Home/Contractors/Navitas Advanced Solutions Group LLC

Federal Contractor Profile

Navitas Advanced Solutions Group LLC

Federal contracting record: $21M obligated across 21 awards from 3 agencies, FY 20162026.

$21M
Total Obligated
21
Award Records
3
Agencies Served
3
NAICS Codes

Company Profile

UEI (Unique Entity Identifier)

MFNHHJ2LTTH3

CAGE Code

6VVE9

Parent Organization

Navitas Systems, LLC

Address

4880 VENTURE DR, ANN ARBOR, MI, 481089559

First Federal Award

Oct 21, 2015

Most Recent Award

Nov 10, 2025

Federal Sales Analytics

Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.

Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).

Top Federal Agencies

  • Department of Defense

    17 awards · 94.6% of total

    $19M
  • National Aeronautics and Space Administration

    3 awards · 4.9% of total

    $1000K
  • Department of Transportation

    1 awards · 0.5% of total

    $100K

Top NAICS Activity

  • 541715

    RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT NANOTECHNOLOGY AND BIOTECHNOLOGY)

    9 awards

    $15M
  • 335911

    STORAGE BATTERY MANUFACTURING

    4 awards

    $3.4M
  • 541712

    RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY)

    8 awards

    $2.1M

Recent Federal Awards

DateAgencyNAICSDescriptionAmount
Jan 25, 2023Department of DefenseDCSO PHILADELPHIA541715AWARD OF CONTRACT$2.0M
Sep 27, 2022Department of DefenseFA9453 AFRL RVK541715STAR - LITHIUM SULFUR ENERGY STORAGE$8.5M
Jun 15, 2022Department of DefenseW6QK ACC-APG335911CWB FAT RELATED COST$87K
Oct 12, 2021Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV541715RESEARCH AND DEVELOPMENT$196K
May 13, 2021Department of DefenseW6QK ACC-APG335911CWB FAT RELATED COST$3.3M
Apr 23, 2020Department of DefenseW6QK ACC-APG ADELPHI541715SBIR PHASE II PROPOSAL# A2-7416 CONFORMAL SOLID STATE BATTERIES ENABLED BY FLEXIBLE SOLID ELECTROLYTE$475K
Apr 13, 2020Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV541712SBIR PHASE II TOPIC N152-093 IGF::OT::IGF$201K
Nov 15, 2019Department of DefenseW6QK ACC-APG DURHAM541715SBIR PHASE II AWARD - LITHIUM ION BATTERY ELECTRODES MANUFACTURING TO IMPROVE POWER AND ENERGY PERFORMANCE$466K
Aug 2, 2019National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER541715EXTENDED CYCLE LIFE HIGH ENERGY LITHIUM SULFER BATTERIES$125K
Jun 14, 2019Department of DefenseW6QK ACC-APG ADELPHI541715SBIR PHASE II PROPOSAL# A2-7416 CONFORMAL SOLID STATE BATTERIES ENABLED BY FLEXIBLE SOLID ELECTROLYTE$525K
Mar 28, 2019Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV541712SBIR PHASE II TOPIC N152-093 IGF::OT::IGF$303K
Mar 18, 2019Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZL541715SBIR I - BALLISTIC-RESISTANT MULTIFUNCTIONAL LITHIUM ION$150K
Dec 20, 2018Department of DefenseW6QK ACC-APG DURHAM541715IGF::OT::IGF PHASE I FIRST MONTHLY TECHNICAL REPORT$150K
Sep 28, 2018Department of DefenseW6QK ACC-APG DURHAM541715SBIR PHASE II AWARD - LITHIUM ION BATTERY ELECTRODES MANUFACTURING TO IMPROVE POWER AND ENERGY PERFORMANCE$534K
Jul 27, 2018Department of DefenseW6QK ACC-APG DURHAM541712IGF::OT::IGF PHASE I FIRST MONTHLY TECHNICAL REPORT--$50K
Jul 26, 2018Department of DefenseW6QK ACC-APG ADELPHI541712IGF::OT::IGF 6 MONTH SBIR PHASE 1 TOPIC A17-025 DEVELOPMENT OF CONFORMAL SOLID STATE BATTERIES ENABLED BY FLEXIBLE SOLID ELECTROLYTES$50K
Jul 12, 2018Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV541715RESEARCH AND DEVELOPMENT$614K
