Federal Contractor Profile
Mag Ds Corp
$1.7B obligated·81 awards·3 agencies·9 NAICS
Federal Contracts
Showing contracts 501–550 of 937 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Mar 25, 2020 | Department of DefenseW6QK ACC-APG | W56KGY19F0025 | 541712 | THIS TASK ORDER IS CREATED FOR OPERATION AND SUSTAINMENT SERVICES FOR THE STORM REQUIREMENT. | $4.7M |
| Mar 25, 2020 | Department of DefenseW6QK ACC-APG | 0014 | 541330 | IGF::OT:IGF THE PURPOSE OF THIS TASK ORDER IS THE AWARD OF W15P7T-10-D-D421-0014, FOR SERVICES IN SUPPORT OF RTEP R23G 1050, WHICH IS THE NAVY'S NAVAL AIR SYSTEMS COMMAND (NAVAIR) LAKEHURST, PMA-257, F402 AND MARK IV (MKIV) GAS TURBINE STARTER ENGINEERING AND TECHNICAL SUPPORT SERVICES. THIS ACTION ALSO PROVIDES INCREMENTAL FUNDING IAW FAR 52.232-22. FUNDING SUPPORTS BASE YEAR EFFORTS UNDER LABOR (0003) AND MATERIAL (0013) CLINS. | $427K |
| Mar 25, 2020 | Department of DefenseW6QK ACC-APG | KZ03 | 541330 | IGF::CL,CT::IGF THIS TASK ORDER, KZ03, IS ISSUED PURSUANT TO THE BASIC CONTRACT, W15P7T-10-D-D421, ON A COST-PLUS-FIXED-FEE (CPFF) TERM AND COST (NO FEE) BASIS (TRAVEL/MATERIAL/ODC) FOR A PERIOD OF PERFORMANCE CONSISTS OF ONE (1) THIRTY (30) DAY TRANSITION PERIOD, ONE (1) ELEVEN (11) MONTH BASE PERIOD AND FOUR (4) TWELVE (12) MONTH OPTION PERIODS. THE PERIO OF PERFORMANCE FOR THE TRANSITION PERIOD STARTS ON 15 AUGUST 2017 THROUGH 14 SEPTEMBER 2017. THE PERIOD OF PERFORMANCE FOR THE BASE PERIOD STARTS ON 15 SEPTEMBER 2017 AND ENDS 14 AUGUST 2018. THE PERIOD OF PERFORMANCE FOR EACH FUNDING SLIN IS IDENTIFIED IN SECTION B. THE RAPID RESPONSE THIRD GENERATION (R2-3G) ORDER NUMBER ASSOCIATED WITH THIS TASK ORDER IS R23G-1002 | $1.3M |
| Mar 20, 2020 | Department of DefenseW6QK ACC-APG | 0006 | 541330 | MULTI-MISSION, MULTI-INT - MANNED AERIAL INTELLIGENCE, SURVEILLANCE AND RECONNAISSANCE OPERATIONS AND SUSTAINMENT AND CONTRACTOR LOGISTICS SUPPORT CONTRACT TO SUPPORT TASK FORCE OBESERVE, DETECT, IDENTIFY, AND NEUTRALIZE. CUSTOMER: PRODUCT MANAGER OBSERVE, DETECT, AND IDENTIFY. | $44 |
| Mar 16, 2020 | Department of DefenseW6QK ACC-APG | W56KGY19F0025 | 541712 | THIS TASK ORDER IS CREATED FOR OPERATION AND SUSTAINMENT SERVICES FOR THE STORM REQUIREMENT. | $11M |
| Mar 9, 2020 | Department of DefenseW6QK ACC-APG | W56KGU19F0010 | 541712 | THIS IS TASK ORDER AWARD FOR FABRICATION INTEGRATION FIELDING FACILITY (FIFF) IN SUPPORT OF C5ISR I2WD. | $5.5M |
