Federal Contractor Profile
Jacobs Government Services CO
$142M obligated·117 awards·1 agencies·3 NAICS
Federal Contracts
Showing contracts 201–250 of 260 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Aug 7, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G17F0098 | 541330 | IGF::OT::IGF DESIGN OF BUILDING 11108&BUILDING 515 AT FT BLISS, TX. PERIOD OF PERFORMANCE: 180 CALENDAR DAYS AFTER CONTRACT AWARD | $23K |
| Aug 2, 2019 | Department of DefenseW072 ENDIST LOUISVILLE | W912QR18F0449 | 541330 | AE SERVICES FOR INDC | $46K |
| Jul 15, 2019 | Department of DefenseW2V6 USA ENG SPT CTR HUNTSVIL | W912DY19F0469 | 541310 | GFEBS COMPLIANCE AUDIT - LETTERKENNY ARSENAL | $1.7M |
| Jul 11, 2019 | Department of DefenseNAVFACSYSCOM PACIFIC | N6274217F0322 | 541330 | IGF::OT::IGF FY19 MCON PROJECT P-946, CORROSION CONTROL HANGAR AND PARKING FACILITY, MCBH, HAWAII - PREPARE DBB PACKAGE | $552K |
| Jul 11, 2019 | Department of DefenseW2V6 USA ENG SPT CTR HUNTSVIL | W912DY19F0438 | 541310 | THE CONTRACTOR SHALL PRODUCE A REQUIREMENTS ANALYSIS, CONDUCT A PLANNING CHARRETTE AND TWO PLANNING CHARRETTE REPORTS FOR TWO SEPARATE FACILITIES AT CLAY KASERNE. | $308K |
| Jun 26, 2019 | Department of DefenseNAVFACSYSCOM ATLANTIC | N6247019F4078 | 541330 | MILCON EXPLOSIVES SAFETY SUBMISSION (ESS) AND COST ESTIMATE DEVELOPMENT, TACMOR - BABELDAOB AND ANGUAR ISLAND, REPUBLIC OF PALAU | $82K |
| Jun 7, 2019 | Department of DefenseW2V6 USA ENG SPT CTR HUNTSVIL | W912DY19F0397 | 541310 | RPLANS TAB ANALYSIS&DATABASE EDITS / 1391 UPDATE, CASERMA EDERLE, ITALY | $75K |
| May 22, 2019 | Department of DefenseNAVFACSYSCOM MARIANAS | N4019218F4198 | 541330 | N6274217D0003, N4019218F4198;A-E SERVICES FOR WON 1391226 FY20 DLA MILCON PROJECT DESC 1908, CONSTRUCT REFUELING FACILITIES X-RAY WHARF AT APRA HARBOR, NAVAL BASE GUAM | $281K |
| May 13, 2019 | Department of DefenseNAVFACSYSCOM PACIFIC | N6274219F0327 | 541330 | IGF::OT::IGF X016 PREPARATION OF DESIGN-BID-BUILD (DBB) PACKAGE CONSISTING OF FULL PLANS AND SPECIFICATIONS, DETAILED COST ESTIMATE, AND OTHER SERVICES FOR FY21 MCAF P-3001 AJJY203001 APSI STANDOFF WEAPONS COMPLEX, MSA 2, ANDERSEN AIR FORCE BASE, GUAM. | $583K |
| May 10, 2019 | Department of DefenseNAVFACSYSCOM PACIFIC | N6274219F0304 | 541330 | FY20 MCAF PROJECT P-9010, APSI FUEL TANKS WITH RECEIPT PIPELINE AND HYDRANT SYSTEM, TINIAN INTERNATIONAL AIRPORT, CNMI | $2.8M |
| May 3, 2019 | Department of DefenseW076 ENDIST TULSA | W912BV19F0055 | 541320 | GUARANTEED MINIMUM | $3K |
