Federal Contractor Profile
Legend Construction And Painting INC
$66M obligated·262 awards·5 agencies·23 NAICS
Federal Contracts
Showing contracts 301–350 of 360 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Sep 1, 2017 | General Services AdministrationPBS R9 SACRAMENTO FIELD OFFICE | 47PK1517C0008 | 236220 | IGF::OT::IGF FOR OTHER FUNCTIONS PROVIDE ALL LABOR, SUPERVISION, MATERIALS, AND EQUIPMENT NECESSARY TO OBTAIN AND INSTALL A NEW METAL GATE AT THE CAFE PATIO LOCATED AT 650 CAPITOL MALL, SACRAMENTO CA 95814. | $8K |
| Aug 31, 2017 | Department of LaborDEPT OF LABOR/OASAM-SF/SEATTLE REG | 1605SS17C0009 | 238210 | IGF::CT::IGF FURNISH AND INSTALL CAT6 PLENUM CABLING IN OSHA SUITE 2-650 IN ASSOCIATION WITH THEIR MOVE. | $7K |
| Aug 29, 2017 | Department of LaborDOL SAN FRAN JC REG PROC OFC CON MT | 1630J617P00002 | 611519 | IGF::CT::IGF CABLE AND ELECTRICAL WORK FOR OFFICE SPACE CONFIGURATION AT U.S. DEPARTMENT OF LABOR. | $5K |
| Aug 23, 2017 | General Services AdministrationPBS R9 SANSOME FIELD OFFICE | 47PK1617C0004 | 236220 | "IGF::OT::IGF" BUILD A CLOSET IN ROOM 1044 | $23K |
| Aug 16, 2017 | General Services AdministrationPBS R9 SACRAMENTO FIELD OFFICE | 47PK1517C0005 | 236220 | IGF::OT::IGF FOR OTHER FUNCTIONS PROVIDE ALL LABOR, SUPERVISION, MATERIALS, AND EQUIPMENT NECESSARY TO UPGRADE USDA FNS SPACE TO INCLUDE CARPET, PAINT, ELECTRICAL, DATA, OFFICE FURNITURE INSTALLATION SUPPORT AND INSTALLATION OF A SOUND MASKING SYSTEM LOCATED AT 801 I STREET, SACRAMENTO CA 95814. | $72K |
| Aug 15, 2017 | General Services AdministrationPBS R9 EAST BAY FIELD OFFICE | 47PK1217C0004 | 236220 | IGF::CL::IGF ELEVATOR #3 INSTALL PHONE | $40K |
| Aug 1, 2017 | General Services AdministrationPBS R9 GOLDEN GATE FIELD OFFICE | 47PK1417C0005 | 236220 | IGF::OT::IGF DESIGN, FURNISH AND INSTALL NEW SIGNAGE AT THE LOBBY AND ELEVATORS AT 450 GG AVE PER SCOPE OF WORK DATED 5/1/2017. | $22K |
| Jul 28, 2017 | Department of LaborDEPT OF LABOR/OASAM-SF/SEATTLE REG | 1605SS17C0008 | 238210 | IGF::CT::IGF FURNISH AND INSTALL CAT6 PLENUM CABLING IN OASAM SUITE 12-300 IN ASSOCIATION WITH THEIR MOVE. | $12K |
| Jul 27, 2017 | General Services AdministrationPBS R9 GOLDEN GATE FIELD OFFICE | 47PK1417C0004 | 236220 | IGF::OT::IGF REPLACEMENT AND REPAIR OF WATER DAMAGED COUNTERTOPS AT SEVERAL GALLEY'S THROUGHOUT THE JAMES R. BROWNING COURTHOUSE. | $45K |
| Jul 26, 2017 | General Services AdministrationPBS R9 GOLDEN GATE FIELD OFFICE | 47PK1417C0002 | 236220 | IGF::OT::IGF DEMOLITION AND REMOVAL OF THE VCT FLOORING AND ACM MASTIC FROM THE 6TH, 7TH, AND 8TH FLOOR LANDINGS WITHIN STAIR #1. INCLUDES INSTALLATION OF NEW VCT AND BASE. | $24K |