| Mar 4, 2020 | Department of DefenseW6QK ACC-APG | KY01 | 541330 | IGF::CL::IGF TASK ORDER (TO) KY01 IS ISSUED ON A COST-PLUS-FIXED-FEE (CPFF) BASIS FOR LABOR AND COST (NO FEE) FOR TRAVEL, MATERIALS AND OTHER DIRECT COSTS IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THE BASIC CONTRACT, W15P7T-10-D-D421 AND MODIFICATIONS THEREAFTER. THE RAPID RESPONSE THIRD GENERATION (R2-3G) ORDER NUMBER ASSOCIATED WITH THIS TASK ORDER IS R2 3G-1000. | $796K |
| Mar 3, 2020 | Department of DefenseW6QK ACC-APG | 0013 | 541330 | IGF::OT::IGF | $91K |
| Feb 28, 2020 | Department of DefenseW6QK ACC-APG | W56KGU19F0010 | 541712 | THIS IS TASK ORDER AWARD FOR FABRICATION INTEGRATION FIELDING FACILITY (FIFF) IN SUPPORT OF C5ISR I2WD. | $1.0M |
| Feb 28, 2020 | Department of DefenseW6QK ACC-APG | KZ03 | 541330 | IGF::CL,CT::IGF THIS TASK ORDER, KZ03, IS ISSUED PURSUANT TO THE BASIC CONTRACT, W15P7T-10-D-D421, ON A COST-PLUS-FIXED-FEE (CPFF) TERM AND COST (NO FEE) BASIS (TRAVEL/MATERIAL/ODC) FOR A PERIOD OF PERFORMANCE CONSISTS OF ONE (1) THIRTY (30) DAY TRANSITION PERIOD, ONE (1) ELEVEN (11) MONTH BASE PERIOD AND FOUR (4) TWELVE (12) MONTH OPTION PERIODS. THE PERIO OF PERFORMANCE FOR THE TRANSITION PERIOD STARTS ON 15 AUGUST 2017 THROUGH 14 SEPTEMBER 2017. THE PERIOD OF PERFORMANCE FOR THE BASE PERIOD STARTS ON 15 SEPTEMBER 2017 AND ENDS 14 AUGUST 2018. THE PERIOD OF PERFORMANCE FOR EACH FUNDING SLIN IS IDENTIFIED IN SECTION B. THE RAPID RESPONSE THIRD GENERATION (R2-3G) ORDER NUMBER ASSOCIATED WITH THIS TASK ORDER IS R23G-1002 | $2.8M |
| Feb 28, 2020 | Department of DefenseW6QK ACC-APG | W56KGU18C0026 | 541715 | THIS IS A COST PLUS FIXED FEE (CPFF) CONTRACT FOR RESEARCH&DEVELOPMENT. THIS CONTRACT/ORDER SUPPORTS THE MISSION OF U.S. ARMY RESEARCH, DEVELOPMENT ENGINEERING COMMAND (RDECOM), COMMUNICATIONS ELECTRONICS RESEARCH, DEVELOPMENT AND ENGINEERING CENTER (CERDEC), COMMAND, POWER AND INTEGRATION (CP&I) DIRECTORATE/SYSTEMS ENGINEERING AND TECHNICAL ASSISTANCE (SETA) SUPPORT. | $314K |
| Feb 27, 2020 | Department of DefenseW6QK ACC-APG | W56KGY19F0025 | 541712 | THIS TASK ORDER IS CREATED FOR OPERATION AND SUSTAINMENT SERVICES FOR THE STORM REQUIREMENT. | $692K |
| Feb 24, 2020 | Department of DefenseW6QK ACC-APG | W56KGU18F0004 | 541712 | RESPONSIVE STRATEGIC SOURCES FOR SERVICES (RS3) OPERATIONS SUPPORT (OPS) AWARD IN SUPPORT OF COMMUNICATIONS ELECTRONICS RESEARCH, DEVELOPMENT AND ENGINEERING CENTER (CERDEC), INTELLIGENCE AND INFORMATION WARFARE DIRECTORATE (I2WD) AND OPERATIONS SUPPORT (OPS) BRANCH. | $52K |
| Feb 19, 2020 | Department of DefenseW6QK ACC-APG | W56KGU19F0010 | 541712 | THIS IS TASK ORDER AWARD FOR FABRICATION INTEGRATION FIELDING FACILITY (FIFF) IN SUPPORT OF C5ISR I2WD. | $495K |
| Feb 18, 2020 | Department of DefenseW6QK ACC-APG | 0013 | 541330 | IGF::OT::IGF | $274K |
