Federal Contractor Profile
Northrop Grumman Corporation
$155B obligated·35,860 awards·23 agencies·229 NAICS
Federal Contracts
Showing contracts 6,201–6,250 of 57,657 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Aug 19, 2024 | Department of DefenseNAVSUP WEAPON SYSTEMS SUPPORT | N0038323PM024 | 336413 | EMBEDDED GLOBAL POS | $16K |
| Aug 19, 2024 | Department of DefenseNAVAL AIR WARFARE CENTER | N6893624F0552 | 541330 | MODIFICATION OF EQUIPMENT- AIRCRAFT COMPONENTS AND ACCESSORIES | $600K |
| Aug 19, 2024 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC20C0085 | 336419 | WFIRST INSTRUMENT CARRIER FABRICTAION | $7K |
| Aug 19, 2024 | Department of DefenseNAVSUP WEAPON SYSTEMS SUPPORT MECH | N0010424FPC1J | 333999 | CIRCUIT CARD ASSEMB | $53K |
| Aug 19, 2024 | Department of DefenseDLA AVIATION | SPE4A524F7660 | 336413 | 8510511429!CANOPY,FIXED | $168K |
| Aug 19, 2024 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | NNM07AA75C | 336415 | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS | $7.0M |
| Aug 19, 2024 | Department of DefenseDEFENSE INFORMATION SYSTEMS AGENCY | HC104723F0033 | 541512 | GLOBAL COMMAND AND CONTROL SYSTEM JOINT SOFTWARE SUSTAINMENT AND MODERNIZATION. MISSION CRITICAL ENGINEERING, SOFTWARE DEVELOPMENT, AND CYBER-SECURITY INFORMATION ASSURANCE SUPPORT. | $505K |
| Aug 19, 2024 | Department of DefenseNAVSUP WEAPON SYSTEMS SUPPORT | N0038323FWK00 | 334412 | COMPUTER,DIGITAL,MI | $77K |
| Aug 19, 2024 | Department of DefenseDLA AVIATION | SPE4A524F150L | 336413 | 8510827248!RACK,BAGGAGE,VEHICU | $21K |
| Aug 19, 2024 | Department of DefenseNAVSUP WEAPON SYSTEMS SUPPORT | N0038323FWK09 | 334412 | COMPUTER,DIGITAL,MI | $103K |
| Aug 19, 2024 | Department of DefenseIT CONTRACTING DIVISION - PL84 | HC108424F0302 | 334220 | KGV-72 DO 42 IN SUPPORT OF ARMY PEO C3T | $14K |
| Aug 19, 2024 | Department of DefenseNAVAL AIR SYSTEMS COMMAND | N0001924F0149 | 336414 | THIS IS THE FIRST TASK ORDER OF ORDERING YEAR 3 (CY 2024) FOR ILS & SUSTAINMENT. | $1.1M |
| Aug 16, 2024 | Department of DefenseDLA AVIATION | SPE4A724F023U | 332999 | 8510829839!SPACER,DRIVE GEAR,C | $4K |
| Aug 16, 2024 | Department of DefenseFA8214 AFNWC PZBB | FA821421F0017 | 541330 | MINUTEMAN III GUIDED MISSILE SAFE AND ARM TEST SET (GMSATS) REPAIR | $567K |
| Aug 16, 2024 | Department of DefenseDLA AVIATION - JACKSONVILLE, FL | SPEFA324P0206 | 488190 | 8510730794!STRUCTURE ASSY VERTICAL STABI | $2.6M |
| Aug 16, 2024 | Department of DefenseFA8214 AFNWC PZBB | FA821421F0015 | 541330 | MINUTEMAN III MISSILE ARM/DISARM SAFE AND ARM SWITCH REPAIR | $913K |
| Aug 16, 2024 | Department of DefenseIT CONTRACTING DIVISION - PL83 | HC102824F2001 | 541512 | COMMON NETWORK PLANNING SYSTEMS SUSTAINMENT & ENHANCEMENT | $1.7M |
| Aug 16, 2024 | Department of DefenseNIWC PACIFIC | N6600124P6344 | 513210 | REPLACE LICENSE ANNUAL MAINTENANCE | $13K |
| Aug 16, 2024 | Department of DefenseFA8538 AFSC PZAAB | FA853824F0077 | 334511 | REPAIR OF APN--241 APPLICABLE TO C--130 | $308K |
| Aug 16, 2024 | Department of DefenseDLA AVIATION | SPE4A524F149P | 335313 | 8510826807!LOCK,TURBINE ROTOR | $135K |
| Aug 16, 2024 | Department of DefenseFA8119 AFSC PZABC | FA811924F0078 | 336413 | REPAIR AND LOAD TEST OF RALF AND I R ADAPTER | $18K |
| Aug 16, 2024 | Department of DefenseFA8119 AFSC PZABC | FA811924C0004 | 336413 | B-2 STRUCTURAL FITTING | $32K |
