPLACE FREIGHT ELEVATOR AND INCREASE HIGH BAY FLOOR$1.4M
Sep 28, 2018Department of DefenseNAVFACSYSCOM WASHINGTONN4008018F5204236220IGF::OT::IGF - DAYROOM RENOVATION AT USAF BAND BLDG 2$68K
Sep 26, 2018Department of DefenseNAVFACSYSCOM WASHINGTONN4008018F5153236220IGF::OT::IGF X006 JBAB 379 REPLACE STORM WATER PUMPSREPLACE TWO ($1.1M
Sep 21, 2018Department of EnergyHEADQUARTERS PROCUREMENT SERVICES89303018FMA400107238220PERFORM REPAIRS TO MER-5.$2.2M
Sep 20, 2018Department of EnergyHEADQUARTERS PROCUREMENT SERVICES89303018FMA400103238220REPLACEMENT OF THE FORCED HEATING CONTROL SYSTEM AT DOE'S FORRESTAL LOCATION IN WASHINGTON, DC.$205K
Sep 13, 2018Department of EnergyHEADQUARTERS PROCUREMENT SERVICES89303018FMA400092238220INSTALL NEW COIL SYSTEM IN AC SW7, THIS SCOPE INCLUDES DEMOLITION OF THE OLD COIL AND INSTALLATION OF A NEW COIL IN AC SW 7. THIS SCOPE ALSO INCLUDES SHEET METAL REPAIRS TO THE CASING AROUND THE COIL WHERE THE COIL WILL BE REINSTALLED.$30K
Sep 13, 2018Department of DefenseNAVFACSYSCOM WASHINGTONN4008018F4906236220IGF::OT::IGF THE INTENT OF THIS TASK ORDER IS COMPLETE REPAIRS TO JBAB 520 SECURE SPACE OFFICE.$652K
Sep 12, 2018Department of EnergyHEADQUARTERS PROCUREMENT SERVICESDEDT0013996238220IGF::OT::IGF BULK FUNDED TASK ORDER FOR EMERGENCY HVAC WORK.$50K
Sep 10, 2018Department of DefenseNAVFACSYSCOM WASHINGTONN4008018F4954531190IGF::OT::IGF X004 TO FOR LR153 TO OBLIGATE FUNDS FOR OPT 3 LR 15$213K
Aug 15, 2018Department of EnergyHEADQUARTERS PROCUREMENT SERVICES89303018FMA400076238220THE PURPOSE OF THIS ORDER IS TO PROVIDE THE DEPARTMENT OF ENERGY WITH DEMOLITION AND INSTALLATION OF (4) NEW COILS FOR HV-SW-4 IN MER-8. THIS SCOPE INCLUDES DEMOLITION AND INSTALLATION THE NEW COILS, REPAIR THE SHEET METAL CASING AROUND THE COIL AFTER REINSTALLATION OF THE NEW COIL.IN THE FORRESTAL BUILDING. THE ORDER IS TO BE PROCESSED IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF CONTRACT. ALL WORK SHALL BE IN ACCORDANCE WITH THE PROPOSAL PRICE OF $33,119.54.$33K
Aug 15, 2018Department of EnergyHEADQUARTERS PROCUREMENT SERVICES89303018FMA400077238220THE PURPOSE OF THIS ORDER IS TO PROVIDE THE DEPARTMENT OF ENERGY WITH DEMO AND INSTALL/REPLACE THE FAN SECTION FOR AC-SW-1 IN MER-8. THE NEW FAN SECTION WILL BE CONTROLLED BY A STATIC PRESSURE SWITCH IN THE FORRESTAL BUILDING. THE ORDER IS TO BE PROCESSED IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF CONTRACT.$73K
Aug 13, 2018Department of EnergyHEADQUARTERS PROCUREMENT SERVICES89303018FMA400073238220THE PURPOSE OF THIS TASK ORDER TO IS TO PERFORM DEMOLITION AND INSTALLATION OF THE FAN SECTION FOR HV-SW-3 IN MER-8. THE NEW FAN SECTION WILL BE CONTROLLED BY A VFD AND STATIC PRESSURE SWITCH. WE WILL RECONNECT THE DUCTWORK TO THE UNIT, PATCH THE UNIT WHERE THE OLD MEETS THE NEW AND TAB THE NEW FANS FOR OVERALL CFM.$87K