| Jul 26, 2017 | General Services AdministrationPBS R9 GOLDEN GATE FIELD OFFICE | 47PK1417C0003 | 236220 | IGF::OT::IGF INCLUDES THE FABRICATION AND INSTALLATION OF FOUR (4) NEW GALVANIZED SHEET METAL ROOF VENTS. WORK INCLUDES NEW MANUAL DAMPERS AT EACH VENT, SHEET METAL DUCTWORK DOWN TO ELEVATOR MACHINE ROOM, AND ALL SEALANT AND WATERPROOFING FOR A COMPLETE INSTALLATION. | $24K |
| Jul 25, 2017 | General Services AdministrationPBS R9 SACRAMENTO FIELD OFFICE | 47PK1517C0002 | 236220 | IGF::OT::IGF FOR OTHER FUNCTIONS PROVIDE ALL LABOR, SUPERVISION, MATERIALS, AND EQUIPMENT NECESSARY TO REMOVE THE FIXED WOOD BENCHES IN ROOM 2-230 AND REPAIR THE FLOORING FOR USCIS LOCATED ON THE 2ND FLOOR, 650 CAPITOL MALL, SACRAMENTO CA 95814. | $20K |
| Jul 24, 2017 | General Services AdministrationPBS R9 GOLDEN GATE FIELD OFFICE | 47PK1417C0001 | 236220 | IGF::OT::IGF INSTALLATION OF FLOOR BOXES, CONDUIT, BACKING, AND POWER FOR THE NEW TELEPRESENCE ROOM AT 50 UNP. | $15K |
| Jul 13, 2017 | General Services AdministrationPBS R9 GOLDEN GATE FIELD OFFICE | GS09P17WCC0010 | 236220 | IGF::OT::IGF SW CORNER EXTERIOR WINDOW CONSTRUCTION&PAINTING | $27K |
| Jul 5, 2017 | General Services AdministrationPBS R9 CENTRAL CA FIELD OFFICE | GS09P17WBC0023 | 238210 | IGF::OT::IGF FOR MENLO PARK OPM SECURITY UPGRADE N1659913 | $33K |
| May 23, 2017 | General Services AdministrationPBS R9 SANSOME FIELD OFFICE | GS09P17WHC0005 | 236220 | "IGF::OT::IGF" CIS COMBO PROJECTS: 1ST, 10TH AND 13TH FLOOR | $121K |
| May 15, 2017 | General Services AdministrationPBS R9 EAST BAY FIELD OFFICE | GS09P17WAC0011 | 236220 | IGF::CL::IGF VA TV INSTALLATION FOR 15 NORTH @ 1301 CLAY STREET, OAKLAND CA 94612 | $3K |
| May 5, 2017 | Department of LaborDEPT OF LABOR/OASAM-SF/SEATTLE REG | 1605SS17C0005 | 238210 | IGF::CT::IGF FURNISH AND INSTALL CAT6 PLENUM CABLING IN BLS SUITES 14-100 AND 2-750 IN ASSOCIATION WITH THEIR MOVE. | $30K |
| Apr 27, 2017 | General Services AdministrationPBS R9 SANSOME FIELD OFFICE | GS09P17WHC0003 | 236220 | "IGF::OT::IGF" DOL BLS ELECTRICAL ALTERATIONS IN SUITES 2-750, 14-100/300 | $35K |
| Mar 22, 2017 | General Services AdministrationPBS R9 GOLDEN GATE FIELD OFFICE | GS09P17WCC0004 | 236220 | IGF::OT::IGF CONVERT THE EXISTING MENS AND WOMENS RESTROOMS ON THE 2ND FLOOR TO A SINGLE USE FAMILY RESTROOM. SCOPE INCLUDES REMOVAL OF TOILETS AND URINALS, BATHROOM PARTITIONS, AND SECONDARY DOOR AND FRAME. ALSO INCLUDES THE INSTALLATION OF BABY CHANGING STATIONS, ADA COMPLIANT DOOR OPERATOR, TILE REPAIR, DRYWALL PATCHING, AND NEW PAINT. | $25K |
| Mar 15, 2017 | General Services AdministrationPBS R9 EAST BAY FIELD OFFICE | GS09P17WAC0003 | 236220 | IGF::CL::IGF REFURBISH COURTHOUSE CHAMBERS 410C @ 1301 CLAY STREET, OAKLAND, CA 94612 | $900 |
