Federal Contractor Profile
Northern Construction LLC
$36M obligated·169 awards·5 agencies·12 NAICS
Federal Contracts
Showing contracts 151–200 of 242 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Sep 28, 2018 | Department of DefenseW075 ENDIST SACRAMENTO | W9123818C0049 | 236220 | D-B F35A MUNITIONS MAINTENANCE COMPLEX | $9.0M |
| Sep 24, 2018 | General Services AdministrationPBS R8 ACQUISITION MANAGEMENT DIVISION | 47PJ0017C0054 | 236220 | IGF::OT::IGF CONSTRUCTION OF SECURITY UPGRADES FOR THE WALLACE F. BENNETT FEDERAL BUILDING LOCATED AT 125 SOUTH STATE STREET, SALT LAKE CITY, UT 84138. | $13K |
| Sep 17, 2018 | Department of CommerceDEPT OF COMMERCE NIST | 1333ND18CNB190016 | 236220 | THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, AND TRANSPORTATION FOR THE DESIGN AND CONSTRUCTION PROJECT TO RELOCATE THE FITNESS FACILITY INTO THE EXISTING CAFETERIA SPACE OF BUILDING 1. | $913K |
| Sep 17, 2018 | Department of CommerceDEPT OF COMMERCE NIST | 1333ND18CNB190015 | 237110 | THIS CONTRACT IS TO REPAIR AND REPLACE STORM AND SEWER PIPES AT THE NIST BOULDER CO SITE. | $553K |
| Sep 12, 2018 | Department of CommerceDEPT OF COMMERCE NIST | 1333ND18FNB190198 | 236220 | THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT TO PERFORM THE 2018 PAVING IMPROVEMENTS AT THE NIST BOULDER CAMPUS. | $268K |
| Sep 11, 2018 | Department of CommerceDEPT OF COMMERCE NIST | 1333ND18FNB190201 | 236220 | THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT TO PERFORM VARIOUS SAFETY AND SECURITY REPAIRS THROUGHOUT THE NIST BOULDER SITE. | $89K |
| Sep 7, 2018 | General Services AdministrationPBS R8 ACQUISITION MANAGEMENT DIVISION | 47PJ0018C0079 | 238220 | BENNETT BDLG AIR DAMPER REPLACEMENT. 125 S. STATE ST. SALT LAKE CITY, UT 84138. IGF::OT::IGF | $20K |
| Sep 7, 2018 | Department of CommerceDEPT OF COMMERCE NIST | 1333ND18FNB190183 | 236220 | THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT TO INSTALL TWO DOORS, TO MATCH EXISTING, IN BUILDING 1, WING 3, AT THE NIST BOULDER CAMPUS. | $24K |
| Sep 6, 2018 | General Services AdministrationPBS R8 ACQUISITION MANAGEMENT DIVISION | 47PJ0018C0075 | 238320 | JAMES V. HANSEN FED BLDG 324 25TH ST., OGDEN, UT 84401. PAINT CORRIDOR WALLS ON 4TH FLOOR. IGF::OT::IGF | $21K |
| Aug 24, 2018 | Department of DefenseW4MM USA JOINT MUNITIONS CMD | W52P1J18F6054 | 236220 | MINOR CONSTRUCTION IGF::OT::IGF | $121K |
| Aug 13, 2018 | General Services AdministrationPBS R8 ACQUISITION MANAGEMENT DIVISION | 47PJ0017C0054 | 236220 | IGF::OT::IGF CONSTRUCTION OF SECURITY UPGRADES FOR THE WALLACE F. BENNETT FEDERAL BUILDING LOCATED AT 125 SOUTH STATE STREET, SALT LAKE CITY, UT 84138. | $21K |
