Mirador Enterprises, INC.

$140M obligated·484 awards·3 agencies·17 NAICS

Federal Contracts

Showing contracts 551594 of 594 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Apr 6, 2016Department of DefenseW076 ENDIST FT WORTH0085236220IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO INSTALL HVAC DDC AT B-4617 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 120 CALENDAR DAYS. BEGINNING 6 APR 2016 THROUGH 6 AUG 2016. IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPLACE FRONT ENTRY DOORS AT B-91235 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 120 CALENDAR DAYS. BEGINNING 6 APR 2016 THROUGH 6 AUG 2016. IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO RENOVATE ROOM 34 AT B-4612 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 60 CALENDAR DAYS. BEGINNING 6 APR 2016 THROUGH 6 JUN 2016.$65K
Apr 4, 2016Department of DefenseW076 ENDIST FT WORTH0062236220IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO RENOVATE THE RESTROOMS AT B-22012 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 2 SEP 2015 THROUGH 3 MAR 2016.$18K
Mar 30, 2016Department of DefenseFA4801 49 CONS PK0083236220IGF::OT::IGF REPAIR BAY ROLLUP DOORS, BLDG 1265 IN ACCORDANCE WITH BASIC SABER CONTRACT TERMS AND CONDITIONS$105K
Mar 24, 2016Department of DefenseW071 ENDIST OMAHAW9128F14C0021236220IGF::OT::IGF M-PROJECT NO: 395538-FLIGHT SIMULATOR, FORT CARSON, COLORADO$47K
Mar 23, 2016Department of DefenseW076 ENDIST FT WORTH0064236220IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPAIR THE GUARD RAILS AT JACKSON CROSSING FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 15 SEP 2015 THROUGH 15 MAR 2016. IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO PAINT THE HANGAR DOORS AT B-7027 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 15 SEP 2015 THROUGH 15 MAR 2016. IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO ABATE MOLD IN THE LAUNDRY ROOM OF B-31014 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 15 SEP 2015 THROUGH 15 MAR 2016.$19K
Mar 22, 2016Department of DefenseW076 ENDIST FT WORTH0083236220IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO PERFORM MISC REPAIRS AT B-23001 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 22 MAR 2016 THROUGH 22 SEP 2016. IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPLACE TRASH CAGES AT DAM 42 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 22 MAR 2016 THROUGH 22 SEP 2016. IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT A HANDICAP RAMP AT B-25030 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 22 MAR 2016 THROUGH 22 SEP 2016.$130K
Mar 22, 2016Department of DefenseW076 ENDIST FT WORTH0084236220IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT A HANDICAP RAMP AT B-4617 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 120 CALENDAR DAYS. BEGINNING 22 MAR 2016 THROUGH 22 JUL 2016.$25K
Mar 21, 2016Department of DefenseW076 ENDIST FT WORTH0082236220IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPLACE CONDENSING UNITS AT 90003 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 120 CALENDAR DAYS. BEGINNING 21 MAR 2016 THROUGH 21 JUL 2016. IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT SIDEWALK AT 36000 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 120 CALENDAR DAYS. BEGINNING 21 MAR 2016 TO 21 JUL 2016.$133K
Mar 17, 2016Department of DefenseW076 ENDIST FT WORTH0081236220IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPLACE UG HVAC PIPING AT B-91227 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 14 MAR 2016 TO 14 SEP 2016.$500K
Mar 16, 2016Department of DefenseW076 ENDIST FT WORTH0064236220IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPAIR THE GUARD RAILS AT JACKSON CROSSING FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 15 SEP 2015 THROUGH 15 MAR 2016. IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO PAINT THE HANGAR DOORS AT B-7027 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 15 SEP 2015 THROUGH 15 MAR 2016. IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO ABATE MOLD IN THE LAUNDRY ROOM OF B-31014 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 15 SEP 2015 THROUGH 15 MAR 2016.$104K
Mar 8, 2016Department of DefenseW071 ENDIST OMAHAW9128F14C0020236220IGF::OT::IGF M-4TH INFANTRY DIVISION (ID) COMBAT AVIATION BRIGADE (CAB) CONSOLIDATED BATTALION HEADQUARTERS, FORT CARSON COLORADO$6K
