Federal Contractor Profile
Mirador Enterprises, INC.
$140M obligated·484 awards·3 agencies·17 NAICS
Federal Contracts
Showing contracts 401–450 of 594 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Nov 9, 2016 | Department of DefenseW076 ENDIST FT WORTH | 0146 | 236220 | IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPAIR THE ROOF ON B-9418 FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 60 CALENDAR DAYS. BEGINNING 8 NOV 2016 THROUGH 07 JAN 2017. | $59K |
| Nov 9, 2016 | Department of DefenseW076 ENDIST FT WORTH | 0147 | 236220 | IGF::OT::IGF PAINT BUILDING B-90031 FOR FT HOOD, TEXAS. | $174K |
| Oct 28, 2016 | Department of DefenseW076 ENDIST FT WORTH | 0145 | 236220 | IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPAIR ROOF AT B-10021 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 28 OCT 2016 THROUGH 26 APR 2017. | $235K |
| Oct 26, 2016 | General Services AdministrationPBS R7 NON-PROSPECTUS - BORDER | GSP0717UK0003 | 236220 | IGF::OT::IGF - CONSTRUCTION, DESIGN/BUILD CONTRACTOR SHALL PROVIDE ALL THE NECESSARY SUPPLIES, MATERIALS, EQUIPMENT, LABOR AND SUPERVISION FOR THE INSTALLATION OF A NEW SECURITY GRADE, EMERGENCY DOOR RELEASE RIM EXIT DEVICE FOR THE MAIN ENTRANCE GLASS DOORS AT THE BORDER PATROL SECTOR HEADQUARTERS IN MARFA, TEXAS. | $16K |
| Oct 17, 2016 | Department of DefenseW076 ENDIST FT WORTH | 0144 | 236220 | IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPAIR STUCCO AT BUILDING 48830 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 17 OCT 2016 THROUGH 15 APR 2017. | $143K |
| Oct 13, 2016 | Department of DefenseW071 ENDIST OMAHA | W9128F14C0021 | 236220 | IGF::OT::IGF M-PROJECT NO: 395538-FLIGHT SIMULATOR, FORT CARSON, COLORADO | $22K |
| Sep 30, 2016 | Department of DefenseFA4801 49 CONS PK | 0129 | 236220 | IGF::OT::IGF KWRD 11-0159, CONSTRUCT NORTH FITNESS CENTER CANOPIES | $261K |
| Sep 30, 2016 | Department of DefenseFA4801 49 CONS PK | 0074 | 236220 | IGF::OT::IGF CONSTRUCT OUTDOOR FITNESS CENTER STORAGE IN ACCORDANCE WITH THE BASIC CONTRACT STATEMENT OF WORK (SOW) AND THE TASK ORDER SOW. | $339K |
| Sep 30, 2016 | Department of DefenseW071 ENDIST OMAHA | W9128F14C0021 | 236220 | IGF::OT::IGF M-PROJECT NO: 395538-FLIGHT SIMULATOR, FORT CARSON, COLORADO | $25K |
| Sep 30, 2016 | Department of DefenseW071 ENDIST OMAHA | W9128F14C0021 | 236220 | IGF::OT::IGF M-PROJECT NO: 395538-FLIGHT SIMULATOR, FORT CARSON, COLORADO | $5K |
| Sep 29, 2016 | Department of DefenseW076 ENDIST FT WORTH | 0143 | 236220 | IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPAIR THE REPAIR THE ROOF AT B-56495 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 29 SEP 2016 THROUGH 28 MAR 2017. | $46K |
| Sep 29, 2016 | Department of DefenseW076 ENDIST FT WORTH | 0142 | 236220 | IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPAIR THE OIL PUMP ON CHILLER 3 AT B-9417 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 29 SEP 2016 THROUGH 28 MAR 2017. IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPAIR THE ROOFS ON B-56615_16_17_19 FOR NORTH FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 29 SEP 2016 THROUGH 28 MAR 2017. IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO RENOVATE B-69005 TO ACCOMMODATE DPS FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 29 SEP 2016 THROUGH 28 MAR 2017. | $106K |
| Sep 28, 2016 | General Services AdministrationPBS R7 NON-PROSPECTUS - BORDER | GSP0716UK7070 | 236220 | IGF::OT::IGF INSTALLATION OF EXIT GATES FOR THE COLUMBUS LAND PORT OF ENTRY IN COLUMBUS, NEW MEXICO. | $7K |
| Sep 27, 2016 | Department of DefenseFA4801 49 CONS PK | 0126 | 236220 | IGF::OT::IGF REPAIR GARAGE DOORS, BUILDING 1261 IN ACCORDANCE WITH THE BASIC CONTRACT STATEMENT OF WORK (SOW) AND THE TASK ORDER SOW. | $100K |
| Sep 27, 2016 | Department of DefenseFA4801 49 CONS PK | 0128 | 236220 | IGF::OT::IGF REPAIR BLAST DOORS, B1209 | $290K |
| Sep 27, 2016 | Department of DefenseFA4801 49 CONS PK | 0125 | 236220 | IGF::OT::IGF SD17 LANDSCAPING, B1265 | $12K |