| Aug 10, 2018 | General Services AdministrationPBS R8 ACQUISITION MANAGEMENT DIVISION | 47PJ0018C0042 | 236220 | IGF::OT::IGF 324 25TH ST, OGDEN, UT 84401 - VINYL COVE BASE INSTALL. | $911 |
| Jul 31, 2018 | General Services AdministrationPBS R8 ACQUISITION MANAGEMENT DIVISION | 47PJ0018C0052 | 236220 | IGF::OT::IGF SSA/ODAR HEARING ROOM SOUND PROOF PROJECT FOR WALLACE F. BENNETT FEDERAL BUILDING 125 S STATE STREET SALT LAKE CITY, UTAH | $32K |
| Jul 31, 2018 | Department of DefenseW4MM USA JOINT MUNITIONS CMD | W52P1J18F6054 | 236220 | MINOR CONSTRUCTION IGF::OT::IGF | $79K |
| Jul 19, 2018 | Department of CommerceDEPT OF COMMERCE NIST | 1333ND18DNB190005 | 236220 | MULTIPLE AWARD CONSTRUCTION CONTRACT FOR NIST BOULDER. GNERAL CONSTRUCTION REQUIREMENTS WILL BE SOLICITED AND AWARD AS TASK ORDERS UNDER THE CONTRACT. THE TOTAL MAXIMUM QUANTITY TO BE ORDERED IS $9,500,000 FOR THE LENGTH OF THE CONTRACT, NOT TO EXCEED FIVE YEARS. THE MAXIMUM QUANTITY IS CALCULATED AS THE SUM OF ALL ORDERS ISSUED, INCLUDING MODIFICATIONS, TO ALL FOUR OF THE MULTIPLE AWARD CONSTRUCTION CONTRACT CONTRACTORS. THE MINIMUM GUARANTEED AMOUNT IS $1,000 OVER THE LIFE OF THE CONTRACT. | $1K |
| Jul 2, 2018 | General Services AdministrationPBS R8 ACQUISITION MANAGEMENT DIVISION | 47PJ0018C0045 | 236220 | IGF::OT::IGF OTHER FUNCTION, SOL OFFICE BUILDOUT PHASE - TWO LOACTED AT 125 S STATE ST SLC UT, 84138. DIVIDE OFFICE, INSTALL STORE FRONT DOOR, AND INSTALL SECURITY ACCESS SYSTEM | $23K |
| Jun 19, 2018 | General Services AdministrationPBS R8 ACQUISITION MANAGEMENT DIVISION | 47PJ0018C0042 | 236220 | IGF::OT::IGF 324 25TH ST, OGDEN, UT 84401 - VINYL COVE BASE INSTALL. | $5K |
| May 23, 2018 | Department of DefenseW4MM USA JOINT MUNITIONS CMD | W52P1J18F6054 | 236220 | MINOR CONSTRUCTION IGF::OT::IGF | $634K |
| May 11, 2018 | General Services AdministrationPBS R8 ACQUISITION MANAGEMENT DIVISION | 47PJ0018C0036 | 236220 | IGF::OT::IGF DOORS AND FRAMES REPLACEMENT - JAMES V. HANSEN FEDERAL BUILDING, 324 25TH ST., OGDEN, UT 84401 | $25K |
| Jan 26, 2018 | General Services AdministrationPBS R8 ACQUISITION MANAGEMENT DIVISION | 47PJ0017C0064 | 236220 | INSTALLATION OF WINDOW FILM ON HANSEN FEDERAL BUILDING IGF::OT::IGF | $13K |
| Jan 24, 2018 | Department of DefenseW075 ENDIST SACRAMENTO | W9123815C0001 | 236220 | IGF::OT::IGF PROJECT: FIRE CRASH RESCUE FACILITY AT HILL AIR FORCE BASE UTAH. | $34K |
| Jan 19, 2018 | Department of DefenseW075 ENDIST SACRAMENTO | W9123818C0011 | 236220 | IGF::OT::IGF DESIGN/CONSTRUCT STAMP @ HILL AFB | $10M |
