| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Jan 29, 2020 | Department of the TreasuryUS MINT HEADQUARTERS | TMHQ14D0017 | 541330 | IGF::OT::IGF -THROUGH THE IMPLEMENTATION OF THIS COMPREHENSIVE ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC), THE U.S. MINT WILL BE MAKING A SOUND INVESTMENT IN THE PHILADELPHIA MINT AND REALIZE SIGNIFICANT PROGRESS TOWARD MEETING THE TREASURY DEPARTMENT S ENERGY REDUCTION GOALS. | $806K |
| Jan 28, 2020 | Department of Homeland SecurityFDCC DET SEATTLE(00050) | HSCG5007FP00005 | 541690 | SUPER ESPC DELIVERY ORDER WITH NORESCO, LLC | $3.1M |
| Jan 28, 2020 | Department of the TreasuryUS MINT HEADQUARTERS | TMHQ14D0017 | 541330 | IGF::OT::IGF -THROUGH THE IMPLEMENTATION OF THIS COMPREHENSIVE ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC), THE U.S. MINT WILL BE MAKING A SOUND INVESTMENT IN THE PHILADELPHIA MINT AND REALIZE SIGNIFICANT PROGRESS TOWARD MEETING THE TREASURY DEPARTMENT S ENERGY REDUCTION GOALS. | $830K |
| Jan 16, 2020 | Department of Homeland SecurityFLETC GLYNCO PROCUREMENT OFFICE | HSFLGL12F00020 | 541330 | ESPC | $11K |
| Jan 14, 2020 | Department of Homeland SecurityCEU PROVIDENCE(000G1) | HSCGG109FQEB231 | 541330 | ESPC CONTRACT PAYMENT. THIS IS FOR A PRE-PERFORMANCE PERIOD PAYMENT (P4) CONTRACT NUMBER: DE-AM36-99EE73674 DATED - 15 AUG2009 | $565K |
| Jan 14, 2020 | Department of DefenseNAVFAC SYSTEMS AND EXP WARFARE CTR | N6258310F0310 | 541330 | ESPC AT NAS JRB FORT WORTH | $225K |
| Jan 3, 2020 | Department of Health and Human ServicesNIH A E CONSTRUCTION | HHSN292201400014U | 541330 | IGF::OT::IGF INFRASTRUCTURE UPGRADES AT THE NIH BETHESDA CAMPUS, POOLESVILLE CAMPUS, RESEARCH TRIANGLE PARK, AND ROCKY MOUNTAIN LABORATORIES | $390K |
| Jan 1, 2020 | Department of Veterans AffairsPCAC NATIONAL ENERGY BUSINESS CENTER (36E776) | VA70115F0084 | 541330 | IGF::CL::IGF VETERANS INTEGRATED SERVICE NETWORK 18, ENERGY SAVINGS PERFORMANCE CONTRACT FOR EL PASO, TEXAS VETERANS AFFAIRS MEDICAL CENTER FOR SOLAR PHOTOVOLTAIC, ENERGY CONSERVATION MEASURE 9. | $398K |
| Dec 31, 2019 | General Services AdministrationPBS R11 SPECIAL PROGRAMS DIVISION ACQUISITION REGIONAL SUPPORT | GSP1115YM0013 | 541330 | REQUEST FY' 2015 FUNDING APPROVAL FOR OBLIGATIONAL FUNDING FOR HOTD ESPC ELLIPSE CONTRACT UNDER UTILITY AREAWIDE CONTRACT DE-AM36-99-EE73680 UNDER DEPARTMENT OF ENERGY IDIQ ENERGY SAVING PERFORMANCE CONTRACTS, FOR REPAYMENT TO NORESCO, LLC COMPANY PER CONTRACT AMORTIZATION SCHEDULE TERMS AND CONDITIONS. | $269K |
| Dec 19, 2019 | Department of DefenseW2V6 USA ENG SPT CTR HUNTSVIL | 0002 | 541330 | MISCELLANEOUS | $178K |