| Feb 7, 2020 | Department of DefenseW6QK ACC-APG CONT CT WASH OFC | W909MY19F0048 | 541712 | BIOMETRICS TACTICAL SENSOR SYSTEM INTEROPERABILITY RESEARCH, DEVELOPMENT, TESTING, ENGINEERING, TRAINING, AND MAINTENANCE SUPPORT | $295K |
| Feb 5, 2020 | Department of DefenseW6QK ACC-APG | W56KGU18F0005 | 541712 | THIS IS TO AWARD TASK ORDER W56KGU18F0005 UNDER CONTRACT W15P7T-14-D-A218 FOR OPERATIONS, PROTOTYPING, TECHNOLOGY, INTEGRATION, MAINTENANCE AND INSTALLATION SUPPORT SERVICES | $140K |
| Feb 3, 2020 | Department of DefenseW6QK ACC-APG | W56KGU19F0010 | 541712 | THIS IS TASK ORDER AWARD FOR FABRICATION INTEGRATION FIELDING FACILITY (FIFF) IN SUPPORT OF C5ISR I2WD. | $1.0M |
| Jan 31, 2020 | Department of DefenseW6QK ACC-APG | KZ03 | 541330 | IGF::CL,CT::IGF THIS TASK ORDER, KZ03, IS ISSUED PURSUANT TO THE BASIC CONTRACT, W15P7T-10-D-D421, ON A COST-PLUS-FIXED-FEE (CPFF) TERM AND COST (NO FEE) BASIS (TRAVEL/MATERIAL/ODC) FOR A PERIOD OF PERFORMANCE CONSISTS OF ONE (1) THIRTY (30) DAY TRANSITION PERIOD, ONE (1) ELEVEN (11) MONTH BASE PERIOD AND FOUR (4) TWELVE (12) MONTH OPTION PERIODS. THE PERIO OF PERFORMANCE FOR THE TRANSITION PERIOD STARTS ON 15 AUGUST 2017 THROUGH 14 SEPTEMBER 2017. THE PERIOD OF PERFORMANCE FOR THE BASE PERIOD STARTS ON 15 SEPTEMBER 2017 AND ENDS 14 AUGUST 2018. THE PERIOD OF PERFORMANCE FOR EACH FUNDING SLIN IS IDENTIFIED IN SECTION B. THE RAPID RESPONSE THIRD GENERATION (R2-3G) ORDER NUMBER ASSOCIATED WITH THIS TASK ORDER IS R23G-1002 | $2.4M |
| Jan 30, 2020 | Department of DefenseW6QK ACC-APG | W56KGY19F0025 | 541712 | THIS TASK ORDER IS CREATED FOR OPERATION AND SUSTAINMENT SERVICES FOR THE STORM REQUIREMENT. | $14M |
| Jan 30, 2020 | Department of DefenseW6QK ACC-APG | 0002 | 541712 | AWARD OF RS3-17-0008 TO PROVIDE ANALYTICAL, TECHNICAL, RESOURCING, AND PROGRAM MANAGEMENT SUPPORT TO THE ARMY NATIONAL GUARD TRAINING DIVISION. | $2.3M |
| Jan 30, 2020 | Department of DefenseW6QK ACC-APG | W56KGU18C0026 | 541715 | THIS IS A COST PLUS FIXED FEE (CPFF) CONTRACT FOR RESEARCH&DEVELOPMENT. THIS CONTRACT/ORDER SUPPORTS THE MISSION OF U.S. ARMY RESEARCH, DEVELOPMENT ENGINEERING COMMAND (RDECOM), COMMUNICATIONS ELECTRONICS RESEARCH, DEVELOPMENT AND ENGINEERING CENTER (CERDEC), COMMAND, POWER AND INTEGRATION (CP&I) DIRECTORATE/SYSTEMS ENGINEERING AND TECHNICAL ASSISTANCE (SETA) SUPPORT. | $408K |
| Jan 28, 2020 | Department of DefenseW6QK ACC-APG | KY01 | 541330 | IGF::CL::IGF TASK ORDER (TO) KY01 IS ISSUED ON A COST-PLUS-FIXED-FEE (CPFF) BASIS FOR LABOR AND COST (NO FEE) FOR TRAVEL, MATERIALS AND OTHER DIRECT COSTS IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THE BASIC CONTRACT, W15P7T-10-D-D421 AND MODIFICATIONS THEREAFTER. THE RAPID RESPONSE THIRD GENERATION (R2-3G) ORDER NUMBER ASSOCIATED WITH THIS TASK ORDER IS R2 3G-1000. | $2.9M |