| Jan 10, 2018 | Department of DefenseW075 ENDIST SACRAMENTO | W9123815C0001 | 236220 | IGF::OT::IGF PROJECT: FIRE CRASH RESCUE FACILITY AT HILL AIR FORCE BASE UTAH. | $31K |
| Jan 8, 2018 | Department of DefenseW075 ENDIST SACRAMENTO | W9123815C0001 | 236220 | IGF::OT::IGF PROJECT: FIRE CRASH RESCUE FACILITY AT HILL AIR FORCE BASE UTAH. | $49K |
| Jan 8, 2018 | Department of DefenseW075 ENDIST SACRAMENTO | W9123815C0001 | 236220 | IGF::OT::IGF PROJECT: FIRE CRASH RESCUE FACILITY AT HILL AIR FORCE BASE UTAH. | $11K |
| Dec 12, 2017 | Department of DefenseW075 ENDIST SACRAMENTO | W9123815C0001 | 236220 | IGF::OT::IGF PROJECT: FIRE CRASH RESCUE FACILITY AT HILL AIR FORCE BASE UTAH. | $23K |
| Dec 12, 2017 | Department of DefenseW075 ENDIST SACRAMENTO | W9123815C0001 | 236220 | IGF::OT::IGF PROJECT: FIRE CRASH RESCUE FACILITY AT HILL AIR FORCE BASE UTAH. | $38K |
| Dec 7, 2017 | Department of DefenseW075 ENDIST SACRAMENTO | W9123815C0001 | 236220 | IGF::OT::IGF PROJECT: FIRE CRASH RESCUE FACILITY AT HILL AIR FORCE BASE UTAH. | $61K |
| Sep 28, 2017 | General Services AdministrationPBS R8 ACQUISITION MANAGEMENT DIVISION | 47PJ0017C0029 | 236220 | IGF::OT::IGF OTHER FUNCTIONS, USDC REFLECTING POOL REPAIR CONSTRUCTION PROJECT; U.S. DISTRICT COURTHOUSE, 351 SOUTH WEST TEMPLE, SALT LAKE CITY, UT 84101. THE CONTRACTOR SHALL PROVIDE CONSTRUCTION SERVICES TO REPAIR 5 BROKEN PIPES THAT ARE PART OF THE PIPING SYSTEM SERVICING TWO WEST REFLECTING POOLS AT THE U.S. DISTRICT COURTHOUSE. CONTRACTOR MUST EXPOSE AND REPAIR THESE FIVE KNOWN PIPE BREAKS, PRESSURE TEST ALL POOL PIPING AFTER REPAIRS, REPAIR ALL PARTS OF THE POOL DAMAGED TO ACCESS BROKEN PIPES, AND PATCH THE POOL WATER BARRIER. THE CONTRACTOR MUST RETURN ALL POOL STONES TO THEIR NORMAL POSITIONS, RE-SET ALL REFLECTING POOL (AT BOTH WEST POOLS) WEIR STONES TO THEIR PROPER POSITIONS, AND SHIM TO THE PROPER HEIGHT AND SPACE EVENLY. CONTRACTOR MUST COORDINATE WITH GSA O&M CONTRACTOR THE STARTUP OF THE POOL OPERATION TO ENSURE PROPER FUNCTION. CONTRACTOR MUST DEVELOP A WINTERIZING PLAN THAT WILL HELP PROTECT AGAINST FUTURE WINTER BREAKS. | $39K |
| Sep 27, 2017 | Department of DefenseW7N3 USPFO ACTIVITY UT ARNG | W911YP17C2200 | 238990 | IGF::OT::IGF CONSTRUCTION, REPAIR FREEZER EQUIPMENT IN DFAC | $69K |
| Sep 21, 2017 | General Services AdministrationPBS R8 ACQUISITION MANAGEMENT DIVISION | 47PJ0017C0064 | 236220 | INSTALLATION OF WINDOW FILM ON HANSEN FEDERAL BUILDING IGF::OT::IGF | $108K |
| Sep 20, 2017 | Department of AgricultureUSDA ARS WBSC ACQUISITION BRANCH | AG8417C160001 | 238220 | IGF::CL::IGF | $2K |
