Home/Contractors/Northrop Grumman Corporation/contracts

Federal Contractor Profile

Northrop Grumman Corporation

$155B obligated·35,860 awards·23 agencies·229 NAICS

Federal Contracts

Showing contracts 7,6517,700 of 57,657 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Apr 25, 2024Department of DefenseDLA AVIATIONSPE4A624F67453364138510382394!FIREWALL,FUSELAGE$59K
Apr 25, 2024Department of DefenseFA8818 ASSRD ACS TO SPC SSC/AAK-KTFA881821F0008336414MK21-2$2.3M
Apr 25, 2024Department of DefenseDEFENSE INFORMATION SYSTEMS AGENCYHC104723F0033541512GLOBAL COMMAND AND CONTROL SYSTEM JOINT SOFTWARE SUSTAINMENT AND MODERNIZATION. MISSION CRITICAL ENGINEERING, SOFTWARE DEVELOPMENT, AND CYBER-SECURITY INFORMATION ASSURANCE SUPPORT.$124K
Apr 25, 2024Department of DefenseFA8818 ASSRD ACS TO SPC SSC/AAK-KTFA881818F0010481212IGF::CT::IGF L174 LAUNCH SERVICE AND MISSION ASSURANCE SPT$2.9M
Apr 24, 2024Department of DefenseFA8807 MIL COMM AND PNT SSC/CGKFA880818C0002334220ENHANCED POLAR SYSTEM RECAPITALIZATION - TWO PAYLOADS (P6&P7)$1.8M
Apr 24, 2024Department of DefenseOFFICE OF NAVAL RESEARCHN0001423C1024541715EGI-M COMMON APPLICATION SPACE (CAS)$128K
Apr 24, 2024Department of DefenseDLA AVIATIONSPE4A524F90113364138510576640!TUBE,METALLIC$3K
Apr 24, 2024Department of DefenseMISSILE DEFENSE AGENCY (MDA)HQ014718F0021541511GF::OT::IGF THE SCOPE OF WORK FOR THIS AWARD WILL INCLUDE OPERATION OF THE MISSILE DEFENSE SPACE WARNING TOOL (MDST) TO SATISFY THE WARFIGHTER DEMAND FOR HIGH FIDELITY EARLY WARNING (EW) TRAINING TO INCLUDE REAL-WORLD OPERATIONAL BALLISTIC MISSILE DEFENSE SYSTEM (BMDS) VERIFICATION AND VALIDATION, AEGIS SHIPBOARD CONSOLE CERTIFICATION, AND WARFIGHTER EXERCISE SUPPORT. THIS INCLUDES PROVIDING EXERCISE SUPPORT TO COMBATANT COMMANDS, MILITARY SERVICES, INTERNATIONAL PARTNERS AND OTHER INTERESTED PARTICIPANTS BY PROVIDING EW THREAT DATA OVER THE OPERATIONAL INTEGRATED BROADCAST SERVICE/COMMON INTERACTIVE BROADCAST (IBS/CIB) AND OTHER TACTICAL INTERFACES.$300K
Apr 24, 2024Department of DefenseMISSILE DEFENSE AGENCY (MDA)HQ014719C0005541715TYPE 4 SUBSCALE TARGETS$8.7M
Apr 24, 2024Department of DefenseFA4890 HQ ACC AMICFA489023C0019541511705 COMBAT TRAINING SQUADRON, KIRTLAND AFB NM - INFRASTRUCTURE, DEVELOPMENT AND ENGINEERING (IDE) SUPPORT SERVICES. CONTRACTOR MAINTAINS THE 705 CTS INFORMATION TECHNOLOGY REQUIREMENTS FOR THE BATTLESPACE.$25K
Apr 24, 2024Department of DefenseFA8750 AFRL RIKFA875023F0501541330INTELLIGENCE SYSTEMS INFRASTRUCTURE, TOOLS, AND ENHANCEMENTS (INSITE)$1.5M
Apr 24, 2024Department of DefenseNAVAL AIR SYSTEMS COMMANDN0001920F0397336413E-2D MGUE RISK REDUCTION SUPPORT$200K