| Dec 16, 2019 | Department of EnergyHEADQUARTERS PROCUREMENT SERVICES | DEDT0001059 | 541330 | TAS::89 0331::TAS RECOVERY OBLIGATE FY 10 ARRA FUNDING IN THE AMOUNT OF $11,587,200.00. THE $11,587,200 ARE FUNDS ASSOCIATED WITH THE CONSTRUCTION PERIOD AND WILL BE DISPERSED IN ACCORDANCE WITH THE PAYMENT SCHEDULE. | $319K |
| Dec 13, 2019 | Department of Transportation693JF7 DOT MARITIME ADMINISTRATION | DTMA5F01633 | 541330 | ENERGY CONSERVATION SERVICES IAW DO EFP#2001-01 AND DO PRICE SCHEDULES SCHEDULE DO-1 ANNUAL CONTRACTOR PAYMENTS SCHEDULE DO-2 IMPLEMENTATION PRICE BY ECM: PROJECT DEVELOPMENT ENERGY SURVEYS = $295,847.00 ENERGY EFFICIENT LIGHTING UPGRADE = $1,149,335.00 CHILLER INTERCONNECTION&CONTROL = $2,252,564.00 WATER FIXTURE UPGRADE = $319,144 SCHEDULE DO-3 PERFORMANCE PERIOD CASH FLOW SCHEDULE DO-4 FIRST YEAR ENERGY AND COST SAVINGS BY ECM TECHNOLOGY CATEGORY AND DELIVERY ORDER SCHEDULE DO-5 ANNUAL CANCELLATION CEILING SCHEDULE TOTAL AMOUNT: $15,129,555.00 (TO BE FUNDED INCREMENTALLY | $438K |
| Dec 13, 2019 | Department of Homeland SecurityFLETC GLYNCO PROCUREMENT OFFICE | HSFLGL12F00020 | 541330 | ESPC | $11K |
| Dec 10, 2019 | Department of EnergyHEADQUARTERS PROCUREMENT SERVICES | DEDT0001059 | 541330 | TAS::89 0331::TAS RECOVERY OBLIGATE FY 10 ARRA FUNDING IN THE AMOUNT OF $11,587,200.00. THE $11,587,200 ARE FUNDS ASSOCIATED WITH THE CONSTRUCTION PERIOD AND WILL BE DISPERSED IN ACCORDANCE WITH THE PAYMENT SCHEDULE. | $2.0M |
| Dec 10, 2019 | Department of Health and Human ServicesNIH A E CONSTRUCTION | HHSN292200800050U | 541330 | ENGINEERING (ENGINEERING) | $2.4M |
| Dec 7, 2019 | Department of DefenseW2V6 USA ENG SPT CTR HUNTSVIL | 0005 | 541330 | ENERGY SAVINGS PERFORMANCE CONTRACT IGF::OT::IGF | $101K |
| Nov 26, 2019 | Department of DefenseNAVFAC SYSTEMS AND EXP WARFARE CTR | N6247307F4082 | 541330 | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) FOR NAB LITTLE CREEK. ECMS INCLUDED HVAC/MECHANICAL UPGRADES, EMCS/DDC UPGRADES, ENERGY EFFICIENT LIGHTING UPGRADES, AND WATER FIXTURE UPGRADES. | $2.2M |
| Nov 21, 2019 | Department of Veterans AffairsPCAC NATIONAL ENERGY BUSINESS CENTER (36E776) | VA70117F0033 | 541330 | IGF::OT::IGF OTHER FUNCTIONS - ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) FOR VISN 2 NORTHPORT, NY VAMC | $358K |
| Nov 21, 2019 | Department of JusticeFBI-JEH | 15F06720F0000137 | 541330 | ANNUAL NORESCO BILL FOR FY20. | $3.6M |
