Federal Contractor Profile
Mainstream Engineering Corp
$142M obligated·404 awards·5 agencies·38 NAICS
Federal Contracts
Showing contracts 301–350 of 461 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Mar 11, 2019 | Department of DefenseDEFENSE THREAT REDUCTION AGENCY | HDTRA119P0009 | 541715 | PROVIDE DESIGN AND PROOF OF CONCEPT FOR A SYSTEM THAT COLLECTS ULTRAFINE PARTICULATES FROM AMBIENT AIR ON A CONTINUOUS BASIS FOR EFFECTIVE INLINE MONITORING FOR RADIONUCLIDES ACTIVITY | $155K |
| Feb 19, 2019 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N6833518C0318 | 541715 | PROGRESS REPORT | $100K |
| Feb 13, 2019 | Department of DefenseDLA LAND AND MARITIME | SPE7M819P1521 | 444190 | 8506289066!SWITCH,PRESSURE | $14K |
| Feb 12, 2019 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N6833518C0362 | 541715 | PROGRESS REPORT "IGF::OT::IGF" | $100K |
| Feb 6, 2019 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N6833518C0306 | 541715 | RESEARCH AND DEVELOPMENT | $375K |
| Dec 13, 2018 | Department of DefenseW6QK ACC-APG DURHAM | W911NF19P0018 | 541715 | MEMBRANELESS WATER PURIFICATION VIA CONTINUOUS, SELF-CONTAINED, VACUUM-ASSISTED DIFFUSIOPHORESIS | $150K |
| Dec 13, 2018 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N6833519C0143 | 541715 | RESEARCH AND DEVELOPMENT IGF::OT::IGF | $505K |
| Dec 12, 2018 | Department of DefenseFA9101 AEDC PKP PROCRMNT BR | FA910119P0030 | 541715 | DEVELOPMENT OF REMOTE SENSOR SYSTEM | $150K |
| Dec 11, 2018 | Department of DefenseOFFICE OF NAVAL RESEARCH | N0001415C0134 | 541712 | IGF::CL::IGF LOW-COST PHASE-DISTRIBUTION ENHANCEMENT FOR TWO-PHASE HEAT EXCHANGERS | $361K |
| Dec 10, 2018 | Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZL | FA865019P2012 | 541715 | IGF::OT::IGF MODULAR APPROACH TO ADDING COOLING | $150K |
| Nov 30, 2018 | Department of DefenseDLA TROOP SUPPORT | SPE8E719V0336 | 333413 | 8506097924!FAN,CENTRIFUGAL | $469 |
| Nov 30, 2018 | Department of DefenseDLA TROOP SUPPORT | SPE8E719V0338 | 333413 | 8506098308!FAN,TUBEAXIAL | $607 |
| Nov 30, 2018 | Department of DefenseMISSILE DEFENSE AGENCY (MDA) | HQ014719C7045 | 541715 | SBIR 18.2 PHASE I - R&D FOR ELECTRON BEAM ADDITIVE MANUFACTURING OF UPPER STAGE PROPELLANT TANKS | $105K |
| Nov 27, 2018 | Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZL | FA865019P2000 | 541715 | HIGH ENERGY LASER FOR C-UAS | $50K |
| Nov 7, 2018 | Department of DefenseDCSO PHILADELPHIA | SP470118P0137 | 541611 | IGF::OT::IGF!8505526102!SERVICES - BASIC | $100K |
| Nov 5, 2018 | Department of DefenseMISSILE DEFENSE AGENCY (MDA) | HQ014718C7215 | 541715 | IGF::OT::IGF SBIR/STTR PHASE I RESEARCH&DEVELOPMENT, PROPOSAL # B172-005-0255, TITLE HIGH PERFORMANCE COOLED SEEKER WINDOW | $50K |
| Nov 2, 2018 | Department of DefenseDLA AVIATION | SPE5EJ19V0822 | 339991 | 8506026513!GASKET | $148 |
| Oct 25, 2018 | Department of DefenseW390 MCALESTER ARMY AMMO PLANT | W44W9M19P0016 | 334512 | ENVIRONMENTAL CONTROL UNIT | $36K |
| Oct 24, 2018 | Department of DefenseW6QK ACC-PICA | W15QKN19P0005 | 541715 | THIS CONTRACT IS FOR A PHASE I SBIR TITLED:"BLAST OVERPRESSURE OMNIDIRECTIONAL MEASUREMENT DEVICE" | $105K |
| Oct 16, 2018 | Department of DefenseDLA LAND AND MARITIME | SPE7L119P0397 | 333618 | 8505975602!DEFLECTOR,AIRFLOW | $635 |
