Home/Contractors/Legend Construction And Painting INC/contracts

Federal Contractor Profile

Legend Construction And Painting INC

$66M obligated·262 awards·5 agencies·23 NAICS

Federal Contracts

Showing contracts 301350 of 360 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Sep 1, 2017General Services AdministrationPBS R9 SACRAMENTO FIELD OFFICE47PK1517C0008236220IGF::OT::IGF FOR OTHER FUNCTIONS PROVIDE ALL LABOR, SUPERVISION, MATERIALS, AND EQUIPMENT NECESSARY TO OBTAIN AND INSTALL A NEW METAL GATE AT THE CAFE PATIO LOCATED AT 650 CAPITOL MALL, SACRAMENTO CA 95814.$8K
Aug 31, 2017Department of LaborDEPT OF LABOR/OASAM-SF/SEATTLE REG1605SS17C0009238210IGF::CT::IGF FURNISH AND INSTALL CAT6 PLENUM CABLING IN OSHA SUITE 2-650 IN ASSOCIATION WITH THEIR MOVE.$7K
Aug 29, 2017Department of LaborDOL SAN FRAN JC REG PROC OFC CON MT1630J617P00002611519IGF::CT::IGF CABLE AND ELECTRICAL WORK FOR OFFICE SPACE CONFIGURATION AT U.S. DEPARTMENT OF LABOR.$5K
Aug 23, 2017General Services AdministrationPBS R9 SANSOME FIELD OFFICE47PK1617C0004236220"IGF::OT::IGF" BUILD A CLOSET IN ROOM 1044$23K
Aug 16, 2017General Services AdministrationPBS R9 SACRAMENTO FIELD OFFICE47PK1517C0005236220IGF::OT::IGF FOR OTHER FUNCTIONS PROVIDE ALL LABOR, SUPERVISION, MATERIALS, AND EQUIPMENT NECESSARY TO UPGRADE USDA FNS SPACE TO INCLUDE CARPET, PAINT, ELECTRICAL, DATA, OFFICE FURNITURE INSTALLATION SUPPORT AND INSTALLATION OF A SOUND MASKING SYSTEM LOCATED AT 801 I STREET, SACRAMENTO CA 95814.$72K
Aug 15, 2017General Services AdministrationPBS R9 EAST BAY FIELD OFFICE47PK1217C0004236220IGF::CL::IGF ELEVATOR #3 INSTALL PHONE$40K
Aug 1, 2017General Services AdministrationPBS R9 GOLDEN GATE FIELD OFFICE47PK1417C0005236220IGF::OT::IGF DESIGN, FURNISH AND INSTALL NEW SIGNAGE AT THE LOBBY AND ELEVATORS AT 450 GG AVE PER SCOPE OF WORK DATED 5/1/2017.$22K
Jul 28, 2017Department of LaborDEPT OF LABOR/OASAM-SF/SEATTLE REG1605SS17C0008238210IGF::CT::IGF FURNISH AND INSTALL CAT6 PLENUM CABLING IN OASAM SUITE 12-300 IN ASSOCIATION WITH THEIR MOVE.$12K
Jul 27, 2017General Services AdministrationPBS R9 GOLDEN GATE FIELD OFFICE47PK1417C0004236220IGF::OT::IGF REPLACEMENT AND REPAIR OF WATER DAMAGED COUNTERTOPS AT SEVERAL GALLEY'S THROUGHOUT THE JAMES R. BROWNING COURTHOUSE.$45K
Jul 26, 2017General Services AdministrationPBS R9 GOLDEN GATE FIELD OFFICE47PK1417C0002236220IGF::OT::IGF DEMOLITION AND REMOVAL OF THE VCT FLOORING AND ACM MASTIC FROM THE 6TH, 7TH, AND 8TH FLOOR LANDINGS WITHIN STAIR #1. INCLUDES INSTALLATION OF NEW VCT AND BASE.$24K