| Sep 20, 2017 | General Services AdministrationPBS R8 ACQUISITION MANAGEMENT DIVISION | 47PJ0017C0062 | 236220 | IGF::OT::IGF DEMO CARPET IN THE 5 CLASSROOMS, REPLACE WITH FULL SHEET LINOLEUM. IRS SERVICE CENTER 1160 N 1200 W OGDEN, UT 84404 | $16K |
| Sep 19, 2017 | General Services AdministrationPBS R8 ACQUISITION MANAGEMENT DIVISION | 47PJ0017C0059 | 236220 | IGF::OT::IGF REPAIR THE CALKING AROUND PARAPET WALL OF THE JAMES V. HANSEN FEDERAL BUILDING LOCATED AT 324 25TH STREET, OGDEN, UT, 84401 | $14K |
| Sep 14, 2017 | General Services AdministrationPBS R8 ACQUISITION MANAGEMENT DIVISION | 47PJ0017C0049 | 236220 | IGF::OT::IGF IRS CHILD CARE PLAYGROUND REPAIRS - 1160 W. 12TH ST OGDEN, UT 84201. | $14K |
| Sep 14, 2017 | General Services AdministrationPBS R8 ACQUISITION MANAGEMENT DIVISION | 47PJ0017C0054 | 236220 | IGF::OT::IGF CONSTRUCTION OF SECURITY UPGRADES FOR THE WALLACE F. BENNETT FEDERAL BUILDING LOCATED AT 125 SOUTH STATE STREET, SALT LAKE CITY, UT 84138. | $176K |
| Sep 12, 2017 | General Services AdministrationPBS R8 ACQUISITION MANAGEMENT DIVISION | GS08P17VEP0004 | 238220 | IGF::OT::IGF INSTALL ISOLATION VALVES IN 7 RESTROOM PLUMBING CHASES LOCATED IN THE WALLACE F. BENNETT FEDERAL BUILDING, SLC, UT | $2K |
| Sep 11, 2017 | General Services AdministrationPBS R8 ACQUISITION MANAGEMENT DIVISION | 47PJ0017C0040 | 236220 | IGF::OT::IGF FITNESS CENTER UPGRADE FOR WALLACE F BENNETT FEDERAL BUILDING 125 S STATE STREET SALT LAKE CITY, UT | $23K |
| Sep 7, 2017 | Department of the InteriorDSC CONTRACTING SERVICES DIVISION | INP16PC00468 | 236220 | IGF::OT::IGF, G:ESTAR, 52.223-2, 52.223-3, 52.223-9, 52.223-15, 52-223-17 FLFO - 156298 A&B - VISITOR CENTER HVAC REPAIRS&NELSON HOUSE DEMOLITION | $81K |
| Sep 6, 2017 | General Services AdministrationPBS R8 ACQUISITION MANAGEMENT DIVISION | 47PJ0017C0033 | 236220 | IGF::OT::IGF OTHER FUNCTIONS, UNITED STATES COURTHOUSE FOR THE DISTRICT OF UTAH EXHAUST FAN INSTALLATION PROJECT, FRANK E. MOSS U.S. COURTHOUSE, 350 SOUTH STATE STREET, SALT LAKE CITY, UT 84101. THE CONTRACTOR SHALL PROVIDE CONSTRUCTION SERVICES TO INSTALL EXHAUST FAN AT THE FRANK E. MOSS U.S. COURTHOUSE. THE CONTRACTOR SHALL PROVIDE ALL CONSTRUCTION SERVICES TO INCLUDE ALL LABOR, TOOLS, DEMOLITION, COORDINATION, INSTALLATION, SUPERVISION AND EXPERTISE TO ACCOMPLISH THE PROJECT SCOPE FOR THE EXHAUST FAN INSTALLATION. | $30K |
| Sep 5, 2017 | General Services AdministrationPBS R8 ACQUISITION MANAGEMENT DIVISION | 47PJ0017C0037 | 236210 | IGF::OT::IGF REPLACE SHRUBS AND REPLACE ALL TREE RINGS AND FILLING THEM WITH GRAVEL. | $15K |
