Showing contracts 151200 of 235 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Sep 28, 2018Department of EnergyEM-CARLSBAD89303218FEM400002562910IGF::OT::IGF DEPARTMENT OF ENERGY (DOE) CARLSBAD TECHNICAL ASSISTANCE CONTRACT (CTAC)$4.9M
Sep 27, 2018Department of DefenseW072 ENDIST BUFFALOW912P417F0030562910IGF::OT::IGF BASE PERIOD, FUSRAP LUCKEY SATOC$6.4M
Sep 26, 2018Department of EnergyEM-ENVIRONMENTAL MGMT CON BUS CTRDEDT0011049562910IGF::OT::IGF THIS A FIXED PRICE AND FIXED UNIT RATE TASK ORDER WITH A COST REIMBURSABLE CLIN FOR EQUIPMENT AND VEHICLES FOR ENVIRONMENTAL REMEDIATION AT THE DEPARTMENT OF ENERGY'S MOAB SITE IN MOAB, UTAH. THIS TASK ORDER IS BEING ISSUED UNDER THE ENVIRONMENTAL MANAGEMENT NATIONWIDE IDIQ SET ASIDE CONTRACT DEEM0000842 AND IS FOR THE PURPOSE OF OPERATING AND MAINTAINING THE DOE MOAB AND CRESCENT JUNCTION SITES. OPERATING ACTIVITIES INCLUDE: EXCAVATING RESIDUAL RADIOACTIVE MATERIAL AT THE MOAB SITE AND TRANSPORTING THE RRM VIA RAIL TO THE DOE CRESCENT JUNCTION SITE FOR PLACEMENT, COMPACTION AND DISPOSAL. THIS TASK ORDER IS ALSO FOR THE PURPOSE OF CONTINUOUS PLACEMENT OF INTERIM COVER, EXCAVATION AND CONSTRUCTION OF THE PHASE 3 DISPOSAL CELL AT THE DOE CRESCENT JUNCTION SITE, AND THE REMEDIATION OF THE FINAL VICINITY PROPERTY.$40K
Sep 25, 2018Department of EnergyEM-CARLSBAD89303218FEM400009562910(CTAC) DEPARTMENT OF ENERGY (DOE) CARLSBAD TECHNICAL ASSISTANCE CONTRACT$384K
Sep 24, 2018Department of DefenseW072 ENDIST BUFFALOW912P417F0008562910IGF::OT::IGF BASE PERIOD, FUSRAP LUCKEY SATOC$7.7M
Sep 20, 2018Department of EnergyEM-ENVIRONMENTAL MGMT CON BUS CTRDEDT0011049562910IGF::OT::IGF THIS A FIXED PRICE AND FIXED UNIT RATE TASK ORDER WITH A COST REIMBURSABLE CLIN FOR EQUIPMENT AND VEHICLES FOR ENVIRONMENTAL REMEDIATION AT THE DEPARTMENT OF ENERGY'S MOAB SITE IN MOAB, UTAH. THIS TASK ORDER IS BEING ISSUED UNDER THE ENVIRONMENTAL MANAGEMENT NATIONWIDE IDIQ SET ASIDE CONTRACT DEEM0000842 AND IS FOR THE PURPOSE OF OPERATING AND MAINTAINING THE DOE MOAB AND CRESCENT JUNCTION SITES. OPERATING ACTIVITIES INCLUDE: EXCAVATING RESIDUAL RADIOACTIVE MATERIAL AT THE MOAB SITE AND TRANSPORTING THE RRM VIA RAIL TO THE DOE CRESCENT JUNCTION SITE FOR PLACEMENT, COMPACTION AND DISPOSAL. THIS TASK ORDER IS ALSO FOR THE PURPOSE OF CONTINUOUS PLACEMENT OF INTERIM COVER, EXCAVATION AND CONSTRUCTION OF THE PHASE 3 DISPOSAL CELL AT THE DOE CRESCENT JUNCTION SITE, AND THE REMEDIATION OF THE FINAL VICINITY PROPERTY.$4.4M
Sep 7, 2018Department of EnergyEM-CARLSBAD89303218FEM400002562910IGF::OT::IGF DEPARTMENT OF ENERGY (DOE) CARLSBAD TECHNICAL ASSISTANCE CONTRACT (CTAC)$2.4M