| Mar 2, 2017 | General Services AdministrationPBS R9 SACRAMENTO FIELD OFFICE | GS09P17WFC0010 | 236220 | IGF::OT::IGF FOR OTHER FUNCTIONS PROVIDE ALL LABOR, SUPERVISION, MATERIALS, AND EQUIPMENT NECESSARY TO MOVE A GATE WHICH ALLOWS ACCESS TO A CHAIN LINK FENCED STORAGE AREA TO A NEW LOCATION. ALSO, TWO STORAGE CONTAINERS WITHIN THE STORAGE AREA MUST BE MOVED APPROXIMATELY 10 FT. SO A TRAILER CAN BE STORED WITHIN THE STORAGE AREA | $7K |
| Feb 27, 2017 | General Services AdministrationPBS R9 SANSOME FIELD OFFICE | GS09P17WHC0002 | 236220 | ''IGF::OT::IGF'' DOL VETS OFFICE BUILDOUT | $46K |
| Feb 3, 2017 | General Services AdministrationPBS R9 AMD SAT SAN FRANCISCO SUPPORT SECTION | GS09P17KLC0003 | 236220 | IGF::OT::IGF DESIGN BUILD CONTRACT FOR "FRB OFFICE BUILDOUT," SAN FRANCISCO FEDERAL BULDING, SAN FRANCISCO, CA | $253K |
| Jan 26, 2017 | General Services AdministrationPBS R9 EAST BAY FIELD OFFICE | GS09P17WAC0004 | 236220 | IGF::CL::IGF OAKLAND COURTHOUSE CLERK'S OFFICE @ 1301 CLAY STREET, OAKLAND CA 94612 | $27K |
| Jan 20, 2017 | General Services AdministrationPBS R9 GOLDEN GATE FIELD OFFICE | GS09P17WCC0001 | 236220 | IGF::OT::IGF PROJECT: US BANKRUPTCY COURT(USBC) GALLEY MODIFICATIONS. PROVIDE ALL LABOR, MATERIALS, AND SUPERVISION TO PROVIDE THE FOLLOWING WORK ON THE 16TH FLOOR AT THE PHILLIP BURTON FEDERAL BUILDING&COURTHOUSE, SAN FRANCISCO, CA. (1) INSTALL A NEW END WALL AT THE GALLEY (INCLUDES WALLPAPER AND BASE). 2) INSTALL NEW UPPER AND LOWER CABINETS. 3) ADD DEDICATED POWER OUTLET AND DATA DROP ON OUTSIDE OF GALLEY. POP: 11/03/2016 - 03/03/2017 | $577 |
| Jan 13, 2017 | General Services AdministrationPBS R9 EAST BAY FIELD OFFICE | GS09P17WAC0003 | 236220 | IGF::CL::IGF REFURBISH COURTHOUSE CHAMBERS 410C @ 1301 CLAY STREET, OAKLAND, CA 94612 | $45K |
| Jan 5, 2017 | General Services AdministrationPBS R9 AMD RECURRING SERVICES | GS09P17KTC0004 | 236220 | RENOVATION OF USDA OFFICE CONFERENCE ROOM CONVERSION AT THE SAN FRANCISCO FEDERAL BUILDING LOCATED AT 90 7TH STREET IN SAN FRANCISCO, CALIFORNIA. IGF::OT::IGF | $167K |
| Dec 13, 2016 | General Services AdministrationPBS R9 GOLDEN GATE FIELD OFFICE | GS09P17WCC0003 | 236220 | IGF::OT::IGF | $24K |
| Dec 9, 2016 | General Services AdministrationPBS R9 SANSOME FIELD OFFICE | GS09P17WHC0001 | 236220 | IGF::OT::IGF UPGRADE OF SCIF DOOR ON THE 9TH FLOOR. | $44K |
| Nov 22, 2016 | General Services AdministrationPBS R9 GOLDEN GATE FIELD OFFICE | GS09P17WCC0002 | 236220 | IGF::CL::IGF COURT OF APPEALS SOUND MITIGATION PROJECT @ JAMES R. BROWN US COURT OF APPEALS 95 7TH STREET, SAN FRANCISCO, CA 94103 | $21K |