| Oct 10, 2018 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N0017817C1131 | 541712 | IGF::OT::IGF STATUS REPORT | $98K |
| Oct 4, 2018 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N6833519C0081 | 541715 | RESEARCH AND DEVELOPMENT IGF::OT::IGF | $129K |
| Oct 1, 2018 | Department of DefenseDLA LAND AND MARITIME | SPE7M419V0026 | 326220 | 8505940686!TUBING,NONMETALLIC | $12K |
| Oct 1, 2018 | Department of DefenseDLA LAND AND MARITIME | SPE7M019V0136 | 336310 | 8505941614!VALVE,EXPANSION | $435 |
| Sep 28, 2018 | Department of DefenseNSWC INDIAN HEAD DIVISION | N0017418C0027 | 541715 | SBIR PHASE I AWARD | $150K |
| Sep 28, 2018 | Department of DefenseDCSO PHILADELPHIA | SP470118P0137 | 541611 | IGF::OT::IGF!8505526102!SERVICES - BASIC | $100K |
| Sep 27, 2018 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N6833518C0790 | 541715 | RESEARCH AND DEVELOPMENT IGF::OT::IGF | $129K |
| Sep 26, 2018 | Department of DefenseDCSO PHILADELPHIA | SP470118C0072 | 561790 | 8505889158!SERVICES - BASIC RESEARCH | $942K |
| Sep 23, 2018 | Environmental Protection AgencyRTP PROC OPS DIVISION (RTPPOD) | 68HE0D18C0020 | 541715 | SBIR PHASE I - MAINSTREAM ENGINEERING CORP CAPACITIVE REMOVAL OF PFOA AND PFOS FROM DRINKING WATER | $100K |
| Sep 17, 2018 | Department of DefenseDLA AVIATION | SPE4A618V519K | 335931 | 8505884966!WIRING HARNESS,BRAN | $46K |
| Sep 11, 2018 | Department of DefenseDLA TROOP SUPPORT | SPE8E818P7089 | 333415 | 8505859429!COMPRESSOR UNIT,REF | $39K |
| Aug 28, 2018 | Department of DefenseFA9550 AFRL AFOSR | FA955018P0007 | 541715 | IGF::OT::IGF THERMOMECHANICAL INSULT TEST SYSTEM FOR POLYMER BONDED COMPOSITES | $150K |
| Aug 24, 2018 | Department of DefenseDLA LAND AND MARITIME | SPE7M518PF227 | 334416 | 8505812705!CAPACITOR,FIXED,ELE | $5K |
| Aug 23, 2018 | Department of DefenseDLA TROOP SUPPORT | SPE8E718V2050 | 333413 | 8505809475!FAN,TUBEAXIAL | $2K |
| Aug 20, 2018 | Department of DefenseMISSILE DEFENSE AGENCY (MDA) | HQ014718C0037 | 541715 | R&D RIF CONTRACT | $2.6M |
| Aug 15, 2018 | Department of DefenseFA8651 AFRL RWK | FA865118P0047 | 541715 | RAPID GRAIN RESTRUCTURING OF MUNITIONS CASINGS | $150K |
| Aug 15, 2018 | Department of DefenseW6QK ACC-APG | W911SR17C0052 | 541712 | IGF::OT::IGF - PHASE II SBIR (SEQUENTIAL) - "SYNERGISTIC AND SMART MICRO-CONTROLS FOR ENHANCED SCBA EQUIPMENT" | $420K |
| Aug 14, 2018 | Department of DefenseOFFICE OF NAVAL RESEARCH | N0001415C0134 | 541712 | IGF::CL::IGF LOW-COST PHASE-DISTRIBUTION ENHANCEMENT FOR TWO-PHASE HEAT EXCHANGERS | $361K |
| Aug 8, 2018 | Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZL | FA865018P2135 | 541715 | IGF::OT::IGF ADVANCED SEALING SYSTEM FOR ROTARY | $150K |
| Jul 31, 2018 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N6833518C0554 | 541715 | IGF::OT::IGF | $500K |
