Home/Contractors/Patriot Construction, LLC/contracts

Federal Contractor Profile

Patriot Construction, LLC

$271M obligated·507 awards·9 agencies·19 NAICS

Federal Contracts

Showing contracts 301350 of 890 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Mar 6, 2019Department of DefenseW071 ENDIST KANSAS CITYW912DQ19F4020236220HENRY DRIVE REPAIRS, FORT RILEY, KS$2.1M
Feb 22, 2019Department of Veterans Affairs245-NETWORK CONTRACT OFFICE 5 (36C245)36C24519N0223236220IGF::OT::IGF DC JOB ORDER CONTRACT IDIQ CONSTRUCTION SINGLE AWARD$101K
Feb 21, 2019Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200019236220IGF::OT::IGF OTHER FUNCTIONS: (REQ#4296969) (WR#C102177) DESIGN-BUILD SERVICES BUILDING 10 (CRC) TO PROVIDE LAMINATED GLASS TO ENCLOSE CRC ATRIUM, 2ND FLOOR SOUTH AND STAINLESS STEEL GRATING TO ENCLOSE 1ST FLOOR SOUTH HOWARD DROGIN HHSN292201500006ITASK ORDER READ AS FOLLOWS:TITLE: DESIGN-BUILD SERVICES BUILDING 10 (CRC) TO PROVIDE LAMINATED GLASS TO ENCLOSE CRC ATRIUM, 2ND FLOOR SOUTH AND STAINLESS STEEL GRATING TO ENCLOSE 1ST FLOOR SOUTH DESIGN SUBMITTALS: THE DESIGN PROCESS CAN BE FAST TRACKED. THE DBC SHALL DELIVER TWO (2) COMPLETE DESIGN SUBMISSIONS AS FOLLOWS: 95% CONSTRUCTION DOCUMENTS, AND 100% (FINAL) CONSTRUCTION DOCUMENTS. A. CONSTRUCTION DOCUMENTS 95% PHASE CONSTRUCTION DOCUMENTS CONSTITUTING 95% OF DESIGN COMPLETION CONSIST OF ALL ITEMS REQUIRED DURING CONSTRUCTION. IF ALL REVIEW COMMENTS CANNOT BE SATISFACTORILY ANSWERED AT THE 95% SUBMISSION, THEN A 95% REV.1 SHALL BE ISSUED. THE 100% SUBMISSION SHALL INCORPORATE ALL COMMENTS AND SHALL BE THE STAMPED CONSTRUCTION DOCUMENTS ONLY. 1. ALL DRAWINGS, SPECIFICATIONS, CALCULATIONS AND REPORTS SHALL BE INCORPORATED INCLUDING ALL PREVIOUSLY ACCEPTED AND RECONCILED DESIGN REVIEW COMMENTS. THE DBC SHALL PROVIDE ELECTRONIC COPY OF SPECIFICATIONS ENGINEERING CALCULATIONS, STUDIES AND REPORTS, AND OTHER PERTINENT INFORMATION REQUIRED BY CONTRACT (SEE APPROPRIATE SECTION FOR REQUIRED DELIVERABLES). 2. SEE NIH DRM FOR DETAILED REQUIREMENTS FOR THIS SUBMITTAL PHASE. B. CONSTRUCTION DOCUMENTS 100% PHASE (FINAL) 1. THE FINAL AE SEALED AND SIGNED CONSTRUCTION DOCUMENTS (PERMIT SET) SHALL BE THE 100% CONSTRUCTION DOCUMENTS INCORPORATING ALL RECONCILED REVIEW COMMENTS, REPRESENTING COMPLETION OF ALL DESIGN WORK. 2. SEE NIH DRM FOR DETAILED REQUIREMENTS FOR THIS SUBMITTAL PHASE.CONSTRUCTION: 1. PROVIDE MATERIAL, LABOR AND EQUIPMENT TO COMPLETE SELECTIVE DEMO FOR EXISTING NON-STRUCTURAL ELEMENTS WITHIN THE PROJECT SITE AS INDICATED WITHIN THE CONTRACT DRAWINGS. 