Aug 31, 2018Department of DefenseW072 ENDIST BUFFALOW912P417F0008562910IGF::OT::IGF BASE PERIOD, FUSRAP LUCKEY SATOC$1.5M
Aug 15, 2018Department of DefenseW072 ENDIST BUFFALOW912P417F0008562910IGF::OT::IGF BASE PERIOD, FUSRAP LUCKEY SATOC$1.5M
Aug 2, 2018Department of EnergyEM-ENVIRONMENTAL MGMT CON BUS CTRDEDT0011049562910IGF::OT::IGF THIS A FIXED PRICE AND FIXED UNIT RATE TASK ORDER WITH A COST REIMBURSABLE CLIN FOR EQUIPMENT AND VEHICLES FOR ENVIRONMENTAL REMEDIATION AT THE DEPARTMENT OF ENERGY'S MOAB SITE IN MOAB, UTAH. THIS TASK ORDER IS BEING ISSUED UNDER THE ENVIRONMENTAL MANAGEMENT NATIONWIDE IDIQ SET ASIDE CONTRACT DEEM0000842 AND IS FOR THE PURPOSE OF OPERATING AND MAINTAINING THE DOE MOAB AND CRESCENT JUNCTION SITES. OPERATING ACTIVITIES INCLUDE: EXCAVATING RESIDUAL RADIOACTIVE MATERIAL AT THE MOAB SITE AND TRANSPORTING THE RRM VIA RAIL TO THE DOE CRESCENT JUNCTION SITE FOR PLACEMENT, COMPACTION AND DISPOSAL. THIS TASK ORDER IS ALSO FOR THE PURPOSE OF CONTINUOUS PLACEMENT OF INTERIM COVER, EXCAVATION AND CONSTRUCTION OF THE PHASE 3 DISPOSAL CELL AT THE DOE CRESCENT JUNCTION SITE, AND THE REMEDIATION OF THE FINAL VICINITY PROPERTY.$2.3M
Aug 1, 2018Department of EnergyEM-ENVIRONMENTAL MGMT CON BUS CTRDEDT0011049562910IGF::OT::IGF THIS A FIXED PRICE AND FIXED UNIT RATE TASK ORDER WITH A COST REIMBURSABLE CLIN FOR EQUIPMENT AND VEHICLES FOR ENVIRONMENTAL REMEDIATION AT THE DEPARTMENT OF ENERGY'S MOAB SITE IN MOAB, UTAH. THIS TASK ORDER IS BEING ISSUED UNDER THE ENVIRONMENTAL MANAGEMENT NATIONWIDE IDIQ SET ASIDE CONTRACT DEEM0000842 AND IS FOR THE PURPOSE OF OPERATING AND MAINTAINING THE DOE MOAB AND CRESCENT JUNCTION SITES. OPERATING ACTIVITIES INCLUDE: EXCAVATING RESIDUAL RADIOACTIVE MATERIAL AT THE MOAB SITE AND TRANSPORTING THE RRM VIA RAIL TO THE DOE CRESCENT JUNCTION SITE FOR PLACEMENT, COMPACTION AND DISPOSAL. THIS TASK ORDER IS ALSO FOR THE PURPOSE OF CONTINUOUS PLACEMENT OF INTERIM COVER, EXCAVATION AND CONSTRUCTION OF THE PHASE 3 DISPOSAL CELL AT THE DOE CRESCENT JUNCTION SITE, AND THE REMEDIATION OF THE FINAL VICINITY PROPERTY.$1.2M
Jun 27, 2018Department of EnergyEM-ENVIRONMENTAL MGMT CON BUS CTRDEDT0011049562910IGF::OT::IGF THIS A FIXED PRICE AND FIXED UNIT RATE TASK ORDER WITH A COST REIMBURSABLE CLIN FOR EQUIPMENT AND VEHICLES FOR ENVIRONMENTAL REMEDIATION AT THE DEPARTMENT OF ENERGY'S MOAB SITE IN MOAB, UTAH. THIS TASK ORDER IS BEING ISSUED UNDER THE ENVIRONMENTAL MANAGEMENT NATIONWIDE IDIQ SET ASIDE CONTRACT