Home/Contractors/Lockheed Martin Integrated Systems, LLC/contracts

Federal Contractor Profile

Lockheed Martin Integrated Systems, LLC

$513M obligated·63 awards·3 agencies·5 NAICS

Federal Contracts

Showing award actions 51–65 of 65 funded award actions, most recent first.

Contracts with positive obligations
63
Funded award actions shown
65
Obligations shown
$513M
Awarding agencies
3

This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.

Award data as of August 27, 2026. Source: USAspending federal award records.

DateAgencyPIIDNAICSDescriptionAmount
Apr 13, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG11FC20C541330THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.$5.1M
Jan 16, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG11FC20C541330THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.$5.5M
Aug 1, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG11FC20C541330THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.$9.1M
Jun 9, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG11FC20C541330THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.$5.0M
May 16, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG11FC20C541330THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.$2.5M
Apr 28, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG11FC20C541330THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.$550K
Mar 27, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG11FC20C541330THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.$2.1M
Dec 21, 2016National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG11FC20C541330THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.$3.0M
Nov 28, 2016National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG11FC20C541330THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.$250K
Aug 31, 2016National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG11FC20C541330THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.$11M
Jun 29, 2016National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG11FC20C541330THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.$4.0M
May 9, 2016National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG11FC20C541330THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.$1.5M
Apr 20, 2016National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG11FC20C541330THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.$761K
Mar 1, 2016National Aeronautics and Space AdministrationGODDARD SPACE FLIGHT CENTERNNG11FC20C541330THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.$1.3M
Oct 23, 2015National Aeronautics and Space AdministrationGODDARD SPACE FLIGHT CENTERNNG11FC20C541330THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.$4.7M

Get Alerted Before Lockheed Martin Integrated Systems, LLC's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free