| Nov 18, 2019 | Department of Transportation693JF7 DOT MARITIME ADMINISTRATION | DTMA5F01633 | 541330 | ENERGY CONSERVATION SERVICES IAW DO EFP#2001-01 AND DO PRICE SCHEDULES SCHEDULE DO-1 ANNUAL CONTRACTOR PAYMENTS SCHEDULE DO-2 IMPLEMENTATION PRICE BY ECM: PROJECT DEVELOPMENT ENERGY SURVEYS = $295,847.00 ENERGY EFFICIENT LIGHTING UPGRADE = $1,149,335.00 CHILLER INTERCONNECTION&CONTROL = $2,252,564.00 WATER FIXTURE UPGRADE = $319,144 SCHEDULE DO-3 PERFORMANCE PERIOD CASH FLOW SCHEDULE DO-4 FIRST YEAR ENERGY AND COST SAVINGS BY ECM TECHNOLOGY CATEGORY AND DELIVERY ORDER SCHEDULE DO-5 ANNUAL CANCELLATION CEILING SCHEDULE TOTAL AMOUNT: $15,129,555.00 (TO BE FUNDED INCREMENTALLY | $1K |
| Nov 14, 2019 | Department of Homeland SecurityFLETC GLYNCO PROCUREMENT OFFICE | HSFLGL12F00020 | 541330 | ESPC | $11K |
| Nov 14, 2019 | Environmental Protection AgencyCINCINNATI ACQUISITION DIV (CAD) | CCO00199809D68C98091 | 541330 | — | $1.6M |
| Nov 5, 2019 | Department of DefenseW2V6 USA ENG SPT CTR HUNTSVIL | 0005 | 541330 | ENERGY SAVINGS PERFORMANCE CONTRACT IGF::OT::IGF | $51K |
| Oct 30, 2019 | Department of Veterans AffairsPCAC NATIONAL ENERGY BUSINESS CENTER (36E776) | VA70116F0055 | 541330 | IGF::CL::IGF VETERANS INTEGRATED SERVICE NETWORK 15, ENERGY SAVINGS PERFORMANCE CONTRACT THROUGHOUT VISN 15 FACILITIES - ALL ECMS | $3.2M |
| Oct 28, 2019 | Department of Health and Human ServicesNIH A E CONSTRUCTION | HHSN292201400014U | 541330 | IGF::OT::IGF INFRASTRUCTURE UPGRADES AT THE NIH BETHESDA CAMPUS, POOLESVILLE CAMPUS, RESEARCH TRIANGLE PARK, AND ROCKY MOUNTAIN LABORATORIES | $390K |
| Oct 25, 2019 | Department of DefenseW2V6 USA ENG SPT CTR HUNTSVIL | 0003 | 541330 | ESPC FT. LEE IGF::OT::IGF | $165K |
| Oct 23, 2019 | Department of the TreasuryUS MINT HEADQUARTERS | TMHQ17D0113 | 541330 | ENERGEY SAVINGS PERFORMANCE CONTRACT - ESCO SERVICES | $365K |
| Oct 22, 2019 | Department of LaborDOL (ETA) OFC OF CONTRACT MGMT | AE134420000345 | 238990 | ENERGY CONTRACT - VARIOUS JOB CORPS CENTERS | $294K |
| Oct 10, 2019 | Department of JusticeFCI OTISVILLE | DJBP0700CCESPC02 | 541330 | IGF::OT::IGF FCI DANBURY/FCI OTISVILLE ESPC PROJECT | $788K |
| Sep 30, 2019 | Department of Veterans AffairsPCAC NATIONAL ENERGY BUSINESS CENTER (36E776) | VA70112F0092 | 541330 | IGF::OT::IGF OTHER FUNCTIONS - ENERGY SAVINGS PERFORMANCE CONTRACT FOR VISN 22 FACILITIES: WEST LOS ANGELES MEDICAL CENTER, SEPULVEDA AMBULATORY CARE CENTER AND LOS ANGELES AMBULATORY CARE CENTER. | $1.1M |
| Sep 28, 2019 | Department of Veterans AffairsPCAC NATIONAL ENERGY BUSINESS CENTER (36E776) | VA70113F0006 | 541330 | IGF::CL::IGF - CLOSELY ASSOCIATED - THESE REQUIREMENTS HAVE BEEN DEVELOPED FOR VA VISN 11 TO PUT FORTH GOVERNMENT IDENTIFIED ECM PROJECTS AT VISN 11 FACILITIES TO REDUCE ENERGY CONSUMPTION, WATER CONSUMPTION AND ASSOCIATED UTILITY COSTS, AND ENERGY-RELATED OPERATIONS AND MAINTENANCE COSTS. | $5.9M |