Aug 12, 2018Department of DefenseNAVFACSYSCOM WASHINGTONN4008018F4804531190IGF::OT::IGF X009 TASK ORDER TO OBLIGATE FUNDS FOR BRIDGE OPTION$69K
Aug 8, 2018Department of EnergyHEADQUARTERS PROCUREMENT SERVICES89303018FMA400070238220THE PURPOSE OF THIS TASK ORDER TO IS TO INSTALL ICE MACHINE IN GA CORRIDOR VENDING MACHINE AREA.$18K
Aug 1, 2018Department of DefenseNAVFACSYSCOM WASHINGTONN4008018C3516236220IGF::OT::IGF REPAIRS TO BUILDING 23SN, STUMP NECK ANNEX, NAVAL SUPPORT FACILITY, INDIAN HEAD, NAVAL SUPPORT ACTIVITY SOUTH POTOMAC, MARYLAND$39K
Jul 26, 2018Department of DefenseNAVFACSYSCOM WASHINGTON0017236220IGF::OT::IGF WNY B200 RE-CONFIGURE CUBICLES AND EXTERIOR REPAIRS$464K
Jul 26, 2018Department of EnergyHEADQUARTERS PROCUREMENT SERVICES89303018FMA400041238220IGF::OT::IGF THE PURPOSE OF THIS DELIVERY ORDER IS TO PROVIDE SERVICES TO THE DEPARTMENT OF ENERGY TO REPLACE THE FLOOR DRAIN PIPE LEADING FROM MER 19 TO BE-127 IN THE DOE FORRESTAL BUILDING. THE ORDER IS TO BE PROCESSED IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF CONTRACT DE-MA0011437. ALL WORK SHALL BE IN ACCORDANCE WITH THE PROPOSAL PRICE OF $9,447.13.$13K
Jul 12, 2018Department of DefenseNAVFACSYSCOM WASHINGTONN4008018F4664531120IGF::OT::IGF X003 OBLIGATE FUNDS FOR OPTION PERIOD 2$733K
Jul 3, 2018Department of DefenseNAVFACSYSCOM WASHINGTONN4008018F4644236220IGF::OT::IGF XO68 THE INTENT OF THIS TASK ORDER IS TO UPGRADE THE HVAC DHW SYSTEM FOR BUILD 417.$927K
Jul 3, 2018Department of DefenseNAVFACSYSCOM WASHINGTONN4008018F4656531120IGF::OT::IGF X002 OBLIGATE FUNDS FOR OPTION 1$677K
Jun 26, 2018Department of EnergyHEADQUARTERS PROCUREMENT SERVICES89303018FMA400050238220IGF::OT::IGF THE PURPOSE OF THIS DELIVERY ORDER IS TO PROVIDE SERVICES TO THE DEPARTMENT OF ENERGY TO PERFORM A STUDY OF THE DOMESTIC HOT WATER SYSTEM AT THE FORRESTAL BUILDING. HONU' APO I PROPOSES TO PROVIDE THE ENGINEERING ANALYSIS FOR THE CURRENTLY INSTALLED DOMESTIC HOT WATER (DHW) SYSTEMS AT FORRESTAL (FORS), SPECIFICALLY THE HOT WATER SUPPLY FOR THE RESTROOMS. THE ORDER IS TO BE PROCESSED IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF CONTRACT DE-MA0011437. SEE ATTACHED STATEMENT OF WORK. 1. H1 PROPOSAL$81K
Jun 22, 2018Department of DefenseNAVFACSYSCOM WASHINGTONN4008018F4632236220IGF::OT::IGF X001 FY18 GENERAL 8A SB MACC-MINIMUM GUARANTEE$10K
Jun 20, 2018Department of DefenseNAVFACSYSCOM WASHINGTONN4008018F4549236220IGF::OT::IGF THE INTENT OF THIS TASK ORDER IS TO UPGRADE THE HVAC DHW SYSTEMS FOR BUILDING 1302 AND 47.$1.2M