2. EXISTING CAMERAS LOCATED AT THE ELEVATOR LOBBY ON THE 2ND FLOOR WILL BE REQUIRED TO BE RELOCATED. 3. COORDINATE AND CONSTRUCT TEMPORARY PLASTIC CONSTRUCTION WALLS AS NECESSARY FOR OCCUPANTS SURROUNDING THE AREA OF CONSTRUCTION HAVE ADEQUATE MEANS OF EGRESS AT ALL TIMES. 4. EXISTING FINISHES WILL BE REPAIRED AS NECESSARY. 5. RELOCATE EXISTING SPRINKLER HEADS THROUGHOUT THE CONSTRUCTION AREA TO MEET THE MINIMUM COVERAGE IN ACCORDANCE WITH NFPA-13. ALL HEADS ARE TO BE LOCATED WITHIN THE CENTER OF THE TILES. POP: WORK TO BE PERFORMED: NTP TO 05/20/2017 TASK ORDER: NTP TO 08/24/2017DELIVER TO: NIH CAMPUS PRODUCT SERVICE CODE: YIJZPRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGSCAN 8025829 NIAID OD OFC DIRTAS::75-16-0886::TAS 08028520161DA0PERFORMANCE CONSTITUTES ACCEPTANCE$9K
Feb 19, 2019Department of Health and Human ServicesNIH A E CONSTRUCTION75N99019F00059236220C106957 TITLE: MULTI-TIER, FIXED PRICE, MULTIPLE AWARD CONTRACT, IDIQ FOR CONSTRUCTION, DESIGN/BUILD, ALTERATION AND REPAIRS PURPOSE: REPLACE VALVE VAULT 60 TRANSFORMER/BREAKER AMIR ABDELSALAM$26K
Feb 15, 2019Department of DefenseW6QK ACC-APG DIRW56ZTN19F0013236220THE PURPOSE OF THIS TASK ORDER IS TO CONSTRUCT AND INSTALL A BRONZE FALLEN SOLDIER STATUE.$32K
Feb 15, 2019Department of DefenseW074 ENDIST MOBILEW9127818F0796236220OPTION 10$15K
Feb 8, 2019Department of DefenseW6QK ACC-APG DIRW56ZTN19F0013236220THE PURPOSE OF THIS TASK ORDER IS TO CONSTRUCT AND INSTALL A BRONZE FALLEN SOLDIER STATUE.$70K
Feb 7, 2019Department of DefenseW6QK ACC-APG DIRW56ZTN19F0032236220THE PURPOSE OF THIS TASK ORDER IS TO FUND THE CONSTRUCTION OF THE LIVING LEGACY FOREST REFLECTION PAVILION ON ABERDEEN PROVING GROUND, MD.$879K
Jan 31, 2019Department of Veterans Affairs255-NETWORK CONTRACT OFFICE 15 (36C255)36C25518N2826236220IGF::OT::IGF NCO 15 JOC IDIQ CONTRACT - LEAVENWORTH$106K
Jan 31, 2019Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200053236220IGF::OT::IGF OTHER FUNCTIONS: (REQ#4667003)(WR#C104701) DESIGN BUILD SERVICES - CONVERT SUPPLY ROOM TO OFFICE, BUILDING 31, SUITE 2B50$5K
Jan 30, 2019Department of Health and Human ServicesNIH A E CONSTRUCTION75N99018F00064236220IGF::OT::IGF - ("OTHER FUNCTIONS") C105045 - DESIGN AND CONSTRUCTION OF ROOMS 8D41, 8D42, 8D54 AND 8D57. DESIGN ONLY OF ROOMS 8D43, 8D47, 8D47 AND THE G-WING CORRIDOR, BLDG. 10, NIH, BETHESDA, MD. - CHRIS ABANGMA THE CONTRACTOR SHALL PROVIDE THE LABOR, MATERIALS, EQUIPMENT, AND SUPERVISION TO ACCOMPLISH THE FOLLOWING: BASE: DESIGN AND CONSTRUCTION OF ROOMS 8D41, 8D42, 8D54 AND 8D57. DESIGN ONLY OF ROOMS 8D43, 