| Sep 23, 2019 | Department of the TreasuryUS MINT HEADQUARTERS | TMHQ17D0113 | 541330 | ENERGEY SAVINGS PERFORMANCE CONTRACT - ESCO SERVICES | $1.1M |
| Sep 20, 2019 | Department of Veterans AffairsPCAC NATIONAL ENERGY BUSINESS CENTER (36E776) | 36E77618F0018 | 541330 | IGF::OT::IGF OTHER FUNCTIONS - ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) VISN 12 | $2.5M |
| Sep 19, 2019 | Department of Veterans AffairsPCAC NATIONAL ENERGY BUSINESS CENTER (36E776) | VA70116F0055 | 541330 | IGF::CL::IGF VETERANS INTEGRATED SERVICE NETWORK 15, ENERGY SAVINGS PERFORMANCE CONTRACT THROUGHOUT VISN 15 FACILITIES - ALL ECMS | $2.2M |
| Sep 18, 2019 | Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS | DTFAWN12F00012 | 541330 | ENERGY SERVICES PERFORMANCE CONTRACT FOR THE NORTHERN CALIFORNIA TRACON, MATHER, CA. IGF::OT::IGF | $165K |
| Sep 18, 2019 | Department of Veterans AffairsPCAC NATIONAL ENERGY BUSINESS CENTER (36E776) | 36E77618F0018 | 541330 | IGF::OT::IGF OTHER FUNCTIONS - ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) VISN 12 | $1.6M |
| Sep 11, 2019 | Department of DefenseW2V6 USA ENG SPT CTR HUNTSVIL | 0002 | 541330 | MISCELLANEOUS | $178K |
| Sep 5, 2019 | Department of DefenseNAVFAC SYSTEMS AND EXP WARFARE CTR | N6258310F0314 | 541690 | ESPC AT NAVY REGION HAWAII | $539K |
| Sep 5, 2019 | Department of JusticeFBI-JEH | DJF1412000012896 | 236220 | IGF::OT::IGF ANNUAL ESPC PAYMENT TO NORESCO. | $1.6M |
| Aug 20, 2019 | Department of DefenseW2V6 USA ENG SPT CTR HUNTSVIL | 0001 | 541330 | UTILITY MONITORING CONTROL SYSTEM | $3.7M |
| Aug 20, 2019 | Department of Transportation693JF7 DOT MARITIME ADMINISTRATION | DTMA5F01633 | 541330 | ENERGY CONSERVATION SERVICES IAW DO EFP#2001-01 AND DO PRICE SCHEDULES SCHEDULE DO-1 ANNUAL CONTRACTOR PAYMENTS SCHEDULE DO-2 IMPLEMENTATION PRICE BY ECM: PROJECT DEVELOPMENT ENERGY SURVEYS = $295,847.00 ENERGY EFFICIENT LIGHTING UPGRADE = $1,149,335.00 CHILLER INTERCONNECTION&CONTROL = $2,252,564.00 WATER FIXTURE UPGRADE = $319,144 SCHEDULE DO-3 PERFORMANCE PERIOD CASH FLOW SCHEDULE DO-4 FIRST YEAR ENERGY AND COST SAVINGS BY ECM TECHNOLOGY CATEGORY AND DELIVERY ORDER SCHEDULE DO-5 ANNUAL CANCELLATION CEILING SCHEDULE TOTAL AMOUNT: $15,129,555.00 (TO BE FUNDED INCREMENTALLY | $441K |
| Aug 16, 2019 | Smithsonian InstitutionSMITHSONIAN INSTITUTION | F13CW10288 | 236220 | THIS IS WORK ORDER CONTRACT F13CW10288 UNDER DOE ID/IQ CONTRACT DE-AM36-09-GO29039 FOR PROVIDE ENERGY SAVING PERFORMANCE CONTRACT (ESPC) SERVICES FOR THE SMITHSONIAN INSTITUTION'S MUSEUM SUPPORT CENTER (MSC), SUITLAND, MD. NO FUNDING IS PROVIDED AT THIS TIME. WHEN PAYMENTS BECOME DUE, THEY WILL BE PAID FROM UTILITY ACCOUNT FUNDS. THIS IS A 25 YEAR ENERGY SAVING CONTRACT. IGF::OT::IGF | $703K |