Jun 7, 2018Department of EnergyHEADQUARTERS PROCUREMENT SERVICES89303018FMA400048238220IGF::OT::IGF THE PURPOSE OF THIS DELIVERY ORDER IS TO PROVIDE SERVICES TO THE DEPARTMENT OF ENERGY TO DEMO AND REPLACE THE EXISTING 8 INCH VALVE LOCATED IN MER 8 IN THE DOE FORRESTAL BUILDING. THE ORDER IS TO BE PROCESSED IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF CONTRACT DE-MA0011437.$11K
May 23, 2018Department of DefenseNAVFACSYSCOM WASHINGTONN4008018F4557531190IGF::OT::IGF X008 B3262 BRIDGE LEASE TO FOR OBLIGATION OF FUNDS$69K
May 16, 2018Department of EnergyHEADQUARTERS PROCUREMENT SERVICES89303018FMA400042238220IGF::OT::IGF THE PURPOSE OF THIS DELIVERY ORDER IS TO PROVIDE SERVICES TO THE DEPARTMENT OF ENERGY TO INSTALL NEW VAV'S AND A NEW FCU IN GA-087 WITH ASSOCIATED PIPE AND NEW DUCT CONNECTION AND UNITS WILL BE ON A STAND-ALONE W/BACNET CAPABILITY AND REPLACE A FAULTY CV ON (1)FCU AND A FAN ASSEMBLY ON (1)FCU IN THE DOE FORRESTAL BUILDING. THE ORDER IS TO BE PROCESSED IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF CONTRACT DE-MA0011437. ALL WORK SHALL BE IN ACCORDANCE WITH THE PROPOSAL PRICE OF $40,215.10.$40K
May 2, 2018Department of EnergyHEADQUARTERS PROCUREMENT SERVICES89303018FMA400040238220IGF::OT::IGF THE PURPOSE OF THIS DELIVERY ORDER IS TO PROVIDE SERVICES TO THE DEPARTMENT OF ENERGY FOR INSTALLING THREE (3) WATER COOLERS STATIONS LOCATED IN VARIOUS LOCATIONS. H1 SHALL ALSO PROVIDE TWO ADDITIONAL WATER FOUNTAINS FOR FUTURE USE. THIS SCOPE INCLUDES REMOVAL AND INSTALLATION OF THREE (3) WATER COOLERS SPECIFIED BY THE DEPARTMENT OF ENERGY AND INCLUDES STAINLESS STEEL BOTTOM TRIM PLATE/ACCESS DOOR, ALL PLUMBING MODIFICATIONS FOR A COMPLETE INSTALLATION.$30K
May 2, 2018Department of EnergyHEADQUARTERS PROCUREMENT SERVICES89303018FMA400041238220IGF::OT::IGF THE PURPOSE OF THIS DELIVERY ORDER IS TO PROVIDE SERVICES TO THE DEPARTMENT OF ENERGY TO REPLACE THE FLOOR DRAIN PIPE LEADING FROM MER 19 TO BE-127 IN THE DOE FORRESTAL BUILDING. THE ORDER IS TO BE PROCESSED IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF CONTRACT DE-MA0011437. ALL WORK SHALL BE IN ACCORDANCE WITH THE PROPOSAL PRICE OF $9,447.13.$9K
Apr 25, 2018Department of DefenseNAVFACSYSCOM WASHINGTON0060236220IGF::OT::IGF REPLACE HVAC AT BUILDING 863, NSF IH, NSA SP, MD$22K
Apr 24, 2018Department of DefenseNAVFACSYSCOM WASHINGTON0059236220IGF::OT::IGF PROVIDE LIGHTNING PROTECTION TO B856$29K