| May 1, 2019 | Department of DefenseNAVFACSYSCOM PACIFIC | N6274219F0306 | 541330 | IGF::OT::IGF X013 AFCEC FY20 MCAF PROJECT P9021 PAF189021 APSI AIRFIELD DEVELOPMENT PHASE 1, TINIAN, COMMONWEALTH OF NORTHERN MARIANA ISLANDS. | $1.5M |
| May 1, 2019 | Department of DefenseNAVFACSYSCOM PACIFIC | N6274219F0308 | 541330 | IGF::OT::IGF X014 AFCEC FY20 MCAF PROJECT P-9022 PAF189022 APSI PARKING APRON, TINIAN, COMMONWEALTH OF NORTHERN MARIANA ISLANDS. | $1.4M |
| Apr 29, 2019 | Department of DefenseW072 ENDIST LOUISVILLE | W912QR19F0211 | 541330 | PROVIDE ARCHITECT/ENGINEERING (A/E) SERVICES FOR THE CONSOLIDATED MISSION COMPLEX, PHASE 3 AT ROBINS AIR FORCE BASE, GEORGIA | $2.9M |
| Apr 24, 2019 | Department of DefenseW072 ENDIST LOUISVILLE | W912QR18F0449 | 541330 | AE SERVICES FOR INDC | $63K |
| Apr 11, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0088 | 541330 | AE TO TO DEVELOP 35% DESIGN THE CONTRACTOR SHALL PROVIDE ALL SERVICES REQUIRED IN THE SCOPE OF WORK FOR AN AE TO TO DEVELOP 35% DESIGN DOCUMENT IN ACCORDANCE WITH CODE 2 DESIGN DIRECTIVE. | $510K |
| Apr 1, 2019 | Department of DefenseNAVFACSYSCOM PACIFIC | N6274218F0329 | 541330 | IGF::OT::IGF X007 EARTH COVERED MAGAZINES, RAAFB TINDAL, AUSTRALIA. TASK ORDER NO. N6274218F0329, PREPARE A DESIGN-BID-BUILD (DBB) CONSTRUCTION PACKAGE CONSISTING OF FULL PLANS, SPECIFICATIONS, DETAILED COST ESTIMATE, AND OTHER SERVICES FOR FY20 MCAF PAF180300 EARTH COVERED MAGAZINES, ROYAL AUSTRALIAN AIR FORCE BASE TINDAL, AUSTRALIA.CONTRACT N62742-17-D-0003 INDEFINITE DELIVERY INDEFINITE QUANTITY ARCHITECT-ENGINEER SERVICES FOR DESIGN, ENGINEERING, SPECIFICATION WRITING, COST ESTIMATING, AND RELATED SERVICES AT VARIOUS LOCATIONS UNDER THE COGNIZANCE OF NAVFAC PACIFIC. | $49K |
| Mar 29, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G18F0228 | 541330 | A-E DESIGN FOR DFAC, CAMP BULLIS, TX | $37K |
| Mar 28, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0119 | 541330 | JOINT BASE SAN ANTONIO RANDOLPH AIR FORCE BASE COMPLETE DESIGN FOR TX MAINTENANCE TRAINING SYSTEM CENTRALIZED TRAINING FACILITY PERIOD OF PERFORMANCE 1000 DAYS FROM AWARD | $1.6M |
| Feb 27, 2019 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0078 | 541330 | TX GROUND BASED TRAINING SYSTEM SIMULATOR, JOINT BASE SAN ANTONIO/RANDOLPH AIR FORCE BASE. PERIOD OF PERFORMANCE 915 DAYS FROM TASK ORDER AWARD. | $1.0M |
| Dec 21, 2018 | Department of DefenseW076 ENDIST FT WORTH | W9126G19F0046 | 541330 | T-X PROGRAM FUEL BARN HUSH HOUSE | $2.0M |
| Dec 19, 2018 | Department of DefenseNAVFACSYSCOM PACIFIC | N6274219F0308 | 541330 | IGF::OT::IGF X014 AFCEC FY20 MCAF PROJECT P-9022 PAF189022 APSI PARKING APRON, TINIAN, COMMONWEALTH OF NORTHERN MARIANA ISLANDS. | $1.8M |