DEEM0000842 AND IS FOR THE PURPOSE OF OPERATING AND MAINTAINING THE DOE MOAB AND CRESCENT JUNCTION SITES. OPERATING ACTIVITIES INCLUDE: EXCAVATING RESIDUAL RADIOACTIVE MATERIAL AT THE MOAB SITE AND TRANSPORTING THE RRM VIA RAIL TO THE DOE CRESCENT JUNCTION SITE FOR PLACEMENT, COMPACTION AND DISPOSAL. THIS TASK ORDER IS ALSO FOR THE PURPOSE OF CONTINUOUS PLACEMENT OF INTERIM COVER, EXCAVATION AND CONSTRUCTION OF THE PHASE 3 DISPOSAL CELL AT THE DOE CRESCENT JUNCTION SITE, AND THE REMEDIATION OF THE FINAL VICINITY PROPERTY.$3.3M
Jun 5, 2018Department of EnergyEM-CARLSBAD89303218FEM400009562910(CTAC) DEPARTMENT OF ENERGY (DOE) CARLSBAD TECHNICAL ASSISTANCE CONTRACT$416K
May 29, 2018Department of EnergyEM-ENVIRONMENTAL MGMT CON BUS CTRDEDT0011049562910IGF::OT::IGF THIS A FIXED PRICE AND FIXED UNIT RATE TASK ORDER WITH A COST REIMBURSABLE CLIN FOR EQUIPMENT AND VEHICLES FOR ENVIRONMENTAL REMEDIATION AT THE DEPARTMENT OF ENERGY'S MOAB SITE IN MOAB, UTAH. THIS TASK ORDER IS BEING ISSUED UNDER THE ENVIRONMENTAL MANAGEMENT NATIONWIDE IDIQ SET ASIDE CONTRACT DEEM0000842 AND IS FOR THE PURPOSE OF OPERATING AND MAINTAINING THE DOE MOAB AND CRESCENT JUNCTION SITES. OPERATING ACTIVITIES INCLUDE: EXCAVATING RESIDUAL RADIOACTIVE MATERIAL AT THE MOAB SITE AND TRANSPORTING THE RRM VIA RAIL TO THE DOE CRESCENT JUNCTION SITE FOR PLACEMENT, COMPACTION AND DISPOSAL. THIS TASK ORDER IS ALSO FOR THE PURPOSE OF CONTINUOUS PLACEMENT OF INTERIM COVER, EXCAVATION AND CONSTRUCTION OF THE PHASE 3 DISPOSAL CELL AT THE DOE CRESCENT JUNCTION SITE, AND THE REMEDIATION OF THE FINAL VICINITY PROPERTY.$3.8M
May 9, 2018Department of EnergyEM-CARLSBAD89303218FEM400002562910IGF::OT::IGF DEPARTMENT OF ENERGY (DOE) CARLSBAD TECHNICAL ASSISTANCE CONTRACT (CTAC)$60K
Apr 13, 2018Department of EnergyEM-ENVIRONMENTAL MGMT CON BUS CTRDEDT0011049562910IGF::OT::IGF THIS A FIXED PRICE AND FIXED UNIT RATE TASK ORDER WITH A COST REIMBURSABLE CLIN FOR EQUIPMENT AND VEHICLES FOR ENVIRONMENTAL REMEDIATION AT THE DEPARTMENT OF ENERGY'S MOAB SITE IN MOAB, UTAH. THIS TASK ORDER IS BEING ISSUED UNDER THE ENVIRONMENTAL MANAGEMENT NATIONWIDE IDIQ SET ASIDE CONTRACT DEEM0000842 AND IS FOR THE PURPOSE OF OPERATING AND MAINTAINING THE DOE MOAB AND CRESCENT JUNCTION SITES. OPERATING ACTIVITIES INCLUDE: EXCAVATING RESIDUAL RADIOACTIVE MATERIAL AT THE MOAB SITE AND TRANSPORTING THE RRM VIA RAIL TO THE DOE CRESCENT JUNCTION SITE FOR PLACEMENT, COMPACTION AND DISPOSAL. THIS TASK ORDER IS ALSO FOR THE PURPOSE OF CONTINUOUS PLACEMENT OF INTERIM COVER, EXCAVATION AND CONSTRUCTION OF THE PHASE 3 DISPOSAL CELL AT THE DOE CRESCENT JUNCTION SITE, AND THE REMEDIATION OF THE FINAL VICINITY PROPERTY.$3.0M