Jul 26, 2017General Services AdministrationPBS R9 GOLDEN GATE FIELD OFFICE47PK1417C0003236220IGF::OT::IGF INCLUDES THE FABRICATION AND INSTALLATION OF FOUR (4) NEW GALVANIZED SHEET METAL ROOF VENTS. WORK INCLUDES NEW MANUAL DAMPERS AT EACH VENT, SHEET METAL DUCTWORK DOWN TO ELEVATOR MACHINE ROOM, AND ALL SEALANT AND WATERPROOFING FOR A COMPLETE INSTALLATION.$24K
Jul 25, 2017General Services AdministrationPBS R9 SACRAMENTO FIELD OFFICE47PK1517C0002236220IGF::OT::IGF FOR OTHER FUNCTIONS PROVIDE ALL LABOR, SUPERVISION, MATERIALS, AND EQUIPMENT NECESSARY TO REMOVE THE FIXED WOOD BENCHES IN ROOM 2-230 AND REPAIR THE FLOORING FOR USCIS LOCATED ON THE 2ND FLOOR, 650 CAPITOL MALL, SACRAMENTO CA 95814.$20K
Jul 24, 2017General Services AdministrationPBS R9 GOLDEN GATE FIELD OFFICE47PK1417C0001236220IGF::OT::IGF INSTALLATION OF FLOOR BOXES, CONDUIT, BACKING, AND POWER FOR THE NEW TELEPRESENCE ROOM AT 50 UNP.$15K
Jul 13, 2017General Services AdministrationPBS R9 GOLDEN GATE FIELD OFFICEGS09P17WCC0010236220IGF::OT::IGF SW CORNER EXTERIOR WINDOW CONSTRUCTION&PAINTING$27K
Jul 5, 2017General Services AdministrationPBS R9 CENTRAL CA FIELD OFFICEGS09P17WBC0023238210IGF::OT::IGF FOR MENLO PARK OPM SECURITY UPGRADE N1659913$33K
May 23, 2017General Services AdministrationPBS R9 SANSOME FIELD OFFICEGS09P17WHC0005236220"IGF::OT::IGF" CIS COMBO PROJECTS: 1ST, 10TH AND 13TH FLOOR$121K
May 15, 2017General Services AdministrationPBS R9 EAST BAY FIELD OFFICEGS09P17WAC0011236220IGF::CL::IGF VA TV INSTALLATION FOR 15 NORTH @ 1301 CLAY STREET, OAKLAND CA 94612$3K
May 5, 2017Department of LaborDEPT OF LABOR/OASAM-SF/SEATTLE REG1605SS17C0005238210IGF::CT::IGF FURNISH AND INSTALL CAT6 PLENUM CABLING IN BLS SUITES 14-100 AND 2-750 IN ASSOCIATION WITH THEIR MOVE.$30K
Apr 27, 2017General Services AdministrationPBS R9 SANSOME FIELD OFFICEGS09P17WHC0003236220"IGF::OT::IGF" DOL BLS ELECTRICAL ALTERATIONS IN SUITES 2-750, 14-100/300$35K
Mar 22, 2017General Services AdministrationPBS R9 GOLDEN GATE FIELD OFFICEGS09P17WCC0004236220IGF::OT::IGF CONVERT THE EXISTING MENS AND WOMENS RESTROOMS ON THE 2ND FLOOR TO A SINGLE USE FAMILY RESTROOM. SCOPE INCLUDES REMOVAL OF TOILETS AND URINALS, BATHROOM PARTITIONS, AND SECONDARY DOOR AND FRAME. ALSO INCLUDES THE INSTALLATION OF BABY CHANGING STATIONS, ADA COMPLIANT DOOR OPERATOR, TILE REPAIR, DRYWALL PATCHING, AND NEW PAINT.$25K