| Dec 18, 2018 | Department of DefenseNAVFACSYSCOM PACIFIC | N6274219F0306 | 541330 | IGF::OT::IGF X013 AFCEC FY20 MCAF PROJECT P9021 PAF189021 APSI AIRFIELD DEVELOPMENT PHASE 1, TINIAN, COMMONWEALTH OF NORTHERN MARIANA ISLANDS. | $1.3M |
| Dec 12, 2018 | Department of DefenseNAVFACSYSCOM PACIFIC | N6274219F0304 | 541330 | FY20 MCAF PROJECT P-9010, APSI FUEL TANKS WITH RECEIPT PIPELINE AND HYDRANT SYSTEM, TINIAN INTERNATIONAL AIRPORT, CNMI | $2.8M |
| Nov 19, 2018 | Department of DefenseW076 ENDIST FT WORTH | W9126G18F0168 | 541330 | LABORATORY INSTRUCTIONAL FACILITY DESIGN | $235K |
| Sep 30, 2018 | Department of DefenseW076 ENDIST FT WORTH | W9126G18F0228 | 541330 | A-E DESIGN FOR DFAC, CAMP BULLIS, TX | $887K |
| Sep 29, 2018 | Department of DefenseW072 ENDIST LOUISVILLE | W912QR18F0560 | 541330 | RPLANS SUPPORT CONUS ARMY INSTALLATIONS | $1.5M |
| Sep 26, 2018 | Department of DefenseW2V6 USA ENG SPT CTR HUNTSVIL | W912DY18F0930 | 541310 | LABOR_TASK 2_USAG KWAJALEIN-ATOLL, RMI IGF::OT::IGF REAL PROPERTY PLANNING AND ANALYSIS SYSTEM (RPLANS) SUPPORT THIS CONTRACTOR SHALL PRODUCE A REAL PROPERTY PLANNING ANALYSIS SYSTEM (RPLANS); THE RPLANS IS A MASTER PLANNING TOOL THAT APPLIES ARMY STANDARD FACILITY PLANNING CRITERIA TO THE FORCE STRUCTURE TO DEVELOP FACILITY ALLOWANCES FOR UNITS, ORGANIZATIONS, AND THE INSTALLATION AS A WHOLE. THE CONTRACTOR'S MUST POSSESS THE ABILITY TO ANALYZE THE ARMY STATIONING AND INSTALLATION PLAN (ASIP) DATABASE, ASSESS ASIP IMPACTS ON THE RPLANS DATA, AND ANALYZE TH FORCE MANAGEMENT SYSTEM (FMS) DATABASE. SOW DATED 16 AUG 18 DEFINES FURTHER RPLANS REQUIREMENTS. | $114K |
| Sep 26, 2018 | Department of DefenseW2V6 USA ENG SPT CTR HUNTSVIL | W912DY18F0990 | 541310 | BUILDER FACILITY ASSESSMENTS AT SIERRA ARMY DEPOT, CA. | $1.9M |
| Sep 26, 2018 | Department of DefenseW2V6 USA ENG SPT CTR HUNTSVIL | W912DY18F1122 | 541310 | THE CONTRACTOR WILL PERFORM THE FOLLOWING GENERAL TASKS: 1) FACILITY PLANNING COURSE OF ACTION (COA) REPORT - DEVELOP A DETAILED REPORT CONTAINING A CHARACTERIZATION OF THE 512TH CURRENT FACILITY AND SUPPORTING INFRASTRUCTURE CONDITIONS, ISSUES AND SHORTFALLS IN ADDITION TO FULLY-DEVELOPED COURSES OF ACTION (COA) THAT KIRTLAND AFB CAN USE TO JUSTIFY THE FACILITY PROGRAMMING ACTION THAT BEST MEETS THEIR MISSION REQUIREMENTS. THE FINAL REPORT CONTENT AND STRUCTURE IS DETAILED IN SECTION 2 OF THE SOW. 2) FACILITY PLANNING COURSE OF ACTION (COA) ADVOCACY BRIEF - DEVELOP A SCRIPTED ADVOCACY BRIEF TO BE USED TO CHARACTERIZE THE NEED/SECURE FUNDING FOR A CONSTRUCTION SOLUTION(S) TO MEET THE FACILITY NEEDS OF THE INCREASED MISSION. THE FINAL BRIEFING CONTENT AND STRUCTURE IS DETAILED IN SECTION 2 OF THE SOW. | $356K |