Mar 28, 2018Department of DefenseW072 ENDIST BUFFALOW912P417F0030562910IGF::OT::IGF BASE PERIOD, FUSRAP LUCKEY SATOC$4.9M
Mar 23, 2018Department of EnergyEM-CARLSBAD89303218FEM400002562910IGF::OT::IGF DEPARTMENT OF ENERGY (DOE) CARLSBAD TECHNICAL ASSISTANCE CONTRACT (CTAC)$3.0M
Feb 21, 2018Department of EnergyEM-ENVIRONMENTAL MGMT CON BUS CTRDEDT0011049562910IGF::OT::IGF THIS A FIXED PRICE AND FIXED UNIT RATE TASK ORDER WITH A COST REIMBURSABLE CLIN FOR EQUIPMENT AND VEHICLES FOR ENVIRONMENTAL REMEDIATION AT THE DEPARTMENT OF ENERGY'S MOAB SITE IN MOAB, UTAH. THIS TASK ORDER IS BEING ISSUED UNDER THE ENVIRONMENTAL MANAGEMENT NATIONWIDE IDIQ SET ASIDE CONTRACT DEEM0000842 AND IS FOR THE PURPOSE OF OPERATING AND MAINTAINING THE DOE MOAB AND CRESCENT JUNCTION SITES. OPERATING ACTIVITIES INCLUDE: EXCAVATING RESIDUAL RADIOACTIVE MATERIAL AT THE MOAB SITE AND TRANSPORTING THE RRM VIA RAIL TO THE DOE CRESCENT JUNCTION SITE FOR PLACEMENT, COMPACTION AND DISPOSAL. THIS TASK ORDER IS ALSO FOR THE PURPOSE OF CONTINUOUS PLACEMENT OF INTERIM COVER, EXCAVATION AND CONSTRUCTION OF THE PHASE 3 DISPOSAL CELL AT THE DOE CRESCENT JUNCTION SITE, AND THE REMEDIATION OF THE FINAL VICINITY PROPERTY.$4.3M
Feb 8, 2018Department of EnergyEM-CARLSBAD89303218FEM400002562910IGF::OT::IGF DEPARTMENT OF ENERGY (DOE) CARLSBAD TECHNICAL ASSISTANCE CONTRACT (CTAC)$875K
Jan 19, 2018Department of EnergyEM-ENVIRONMENTAL MGMT CON BUS CTRDEDT0011049562910IGF::OT::IGF THIS A FIXED PRICE AND FIXED UNIT RATE TASK ORDER WITH A COST REIMBURSABLE CLIN FOR EQUIPMENT AND VEHICLES FOR ENVIRONMENTAL REMEDIATION AT THE DEPARTMENT OF ENERGY'S MOAB SITE IN MOAB, UTAH. THIS TASK ORDER IS BEING ISSUED UNDER THE ENVIRONMENTAL MANAGEMENT NATIONWIDE IDIQ SET ASIDE CONTRACT DEEM0000842 AND IS FOR THE PURPOSE OF OPERATING AND MAINTAINING THE DOE MOAB AND CRESCENT JUNCTION SITES. OPERATING ACTIVITIES INCLUDE: EXCAVATING RESIDUAL RADIOACTIVE MATERIAL AT THE MOAB SITE AND TRANSPORTING THE RRM VIA RAIL TO THE DOE CRESCENT JUNCTION SITE FOR PLACEMENT, COMPACTION AND DISPOSAL. THIS TASK ORDER IS ALSO FOR THE PURPOSE OF CONTINUOUS PLACEMENT OF INTERIM COVER, EXCAVATION AND CONSTRUCTION OF THE PHASE 3 DISPOSAL CELL AT THE DOE CRESCENT JUNCTION SITE, AND THE REMEDIATION OF THE FINAL VICINITY PROPERTY.$1.0M
Jan 10, 2018Department of EnergyEM-CARLSBAD89303218FEM400002562910IGF::OT::IGF DEPARTMENT OF ENERGY (DOE) CARLSBAD TECHNICAL ASSISTANCE CONTRACT (CTAC)$1.4M