8D47, 8D47 AND THE G-WING CORRIDOR. $524,082.83 OPTION 1: CONSTRUCTION ONLY OF ROOMS 8D43, 8D47, 8D51 AND THE G-WING CORRIDOR. $539,755.59 THIS OPTION WILL BE AWARDED WITH THE BASE OF THIS TASK ORDER. UNSOLICITED OPTIONS OPTION 1: FURNITURE DESIGN SERVICES FROM LSY. $7,857.00 THIS OPTION IS NOT ACCEPTED AND WILL NOT BE EXERCISED. OPTION 2: ADDITIONAL PCAS FROM LSY. $6,246.00 THIS OPTION WILL BE AWARDED WITH THE BASE OF THIS TASK ORDER. POP: TASK: 09/28/2018 - 11/15/2019 ORDER: 09/28/2018 - 03/15/2020 PRICE: BASE: $524,082.83 OPTION 1: $539,755.59 OPTION 2: $6,246.00 TOTAL: $1,070,084.42 DELIVER TO: NIH CAMPUS, BLDG. 10, BETHMC PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8035487, NHGRI TAS::75 8 0891::TAS 08029120181DA0 DUNS # 829353106 FAR 52.211-10 - COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR1984) THE CONTRACTOR SHALL BE REQUIRED TO (A) COMMENCE WORK UNDER THIS CONTRACT WITHIN 5 (FIVE) CALENDAR DAYS AFTER THE DATE THE CONTRACTOR RECEIVES THE NOTICE TO PROCEED, (B) PROSECUTE THE WORK DILIGENTLY, AND (C) COMPLETE THE ENTIRE WORK READY FOR USE NOT LATER THAN NOVEMBER 15, 2019. * THE TIME STATED FOR COMPLETION SHALL INCLUDE 10 DAYS FOR MOBILIZATION AND FINAL CLEANUP OF THE PREMISES. (END OF CLAUSE) ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$5K
Jan 29, 2019Department of Veterans Affairs245-NETWORK CONTRACT OFFICE 5 (36C245)36C24518N0128236220IGF::OT::IGF VISN 5 MULTIPLE AWARD CONSTRUCTION TASK ORDER CONTRACT OPTION YEAR 2$3K
Jan 24, 2019Department of DefenseW6QK ACC-APG DIRW91ZLK18F0046236220THIS TASK ORDER PROVIDES FUNDING FOR THE RENOVATION OF THE DIRECTORATE OF PUBLIC WORKS HEADQUARTERS. MATOC - OPTION PERIOD 4$241K
Jan 22, 2019Department of Veterans Affairs249-NETWORK CONTRACT OFFICE 9 (36C249)36C24918N0164236220IGF::OT::IGF VA TVHS MATOC OPTION YEAR 3 FOR PATRIOT CONSTRUCTION, LLC.$44K
Jan 18, 2019Department of Veterans Affairs255-NETWORK CONTRACT OFFICE 15 (36C255)36C25519N0129236220IGF::OT::IGF PROJECT 589-19-307 NCO 15 JOC IDIQ CONTRACT - KANSAS CITY$196K
Jan 16, 2019Department of Veterans Affairs249-NETWORK CONTRACT OFFICE 9 (36C249)VA24917J6002236220IGF::OT::IGF$43K
Jan 15, 2019Department of Veterans Affairs255-NETWORK CONTRACT OFFICE 15 (36C255)36C25518C0015236220IGF::OT::IGF 589-15-610- RENOVATE RESEARCH BUILDIN 15$9K
Jan 11, 2019Department of Veterans Affairs245-NETWORK CONTRACT OFFICE 5 (36C245)36C24518N3626236220IGF::OT::IGF MARINSBURG VAMC IDIQ JOC TASK 23$45K