Apr 24, 2024Department of DefenseW6QK ACC-APG NATICKW911QY24F0024541330ANALYSIS & SUPPORT$5.5M
Apr 24, 2024Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZLFA865020C9315541715DEFENSE EXPERIMENTATION USING COMMERCIAL SPACE INTERNET$1.5M
Apr 24, 2024Department of DefenseMISSILE DEFENSE AGENCY (MDA)HQ014718F0022541511IGF::OT::IGF CONTRACT. THE PRIMARY PURPOSE OF THIS TASK ORDER IS TO IDENTIFY AND OPERATIONALIZE OVERHEAD PERSISTENT INFRARED (OPIR) AND OTHER SENSOR EXPLOITATION CAPABILITIES WHICH PROVIDE EARLY INTERCEPT OPPORTUNITIES AND INCREASE RAID HANDLING OF THE BALLISTIC MISSILE DEFENSE SYSTEM (BMDS). THE DEVELOPED CAPABILITIES WILL BE INTEGRATED WITH THE COMMAND AND CONTROL, BATTLE MANAGEMENT, AND COMMUNICATIONS (C2BMC) PROGRAM OF RECORD AS WELL AS TO PERFORM DISCRETE EXPERIMENTATION AND DEVELOPMENT OF RELATED ACTIVITIES IN SUPPORT OF THE OVERALL MISSION.$105K
Apr 23, 2024Department of DefenseW6QK ACC-RSAW31P4Q22F0031336414INTEGRATED BATTLE COMMAND SYSTEM (IBCS) HARDWARE LOW RATE INITIAL PRODUCTION/FULL RATE PRODUCTION (LRIP/FRP).$47M
Apr 23, 2024Department of DefenseFA8539 AFSC PZABAFA853924F0001811219REPAIR AND SUSTAINMENT OF THE RQ-4 GLOBAL HAWK AND MQ-4C TRITON SYSTEMS$4.0M
Apr 23, 2024Department of DefenseFA8818 ASSRD ACS TO SPC SSC/AAK-KTFA881821F0015336415INCREMENTAL FUNDING$761K
Apr 23, 2024Department of DefenseNAVAL AIR SYSTEMS COMMANDN0001923C0001334511APR-39 D(V)2 RWR PRODUCTION PROCUREMENT$9.1M
Apr 23, 2024Department of DefenseNAVSUP WEAPON SYSTEMS SUPPORT MECHN0010424FPC0Z333999CIRCUIT CARD ASSEMB$16K
Apr 23, 2024Department of DefenseNAVSUP WEAPON SYSTEMS SUPPORTN0038323FS50R336413PAM,AIRCRAFT,MATERI$68K
Apr 23, 2024Department of DefenseNAVAL AIR SYSTEMS COMMANDN0001922F0910336413FULL SCALE FATIGUE TEST$2.4M
Apr 23, 2024Department of DefenseDLA AVIATIONSPE4AX24F00253364138510187829!FORMER,AIRCRAFT$127K
Apr 23, 2024Department of DefenseNAVSEA HQN0002420F6200334511BPS-16 ENGINEERING&TECHNICAL SERVICES$575K
Apr 23, 2024Department of DefenseNAVSUP WEAPON SYSTEMS SUPPORTN0038323F0S53336413POWER SUPPLY$64K
Apr 22, 2024National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTERNNH15CN76C541712IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO THE CRS PROGRAM, FLYING THREE VERY SUCCESSFUL PRESSURIZED CARGO RESUPPLY MISSIONS TO THE ISS, USING THE CYGNUS SPACECRAFT. ORBITAL ALSO SUCCESSFULLY DEVELOPED SPACECRAFT FOR SOLAR SYSTEM EXPLORATION TO INCLUDE THE CURRENTLY OPERATIONAL DAWN MISSION. THIS MISSION WAS LAUNCHED IN SEPTEMBER 2007, COMPLETED ITS RENDEZVOUS MISSION AT VESTA IN JULY 2012 AND IS EN ROUTE TO CERES IN EARLY 2015. WITH SPACE AGENCY BUDGETS CONTINUING TO BE TIGHT, EXPLORATION PLANS NEED TO EMPHASIZE EVOLUTION OF EXISTING SYSTEMS, WHERE COST AND SCHEDULE