| Sep 27, 2016 | Department of DefenseFA4801 49 CONS PK | 0127 | 236220 | IGF::OT::IGF REPAIR ELECTRICAL WEST AREA FEEDER, HERITAGE PARK | $577K |
| Sep 26, 2016 | Department of DefenseW076 ENDIST FT WORTH | 0141 | 236220 | IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REMEDIATE MOLD AT B-4820 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 60 CALENDAR DAYS. BEGINNING 26 SEP 2016 THROUGH 25 NOV 2016. | $24K |
| Sep 23, 2016 | Department of DefenseFA4801 49 CONS PK | 0015 | 236220 | IGF::OT::IGF CONSTRUCT SEVEN NEW FIXED GDT TOWERS | $1.1M |
| Sep 23, 2016 | Department of DefenseFA4801 49 CONS PK | 0124 | 236220 | IGF::OT::IGF PROJECT 1007260 REPAIR FUEL LINES BEAR BASE | $37K |
| Sep 23, 2016 | Department of DefenseFA4801 49 CONS PK | 0122 | 236220 | IGF::OT::IGF INSTALL LPS AND BYPASS, ATLAS SUBSTATION | $318K |
| Sep 23, 2016 | Department of DefenseFA4801 49 CONS PK | 0123 | 236220 | IGF::OT::IGF REPAIR BURN ROOM B17904 | $67K |
| Sep 22, 2016 | Department of DefenseW076 ENDIST FT WORTH | 0136 | 236220 | IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO RENOVATE THE 4TH FLOOR OF B-36000 TO ACCOMODATE NEW END USERS FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 26 SEP 2016 THROUGH 25 MAR 2017. | $706K |
| Sep 21, 2016 | Department of DefenseFA4801 49 CONS PK | 0017 | 236220 | IGF::OT::IGF REPAINT HANGAR FLOORS IN ACCORDANCE WITH THE TASK ORDER SOW. | $734K |
| Sep 21, 2016 | Department of DefenseW076 ENDIST FT WORTH | 0140 | 236220 | IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPAIR DRAIN LINE AT B-9401 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 21 SEP 2016 THROUGH 20 MAR 2017. | $16K |
| Sep 20, 2016 | Department of DefenseW076 ENDIST FT WORTH | 0139 | 236220 | IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REMOVE BIRD NESTS FROM B-56550 FOR NORTH FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 240 CALENDAR DAYS. BEGINNING 20 SEP 2016 THROUGH 18 MAY 2017. | $234K |
| Sep 20, 2016 | Department of DefenseW076 ENDIST FT WORTH | 0138 | 236220 | IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO RENOVATE THE LATRINES AT B-16005 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 20 SEP 2016 THROUGH 19 MAR 2017. | $93K |
| Sep 19, 2016 | Department of DefenseFA4801 49 CONS PK | 0120 | 236220 | IGF::OT::IGF RPR ELEC WEST AREA FEEDER, HERITAGE PARK | $577K |
| Sep 19, 2016 | Department of DefenseW076 ENDIST FT WORTH | 0137 | 236220 | IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO BUILD TWO MOBILE SOILS LABS FOR FT WORTH, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 19 SEP 2016 THROUGH 18 MAR 2017. | $66K |
| Sep 19, 2016 | Department of DefenseW076 ENDIST FT WORTH | 0135 | 236220 | IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPAIR WATER LINES AT B-88005&88007 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 19 SEP 2016 THROUGH 18 MAR 2017. IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO INSTALL CARPET AT B-40023 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 19 SEP 2016 THROUGH 18 MAR 2017. IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT A WALL AND DOOR AT B-2804 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 19 SEP 2016 THROUGH 18 MAR 2017. IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPLACE OIL LABELS AT B-40054 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 19 SEP 2016 THROUGH 18 MAR 2017. | $104K |
| Sep 16, 2016 | Department of DefenseFA4801 49 CONS PK | 0117 | 236220 | IGF::OT::IGF REPAIR LIFT STATION, BLDG 295 | $139K |
| Sep 16, 2016 | Department of DefenseFA4801 49 CONS PK | 0121 | 236220 | IGF::OT::IGF KWRD 16-0074 CONST ST LIGHTING, NM AVE | $176K |
| Sep 16, 2016 | Department of DefenseFA4801 49 CONS PK | 0119 | 236220 | IGF::OT::IGF RUNWAY RUBBER REMOVAL IN ACCORDANCE WITH THE BASIC CONTRACT TERMS, CONDITIONS, AND STATEMENT OF WORK (SOW) AND ALSO THE TASK ORDER SOW. | $138K |
| Sep 16, 2016 | Department of DefenseFA4801 49 CONS PK | 0116 | 236220 | IGF::OT::IGF PAINT STRIPING MAIN GATE IN ACCORDANCE WITH THE BASIC CONTRACT AND TASK ORDER STATEMENT OF WORK (SOW). | $12K |