Mar 15, 2017General Services AdministrationPBS R9 EAST BAY FIELD OFFICEGS09P17WAC0003236220IGF::CL::IGF REFURBISH COURTHOUSE CHAMBERS 410C @ 1301 CLAY STREET, OAKLAND, CA 94612$900
Mar 2, 2017General Services AdministrationPBS R9 SACRAMENTO FIELD OFFICEGS09P17WFC0010236220IGF::OT::IGF FOR OTHER FUNCTIONS PROVIDE ALL LABOR, SUPERVISION, MATERIALS, AND EQUIPMENT NECESSARY TO MOVE A GATE WHICH ALLOWS ACCESS TO A CHAIN LINK FENCED STORAGE AREA TO A NEW LOCATION. ALSO, TWO STORAGE CONTAINERS WITHIN THE STORAGE AREA MUST BE MOVED APPROXIMATELY 10 FT. SO A TRAILER CAN BE STORED WITHIN THE STORAGE AREA$7K
Feb 27, 2017General Services AdministrationPBS R9 SANSOME FIELD OFFICEGS09P17WHC0002236220''IGF::OT::IGF'' DOL VETS OFFICE BUILDOUT$46K
Feb 3, 2017General Services AdministrationPBS R9 AMD SAT SAN FRANCISCO SUPPORT SECTIONGS09P17KLC0003236220IGF::OT::IGF DESIGN BUILD CONTRACT FOR "FRB OFFICE BUILDOUT," SAN FRANCISCO FEDERAL BULDING, SAN FRANCISCO, CA$253K
Jan 26, 2017General Services AdministrationPBS R9 EAST BAY FIELD OFFICEGS09P17WAC0004236220IGF::CL::IGF OAKLAND COURTHOUSE CLERK'S OFFICE @ 1301 CLAY STREET, OAKLAND CA 94612$27K
Jan 20, 2017General Services AdministrationPBS R9 GOLDEN GATE FIELD OFFICEGS09P17WCC0001236220IGF::OT::IGF PROJECT: US BANKRUPTCY COURT(USBC) GALLEY MODIFICATIONS. PROVIDE ALL LABOR, MATERIALS, AND SUPERVISION TO PROVIDE THE FOLLOWING WORK ON THE 16TH FLOOR AT THE PHILLIP BURTON FEDERAL BUILDING&COURTHOUSE, SAN FRANCISCO, CA. (1) INSTALL A NEW END WALL AT THE GALLEY (INCLUDES WALLPAPER AND BASE). 2) INSTALL NEW UPPER AND LOWER CABINETS. 3) ADD DEDICATED POWER OUTLET AND DATA DROP ON OUTSIDE OF GALLEY. POP: 11/03/2016 - 03/03/2017$577
Jan 13, 2017General Services AdministrationPBS R9 EAST BAY FIELD OFFICEGS09P17WAC0003236220IGF::CL::IGF REFURBISH COURTHOUSE CHAMBERS 410C @ 1301 CLAY STREET, OAKLAND, CA 94612$45K
Jan 5, 2017General Services AdministrationPBS R9 AMD RECURRING SERVICESGS09P17KTC0004236220RENOVATION OF USDA OFFICE CONFERENCE ROOM CONVERSION AT THE SAN FRANCISCO FEDERAL BUILDING LOCATED AT 90 7TH STREET IN SAN FRANCISCO, CALIFORNIA. IGF::OT::IGF$167K
Dec 13, 2016General Services AdministrationPBS R9 GOLDEN GATE FIELD OFFICEGS09P17WCC0003236220IGF::OT::IGF$24K
Dec 9, 2016General Services AdministrationPBS R9 SANSOME FIELD OFFICEGS09P17WHC0001236220IGF::OT::IGF UPGRADE OF SCIF DOOR ON THE 9TH FLOOR.$44K
Nov 22, 2016General Services AdministrationPBS R9 GOLDEN GATE FIELD OFFICEGS09P17WCC0002236220IGF::CL::IGF COURT OF APPEALS SOUND MITIGATION PROJECT @ JAMES R. BROWN US COURT OF APPEALS 95 7TH STREET, SAN FRANCISCO, CA 94103$21K