| Sep 5, 2017 | Department of DefenseW075 ENDIST SACRAMENTO | W9123815C0001 | 236220 | IGF::OT::IGF PROJECT: FIRE CRASH RESCUE FACILITY AT HILL AIR FORCE BASE UTAH. | $546K |
| Aug 30, 2017 | Department of DefenseW0MM TOOELE ARMY DEPOT | 0004 | 236220 | IGF::OT::IGF | $55K |
| Aug 29, 2017 | General Services AdministrationPBS R8 ACQUISITION MANAGEMENT DIVISION | 47PJ0017P0070 | 236220 | IGF::OT::IGF BOLLARD INSTALLATION AT TWIN RIVERS OFFICE BUILDING FOR THE IRS IN OGDEN, UTAH | $5K |
| Aug 28, 2017 | General Services AdministrationPBS R8 ACQUISITION MANAGEMENT DIVISION | 47PJ0017C0027 | 238220 | IGF::CT::IGF INSTALL DRINKING WATER FOUNTAINS AT THE WALLACE F. BENNETT FEDERAL BUILDING, LOCATED AT 125 S STATE STREET, SALT LAKE CITY, UT 84138. | $10K |
| Aug 24, 2017 | Department of AgricultureNRCS CONTRACTING SVS BRANCH-TEAM 4 | AG4D90C160025 | 212321 | ZIGF::OT::IGF SHOTGUN SPRINGS EWP EASEMENT #668D430700FCM. REQ 16-213. FUND 10XXWRPGF49000SI0000. BOC 3216. | $50K |
| Aug 22, 2017 | General Services AdministrationPBS R8 ACQUISITION MANAGEMENT DIVISION | 47PJ0017C0028 | 236220 | IGF::OT::IGF FOUNTAIN FILTRATION SYSTEM INSTALLATION FOR JAMES V. HANSEN FEDERAL BUILDING 324 25TH STREET OGDEN, UT | $25K |
| Aug 22, 2017 | Department of DefenseW0MM TOOELE ARMY DEPOT | W90WL517C0005 | 238990 | IGF::OT::IGF REPLACE DOORS BLDG. 8 | $785 |
| Aug 21, 2017 | General Services AdministrationPBS R8 ACQUISITION MANAGEMENT DIVISION | 47PJ0017C0029 | 236220 | IGF::OT::IGF OTHER FUNCTIONS, USDC REFLECTING POOL REPAIR CONSTRUCTION PROJECT; U.S. DISTRICT COURTHOUSE, 351 SOUTH WEST TEMPLE, SALT LAKE CITY, UT 84101. THE CONTRACTOR SHALL PROVIDE CONSTRUCTION SERVICES TO REPAIR 5 BROKEN PIPES THAT ARE PART OF THE PIPING SYSTEM SERVICING TWO WEST REFLECTING POOLS AT THE U.S. DISTRICT COURTHOUSE. CONTRACTOR MUST EXPOSE AND REPAIR THESE FIVE KNOWN PIPE BREAKS, PRESSURE TEST ALL POOL PIPING AFTER REPAIRS, REPAIR ALL PARTS OF THE POOL DAMAGED TO ACCESS BROKEN PIPES, AND PATCH THE POOL WATER BARRIER. THE CONTRACTOR MUST RETURN ALL POOL STONES TO THEIR NORMAL POSITIONS, RE-SET ALL REFLECTING POOL (AT BOTH WEST POOLS) WEIR STONES TO THEIR PROPER POSITIONS, AND SHIM TO THE PROPER HEIGHT AND SPACE EVENLY. CONTRACTOR MUST COORDINATE WITH GSA O&M CONTRACTOR THE STARTUP OF THE POOL OPERATION TO ENSURE PROPER FUNCTION. CONTRACTOR MUST DEVELOP A WINTERIZING PLAN THAT WILL HELP PROTECT AGAINST FUTURE WINTER BREAKS. | $21K |
| Aug 14, 2017 | Department of DefenseW7N3 USPFO ACTIVITY UT ARNG | ZG05 | 236220 | IGF::OT::IGF XP AND COMMAND POST DOORWAY, BUILDING 210 | $5K |
Get Alerted Before Northern Construction LLC's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free