Jan 5, 2018Department of EnergyEM-ENVIRONMENTAL MGMT CON BUS CTRDEDT0011049562910IGF::OT::IGF THIS A FIXED PRICE AND FIXED UNIT RATE TASK ORDER WITH A COST REIMBURSABLE CLIN FOR EQUIPMENT AND VEHICLES FOR ENVIRONMENTAL REMEDIATION AT THE DEPARTMENT OF ENERGY'S MOAB SITE IN MOAB, UTAH. THIS TASK ORDER IS BEING ISSUED UNDER THE ENVIRONMENTAL MANAGEMENT NATIONWIDE IDIQ SET ASIDE CONTRACT DEEM0000842 AND IS FOR THE PURPOSE OF OPERATING AND MAINTAINING THE DOE MOAB AND CRESCENT JUNCTION SITES. OPERATING ACTIVITIES INCLUDE: EXCAVATING RESIDUAL RADIOACTIVE MATERIAL AT THE MOAB SITE AND TRANSPORTING THE RRM VIA RAIL TO THE DOE CRESCENT JUNCTION SITE FOR PLACEMENT, COMPACTION AND DISPOSAL. THIS TASK ORDER IS ALSO FOR THE PURPOSE OF CONTINUOUS PLACEMENT OF INTERIM COVER, EXCAVATION AND CONSTRUCTION OF THE PHASE 3 DISPOSAL CELL AT THE DOE CRESCENT JUNCTION SITE, AND THE REMEDIATION OF THE FINAL VICINITY PROPERTY.$2.2M
Dec 18, 2017Department of EnergyEM-ENVIRONMENTAL MGMT CON BUS CTRDEDT0011049562910IGF::OT::IGF THIS A FIXED PRICE AND FIXED UNIT RATE TASK ORDER WITH A COST REIMBURSABLE CLIN FOR EQUIPMENT AND VEHICLES FOR ENVIRONMENTAL REMEDIATION AT THE DEPARTMENT OF ENERGY'S MOAB SITE IN MOAB, UTAH. THIS TASK ORDER IS BEING ISSUED UNDER THE ENVIRONMENTAL MANAGEMENT NATIONWIDE IDIQ SET ASIDE CONTRACT DEEM0000842 AND IS FOR THE PURPOSE OF OPERATING AND MAINTAINING THE DOE MOAB AND CRESCENT JUNCTION SITES. OPERATING ACTIVITIES INCLUDE: EXCAVATING RESIDUAL RADIOACTIVE MATERIAL AT THE MOAB SITE AND TRANSPORTING THE RRM VIA RAIL TO THE DOE CRESCENT JUNCTION SITE FOR PLACEMENT, COMPACTION AND DISPOSAL. THIS TASK ORDER IS ALSO FOR THE PURPOSE OF CONTINUOUS PLACEMENT OF INTERIM COVER, EXCAVATION AND CONSTRUCTION OF THE PHASE 3 DISPOSAL CELL AT THE DOE CRESCENT JUNCTION SITE, AND THE REMEDIATION OF THE FINAL VICINITY PROPERTY.$1.4M
Nov 24, 2017Department of EnergyEM-ENVIRONMENTAL MGMT CON BUS CTRDEDT0011049562910IGF::OT::IGF THIS A FIXED PRICE AND FIXED UNIT RATE TASK ORDER WITH A COST REIMBURSABLE CLIN FOR EQUIPMENT AND VEHICLES FOR ENVIRONMENTAL REMEDIATION AT THE DEPARTMENT OF ENERGY'S MOAB SITE IN MOAB, UTAH. THIS TASK ORDER IS BEING ISSUED UNDER THE ENVIRONMENTAL MANAGEMENT NATIONWIDE IDIQ SET ASIDE CONTRACT DEEM0000842 AND IS FOR THE PURPOSE OF OPERATING AND MAINTAINING THE DOE MOAB AND CRESCENT JUNCTION SITES. OPERATING ACTIVITIES INCLUDE: EXCAVATING RESIDUAL RADIOACTIVE MATERIAL AT THE MOAB SITE AND TRANSPORTING THE RRM VIA RAIL TO THE DOE CRESCENT JUNCTION SITE FOR PLACEMENT, COMPACTION AND DISPOSAL. THIS TASK ORDER IS ALSO FOR THE PURPOSE OF CONTINUOUS PLACEMENT OF INTERIM COVER, EXCAVATION AND CONSTRUCTION OF THE PHASE 3 DISPOSAL CELL AT THE DOE CRESCENT JUNCTION SITE, AND THE REMEDIATION OF THE FINAL VICINITY PROPERTY.$1.8M