Oct 25, 2016General Services AdministrationPBS R9 GOLDEN GATE FIELD OFFICEGS09P17WCC0001236220IGF::OT::IGF PROJECT: US BANKRUPTCY COURT(USBC) GALLEY MODIFICATIONS. PROVIDE ALL LABOR, MATERIALS, AND SUPERVISION TO PROVIDE THE FOLLOWING WORK ON THE 16TH FLOOR AT THE PHILLIP BURTON FEDERAL BUILDING&COURTHOUSE, SAN FRANCISCO, CA. (1) INSTALL A NEW END WALL AT THE GALLEY (INCLUDES WALLPAPER AND BASE). 2) INSTALL NEW UPPER AND LOWER CABINETS. 3) ADD DEDICATED POWER OUTLET AND DATA DROP ON OUTSIDE OF GALLEY. POP: 11/03/2016 - 03/03/2017$29K
Oct 13, 2016General Services AdministrationPBS R9 SACRAMENTO FIELD OFFICEGS09P17WFC0003236220IGF::OT::IGF FOR OTHER FUNCTIONS PROVIDE ALL LABOR, SUPERVISION, MATERIALS, AND EQUIPMENT NECESSARY TO PAINT AND INSTALL NEW CARPET WITHIN THE AGENCIES DIRECTORS OFFICE SUITE FOR BLM LOCATED AT 2800 COTTAGE WAY, SACRAMENT CA 95814$50K
Sep 30, 2016Department of DefenseNAVFACSYSCOM SOUTHWESTN6247316C0004238220IGF::OT::IGF = OTHER FUNCTIONS HVAC - 1352&1353$1.1M
Sep 28, 2016Department of DefenseW075 ENDIST SACRAMENTOW9123816P0069562910IGF::OT::IGFDEMOLITION OF RAILROAD TRACKS$868K
Sep 23, 2016General Services AdministrationPBS R9 SACRAMENTO FIELD OFFICEGS09P16WFC7032236220IGF::OT::IGF FOR OTHER FUNCTIONS PROVIDE ALL LABOR, SUPERVISION, MATERIALS, AND EQUIPMENT NECESSARY TO ENCLOSE EXISTING CAFE PATIO AREA WITH ORNAMENTAL FENCING ADJACENT TO THE BUILDING CAFE SPACE LOCATED AT 650 CAPITOL MALL, SACRAMENTO CA 95814.$22K
Sep 22, 2016General Services AdministrationPBS R9 EAST BAY FIELD OFFICEGS09P16WAC7019236220IGF::CL::IGF USMS EGRESS DOOR MODIFICATIONS @ 1301 CLAY STREET, OAKLAND, CA 94612.$24K
Sep 20, 2016General Services AdministrationPBS R9 SACRAMENTO FIELD OFFICEGS09P16WFC7030236220IGF::OT::IGF FOR OTHER FUNCTIONS PROVIDE ALL LABOR, SUPERVISION, MATERIALS, AND EQUIPMENT NECESSARY TO CONSTRUCT AN OUTDOOR PATIO AREA ADJACENT TO THE BUILDING CAFE SPACE LOCATED AT 650 CAPITOL MALL, SACRAMENTO CA 95814.$24K
Sep 16, 2016General Services AdministrationPBS R9 SANSOME FIELD OFFICEGS09P16WHC7009238210IGF::OT::IGF INSTALL PHONE/DATA DROPS RM 1063$7K
Sep 15, 2016General Services AdministrationPBS R9 SANSOME FIELD OFFICEGS09P16WHC7008236220IGF::OT::IGF CLOSET BUILD-OUT IN CONFERENCE ROOM 1042$25K