| Jan 24, 2020 | Department of DefenseW6QK ACC-APG | W56KGY19F0025 | 541712 | THIS TASK ORDER IS CREATED FOR OPERATION AND SUSTAINMENT SERVICES FOR THE STORM REQUIREMENT. | $1.1M |
| Jan 9, 2020 | Department of DefenseW6QK ACC-APG | W56KGU19F0010 | 541712 | THIS IS TASK ORDER AWARD FOR FABRICATION INTEGRATION FIELDING FACILITY (FIFF) IN SUPPORT OF C5ISR I2WD. | $3.4M |
| Jan 8, 2020 | Department of DefenseW6QK ACC-APG | KY01 | 541330 | IGF::CL::IGF TASK ORDER (TO) KY01 IS ISSUED ON A COST-PLUS-FIXED-FEE (CPFF) BASIS FOR LABOR AND COST (NO FEE) FOR TRAVEL, MATERIALS AND OTHER DIRECT COSTS IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THE BASIC CONTRACT, W15P7T-10-D-D421 AND MODIFICATIONS THEREAFTER. THE RAPID RESPONSE THIRD GENERATION (R2-3G) ORDER NUMBER ASSOCIATED WITH THIS TASK ORDER IS R2 3G-1000. | $750K |
| Jan 7, 2020 | Department of DefenseW6QK ACC-APG | W56KGU18F0005 | 541712 | THIS IS TO AWARD TASK ORDER W56KGU18F0005 UNDER CONTRACT W15P7T-14-D-A218 FOR OPERATIONS, PROTOTYPING, TECHNOLOGY, INTEGRATION, MAINTENANCE AND INSTALLATION SUPPORT SERVICES | $131K |
| Jan 6, 2020 | Department of DefenseW6QK ACC-APG CONT CT SW SECTOR | Y601 | 541330 | IGF::OT::IGF LOG T.O. FOR CSLA R2 3G | $219K |
| Dec 31, 2019 | Department of DefenseW6QK ACC-APG | 0013 | 541330 | IGF::OT::IGF | $101K |
| Dec 26, 2019 | Department of DefenseW6QK ACC-APG | KZ03 | 541330 | IGF::CL,CT::IGF THIS TASK ORDER, KZ03, IS ISSUED PURSUANT TO THE BASIC CONTRACT, W15P7T-10-D-D421, ON A COST-PLUS-FIXED-FEE (CPFF) TERM AND COST (NO FEE) BASIS (TRAVEL/MATERIAL/ODC) FOR A PERIOD OF PERFORMANCE CONSISTS OF ONE (1) THIRTY (30) DAY TRANSITION PERIOD, ONE (1) ELEVEN (11) MONTH BASE PERIOD AND FOUR (4) TWELVE (12) MONTH OPTION PERIODS. THE PERIO OF PERFORMANCE FOR THE TRANSITION PERIOD STARTS ON 15 AUGUST 2017 THROUGH 14 SEPTEMBER 2017. THE PERIOD OF PERFORMANCE FOR THE BASE PERIOD STARTS ON 15 SEPTEMBER 2017 AND ENDS 14 AUGUST 2018. THE PERIOD OF PERFORMANCE FOR EACH FUNDING SLIN IS IDENTIFIED IN SECTION B. THE RAPID RESPONSE THIRD GENERATION (R2-3G) ORDER NUMBER ASSOCIATED WITH THIS TASK ORDER IS R23G-1002 | $1.8M |
| Dec 23, 2019 | Department of DefenseW6QK ACC-APG | 0013 | 541330 | IGF::OT::IGF | $966K |
| Dec 18, 2019 | Department of DefenseW6QK ACC-APG | W56KGY19F0025 | 541712 | THIS TASK ORDER IS CREATED FOR OPERATION AND SUSTAINMENT SERVICES FOR THE STORM REQUIREMENT. | $12M |