Oct 11, 2017Department of EnergyEM-ENVIRONMENTAL MGMT CON BUS CTRDEDT0011049562910IGF::OT::IGF THIS A FIXED PRICE AND FIXED UNIT RATE TASK ORDER WITH A COST REIMBURSABLE CLIN FOR EQUIPMENT AND VEHICLES FOR ENVIRONMENTAL REMEDIATION AT THE DEPARTMENT OF ENERGY'S MOAB SITE IN MOAB, UTAH. THIS TASK ORDER IS BEING ISSUED UNDER THE ENVIRONMENTAL MANAGEMENT NATIONWIDE IDIQ SET ASIDE CONTRACT DEEM0000842 AND IS FOR THE PURPOSE OF OPERATING AND MAINTAINING THE DOE MOAB AND CRESCENT JUNCTION SITES. OPERATING ACTIVITIES INCLUDE: EXCAVATING RESIDUAL RADIOACTIVE MATERIAL AT THE MOAB SITE AND TRANSPORTING THE RRM VIA RAIL TO THE DOE CRESCENT JUNCTION SITE FOR PLACEMENT, COMPACTION AND DISPOSAL. THIS TASK ORDER IS ALSO FOR THE PURPOSE OF CONTINUOUS PLACEMENT OF INTERIM COVER, EXCAVATION AND CONSTRUCTION OF THE PHASE 3 DISPOSAL CELL AT THE DOE CRESCENT JUNCTION SITE, AND THE REMEDIATION OF THE FINAL VICINITY PROPERTY.$4.0M
Sep 29, 2017Department of DefenseDCMA MOUNTAIN PACIFIC (DENVER)0209541620GEITA05 - SUPPORT TO TYNDALL AFB, FL$5K
Sep 27, 2017Department of EnergyEM-ENVIRONMENTAL MGMT CON BUS CTRDEDT0011049562910IGF::OT::IGF THIS A FIXED PRICE AND FIXED UNIT RATE TASK ORDER WITH A COST REIMBURSABLE CLIN FOR EQUIPMENT AND VEHICLES FOR ENVIRONMENTAL REMEDIATION AT THE DEPARTMENT OF ENERGY'S MOAB SITE IN MOAB, UTAH. THIS TASK ORDER IS BEING ISSUED UNDER THE ENVIRONMENTAL MANAGEMENT NATIONWIDE IDIQ SET ASIDE CONTRACT DEEM0000842 AND IS FOR THE PURPOSE OF OPERATING AND MAINTAINING THE DOE MOAB AND CRESCENT JUNCTION SITES. OPERATING ACTIVITIES INCLUDE: EXCAVATING RESIDUAL RADIOACTIVE MATERIAL AT THE MOAB SITE AND TRANSPORTING THE RRM VIA RAIL TO THE DOE CRESCENT JUNCTION SITE FOR PLACEMENT, COMPACTION AND DISPOSAL. THIS TASK ORDER IS ALSO FOR THE PURPOSE OF CONTINUOUS PLACEMENT OF INTERIM COVER, EXCAVATION AND CONSTRUCTION OF THE PHASE 3 DISPOSAL CELL AT THE DOE CRESCENT JUNCTION SITE, AND THE REMEDIATION OF THE FINAL VICINITY PROPERTY.$222K
Sep 27, 2017Department of EnergyEM-CARLSBADDEDT0012702562910IGF::OT::IGF DEPARTMENT OF ENERGY (DOE) CARLSBAD TECHNICAL ASSISTANCE CONTRACT (CTAC)$25K
Sep 27, 2017Department of DefenseW072 ENDIST BUFFALOW912P417F0030562910IGF::OT::IGF BASE PERIOD, FUSRAP LUCKEY SATOC$3.9M
Sep 26, 2017Department of EnergyEM-CARLSBADDEDT0012702562910IGF::OT::IGF DEPARTMENT OF ENERGY (DOE) CARLSBAD TECHNICAL ASSISTANCE CONTRACT (CTAC)$393K