| Sep 16, 2016 | Department of DefenseFA4801 49 CONS PK | 0016 | 236220 | IGF::OT::IGF PROJECT 1007257 REPAIR SCHOOL CROSSING | $474K |
| Sep 16, 2016 | Department of DefenseFA4801 49 CONS PK | 0075 | 236220 | IGF::OT::IGF CONSTRUCT HONOR GAURD DRILL PAD COVER IN ACCORDANCE WITH BASIC CONTRACT TERMS AND CONDITIONS ,STATEMENT OF WORK (SOW)AND TASK ORDER SOW. | $339K |
| Sep 16, 2016 | Department of DefenseFA4801 49 CONS PK | 0118 | 236220 | IGF::OT::IGF SD29 APPLY FOG SEAL TO PAVEMENT, BALLOON PAD | $26K |
| Sep 15, 2016 | General Services AdministrationPBS R7 NON-PROSPECTUS - BORDER | GSP0716UK7063 | 236220 | ::IGF::OT::IGF:: YSLETA LAND PORT OF ENTRY, KENNEL FLOOR REFINISHING 797 ZARAGOSA ROAD EL PASO, TX 79907-6656 CUSTOMS AND BORDER PROTECTION (CBP) REQUIRES THE RESURFACING OF THE CONCRETE FLOOR AT THE YSLETA KENNEL. | $20K |
| Sep 14, 2016 | Department of DefenseW076 ENDIST FT WORTH | 0133 | 236220 | IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPAIR THE UG HVAC PIPING FOR B-91220 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 240 CALENDAR DAYS. BEGINNING 15 SEP 2016 THROUGH 13 MAY 2017. | $842K |
| Sep 13, 2016 | General Services AdministrationPBS R7 NON-PROSPECTUS - BORDER | GSP0716UK7046 | 236220 | IGF::OT::IGF TASK ORDER FOR OFFICE ALTERATIONS TO THE ADMINISTRATIVE OFFICES OF THE USDA-APHIS LOCATED AT THE BRIDGE OF THE AMERICAS LAND PORT OF ENTRY, EL PASO, TEXAS. | $77K |
| Sep 12, 2016 | Department of DefenseFA4801 49 CONS PK | 0115 | 236220 | IGF::OT::IGF KWRD 16-0073 REPAIR STREET LIGHTING | $253K |
| Sep 12, 2016 | Department of DefenseW076 ENDIST FT WORTH | 0134 | 236220 | IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO INSTALL CIPHER LOCKS AT B-90052&90029 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 12 SEP 2016 THROUGH 11 MAR 2017. IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO INSTALL CIPHER LOCKS AT B-90098 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 12 SEP 2016 THROUGH 11 MAR 2017. IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPLACE THE CO DETECTION SYSTEM AT B-35040 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 12 SEP 2016 THROUGH 11 MAR 2017. IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT AN OPEN STORAGE VAULT FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 12 SEP 2016 THROUGH 11 MAR 2017. IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPAIR THE DRAINAGE IN THE VICINITY OF B-51000 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 12 SEP 2016 THROUGH 11 MAR 2017. | $142K |
| Sep 9, 2016 | Department of DefenseFA4801 49 CONS PK | 0114 | 236220 | IGF::OT::IGF SD20 REPAIR GARAGE DOOR, B284 | $7K |
| Sep 9, 2016 | Department of DefenseFA4801 49 CONS PK | 0005 | 236220 | IGF::OT::IGF KWRD 13-0075 REPAIR CHAPEL LIGHTING | $144K |
| Sep 8, 2016 | Department of DefenseFA4801 49 CONS PK | 0113 | 236220 | IGF::OT::IGF SD01 REPAIR PAINT BARN DOORS, B282 | $12K |
| Sep 7, 2016 | Department of DefenseW076 ENDIST FT WORTH | 0132 | 236220 | IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO RENOVATE B-56343 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 7 SEP 2016 THROUGH 7 MAR 2017. | $115K |
| Sep 6, 2016 | Department of DefenseFA4801 49 CONS PK | 0112 | 236220 | IGF::OT::IGF SD19 - UPGRADE HVAC/EMCS BLDG 54 | $21K |
| Sep 6, 2016 | Department of DefenseFA9401 377 MSG PK | 0005 | 236220 | IGF::OT::IGF INSTALL REMOVABLE GATES/ BARRIERS, SE FLIGHT LINE PADS 4&5 | $875K |
| Sep 6, 2016 | Department of DefenseW076 ENDIST FT WORTH | 0130 | 236220 | IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO DISCONNECT UTILITIES FOR VARIOUS BUILDINGS FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 6 SEP 2016 THROUGH 5 MAR 2017. | $117K |
| Sep 6, 2016 | Department of DefenseW076 ENDIST FT WORTH | 0131 | 236220 | IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO REPAIR FLOORING AND WINDOW TRIM AT B-70004 FOR FT HOOD, TEXAS. THE CONTRACT PERFORMANCE PERIOD IS 180 CALENDAR DAYS. BEGINNING 6 SEP 2016 THROUGH 5 MAR 2017. | $81K |
Get Alerted Before Mirador Enterprises, INC.'s Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free