Mar 8, 2016Department of DefenseW071 ENDIST OMAHAW9128F14C0021236220IGF::OT::IGF M-PROJECT NO: 395538-FLIGHT SIMULATOR, FORT CARSON, COLORADO$1K
Mar 4, 2016Department of DefenseFA4801 49 CONS PK0005236220IGF::OT::IGF KWRD 13-0075 REPAIR CHAPEL LIGHTING$32K
Mar 1, 2016Department of DefenseW076 ENDIST FT WORTH0079236220IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPLACE CARPET AND REMODEL THE KITCHEN AT B-90145 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 90 CALENDAR DAYS. BEGINNING 1 MAR 2016 THROUGH 28 AUG 2016.$89K
Mar 1, 2016Department of DefenseW076 ENDIST FT WORTH0080236220IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPAIR THE EXTERIOR WALL AT B-49015 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 1 MAR 2016 TO 28 AUG 2016. IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPAIR THE EXTERIOR WALL AT B-11059 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 1 MAR 2016 TO 28 AUG 2016. IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPLACE THE DISCHARGE VALVE AT DAM 34 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 1 MAR 2016 TO 28 AUG 2016.$62K
Feb 23, 2016Department of DefenseW076 ENDIST FT WORTH0078236220IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPLACE WOODEN DECKS AT BLORA FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 22 FEB 2016 TO 20 AUG 2016. IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPLACE ROOF AT B-118 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 120 CALENDAR DAYS. BEGINNING 22 FEB 2016 TO 21 JUN 2016.$141K
Feb 19, 2016Department of DefenseW071 ENDIST OMAHAW9128F14C0021236220IGF::OT::IGF M-PROJECT NO: 395538-FLIGHT SIMULATOR, FORT CARSON, COLORADO$50K
Feb 17, 2016Department of DefenseW071 ENDIST OMAHAW9128F14C0021236220IGF::OT::IGF M-PROJECT NO: 395538-FLIGHT SIMULATOR, FORT CARSON, COLORADO$94K
Feb 5, 2016Department of DefenseW071 ENDIST OMAHAW9128F14C0021236220IGF::OT::IGF M-PROJECT NO: 395538-FLIGHT SIMULATOR, FORT CARSON, COLORADO$31K
Jan 25, 2016Department of DefenseW076 ENDIST FT WORTH0077236220IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO RENOVATE THE J-WING OF B-33009 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 90 CALENDAR DAYS. BEGINNING 25 JAN 2016 THROUGH 25 APR 2016.$150K
Jan 20, 2016Department of Homeland SecurityTRADE FACILITATION&MISSION SUPPORT CONTRACTING DIVISIONHSBP1015P00040561110IGF::OT::IGF NOTE: COMMERCIAL ACQUISITION PROCEDURES NOT USED. ADMIN SUPPORT CANINE CENTER EL PASO.$208K
Jan 15, 2016Department of DefenseW071 ENDIST OMAHAW9128F14C0020236220IGF::OT::IGF M-4TH INFANTRY DIVISION (ID) COMBAT AVIATION BRIGADE (CAB) CONSOLIDATED BATTALION HEADQUARTERS, FORT CARSON COLORADO$117K
Jan 14, 2016Department of DefenseW071 ENDIST OMAHAW9128F14C0020236220IGF::OT::IGF M-4TH INFANTRY DIVISION (ID) COMBAT AVIATION BRIGADE (CAB) CONSOLIDATED BATTALION HEADQUARTERS, FORT CARSON COLORADO$15K
Jan 11, 2016Department of DefenseW071 ENDIST OMAHAW9128F14C0020236220IGF::OT::IGF M-4TH INFANTRY DIVISION (ID) COMBAT AVIATION BRIGADE (CAB) CONSOLIDATED BATTALION HEADQUARTERS, FORT CARSON COLORADO$1K
Jan 11, 2016Department of DefenseW071 ENDIST OMAHAW9128F14C0021236220IGF::OT::IGF M-PROJECT NO: 395538-FLIGHT SIMULATOR, FORT CARSON, COLORADO$238K
Jan 6, 2016Department of DefenseW076 ENDIST FT WORTH0076236220IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPLACE WOODEN STAIRS AND RAMP AT B-4626 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 6 JAN 2016 THROUGH 6 JUL 2016. IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPLACE CURB INLT IN VIC OF 43032 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 6 JAN 2016 THROUGH 6 JUL 2016. IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPLACE DOUBLE ENTRY DOORS AT 25015 AND 12006 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 6 JAN 2016 THROUGH 6 JUL 2016. IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO PROVIDE RAMPS TO PORTABLE BUILDINGS IN VIC OF 1342 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 6 JAN 2016 THROUGH 6 JUL 2016.$72K
Jan 6, 2016Department of DefenseW071 ENDIST OMAHAW9128F14C0021236220IGF::OT::IGF M-PROJECT NO: 395538-FLIGHT SIMULATOR, FORT CARSON, COLORADO$2K
Jan 6, 2016Department of DefenseW071 ENDIST OMAHAW9128F14C0020236220IGF::OT::IGF M-4TH INFANTRY DIVISION (ID) COMBAT AVIATION BRIGADE (CAB) CONSOLIDATED BATTALION HEADQUARTERS, FORT CARSON COLORADO$8K