| Aug 16, 2024 | Department of DefenseFA8523 AFLCMC ESKA | FA852324F0040 | 541330 | SUSTAINMENT FOR THE AN/ALQ--131 AND AN/ALQ--184 SYSTEMS | $929K |
| Aug 16, 2024 | Department of DefenseDLA AVIATION | SPE4A624F372M | 335313 | 8510830762!BUSHING,SLEEVE | $19K |
| Aug 16, 2024 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | NNH15CN76C | 541712 | IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO THE CRS PROGRAM, FLYING THREE VERY SUCCESSFUL PRESSURIZED CARGO RESUPPLY MISSIONS TO THE ISS, USING THE CYGNUS SPACECRAFT. ORBITAL ALSO SUCCESSFULLY DEVELOPED SPACECRAFT FOR SOLAR SYSTEM EXPLORATION TO INCLUDE THE CURRENTLY OPERATIONAL DAWN MISSION. THIS MISSION WAS LAUNCHED IN SEPTEMBER 2007, COMPLETED ITS RENDEZVOUS MISSION AT VESTA IN JULY 2012 AND IS EN ROUTE TO CERES IN EARLY 2015. WITH SPACE AGENCY BUDGETS CONTINUING TO BE TIGHT, EXPLORATION PLANS NEED TO EMPHASIZE EVOLUTION OF EXISTING SYSTEMS, WHERE COST AND SCHEDULE IS BETTER CONTROLLED, AND DEVELOPMENT RISK REDUCED. SPECIFICALLY, ELEMENTS OF THE CURRENT ISS, INCLUDING CYGNUS, CAN BE EVOLVED TO SUPPORT MORE DISTANT SPACE DESTINATIONS. TO SUPPORT THESE ENDEAVORS, ORBITAL CONTRIBUTES TO THE DEVELOPMENT AND PRODUCT IMPROVEMENT OF CYGNUS AND TO NEXTSTEP ACTIVITIES AND HAVE INVESTED IN THE COTS CRS PUBLIC-PRIVATE PARTNERSHIP ENDEAVOR. ORBITAL'S EXPLORATION AUGMENTATION MODULE (BAM) ARCHITECTURE USES A MODULAR, BUILDING BLOCK APPROACH THAT LEVERAGES THE CYGNUS SPACECRAFT TO EXPAND CISLUNAR AND LONG DURATION DEEP SPACE TRANSIT HABITATION CAPABILITIES AND TECHNOLOGIES CRITICAL TO NASAS LONG-TERM EXPLORATION GOALS. ORBITALS ARCHITECTURE CONCEPT BLENDS IN-PRODUCTION HARDWARE WITH ADAPTATION, EVOLUTION, PLANNING, AND FORWARD THINKING. CYGNUS WILL SERVE AS A MODULAR HABITAT AND TEST PLATFORM FOR QUALIFYING TECHNOLOGIES IN A DISTANT RETROGRADE ORBIT (DRO) OR IN A LOW EARTH ORBIT (LEO), EITHER WHILE ATTACHED TO THE ISS OR AS A FREE-FLYER. USING THE EXISTING, OPERATIONAL CYGNUS TO PERFORM THESE MISSIONS HAS THE ADVANTAGE OF DECREASING OVERALL DEVELOPMENT TIME AND COSTS, AND FREEING UP RESOURCES THAT WOULD BE SPENT ON DEVELOPING A SPACECRAFT TO FOCUS ON CULTIVATING MISSION ENABLING TECHNOLOGIES. THE GOAL IS TO HAVE A CYGNUS DERIVED EAM DEPLOYED IN CISLUNAR SPACE BEFORE 2020. THIS SPACECRAFT WILL BE THE FIRST BUILDING BLOCK IN SUPPORTING BOTH COMMERCIAL MARKETS AND GOVERNMENT OBJECTIVES. THE PROPOSED EFFORT FOR THIS NEXTSTEP BAA PHASE I, INVOLVES DEFINING AN EAM ARCHITECTURE AND CONCEPT OF OPERATIONS (CONOPS) THAT ADDRESSES COMMERCIAL MARKETS AND NASA EXPLORATION OBJECTIVES, TECHNOLOGY MATURATION PLANNING AND INFRASTRUCTURE DEVELOPMENT, AND TO IDENTIFY TECHNOLOGIES THAT CAN BE IMPLEMENTED AND DEMONSTRATED IN THE ISSILEO ENVIRONMENT WITHIN THE NEXT THREE YEARS. TO MATURE HABITATION TECHNOLOGIES, THE CONTRACTOR WILL IDENTIFY STATE OF THE ART (SOA) TECHNOLOGIES ACROSS NASA TECHNOLOGY AREAS (TAS) DEFINED IN THE NASA TECHNOLOGY ROADMAP. FOCUS WILL BE ON MATURATION OF THE FOLLOWING TECHNOLOGIES ENVIRONMENTAL CONTROL AND LIFE SUPPORT SYSTEMS ENVIRONMENTAL MONITORING SAFETY AND EMERGENCY RESPONSE AND HABITATION THERMAL CONTROL SYSTEMS AUTONOMOUS HABITATION SYSTEMS NAVIGATION SYSTEMS MANAGEMENT DOCKING AND CAPTURE MECHANISMS AND DEPLOYABLE HABITATION ELEMENTS | $30M |
| Aug 16, 2024 | Department of DefenseDEFENSE MICROELECTRONICS ACTIVITY | HQ072724F1401 | 541330 | ENGINEERING SERVICES | $120K |