IS BETTER CONTROLLED, AND DEVELOPMENT RISK REDUCED. SPECIFICALLY, ELEMENTS OF THE CURRENT ISS, INCLUDING CYGNUS, CAN BE EVOLVED TO SUPPORT MORE DISTANT SPACE DESTINATIONS. TO SUPPORT THESE ENDEAVORS, ORBITAL CONTRIBUTES TO THE DEVELOPMENT AND PRODUCT IMPROVEMENT OF CYGNUS AND TO NEXTSTEP ACTIVITIES AND HAVE INVESTED IN THE COTS CRS PUBLIC-PRIVATE PARTNERSHIP ENDEAVOR. ORBITAL'S EXPLORATION AUGMENTATION MODULE (BAM) ARCHITECTURE USES A MODULAR, BUILDING BLOCK APPROACH THAT LEVERAGES THE CYGNUS SPACECRAFT TO EXPAND CISLUNAR AND LONG DURATION DEEP SPACE TRANSIT HABITATION CAPABILITIES AND TECHNOLOGIES CRITICAL TO NASAS LONG-TERM EXPLORATION GOALS. ORBITALS ARCHITECTURE CONCEPT BLENDS IN-PRODUCTION HARDWARE WITH ADAPTATION, EVOLUTION, PLANNING, AND FORWARD THINKING. CYGNUS WILL SERVE AS A MODULAR HABITAT AND TEST PLATFORM FOR QUALIFYING TECHNOLOGIES IN A DISTANT RETROGRADE ORBIT (DRO) OR IN A LOW EARTH ORBIT (LEO), EITHER WHILE ATTACHED TO THE ISS OR AS A FREE-FLYER. USING THE EXISTING, OPERATIONAL CYGNUS TO PERFORM THESE MISSIONS HAS THE ADVANTAGE OF DECREASING OVERALL DEVELOPMENT TIME AND COSTS, AND FREEING UP RESOURCES THAT WOULD BE SPENT ON DEVELOPING A SPACECRAFT TO FOCUS ON CULTIVATING MISSION ENABLING TECHNOLOGIES. THE GOAL IS TO HAVE A CYGNUS DERIVED EAM DEPLOYED IN CISLUNAR SPACE BEFORE 2020. THIS SPACECRAFT WILL BE THE FIRST BUILDING BLOCK IN SUPPORTING BOTH COMMERCIAL MARKETS AND GOVERNMENT OBJECTIVES. THE PROPOSED EFFORT FOR THIS NEXTSTEP BAA PHASE I, INVOLVES DEFINING AN EAM ARCHITECTURE AND CONCEPT OF OPERATIONS (CONOPS) THAT ADDRESSES COMMERCIAL MARKETS AND NASA EXPLORATION OBJECTIVES, TECHNOLOGY MATURATION PLANNING AND INFRASTRUCTURE DEVELOPMENT, AND TO IDENTIFY TECHNOLOGIES THAT CAN BE IMPLEMENTED AND DEMONSTRATED IN THE ISSILEO ENVIRONMENT WITHIN THE NEXT THREE YEARS. TO MATURE HABITATION TECHNOLOGIES, THE CONTRACTOR WILL IDENTIFY STATE OF THE ART (SOA) TECHNOLOGIES ACROSS NASA TECHNOLOGY AREAS (TAS) DEFINED IN THE NASA TECHNOLOGY ROADMAP. FOCUS WILL BE ON MATURATION OF THE FOLLOWING TECHNOLOGIES ENVIRONMENTAL CONTROL AND LIFE SUPPORT SYSTEMS ENVIRONMENTAL MONITORING SAFETY AND EMERGENCY RESPONSE AND HABITATION THERMAL CONTROL SYSTEMS AUTONOMOUS HABITATION SYSTEMS NAVIGATION SYSTEMS MANAGEMENT DOCKING AND CAPTURE MECHANISMS AND DEPLOYABLE HABITATION ELEMENTS$370K
Apr 22, 2024Department of DefenseNAVAL AIR WARFARE CENTERN6893623F0899541330ENGINEERING SUPPORT FOR NEWEG$100K
Apr 22, 2024Department of DefenseNAVAL AIR SYSTEMS COMMANDN0001921F0362336413UA B10 PRESERVATION AND STORAGE$433K
Apr 22, 2024Department of DefenseNAVAL AIR WARFARE CENTERN6893624F0241541330MODIFICATION OF EQUIPMENT- AIRCRAFT COMPONENTS AND ACCESSORIES$1.6M