Sep 26, 2017Department of EnergyEM-ENVIRONMENTAL MGMT CON BUS CTRDEDT0011049562910IGF::OT::IGF THIS A FIXED PRICE AND FIXED UNIT RATE TASK ORDER WITH A COST REIMBURSABLE CLIN FOR EQUIPMENT AND VEHICLES FOR ENVIRONMENTAL REMEDIATION AT THE DEPARTMENT OF ENERGY'S MOAB SITE IN MOAB, UTAH. THIS TASK ORDER IS BEING ISSUED UNDER THE ENVIRONMENTAL MANAGEMENT NATIONWIDE IDIQ SET ASIDE CONTRACT DEEM0000842 AND IS FOR THE PURPOSE OF OPERATING AND MAINTAINING THE DOE MOAB AND CRESCENT JUNCTION SITES. OPERATING ACTIVITIES INCLUDE: EXCAVATING RESIDUAL RADIOACTIVE MATERIAL AT THE MOAB SITE AND TRANSPORTING THE RRM VIA RAIL TO THE DOE CRESCENT JUNCTION SITE FOR PLACEMENT, COMPACTION AND DISPOSAL. THIS TASK ORDER IS ALSO FOR THE PURPOSE OF CONTINUOUS PLACEMENT OF INTERIM COVER, EXCAVATION AND CONSTRUCTION OF THE PHASE 3 DISPOSAL CELL AT THE DOE CRESCENT JUNCTION SITE, AND THE REMEDIATION OF THE FINAL VICINITY PROPERTY.$3.6M
Sep 25, 2017Department of DefenseW072 ENDIST BUFFALOW912P417F0030562910IGF::OT::IGF BASE PERIOD, FUSRAP LUCKEY SATOC$3.8M
Sep 21, 2017Department of EnergyEM-CARLSBADDEDT0012702562910IGF::OT::IGF DEPARTMENT OF ENERGY (DOE) CARLSBAD TECHNICAL ASSISTANCE CONTRACT (CTAC)$87K
Sep 14, 2017Department of EnergyEM-CARLSBADDEDT0012702562910IGF::OT::IGF DEPARTMENT OF ENERGY (DOE) CARLSBAD TECHNICAL ASSISTANCE CONTRACT (CTAC)$1.3M
Sep 7, 2017Department of EnergyEM-CARLSBADDEDT0012702562910IGF::OT::IGF DEPARTMENT OF ENERGY (DOE) CARLSBAD TECHNICAL ASSISTANCE CONTRACT (CTAC)$260K
Sep 6, 2017Department of EnergyEM-CARLSBADDEDT0012702562910IGF::OT::IGF DEPARTMENT OF ENERGY (DOE) CARLSBAD TECHNICAL ASSISTANCE CONTRACT (CTAC)$249K
Sep 1, 2017Department of EnergyEM-CARLSBADDEDT0012702562910IGF::OT::IGF DEPARTMENT OF ENERGY (DOE) CARLSBAD TECHNICAL ASSISTANCE CONTRACT (CTAC)$680K
Aug 18, 2017Department of EnergyEM-CARLSBADDEDT0012702562910IGF::OT::IGF DEPARTMENT OF ENERGY (DOE) CARLSBAD TECHNICAL ASSISTANCE CONTRACT (CTAC)$610K
Jul 31, 2017Department of DefenseW072 ENDIST BUFFALOW912P417F0008562910IGF::OT::IGF BASE PERIOD, FUSRAP LUCKEY SATOC$5.9M
Jul 28, 2017Department of EnergyEM-CARLSBADDEDT0012702562910IGF::OT::IGF DEPARTMENT OF ENERGY (DOE) CARLSBAD TECHNICAL ASSISTANCE CONTRACT (CTAC)$800K
Jul 14, 2017Department of the InteriorFWS MOUNTAIN-PRAIRIE REGIONAL OFFICINF16PD01426562910''IGF::OT::IGF''$47K
Jun 30, 2017Department of EnergyEM-CARLSBADDEDT0012702562910IGF::OT::IGF DEPARTMENT OF ENERGY (DOE) CARLSBAD TECHNICAL ASSISTANCE CONTRACT (CTAC)$952K