| Oct 25, 2016 | General Services AdministrationPBS R9 GOLDEN GATE FIELD OFFICE | GS09P17WCC0001 | 236220 | IGF::OT::IGF PROJECT: US BANKRUPTCY COURT(USBC) GALLEY MODIFICATIONS. PROVIDE ALL LABOR, MATERIALS, AND SUPERVISION TO PROVIDE THE FOLLOWING WORK ON THE 16TH FLOOR AT THE PHILLIP BURTON FEDERAL BUILDING&COURTHOUSE, SAN FRANCISCO, CA. (1) INSTALL A NEW END WALL AT THE GALLEY (INCLUDES WALLPAPER AND BASE). 2) INSTALL NEW UPPER AND LOWER CABINETS. 3) ADD DEDICATED POWER OUTLET AND DATA DROP ON OUTSIDE OF GALLEY. POP: 11/03/2016 - 03/03/2017 | $29K |
| Oct 13, 2016 | General Services AdministrationPBS R9 SACRAMENTO FIELD OFFICE | GS09P17WFC0003 | 236220 | IGF::OT::IGF FOR OTHER FUNCTIONS PROVIDE ALL LABOR, SUPERVISION, MATERIALS, AND EQUIPMENT NECESSARY TO PAINT AND INSTALL NEW CARPET WITHIN THE AGENCIES DIRECTORS OFFICE SUITE FOR BLM LOCATED AT 2800 COTTAGE WAY, SACRAMENT CA 95814 | $50K |
| Sep 30, 2016 | Department of DefenseNAVFACSYSCOM SOUTHWEST | N6247316C0004 | 238220 | IGF::OT::IGF = OTHER FUNCTIONS HVAC - 1352&1353 | $1.1M |
| Sep 28, 2016 | Department of DefenseW075 ENDIST SACRAMENTO | W9123816P0069 | 562910 | IGF::OT::IGFDEMOLITION OF RAILROAD TRACKS | $868K |
| Sep 23, 2016 | General Services AdministrationPBS R9 SACRAMENTO FIELD OFFICE | GS09P16WFC7032 | 236220 | IGF::OT::IGF FOR OTHER FUNCTIONS PROVIDE ALL LABOR, SUPERVISION, MATERIALS, AND EQUIPMENT NECESSARY TO ENCLOSE EXISTING CAFE PATIO AREA WITH ORNAMENTAL FENCING ADJACENT TO THE BUILDING CAFE SPACE LOCATED AT 650 CAPITOL MALL, SACRAMENTO CA 95814. | $22K |
| Sep 22, 2016 | General Services AdministrationPBS R9 EAST BAY FIELD OFFICE | GS09P16WAC7019 | 236220 | IGF::CL::IGF USMS EGRESS DOOR MODIFICATIONS @ 1301 CLAY STREET, OAKLAND, CA 94612. | $24K |
| Sep 20, 2016 | General Services AdministrationPBS R9 SACRAMENTO FIELD OFFICE | GS09P16WFC7030 | 236220 | IGF::OT::IGF FOR OTHER FUNCTIONS PROVIDE ALL LABOR, SUPERVISION, MATERIALS, AND EQUIPMENT NECESSARY TO CONSTRUCT AN OUTDOOR PATIO AREA ADJACENT TO THE BUILDING CAFE SPACE LOCATED AT 650 CAPITOL MALL, SACRAMENTO CA 95814. | $24K |
| Sep 16, 2016 | General Services AdministrationPBS R9 SANSOME FIELD OFFICE | GS09P16WHC7009 | 238210 | IGF::OT::IGF INSTALL PHONE/DATA DROPS RM 1063 | $7K |
| Sep 15, 2016 | General Services AdministrationPBS R9 SANSOME FIELD OFFICE | GS09P16WHC7008 | 236220 | IGF::OT::IGF CLOSET BUILD-OUT IN CONFERENCE ROOM 1042 | $25K |