Dec 31, 2015Department of DefenseFA4801 49 CONS PK0082236220IGF::OT::IGF KWRD 15-0054 RPR FIRE ALARM$107K
Dec 22, 2015Department of DefenseW076 ENDIST FT WORTH0074236220IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPLACE CARPET AT B-39009 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 22 DEC 2015 THROUGH 22 JUNE 2016.$32K
Dec 22, 2015Department of DefenseW076 ENDIST FT WORTH0075236220IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPAIR THE CONVEYOR SYSTEM AT B-34002 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 210 CALENDAR DAYS. BEGINNING 22 DEC 2015 THROUGH 19 JULY 2016.$244K
Dec 21, 2015Department of DefenseW071 ENDIST OMAHAW9128F14C0020236220IGF::OT::IGF M-4TH INFANTRY DIVISION (ID) COMBAT AVIATION BRIGADE (CAB) CONSOLIDATED BATTALION HEADQUARTERS, FORT CARSON COLORADO$22K
Dec 16, 2015Department of DefenseW071 ENDIST OMAHAW9128F14C0020236220IGF::OT::IGF M-4TH INFANTRY DIVISION (ID) COMBAT AVIATION BRIGADE (CAB) CONSOLIDATED BATTALION HEADQUARTERS, FORT CARSON COLORADO$2K
Dec 9, 2015Department of DefenseW071 ENDIST OMAHAW9128F14C0020236220IGF::OT::IGF M-4TH INFANTRY DIVISION (ID) COMBAT AVIATION BRIGADE (CAB) CONSOLIDATED BATTALION HEADQUARTERS, FORT CARSON COLORADO$10K
Nov 30, 2015Department of DefenseW076 ENDIST FT WORTH0072236220IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPAIR THE HVAC SYSTEM AT B-14023 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 18 NOV 2015 THROUGH 18 MAY 2016.$366K
Nov 30, 2015Department of DefenseW076 ENDIST FT WORTH0071236220IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPAIR THE HVAC SYSTEM AT B-14019 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 18 NOV 2015 THROUGH 18 MAY 2016.$360K
Nov 23, 2015Department of DefenseW071 ENDIST OMAHAW9128F14C0020236220IGF::OT::IGF M-4TH INFANTRY DIVISION (ID) COMBAT AVIATION BRIGADE (CAB) CONSOLIDATED BATTALION HEADQUARTERS, FORT CARSON COLORADO$18K
Nov 18, 2015Department of DefenseW076 ENDIST FT WORTH0073236220IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO RENOVATE B-57128 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 16 NOV 2015 THROUGH 16 MAY 2016. IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPLACE CARPET AND PAINT AT B-33010 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 16 NOV 2015 THROUGH 16 MAY 2016.$77K
Nov 6, 2015Department of DefenseW071 ENDIST OMAHAW9128F14C0020236220IGF::OT::IGF M-4TH INFANTRY DIVISION (ID) COMBAT AVIATION BRIGADE (CAB) CONSOLIDATED BATTALION HEADQUARTERS, FORT CARSON COLORADO$14K
Oct 30, 2015Department of DefenseW071 ENDIST OMAHAW9128F14C0020236220IGF::OT::IGF M-4TH INFANTRY DIVISION (ID) COMBAT AVIATION BRIGADE (CAB) CONSOLIDATED BATTALION HEADQUARTERS, FORT CARSON COLORADO$37K
Oct 20, 2015Department of DefenseW071 ENDIST OMAHAW9128F14C0020236220IGF::OT::IGF M-4TH INFANTRY DIVISION (ID) COMBAT AVIATION BRIGADE (CAB) CONSOLIDATED BATTALION HEADQUARTERS, FORT CARSON COLORADO$1K
Oct 16, 2015Department of DefenseW071 ENDIST OMAHAW9128F14C0020236220IGF::OT::IGF M-4TH INFANTRY DIVISION (ID) COMBAT AVIATION BRIGADE (CAB) CONSOLIDATED BATTALION HEADQUARTERS, FORT CARSON COLORADO$128K
Oct 14, 2015Department of DefenseW076 ENDIST FT WORTH0070236220IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REMOVE THE FIRE SUPRESSION SYSTEMS AT DESIGNATED BUILDINGS AT THE 88000 BLK FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 14 OCT 2015 THROUGH 14 APR 2016.$52K
Oct 5, 2015Department of DefenseW076 ENDIST FT WORTH0020236220IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPAIR FLOORING AT B-70004 FOR FORT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 2 SEP 2014 THROUGH 19 JUN 2015. IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPLACE KITCHEN SHUTTERS AT B-52943 FOR FORT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 2 SEP 2014 THROUGH 19 JUN 2015. IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPAIR FUEL TANKS AT B-89260 FOR FORT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 2 SEP 2014 THROUGH 19 JUN 2015. IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPAIR FUEL TANKS AT B-25060 FOR FORT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 2 SEP 2014 THROUGH 19 JUN 2015. IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPAIR THE ROOF AT B-35021 FOR FORT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 2 SEP 2014 THROUGH 19 JUN 2015.$4K