Jun 28, 2017Department of DefenseW072 ENDIST BUFFALOW912P417F0008562910IGF::OT::IGF BASE PERIOD, FUSRAP LUCKEY SATOC$3.2M
Jun 21, 2017Department of EnergyEM-CARLSBADDEDT0012702562910IGF::OT::IGF DEPARTMENT OF ENERGY (DOE) CARLSBAD TECHNICAL ASSISTANCE CONTRACT (CTAC)$45K
Jun 15, 2017Department of EnergyEM-CARLSBADDEDT0012702562910IGF::OT::IGF DEPARTMENT OF ENERGY (DOE) CARLSBAD TECHNICAL ASSISTANCE CONTRACT (CTAC)$940K
May 30, 2017Department of EnergyEM-ENVIRONMENTAL MGMT CON BUS CTRDEDT0011049562910IGF::OT::IGF THIS A FIXED PRICE AND FIXED UNIT RATE TASK ORDER WITH A COST REIMBURSABLE CLIN FOR EQUIPMENT AND VEHICLES FOR ENVIRONMENTAL REMEDIATION AT THE DEPARTMENT OF ENERGY'S MOAB SITE IN MOAB, UTAH. THIS TASK ORDER IS BEING ISSUED UNDER THE ENVIRONMENTAL MANAGEMENT NATIONWIDE IDIQ SET ASIDE CONTRACT DEEM0000842 AND IS FOR THE PURPOSE OF OPERATING AND MAINTAINING THE DOE MOAB AND CRESCENT JUNCTION SITES. OPERATING ACTIVITIES INCLUDE: EXCAVATING RESIDUAL RADIOACTIVE MATERIAL AT THE MOAB SITE AND TRANSPORTING THE RRM VIA RAIL TO THE DOE CRESCENT JUNCTION SITE FOR PLACEMENT, COMPACTION AND DISPOSAL. THIS TASK ORDER IS ALSO FOR THE PURPOSE OF CONTINUOUS PLACEMENT OF INTERIM COVER, EXCAVATION AND CONSTRUCTION OF THE PHASE 3 DISPOSAL CELL AT THE DOE CRESCENT JUNCTION SITE, AND THE REMEDIATION OF THE FINAL VICINITY PROPERTY.$3.1M
Apr 28, 2017Department of EnergyEM-CARLSBADDEDT0012702562910IGF::OT::IGF DEPARTMENT OF ENERGY (DOE) CARLSBAD TECHNICAL ASSISTANCE CONTRACT (CTAC)$113K
Mar 15, 2017Department of EnergyEM-CARLSBADDEDT0012702562910IGF::OT::IGF DEPARTMENT OF ENERGY (DOE) CARLSBAD TECHNICAL ASSISTANCE CONTRACT (CTAC)$740K
Feb 17, 2017Department of EnergyEM-ENVIRONMENTAL MGMT CON BUS CTRDEDT0011049562910IGF::OT::IGF THIS A FIXED PRICE AND FIXED UNIT RATE TASK ORDER WITH A COST REIMBURSABLE CLIN FOR EQUIPMENT AND VEHICLES FOR ENVIRONMENTAL REMEDIATION AT THE DEPARTMENT OF ENERGY'S MOAB SITE IN MOAB, UTAH. THIS TASK ORDER IS BEING ISSUED UNDER THE ENVIRONMENTAL MANAGEMENT NATIONWIDE IDIQ SET ASIDE CONTRACT DEEM0000842 AND IS FOR THE PURPOSE OF OPERATING AND MAINTAINING THE DOE MOAB AND CRESCENT JUNCTION SITES. OPERATING ACTIVITIES INCLUDE: EXCAVATING RESIDUAL RADIOACTIVE MATERIAL AT THE MOAB SITE AND TRANSPORTING THE RRM VIA RAIL TO THE DOE CRESCENT JUNCTION SITE FOR PLACEMENT, COMPACTION AND DISPOSAL. THIS TASK ORDER IS ALSO FOR THE PURPOSE OF CONTINUOUS PLACEMENT OF INTERIM COVER, EXCAVATION AND CONSTRUCTION OF THE PHASE 3 DISPOSAL CELL AT THE DOE CRESCENT JUNCTION SITE, AND THE REMEDIATION OF THE FINAL VICINITY PROPERTY.$688K