Apr 3, 2018Department of EnergyHEADQUARTERS PROCUREMENT SERVICES89303018FMA400032238220IGF::OT::IGF THE PURPOSE OF THIS DELIVERY ORDER IS TO PROVIDE SUPPORT TO THE DEPARTMENT OF ENERGY FOR H1 TO PERFORM THE EMERGENCY SEASONAL VALVE REPLACEMENT PROJECT IN MER 5&8 IN THE DOE FORRESTAL BUILDING. MER 115 S E-6 REPLACE COOLING COIL CONTROL VALVE, REMOVE OLD HONEYWELL CHILL WATERING REGULATING VALVE PNEUMATIC OPERA TOR. REMOVE OLD CHILL WATER REGULATING VALVE FROM THE PIPING (5 INCH HONEYWELL VALVE) CLEAN FLANGES OF GREASE, DEBRIS AND FOREIGN MATTER, INSTALL OWNER SUPPLIED 5 INCH HONEYWELL VALVE WITH OWNER SUPPLIED FLANGE GASKETS AND NEW BOLTS. RE-INSTALL THE PNEUMATIC VALVE OPERATOR HEAD. SE-5 REPLACE COOLING COIL SUPPLY SHUT-OFF VALVE, RETURN SHUT-OFF VALVE, AND CONTROL VALVE FREEZE 4 INCH CHILL WATER SUPPLY PIPE ON BOTH SIDES OF CHILL WATER SUPPLY SHUT OFF VALVE . REMOVE PNEUMATIC VALVE OPERATOR, REMOVE OLD 4 INCH CHILL WATER SUPPLY SHUT OFF VALVE, CLEAN FLANGES OF GREASE, DEBRIS AND FOREIGN MATTER. INSTALL NEW OWNER SUPPLIED GEAR OPERATED BUTTERFLY VALVE (4 INCH VALVE) UTILIZING OWNER SUPPLIED FLANGE GASKETS AND BOLTS. RE-INSTALL PNEUMATIC VALVE OPERATOR FREEZE 4 INCH CHILL WATER RETURN PIPE ON BOTH SIDES OF CHILL WATER RETURN SHUT OFF VALVE. REMOVE PNEUMATIC OPERATOR REMOVE OLD 4 INCH CHILL WATER RETURN SHUT OFF VALVE. CLEAN FLANGES OF GREASE, DEBRIS IS AND FOREIGN MATTER. INSTALL NEW CHILL WATER RETURN SHUT OFF VALVE, INSTALL OWNER SUPPLIED FLANGE GASKETS AND BOLTS. CLOSE THE NEW CHILL WATER SUPPLY AND RETURN SHUT OFF VALVES. REMOVE OLD CHILL WATER REGULATING VALVE OPERATOR. REMOVE OLD CHILL WATER REGULATING VALVE. C LEAN FLANGES OF GREASE, DEBRIS AND FOREIGN MATTER. INSTALL NEW OWNER SUPPLIED CHILL WATER REGULATING VALVE (4 INCH HONEYWELL VALVE) WITH OWNER SUPPLIED GASKETS AND BOLTS. S E-14 REPLACE COOLING COIL SUPPLY SHUT-OFF VALVE AND RETURN S HUT-OFF VALVE FREEZE 5 INCH CHILL WATER SUPPLY PIPE ON BOTH SIDES OF CHILL WATER SUPPLY SHUT OFF VALVE. REMOVE 5 INCH CHILL WATER SUPPLY SHUT OFF VALVE. CLEAN BOTH SIDES OF PIPE FLANGES OF GREASE, DEBRIS AND FOREIGN MATTER. RE-INSTALL NEW OWNER SUPPLIED (5 INCH) CHILL WATER SUPPLY SHUT OFF VALVE USING OWNER SUPPLIED FLANGE GASKETS AND BOLTS. FREEZE 5 INCH CHILL WATER RETURN PIPE ON BOTH SIDES OF CHILL WATER RE TURN SHUT OFF VALVE. REMOVE 5 INCH CHILL WATER RETURN SHUT OFF VALVE. CLEAN BOTH SIDES OF PIPE FLANGES OF GREASE, DEBRIS AND FOREIGN MATTER RE-INSTALL NEW OWNER SUPPLIED (5 INCH) CHILL WATER RETURN SHUT OFF VALVE USING OWNER SUPPLIED FLANGE GASKETS AND BOLTS. MER # 8 SW-6 REPLACE COOLING COIL CONTROL VALVE, REMOVE PNEUMATIC OPERATOR ON CHILL WATER REGULATING VALVE. REMOVE OLD CHILL WATER REGULATING VALVE. CLEAN BOTH PIPE FLANGES OF GREASE, DEBRIS AND FOREIGN MATTER. INSTALL NEW OWNER SUPPLIED CHILL WATER REGULATING VALVE USING NEW OWNER SUPPLIED FLANGE GASKETS&BOLTS. RE-INSTALL PNEUMATIC VALVE OPERATOR. THE ORDER IS TO BE PROCESSED IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF CONTRACT DE-MA0011437. ALL WORK SHALL BE IN ACCORDANCE WITH THE PROPOSAL PRICE OF $47,687.43.$48K