| Sep 1, 2016 | General Services AdministrationPBS R9 SACRAMENTO FIELD OFFICE | GS09P16WFC7028 | 236220 | IGF::OT::IGF FOR OTHER FUNCTIONS PROVIDE ALL LABOR, SUPERVISION, MATERIALS, AND EQUIPMENT NECESSARY TO INSTALL VIDEO SPECIFIC LIGHTING AND ASSOCIATED DIMMABLE CONTROLS IN THE EXISTING SSA VIDEO-EQUIPPED HEARING ROOM TO IMPROVE THE QUALITY OF THE VIDEO IMAGE TRANSMITTED DURING HEARING PROCEDURES. WORK TO BE DONE AT SSA ODAR SACRAMENTO PER SCOPE OF WORK. | $117K |
| Sep 1, 2016 | General Services AdministrationPBS R9 SACRAMENTO FIELD OFFICE | GS09P16WFC7027 | 236220 | IGF::OT::IGF FOR OTHER FUNCTIONS PROVIDE ALL LABOR, SUPERVISION, MATERIALS, AND EQUIPMENT NECESSARY TO INSTALL VIDEO SPECIFIC LIGHTING AND ASSOCIATED DIMMABLE CONTROLS IN THE EXISTING SSA VIDEO-EQUIPPED HEARING ROOM TO IMPROVE THE QUALITY OF THE VIDEO IMAGE TRANSMITTED DURING HEARING PROCEDURES. WORK TO BE DONE AT 3 LOCATIONS SPECIFIED IN THE SCOPE OF WORK. | $50K |
| Aug 12, 2016 | General Services AdministrationPBS R9 EAST BAY FIELD OFFICE | GS09P16WAC7014 | 238310 | IGF::CL::IGF INSTALL SOUND BATTEN INSULATION, DRYWALL AND PAINT OFFICE @ 1301 CLAY STREET, OAKLAND, CA 94612. | $22K |
| Aug 10, 2016 | General Services AdministrationPBS R9 SACRAMENTO FIELD OFFICE | GS09P16WFC7026 | 236220 | IGF::OT::IGF FOR OTHER FUNCTIONS PROVIDE ALL LABOR, SUPERVISION, MATERIALS, AND EQUIPMENT NECESSARY TO INSTALL THREE (3) CONCRETE SECURITY BOLLARDS AT THE MAIN ENTRANCE FOR MEPS LOCATED AT 1651 ALHAMBRA BLVD., SACRAMENTO CA 95816. | $8K |
| Jul 25, 2016 | General Services AdministrationPBS R9 EAST BAY FIELD OFFICE | GS09P16WAC7013 | 236220 | IGF::CT::IGF INSTALLATION OF A NEW EGRESS DOOR FOR DOD, REINSTALLATION OF ACOUSTICAL CEILING GRID AND LIGHT FIXTURE, INSTALL AIPHONE AND TWO MONITORS @ 1301 CLAY STREET, OAKLAND, CA. 94612 | $25K |
| Jun 27, 2016 | General Services AdministrationPBS R9 SACRAMENTO FIELD OFFICE | GS09P16WFC7022 | 236220 | CONVERT CONFERENCE ROOM. IGF::OT::IGF FOR OTHER FUNCTIONS | $8K |
| Jun 9, 2016 | General Services AdministrationPBS R9 EAST BAY FIELD OFFICE | GS09P16WAC7012 | 236220 | IGF::CL::IGF ATF VAULT RENOVATION AND INSTALLATION OF A HIGH DENSITY SPACE SAVING SYSTEM @ 1301 CLAY STREET, OAKLAND, CA 94612. | $54K |
| Jun 3, 2016 | Department of JusticeFAO | DJBP0610RP510037 | 562910 | IGF::OT::IGF CONDUCT MOLD REMEDIATION ON VARIOUS FLOORS THROUGHOUT THE INSTITUTION. | $14K |
| May 20, 2016 | General Services AdministrationPBS R9 EAST BAY FIELD OFFICE | GS09P16WAC7010 | 236220 | IGF::CL::IGF VARIOUS REPAIRS AND SKATEBOARD CLIPS INSTALLATION @ 1301 CLAY STREET, OAKLAND, CA. 94612 | $16K |
| May 20, 2016 | Department of DefenseW075 ENDIST SACRAMENTO | W9123815P0104 | 562910 | IGF::OT::IGF - DEMOLITION OF WAREHOUSE 1 AT DDJC TRACY | $12K |
Get Alerted Before Legend Construction And Painting INC's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free