| Dec 18, 2019 | Department of DefenseW6QK ACC-APG | KY01 | 541330 | IGF::CL::IGF TASK ORDER (TO) KY01 IS ISSUED ON A COST-PLUS-FIXED-FEE (CPFF) BASIS FOR LABOR AND COST (NO FEE) FOR TRAVEL, MATERIALS AND OTHER DIRECT COSTS IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THE BASIC CONTRACT, W15P7T-10-D-D421 AND MODIFICATIONS THEREAFTER. THE RAPID RESPONSE THIRD GENERATION (R2-3G) ORDER NUMBER ASSOCIATED WITH THIS TASK ORDER IS R2 3G-1000. | $350K |
| Dec 18, 2019 | Department of DefenseW6QK ACC-APG | W56KGU18C0026 | 541715 | THIS IS A COST PLUS FIXED FEE (CPFF) CONTRACT FOR RESEARCH&DEVELOPMENT. THIS CONTRACT/ORDER SUPPORTS THE MISSION OF U.S. ARMY RESEARCH, DEVELOPMENT ENGINEERING COMMAND (RDECOM), COMMUNICATIONS ELECTRONICS RESEARCH, DEVELOPMENT AND ENGINEERING CENTER (CERDEC), COMMAND, POWER AND INTEGRATION (CP&I) DIRECTORATE/SYSTEMS ENGINEERING AND TECHNICAL ASSISTANCE (SETA) SUPPORT. | $55K |
| Dec 17, 2019 | Department of DefenseW6QK ACC-APG | 0013 | 541330 | IGF::OT::IGF | $202K |
| Dec 16, 2019 | Department of DefenseW6QK ACC-APG | KY01 | 541330 | IGF::CL::IGF TASK ORDER (TO) KY01 IS ISSUED ON A COST-PLUS-FIXED-FEE (CPFF) BASIS FOR LABOR AND COST (NO FEE) FOR TRAVEL, MATERIALS AND OTHER DIRECT COSTS IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THE BASIC CONTRACT, W15P7T-10-D-D421 AND MODIFICATIONS THEREAFTER. THE RAPID RESPONSE THIRD GENERATION (R2-3G) ORDER NUMBER ASSOCIATED WITH THIS TASK ORDER IS R2 3G-1000. | $300K |
| Dec 16, 2019 | Department of DefenseW6QK ACC-APG | W56KGU18F0004 | 541712 | RESPONSIVE STRATEGIC SOURCES FOR SERVICES (RS3) OPERATIONS SUPPORT (OPS) AWARD IN SUPPORT OF COMMUNICATIONS ELECTRONICS RESEARCH, DEVELOPMENT AND ENGINEERING CENTER (CERDEC), INTELLIGENCE AND INFORMATION WARFARE DIRECTORATE (I2WD) AND OPERATIONS SUPPORT (OPS) BRANCH. | $1.0M |
| Dec 11, 2019 | Department of DefenseW6QK ACC-APG | W56KGY19F0025 | 541712 | THIS TASK ORDER IS CREATED FOR OPERATION AND SUSTAINMENT SERVICES FOR THE STORM REQUIREMENT. | $4.2M |
| Dec 6, 2019 | Department of DefenseW6QK ACC-APG | 0013 | 541330 | IGF::OT::IGF | $325K |
| Dec 3, 2019 | Department of DefenseW6QK ACC-APG | W56KGY19F0025 | 541712 | THIS TASK ORDER IS CREATED FOR OPERATION AND SUSTAINMENT SERVICES FOR THE STORM REQUIREMENT. | $1.6M |
| Dec 2, 2019 | Department of DefenseW6QK ACC-APG | W56KGY19F0025 | 541712 | THIS TASK ORDER IS CREATED FOR OPERATION AND SUSTAINMENT SERVICES FOR THE STORM REQUIREMENT. | $6.1M |
| Dec 2, 2019 | Department of DefenseW6QK ACC-APG | 0013 | 541330 | IGF::OT::IGF | $23K |
| Dec 2, 2019 | Department of DefenseW4MM USA JOINT MUNITIONS CMD | W52P1J19F0713 | 541712 | THIS AWARD IS FOR SYSTEMS ENGINEERING TECHNICAL ASSISTANCE (SETA) SUPPORT SERVICES. CONTRACTOR: AASKI CPFF, $24.9M | $3.9M |