Apr 20, 2018National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER541715THE ADOPTION OF HIGH ENERGY LITHIUM SULFUR BATTERIES HINGES ON SIGNIFICANT IMPROVEMENTS IN CHARGE/RECHARGE CYCLE LIFE. CYCLE LIFE IS LIMITED BY MIGRATION OF DISSOLVED POLYSULFIDE SPECIES WHICH CREATES AN ELECTROCHEMICAL SHORT CIRCUIT. IN THIS NASA SBIR, NAVITAS SYSTEMS PROPOSES TO DEVELOP AN ATOMICALLY PRECISE AND BIFUNCTIONAL MEMBRANE SEPARATOR FOR LITHIUM SULFUR BATTERIES THAT IMPEDES POLYSULFIDE TRANSPORT. BIFUNCTIONALITY WILL COMBINE PORE STRUCTURE ENGINEERED FOR HIGH CAPACITY AND SELECTIVITY TO POLYSULFIDES WITH METAL-LIKE ELECTRONIC CONDUCTIVITY TO SUPPORT ELECTROCHEMICAL REGENERATION. PHASE I RESULTS SHOWED THAT THE PROPOSED SEPARATOR SIGNIFICANTLY IMPROVES THE ENERGY DENSITY AND CYCLE LIFE OF LITHIUM SULFUR BATTERIES. THE PHASE I PROOF OF CONCEPT EFFORT FOCUSED ON VALIDATING THE MEMBRANE MATERIALS PROPERTY ADVANTAGES IN LAB PROTOTYPE CELLS. PHASE II WILL SCALE UP PRODUCTION OF SEPARATOR USING HIGH VOLUME ROLL-TO-ROLL (R2R) COATING. PHASE II WILL DEMONSTRATE SEPARATOR ROBUSTNESS TO AUTOMATED HIGH-SPEED CELL ASSEMBLY OPERATIONS AND TO VARIATION IN THE POROUS POLYMER SUBSTRATE. MEMBRANE PERFORMANCE, CYCLE LIFE, AND ABUSE TOLERANCE ADVANTAGES WILL BE VALIDATED IN COMMERCIALLY RELEVANT PROTOTYPE POUCH CELLS WITH AT LEAST 2AH CAPACITY. PHASE II TECHNICAL OBJECTIVES ARE TO REDUCE COATING THICKNESS TO<5 M, CONTINUOUSLY COAT AT LEAST 20M OF SEPARATOR, DEMONSTRATE A 400 WH/KG LITHIUM SULFUR BATTERY CELL WITH 200% IMPROVEMENT IN CYCLE LIFE, AND SHOW IMMUNITY TO THERMAL RUNAWAY UNDER NASA MISSION-RELEVANT ABUSE TESTING PROTOCOLS..$750K
Mar 1, 2018Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV541715RESEARCH AND DEVELOPMENT$600K
Sep 19, 2017Department of DefenseNSWC DAHLGREN541712IGF::OT::IGF STATUS REPORT$125K
Aug 9, 2017Department of DefenseW6QK ACC-APG DURHAM541712IGF::OT::IGF PHASE I FIRST MONTHLY TECHNICAL REPORT--$100K
Jul 13, 2017Department of DefenseW6QK ACC-APG ADELPHI541712IGF::OT::IGF 6 MONTH SBIR PHASE 1 TOPIC A17-025 DEVELOPMENT OF CONFORMAL SOLID STATE BATTERIES ENABLED BY FLEXIBLE SOLID ELECTROLYTES$100K
Jun 21, 2017Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV541712SBIR PHASE II TOPIC N152-093 IGF::OT::IGF$230K
May 25, 2017Department of Transportation6913G6 VOLPE NATL. TRANS. SYS CNTR541712IGF::OT::IGF SBIR PHASE I ON TOPIC 17.1-OS1 FOR PROJECT TITLED "REPURPOSING LITHIUM ION BATTERIES FOR LIGHT DUTY STATIONARY APPLICATIONS"$100K
May 22, 2017National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER541712IGF::OT::IGF THE ADOPTION OF HIGH ENERGY LITHIUM SULFUR BATTERIES HINGES ON SIGNIFICANT IMPROVEMENTS IN CHARGE/RECHARGE CYCLE LIFE. CYCLE LIFE IS LIMITED BY MIGRATION OF DISSOLVED POLYSULFIDE SPECIES WHICH CREATES AN ELECTROCHEMICAL SHORT CIRCUIT. IN THIS NASA SBIR, NAVITAS SYSTEMS WILL DEMONSTRATE AND SCALE UP A BIFUNCTIONAL MEMBRANE SEPARATOR THAT IMPEDES POLYSULFIDE TRANSPORT. BIFUNCTIONALITY WILL COMBINE PORE STRUCTURE ENGINEERED FOR HIGH CAPACITY AND SELECTIVITY TO POLYSULFIDES WITH METAL-LIKE ELECTRONIC CONDUCTIVITY TO SUPPORT ELECTROCHEMICAL REGENERATION. THE PROPOSED MEMBRANES WILL BE FABRICATED USING SLURRY CAST METHODS THAT READILY SCALE TO CONTINUOUS ROLL-TO-ROLL PRODUCTION. THE SLURRY WILL COMBINE A NANOPOROUS CONDUCTIVE CERAMIC POWDER WITH A BINDER AND SOLVENT. SLURRIES WILL BE CASTABLE ONTO CONVENTIONAL POROUS POLYOLEFIN BATTERY SEPARATORS. IN PHASE I, MEMBRANE SEPARATORS WILL BE PRODUCED AT BENCH SCALE AND EVALUATED TO ASSURE GOOD ADHESION AND UNIFORM DISPERSION AT THE TARGET WEIGHT LOADING, WITH MINIMAL ADDED IMPEDANCE TO LITHIUM ION TRANSPORT. MEMBRANE SEPARATORS WILL BE INCORPORATED INTO PROTOTYPE LITHIUM SULFUR BATTERIES AND SUBJECTED TO COMMERCIALLY RELEVANT PERFORMANCE AND LIFE TESTING.$125K

Subawards Received

Navitas Advanced Solutions Group LLC also receives subaward dollars from other prime contractors. Aggregated from USAspending sub-award reporting (FY2016-FY2026).

$2.1M
Total Received
8
Sub Awards
2
Distinct Primes

Top 2 Primes Paying Navitas Advanced Solutions Group LLC

Related Contractors

Other companies active in NAICS 541715RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT NANOTECHNOLOGY AND BIOTECHNOLOGY).

Track Navitas Advanced Solutions Group LLC Recompetes Before They Post

Mindy monitors Navitas Advanced Solutions Group LLC's active contracts and alerts you 12 months before they expire — so you can position to compete on recompete.

Get Free Recompete Alerts