| Jul 26, 2018 | National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER | 80NSSC18P2181 | 541715 | THE THERMAL CONTROL SYSTEMS (TCS) FOR MANNED SPACECRAFT ARE TYPICALLY TWO-LOOP DESIGNS WHERE A LOW FREEZING POINT SINGLE-PHASE LIQUID IS USED EXTERIOR TO THE MANNED VESSEL TO REJECT HEAT THROUGH THE RADIATOR ARRAY, AND A SINGLE-PHASE THERMAL LOOP INSIDE THE MANNED VESSEL THAT USES A NON-TOXIC LIQUID IS USED FOR PAYLOAD COOLING AND SPACE CONDITIONING. AS AN EXAMPLE, THE ORION TCS USES HFE-7200 LIQUID (-138 C POUR POINT) IN THE RADIATORS, AND PGW IN THE MANNED CABIN. THESE LOOPS INTERFACE THROUGH A SHARED HEAT EXCHANGER THAT IS EXTERNAL TO THE MANNED VESSEL TO ENSURE THAT THE WORKING FLUID FOR THE EXTERNAL LOOP CANNOT LEAK INTO THE MANNED CABIN. THIS ARCHITECTURE IS NECESSARY FOR CREW SAFETY (MOST VERY LOW FREEZING POINT FLUIDS ARE SOMEWHAT TOXIC OR UNTESTED) BUT COMES WITH A MASS PENALTY DUE TO THE DUPLICITY OF PRIME MOVERS (PUMPS), MASS OF THE INTERMEDIATE HEAT EXCHANGER, AND EXTRA RADIATOR SURFACE AREA TO ACCOUNT FOR THE ADDITIONAL TEMPERATURE DELTA REQUIRED FOR THE INTERMEDIATE HEAT EXCHANGE PROCESS. THE TWO-LOOP MASS PENALTY IS A DRIVING FORCE TOWARD REDUCING THE TCS TO A SINGLE WORKING FLUID. HOWEVER, THE TOXICITY RISK MUST BE MITIGATED FOR THIS ARCHITECTURE TO BE REALIZED. MAINSTREAM PROPOSES TO REPLACE THE TWO LOOP TCS ARCHITECTURE WITH A SINGLE LOOP TCS ARCHITECTURE THAT HAS TOXICITY MITIGATING TECHNOLOGY | $124K |
| Jul 23, 2018 | National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER | 80NSSC18P1960 | 541715 | NASA IS CURRENTLY PURSUING AN ADVANCED SPACE SUIT PORTABLE LIFE SUPPORT SYSTEM (PLSS) FOR FUTURE MISSIONS THAT COULD REACH THE MOON OR MARS. THE LIQUID COOLING AND VENTILATION GARMENT (LCVG) IS A CRITICAL COMPONENT OF THE PLSS AND IMPROVEMENTS ARE NEEDED TO REDUCE WEIGHT AND IMPROVE COMFORT AND MOBILITY. NASA RESEARCH HAS SHOWN THAT THE LCVG TUBING IS A SIGNIFICANT HEAT TRANSFER BOTTLENECK BECAUSE OF THE LOW TUBING THERMAL CONDUCTIVITY AND HIGH THERMAL RESISTANCE BETWEEN THE TUBING/GARMENT AND THE BODY. PREVIOUS RESEARCH AT MAINSTREAM DEVELOPED INNOVATIVE TECHNIQUES FOR IMPROVING TUBING THERMAL RESISTANCE. LEVERAGING THIS WORK, MAINSTREAM PROPOSES TO DEVELOP NEXT-GENERATION TUBING THAT IMPROVES LCVG PERFORMANCE. IN PHASE I, MAINSTREAM WILL ESTABLISH A BASELINE THERMAL MODEL AND EXPERIMENTALLY DEMONSTRATE PERFORMANCE IMPROVEMENTS FROM DIFFERENT TUBING CONFIGURATIONS. IN PHASE II, MAINSTREAM WILL USE THE NEW TUBING DESIGN TO CREATE A FULL SCALE LCVG AND TEST ITS PERFORMANCE IN A REPRESENTATIVE ENVIRONMENT. | $125K |
| Jul 23, 2018 | Department of DefenseDLA LAND AND MARITIME | SPE7MC18P5482 | 444190 | 8505694656!SWITCH,PRESSURE | $14K |
| Jul 16, 2018 | Department of DefenseW4GG HQ US ARMY TACOM | W56HZV18C0106 | 541715 | SBIR PH I: A181-100-1793 HIGH TEMPERATURE MOTOR DRIVE | $105K |
| Jul 9, 2018 | Department of DefenseW4GG HQ US ARMY TACOM | W56HZV18C0021 | 541715 | IGF::OT::IGF PHASE II SBIR RESEARCH | $520K |
| Jul 5, 2018 | Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZL | FA865018P5065 | 541715 | PORTABLE FUEL PURIFICATION SYSTEM | $150K |
| Jul 5, 2018 | Department of DefenseDLA TROOP SUPPORT | SPE8E818P7075 | 333415 | 8505659465!ACCUMULATOR,REFRIGE | $862 |
| Jun 28, 2018 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N6833516C0279 | 541712 | IGF::OT::IGF, ONR SBIR PHASE II | $250K |
| Jun 27, 2018 | Department of DefenseDLA LAND AND MARITIME | SPE7MC18P5072 | 326220 | 8505636603!TUBING,NONMETALLIC | $598 |
| Jun 27, 2018 | Department of DefenseDLA LAND AND MARITIME | SPE7MC18P5077 | 326220 | 8505639196!TUBING,NONMETALLIC | $3K |
Get Alerted Before Mainstream Engineering Corp's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free