| Sep 22, 2018 | Department of DefenseNAVFACSYSCOM PACIFIC | N6274218F0352 | 541330 | IGF::OT::IGF X011 P-314 AND P-280 PROGRAMMING WORKSHOP AND DD1391. FY22 MILCON P-314, MARINE EXPEDITIONARY BRIGADE (MEB) ENABLERS, FINEGAYAN, GUAM AND FY22 MILCON P-280, AVIATION OPERATIONS BUILDING, ANDERSEN AIR FORCE BASE, GUAM. CONTRACT N62742-17-D-0003 INDEFINITE DELIVERY INDEFINITE QUANTITY ARCHITECT-ENGINEER SERVICES FOR DESIGN, ENGINEERING, SPECIFICATION WRITING, COST ESTIMATING, AND RELATED SERVICES AT VARIOUS LOCATIONS UNDER THE COGNIZANCE OF NAVFAC PACIFIC. | $481K |
| Sep 22, 2018 | Department of DefenseW076 ENDIST TULSA | W912BV18F0153 | 541330 | UNITED STATES ARMY SERGEANT MAJOR ACADEMY, REQUIREMENTS ANALYSIS, PLANNING CHARRETTE, AND ECONOMIC ANALYSIS | $351K |
| Sep 20, 2018 | Department of DefenseW076 ENDIST FT WORTH | W9126G17F0098 | 541330 | IGF::OT::IGF DESIGN OF BUILDING 11108&BUILDING 515 AT FT BLISS, TX. PERIOD OF PERFORMANCE: 180 CALENDAR DAYS AFTER CONTRACT AWARD | $74K |
| Sep 16, 2018 | Department of DefenseW076 ENDIST TULSA | W912BV18F0136 | 541330 | FORT POLK REQUIREMENTS ANALYSIS AND PLANNING CHARRETTE | $323K |
| Sep 14, 2018 | Department of DefenseNAVFACSYSCOM PACIFIC | N6274218F0329 | 541330 | IGF::OT::IGF X007 EARTH COVERED MAGAZINES, RAAFB TINDAL, AUSTRALIA. TASK ORDER NO. N6274218F0329, PREPARE A DESIGN-BID-BUILD (DBB) CONSTRUCTION PACKAGE CONSISTING OF FULL PLANS, SPECIFICATIONS, DETAILED COST ESTIMATE, AND OTHER SERVICES FOR FY20 MCAF PAF180300 EARTH COVERED MAGAZINES, ROYAL AUSTRALIAN AIR FORCE BASE TINDAL, AUSTRALIA.CONTRACT N62742-17-D-0003 INDEFINITE DELIVERY INDEFINITE QUANTITY ARCHITECT-ENGINEER SERVICES FOR DESIGN, ENGINEERING, SPECIFICATION WRITING, COST ESTIMATING, AND RELATED SERVICES AT VARIOUS LOCATIONS UNDER THE COGNIZANCE OF NAVFAC PACIFIC. | $965K |
| Sep 14, 2018 | Department of DefenseW072 ENDIST LOUISVILLE | W912QR18F0449 | 541330 | AE SERVICES FOR INDC | $90K |
| Sep 12, 2018 | Department of DefenseNAVFACSYSCOM MARIANAS | N4019218F4198 | 541330 | N6274217D0003, N4019218F4198;A-E SERVICES FOR WON 1391226 FY20 DLA MILCON PROJECT DESC 1908, CONSTRUCT REFUELING FACILITIES X-RAY WHARF AT APRA HARBOR, NAVAL BASE GUAM | $328K |
| Sep 12, 2018 | Department of DefenseW076 ENDIST FT WORTH | W9126G18F0344 | 541330 | B515 EXTERIOR RENOVATION | $1.1M |
| Sep 10, 2018 | Department of DefenseW2V6 USA ENG SPT CTR HUNTSVIL | W912DY18F0566 | 541310 | OACSIM NO 5 (USARPAC) PLANNING CHARETTES&REQUIREMENTS ANALYSES | $330K |