| Aug 16, 2024 | Department of DefenseW6QK ACC-APG | W56KGY24F0036 | 334511 | TASK ORDER 03 FOR LRR-E SUSTAINMENT UNDER IDIQ W56KGY-20-D-0012 | $9.4M |
| Aug 16, 2024 | Department of DefenseDLA AVIATION | SPE4AX24F7176 | 336413 | 8510829686!PRINTED CIRCUIT BOA | $552 |
| Aug 16, 2024 | Department of DefenseDLA AVIATION | SPE4A024F0132 | 336413 | 8510830857!CAP,PROTECTIVE,DUST | $153K |
| Aug 16, 2024 | Department of DefenseDLA AVIATION | SPE4AX24F7197 | 336413 | 8510829873!PRINTED CIRCUIT BOA | $8K |
| Aug 16, 2024 | Department of DefenseDLA AVIATION | SPE4A524F088W | 334412 | 8510748015!CHASSIS,ELECTRICAL- | $14K |
| Aug 16, 2024 | Department of DefenseDLA AVIATION | SPE4A524F155E | 336413 | 8510829746!AILERON | $150 |
| Aug 16, 2024 | Department of DefenseDLA AVIATION | SPE4A524F156H | 336413 | 8510830047!FIREWALL,FUSELAGE | $600 |
| Aug 16, 2024 | Department of DefenseDLA AVIATION | SPE4A524F155B | 336413 | 8510829824!FIREWALL,FUSELAGE | $150 |
| Aug 16, 2024 | Department of DefenseW6QK ACC-APG DURHAM | W911NF24C0002 | 541715 | RESEARCH AND DEVELOPMENT SERVICES FOR BIT-FLIP SUPPRESSED FLUXONIUM GATES FOR HIGH-THRESHOLD ERROR CORRECTION | $1.5M |
| Aug 16, 2024 | Department of DefenseDLA AVIATION | SPE4A524F156Q | 336413 | 8510830107!BLANKET ASSEMBLY,FI | $150 |
| Aug 16, 2024 | Department of DefenseDLA AVIATION | SPE4A524F6525 | 336413 | 8510458214!FIREWALL,FUSELAGE | $43K |
| Aug 15, 2024 | Department of DefenseDLA AVIATION AT HUNTSVILLE, AL | SPRRA224F0136 | 333415 | AIR CONDITIONER | $3.6M |
| Aug 15, 2024 | Department of DefenseNAVAL AIR SYSTEMS COMMAND | N0001924F1850 | 541511 | NGNMPS/CMPC INTEGRATION AND SAFE | $3.9M |
| Aug 15, 2024 | Department of DefenseFA8578 AFLCMC WIKA | FA857823F0001 | 336411 | CONTRACTOR LOGISTICS SUPPORT AND SERVICES (CLS VII) FOR THE RG-4 GLOBAL HAWK PLATFORM. | $3.3M |
| Aug 15, 2024 | Department of DefenseDLA LAND AND MARITIME | SPE7L124F9459 | 332994 | 8510825909!HOUSING,MECHANICAL | $71K |
| Aug 15, 2024 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC21C0010 | 336415 | MARS ASCENT PROPULSION SYSTEM (MAPS) | $1.4M |
| Aug 15, 2024 | Department of DefenseDLA AVIATION | SPE4A524F149U | 336413 | 8510826921!FIREWALL,FUSELAGE | $4K |
| Aug 15, 2024 | Department of DefenseDLA AVIATION | SPE4A524P8871 | 335931 | 8510826451!CABLE ASSEMBLY,SPEC | $142K |
| Aug 15, 2024 | Department of DefenseFA8690 AFLCMC WIAK GLOBAL HAWK | FA869024CB001 | 541330 | SUSTAINMENT- CONTRACTOR LOGISTICS SUPPORT FOR JAPAN, REPUBLIC OF KOREA (ROK), AND NORTH ATLANTIC TREATY ORGANIZATION (NATO). | $52M |
| Aug 15, 2024 | Department of DefenseW6QK ACC-RSA | W58RGZ24F0172 | 334511 | TASK ORDER FOR JUPITER LASER | $1.9M |
| Aug 15, 2024 | Department of DefenseFA8540 AFLCMC ESKB | FA854024F0036 | 541330 | LITENING CATP TARGETING PODS | $6.4M |
| Aug 15, 2024 | Department of DefenseDLA AVIATION | SPE4A524F5728 | 336413 | 8510429849!CANOPY,MOVABLE | $102K |
| Aug 15, 2024 | Department of DefenseNAVAL AIR WARFARE CENTER | N6893623F0899 | 541330 | ENGINEERING SUPPORT FOR NEWEG | $33K |
| Aug 15, 2024 | Department of DefenseNAVAL AIR SYSTEMS COMMAND | N0001920F5008 | 336413 | INTEGRATED TEST TEAM (ITT) SUPPORT FOR THE E-2D | $1.2M |
Get Alerted Before Northrop Grumman Corporation's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free