| Nov 26, 2019 | Department of DefenseW6QK ACC-APG | 0014 | 541330 | IGF::OT:IGF THE PURPOSE OF THIS TASK ORDER IS THE AWARD OF W15P7T-10-D-D421-0014, FOR SERVICES IN SUPPORT OF RTEP R23G 1050, WHICH IS THE NAVY'S NAVAL AIR SYSTEMS COMMAND (NAVAIR) LAKEHURST, PMA-257, F402 AND MARK IV (MKIV) GAS TURBINE STARTER ENGINEERING AND TECHNICAL SUPPORT SERVICES. THIS ACTION ALSO PROVIDES INCREMENTAL FUNDING IAW FAR 52.232-22. FUNDING SUPPORTS BASE YEAR EFFORTS UNDER LABOR (0003) AND MATERIAL (0013) CLINS. | $250K |
| Nov 20, 2019 | Department of DefenseW6QK ACC-APG | W56KGU19F0010 | 541712 | THIS IS TASK ORDER AWARD FOR FABRICATION INTEGRATION FIELDING FACILITY (FIFF) IN SUPPORT OF C5ISR I2WD. | $2.0M |
| Nov 20, 2019 | Department of DefenseW6QK ACC-APG | 0013 | 541330 | IGF::OT::IGF | $400K |
| Nov 20, 2019 | Department of DefenseW6QK ACC-APG | KZ03 | 541330 | IGF::CL,CT::IGF THIS TASK ORDER, KZ03, IS ISSUED PURSUANT TO THE BASIC CONTRACT, W15P7T-10-D-D421, ON A COST-PLUS-FIXED-FEE (CPFF) TERM AND COST (NO FEE) BASIS (TRAVEL/MATERIAL/ODC) FOR A PERIOD OF PERFORMANCE CONSISTS OF ONE (1) THIRTY (30) DAY TRANSITION PERIOD, ONE (1) ELEVEN (11) MONTH BASE PERIOD AND FOUR (4) TWELVE (12) MONTH OPTION PERIODS. THE PERIO OF PERFORMANCE FOR THE TRANSITION PERIOD STARTS ON 15 AUGUST 2017 THROUGH 14 SEPTEMBER 2017. THE PERIOD OF PERFORMANCE FOR THE BASE PERIOD STARTS ON 15 SEPTEMBER 2017 AND ENDS 14 AUGUST 2018. THE PERIOD OF PERFORMANCE FOR EACH FUNDING SLIN IS IDENTIFIED IN SECTION B. THE RAPID RESPONSE THIRD GENERATION (R2-3G) ORDER NUMBER ASSOCIATED WITH THIS TASK ORDER IS R23G-1002 | $1.0M |
| Nov 18, 2019 | Department of DefenseW6QK ACC-APG | W56KGY19F0025 | 541712 | THIS TASK ORDER IS CREATED FOR OPERATION AND SUSTAINMENT SERVICES FOR THE STORM REQUIREMENT. | $877K |
| Nov 18, 2019 | Department of DefenseW6QK ACC-APG | KY01 | 541330 | IGF::CL::IGF TASK ORDER (TO) KY01 IS ISSUED ON A COST-PLUS-FIXED-FEE (CPFF) BASIS FOR LABOR AND COST (NO FEE) FOR TRAVEL, MATERIALS AND OTHER DIRECT COSTS IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THE BASIC CONTRACT, W15P7T-10-D-D421 AND MODIFICATIONS THEREAFTER. THE RAPID RESPONSE THIRD GENERATION (R2-3G) ORDER NUMBER ASSOCIATED WITH THIS TASK ORDER IS R2 3G-1000. | $65K |
| Nov 18, 2019 | Department of DefenseW6QK ACC-APG | W56KGU18F0005 | 541712 | THIS IS TO AWARD TASK ORDER W56KGU18F0005 UNDER CONTRACT W15P7T-14-D-A218 FOR OPERATIONS, PROTOTYPING, TECHNOLOGY, INTEGRATION, MAINTENANCE AND INSTALLATION SUPPORT SERVICES | $137K |
Get Alerted Before Mag Ds Corp's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free