| Sep 4, 2018 | Department of DefenseNAVFACSYSCOM PACIFIC | N6274218F0340 | 541330 | IGF::OT::IGF X006 AFCEC FY19 P-9030 APR CARGO PAD WITH TAXIWAY, TINIAN, COMMONWEALTH OF NORTHERN MARIANA ISLANDS. | $3.4M |
| Sep 4, 2018 | Department of DefenseNAVFACSYSCOM PACIFIC | N6274218F0341 | 541330 | IGF::OT::IGF X008 TASK ORDER NO. N6274218F0340, AFCEC FY19 P-9040 PAF189040 APR MAINTENANCE SUPPORT FACILITY, TINIAN, COMMONWEALTH OF NORTHERN MARIANA ISLANDS. CONTRACT N62742-17-D-0003 | $291K |
| Aug 8, 2018 | Department of DefenseW2V6 USA ENG SPT CTR HUNTSVIL | W912DY18F0566 | 541310 | OACSIM NO 5 (USARPAC) PLANNING CHARETTES&REQUIREMENTS ANALYSES | $474K |
| Jul 17, 2018 | Department of DefenseNAVFACSYSCOM PACIFIC | N6274218F0327 | 541330 | IGF::OT::IGF X005 CONTRACT N62742-17-D-0003 INDEFINITE DELIVERY INDEFINITE QUANTITY ARCHITECT-ENGINEER SERVICES FOR DESIGN, ENGINEERING, SPECIFICATION WRITING, COST ESTIMATING, AND RELATED SERVICES AT VARIOUS LOCATIONS UNDER THE COGNIZANCE OF NAVFAC PACIFIC. TASK ORDER NO. N6274218F0327, STUDIES TO SUPPORT THE ENVIRONMENTAL ASSESSMENT TRAFFIC INVESTIGATION AND MITIGATION CONCEPT DESIGN FOR FY18 PROJECT P-013 TRAFFIC INVESTIGATION / MITIGATION STUDY AT WAHIAWA, OAHU, HAWAII. | $429K |
| Jun 28, 2018 | Department of DefenseNAVFACSYSCOM PACIFIC | N6274217F0322 | 541330 | IGF::OT::IGF FY19 MCON PROJECT P-946, CORROSION CONTROL HANGAR AND PARKING FACILITY, MCBH, HAWAII - PREPARE DBB PACKAGE | $21K |
| May 22, 2018 | Department of DefenseW076 ENDIST FT WORTH | 0002 | 541330 | IGF::OT::IGF A&E SERVICES FOR PARAMETRIC DESIGN REPORT (PDR) | $106K |
| May 16, 2018 | Department of DefenseNAVFACSYSCOM MARIANAS | N4019218F4198 | 541330 | N6274217D0003, N4019218F4198;A-E SERVICES FOR WON 1391226 FY20 DLA MILCON PROJECT DESC 1908, CONSTRUCT REFUELING FACILITIES X-RAY WHARF AT APRA HARBOR, NAVAL BASE GUAM | $404K |
| May 4, 2018 | Department of DefenseW076 ENDIST FT WORTH | W9126G18F0034 | 541330 | IGF::OT::IGF: AIR TRAFFIC CONTROL TOWER DESIGN PACKAGE KELLY FIELD | $62K |
| May 3, 2018 | Department of DefenseW076 ENDIST FT WORTH | W9126G18F0168 | 541330 | LABORATORY INSTRUCTIONAL FACILITY DESIGN | $683K |
| Apr 9, 2018 | Department of DefenseFA5209 374 CONS PK | FA520918F0055 | 541310 | DESIGN CONST F2/F3 AIRFIELD APRON EXPANSION | $271K |
| Apr 9, 2018 | Department of DefenseFA5209 374 CONS PK | FA520918F0056 | 541310 | DESIGN FOR REPAIR FAILED C130 HANGAR DOORS SYSTEM, YOKOTA AIR BASE, JAPAN | $373K |
Get Alerted Before Jacobs Government Services CO's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free