Apr 22, 2024Department of DefenseFA8110 AFLCMC WBK-2 B-2FA811023F0003336411B-2 SOFTWARE SUSTAINMENT AND LABORATORY SUPPORT.$31M
Apr 22, 2024Department of DefenseNAVSUP WEAPON SYSTEMS SUPPORTN0038324FV40H336413GLOBAL POSITIONING$40K
Apr 22, 2024Department of DefenseNAVSUP WEAPON SYSTEMS SUPPORTN0038324FV40G336413ANTENNA$75K
Apr 22, 2024Department of DefenseFA8576 AFLCMC ESKCFA857624F0022334511EMBEDDED GLOBAL POSITIONING SYSTEM / INERTIAL NAVIGATION SYSTEM (EGI), LN-100 REPAIR AND RETURN$51K
Apr 22, 2024Department of DefenseNAVAL AIR WARFARE CENTERN6893624F0149541330ENGINEERING SERVICES FOR ELECTRONIC WARFARE TACTICAL INFORMATION AND REPORT MANAGEMENT SYSTEM$300K
Apr 22, 2024Department of DefenseDLA LAND AND MARITIMESPE7L424P13833329948510586336!BOLT,BREECH$793K
Apr 22, 2024Department of DefenseCOMMANDERM6785419C0043334511G/ATOR GAN FRP LOT 1 QTY 4$167M
Apr 22, 2024Department of DefenseDLA AVIATIONSPE4A524F91753364138510587703!STABILIZER,HORIZONT$450
Apr 22, 2024Department of DefenseDLA LAND AND MARITIMESPE7L124F63213329948510585702!TRACK ASSEMBLY,AFT$93K
Apr 22, 2024Department of DefenseFA8616 AFLCMC WBZK B2FA861623F1001336411B-2 ESDO 23-25$5.8M
Apr 21, 2024Department of DefenseDLA AVIATIONSPE4A124P11293364138510583240!FILTER,COUPLER,AIRC$114K
Apr 21, 2024Department of DefenseDLA AVIATIONSPE4A124P11283364138510583148!FILTER,COUPLER,AIRC$127K
Apr 19, 2024Department of DefenseNAVAL AIR SYSTEMS COMMANDN0001921F0889336413JAPAN E-2C/E-2D CY21 ISS & TECH SUPPORT$12M
Apr 19, 2024National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM07AA75C336415FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS$30M
Apr 19, 2024Department of DefensePAE STRATEGIC SYSTEMS PROGRAMSN0003019C0015541330UK09 DREADNOUGHT HARDWARE PRODUCTION$2.6M
Apr 19, 2024Department of DefenseDLA AVIATIONSPE4A524F90763353138510580453!GASKET$5K
Apr 19, 2024Department of DefenseDLA LAND AND MARITIMESPE7M024F00473353138510583600!WASHER,LOCK$9K
Apr 19, 2024National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC21F0031488190PROVIDE AIRCRAFT AND GROUND CONTROL STATION (GCS) SPARE PARTS AND PROVIDE ENGINEERING, MAINTENANCE TECHNICIAN, LOGISTICS TECHNICIAN AND PILOT SUPPORT.$556K
Apr 19, 2024Department of DefensePAE STRATEGIC SYSTEMS PROGRAMSN0003019C0015541330UK09 DREADNOUGHT HARDWARE PRODUCTION$1.5M
Apr 19, 2024Department of DefenseDLA AVIATIONSPE4A524F88853345118510569179!BLOCK,TACKLE$440K
Apr 19, 2024Department of DefenseFA8214 AFNWC PZBBFA821421F0013541330GROUND SUBSYSTEMS SUPPORT CONTRACT (GSSC) 2.0 - STRATEGIC AUTOMATED COMMAND CONTROL SYSTEMS (SACCS) SUSTAINMENT$1.7M

Get Alerted Before Northrop Grumman Corporation's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free