Sep 1, 2016General Services AdministrationPBS R9 SACRAMENTO FIELD OFFICEGS09P16WFC7028236220IGF::OT::IGF FOR OTHER FUNCTIONS PROVIDE ALL LABOR, SUPERVISION, MATERIALS, AND EQUIPMENT NECESSARY TO INSTALL VIDEO SPECIFIC LIGHTING AND ASSOCIATED DIMMABLE CONTROLS IN THE EXISTING SSA VIDEO-EQUIPPED HEARING ROOM TO IMPROVE THE QUALITY OF THE VIDEO IMAGE TRANSMITTED DURING HEARING PROCEDURES. WORK TO BE DONE AT SSA ODAR SACRAMENTO PER SCOPE OF WORK.$117K
Sep 1, 2016General Services AdministrationPBS R9 SACRAMENTO FIELD OFFICEGS09P16WFC7027236220IGF::OT::IGF FOR OTHER FUNCTIONS PROVIDE ALL LABOR, SUPERVISION, MATERIALS, AND EQUIPMENT NECESSARY TO INSTALL VIDEO SPECIFIC LIGHTING AND ASSOCIATED DIMMABLE CONTROLS IN THE EXISTING SSA VIDEO-EQUIPPED HEARING ROOM TO IMPROVE THE QUALITY OF THE VIDEO IMAGE TRANSMITTED DURING HEARING PROCEDURES. WORK TO BE DONE AT 3 LOCATIONS SPECIFIED IN THE SCOPE OF WORK.$50K
Aug 12, 2016General Services AdministrationPBS R9 EAST BAY FIELD OFFICEGS09P16WAC7014238310IGF::CL::IGF INSTALL SOUND BATTEN INSULATION, DRYWALL AND PAINT OFFICE @ 1301 CLAY STREET, OAKLAND, CA 94612.$22K
Aug 10, 2016General Services AdministrationPBS R9 SACRAMENTO FIELD OFFICEGS09P16WFC7026236220IGF::OT::IGF FOR OTHER FUNCTIONS PROVIDE ALL LABOR, SUPERVISION, MATERIALS, AND EQUIPMENT NECESSARY TO INSTALL THREE (3) CONCRETE SECURITY BOLLARDS AT THE MAIN ENTRANCE FOR MEPS LOCATED AT 1651 ALHAMBRA BLVD., SACRAMENTO CA 95816.$8K
Jul 25, 2016General Services AdministrationPBS R9 EAST BAY FIELD OFFICEGS09P16WAC7013236220IGF::CT::IGF INSTALLATION OF A NEW EGRESS DOOR FOR DOD, REINSTALLATION OF ACOUSTICAL CEILING GRID AND LIGHT FIXTURE, INSTALL AIPHONE AND TWO MONITORS @ 1301 CLAY STREET, OAKLAND, CA. 94612$25K
Jun 27, 2016General Services AdministrationPBS R9 SACRAMENTO FIELD OFFICEGS09P16WFC7022236220CONVERT CONFERENCE ROOM. IGF::OT::IGF FOR OTHER FUNCTIONS$8K
Jun 9, 2016General Services AdministrationPBS R9 EAST BAY FIELD OFFICEGS09P16WAC7012236220IGF::CL::IGF ATF VAULT RENOVATION AND INSTALLATION OF A HIGH DENSITY SPACE SAVING SYSTEM @ 1301 CLAY STREET, OAKLAND, CA 94612.$54K
Jun 3, 2016Department of JusticeFAODJBP0610RP510037562910IGF::OT::IGF CONDUCT MOLD REMEDIATION ON VARIOUS FLOORS THROUGHOUT THE INSTITUTION.$14K
May 20, 2016General Services AdministrationPBS R9 EAST BAY FIELD OFFICEGS09P16WAC7010236220IGF::CL::IGF VARIOUS REPAIRS AND SKATEBOARD CLIPS INSTALLATION @ 1301 CLAY STREET, OAKLAND, CA. 94612$16K
May 20, 2016Department of DefenseW075 ENDIST SACRAMENTOW9123815P0104562910IGF::OT::IGF - DEMOLITION OF WAREHOUSE 1 AT DDJC TRACY$12K

Get Alerted Before Legend Construction And Painting INC's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free