| Jul 31, 2019 | Department of Veterans AffairsPCAC NATIONAL ENERGY BUSINESS CENTER (36E776) | 36E77618F0018 | 541330 | IGF::OT::IGF OTHER FUNCTIONS - ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) VISN 12 | $3.7M |
| Jul 23, 2019 | Department of DefenseDLA ENERGY | SP060014F8001 | 541330 | IGF::OT::IGF THE CONTRACTOR WILL COMPLETE INSTALLATION AND PERFORMANCE OF ENERGY CONSERVATION MEASURES IN ACCORDANCE WITH TASK ORDER AND THE REFERENCED DEPARTMNENT OF ENERGY SUPER ENERGY SAVINGS PERFORMANCE CONTRACT. | $31K |
| Jul 22, 2019 | Department of DefenseNAVFAC SYSTEMS AND EXP WARFARE CTR | N6258308F0029 | 541690 | MARINE CORPS BASE HAWAII - ESPC | $1.3M |
| Jul 11, 2019 | Department of DefenseW2V6 USA ENG SPT CTR HUNTSVIL | 0002 | 541330 | MISCELLANEOUS | $178K |
| Jul 3, 2019 | Department of DefenseNAVFAC SYSTEMS AND EXP WARFARE CTR | N4740803F5272 | 541330 | 200311!190367!1700!C7408 !NAVAL FACILITIES ENGINEERING COM!DEAM3699EE73680!C!N! !N!N4740803F5272 !20030825!20080825!606727402!606727402!007915663!N!NORESCO, LLC !ONE RESEARCH DRIVE !WESTBOROUGH !MA!01581!57000!710!51!NORFOLK !NORFOLK (CITY) !VIRGINIA !+000003000000!N!N!000000000000!R799!OTHER MANAGEMENT SUPPORT SERVICES !S1 !SERVICES !2000!NOT DISCERNABLE OR CLASSIFIED !541330!E! !5!B!M! !A! !99990909!B! ! !A! !A! !J! !030!A! !C! ! ! ! ! !C!N! ! ! !Z!Z!A!A!000! !C!N! ! ! ! ! ! !0001! ! | $2.9M |
| Jul 2, 2019 | Department of Health and Human ServicesNIH A E CONSTRUCTION | HHSN292201400014U | 541330 | IGF::OT::IGF INFRASTRUCTURE UPGRADES AT THE NIH BETHESDA CAMPUS, POOLESVILLE CAMPUS, RESEARCH TRIANGLE PARK, AND ROCKY MOUNTAIN LABORATORIES | $390K |
| Jun 28, 2019 | Department of Veterans AffairsPCAC NATIONAL ENERGY BUSINESS CENTER (36E776) | 36E77618F0018 | 541330 | IGF::OT::IGF OTHER FUNCTIONS - ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) VISN 12 | $4.6M |
| Jun 26, 2019 | General Services AdministrationPBS R5 ACQUISITION MANAGEMENT DIVISION | GSP0514GA0004 | 541330 | IGF::OT::IGF DE-AM36-09G0229039/GS-P-05-14-GA-0004,GSA NATIONAL DEEP ENERGY RETROFIT (NDER), ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER, FOR REGION 5, NORESCO, LLC, METCALFE FEDERAL BUILDING, 536 S. CLARK FEDERAL BUILDING, U.S. CUSTOM HOUSE, FEDERAL ARCHIVES&RECORDS CENTER, EVERETT M. DIRKSEN U.S. COURTHOUSE, JOHN C. KLUCZYNSKI FEDERAL BUILDING, AND U.S. POST OFFICE/LOOP STATION, CHICAGO, IL. | $2.7M |