Mar 30, 2018Department of EnergyHEADQUARTERS PROCUREMENT SERVICES89303018FMA400031238220IGF::OT:IGF GTN BACKFLOW PREVENTERS STUDY.$26K
Mar 28, 2018Department of DefenseNAVFACSYSCOM WASHINGTONN4008018C3516236220IGF::OT::IGF REPAIRS TO BUILDING 23SN, STUMP NECK ANNEX, NAVAL SUPPORT FACILITY, INDIAN HEAD, NAVAL SUPPORT ACTIVITY SOUTH POTOMAC, MARYLAND$213K
Mar 16, 2018Department of DefenseNAVFACSYSCOM WASHINGTONN4008017C3524236220IGF::OT::IGF REPAIRS TO BUILDING 764, NAVAL SURFACE FACILITY (NSF) INDIAN HEAD, MARYLAND$29K
Mar 16, 2018Department of DefenseNAVFACSYSCOM WASHINGTON0011236220IGF::OT::IGF 8A MACC - OPTION YEAR 1$791K
Mar 15, 2018Department of DefenseNAVFACSYSCOM WASHINGTON0015236220IGF::OT::IGF NRL-215 REPLACE CHILLERS AND COOLING TOW$40K
Mar 2, 2018Department of DefenseNAVFACSYSCOM WASHINGTONN4008017F43C2236220IGF::OT::IGF XO65 B1520 TI-12H TRAINER REMODEL LAB SPACE (REVIEW/$10K
Mar 1, 2018Department of EnergyHEADQUARTERS PROCUREMENT SERVICES89303018FMA400027238220IGF::OT::IGF THE PURPOSE OF THIS DELIVERY ORDER IS TO PROVIDE SUPPORT TO THE DEPARTMENT OF ENERGY FOR H1 TO INSTALL FOUR(4) SHOT FEEDERS IN THE KITCHEN AND CAFETERIA TO COMPLY WITH THE ECOFLOW BIO-AMP PROGRAM IN THE DOE FORRESTAL BUILDING. THE ORDER IS TO BE PROCESSED IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF CONTRACT DE-MA0011437. ALL WORK SHALL BE IN ACCORDANCE WITH THE PROPOSAL PRICE OF $22,946.99.$23K
Feb 21, 2018Department of EnergyHEADQUARTERS PROCUREMENT SERVICES89303018FMA400022238220IGF::OT::IGF THE PURPOSE OF THIS DELIVERY ORDER IS TO PROVIDE SUPPORT TO THE DEPARTMENT OF ENERGY WITH H1 EMERGENCY WORK TO REMOVE INOPERABLE LEAKING FORCED FLOW HEATER IN THE DOE FORRESTAL BUILDING. THE ORDER IS TO BE PROCESSED IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF CONTRACT DE-MA0011437. ALL WORK SHALL BE IN ACCORDANCE WITH THE PROPOSAL PRICE OF $35,338.49.$35K
Jan 19, 2018Department of EnergyHEADQUARTERS PROCUREMENT SERVICES89303018FMA400017238220IGF::OT::IGF THE PURPOSE OF THIS DELIVERY ORDER IS TO PROVIDE SUPPORT TO THE DEPARTMENT OF ENERGY WITH REPLACING TAPS ON TWO 6" PIPES IN THE DOE FORRESTAL BUILDING. THE ORDER IS TO BE PROCESSED IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF CONTRACT DE-MA0011437. ALL WORK SHALL BE IN ACCORDANCE WITH THE PROPOSAL PRICE OF $4.129.54.$4K

Get Alerted Before Honu'apo I, LLC's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free