Jan 10, 2019Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200015236220IGF::OT::IGF - 75 16 0886 - TASK ORDER - C102662 - DESIGN-BUILD MRI LAB RENOVATION, BLDG. 49, NINDS -AND C103591 CONSTRUCTION SERVICES FOR ROOF HATCH&REPAIRS ASSOCIATED WITH C102662, BLDG 49, JAMES NG.$35K
Jan 9, 2019Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200040236220IGF::OT::IGF - ("OTHER FUNCTIONS") C104473 - CONSTRUCTION SERVICES TO RENOVATE FIGG LABS BUILDING 10, 5A01, 5A01, 5A06, 5A07, 5A08, 5A09, 5A10,&5A12, NIH, BETHESDA, MD. - CF LIN THE CONTRACTOR SHALL PROVIDE THE LABOR, MATERIALS, EQUIPMENT, AND SUPERVISION TO ACCOMPLISH THE FOLLOWING: BASE: CONSTRUCTION SERVICES TO RENOVATE FIGG LABS BUILDING 10, 5A01, 5A01, 5A06, 5A07, 5A08, 5A09, 5A10,&5A12. $931,860.11 OPTION 1: PHASE 2 HAZMAT ABATEMENT FOR ASBESTOS AND MERCURY. $38,055.79 THIS OPTION WILL NOT BE EXERCISED WITH TASK ORDER. OPTION 2: PHASE 3 HAZMAT ABATEMENT FOR ASBESTOS AND MERCURY. $27,354.78 THIS OPTION WILL NOT BE EXERCISED WITH TASK ORDER. OPTION 3: PHASE 4 HAZMAT ABATEMENT FOR ASBESTOS AND MERCURY. $31.858.50 THIS OPTION WILL NOT BE EXERCISED WITH TASK ORDER. OPTIONS TO THIS TASK ORDER WILL ONLY BE EXECUTED IF NIH DETERMINES THAT THE WORK IS NEEDED. THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE THE OPTIONS THROUGH A UNILATERAL MODIFICATION AT ITS OWN DISCRETION. POP: TASK: 09/15/2017 - 06/15/2018 ORDER 09/15/2017 - 09/15/2018 PRICE: BASE TASK ORDER: $931,860.11 DELIVER TO: NIH CAMPUS, BLDG. 10, BETHMC PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8028827, ORF TAS::75 7/1 0838::TAS 08023820175DB0 DUNS # 829353106 FAR 52.211-10 - COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR1984) THE CONTRACTOR SHALL BE REQUIRED TO (A) COMMENCE WORK UNDER THIS CONTRACT WITHIN 5 (FIVE) CALENDAR DAYS AFTER THE DATE THE CONTRACTOR RECEIVES THE NOTICE TO PROCEED, (B) PROSECUTE THE WORK DILIGENTLY, AND (C) COMPLETE THE ENTIRE WORK READY FOR USE NOT LATER THAN MAY 31, 2018. * THE TIME STATED FOR COMPLETION SHALL INCLUDE 10 DAYS FOR MOBILIZATION AND FINAL CLEANUP OF THE PREMISES. (END OF CLAUSE) ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$22K
Jan 9, 2019Department of DefenseW6QK ACC-APG DIRW56ZTN18F0054236220THE PURPOSE OF THIS TASK ORDER IS FOR THE RENOVATION OF THE RESTROOMS IN BUILDING 2342.$120K
Jan 4, 2019Department of DefenseW071 ENDIST KANSAS CITYW912DQ17F4013236220IGF::OT::IGF THE ARMY CORPS OF ENGINEERS AWARDS A CONSTRUCTION FIRM-FIXED-PRICE DESIGN-BID-BUILD TASK ORDER FOR THE CONVERT HISTORICAL WWII BUILDING 2101 AT FORT LEONARD WOOD, MO.$1K
Jan 2, 2019Department of DefenseW6QK ACC-APG DIRW56ZTN19F0021236220THIS TASK ORDER IS FOR THE CONVERSION AND REPAIR OF THE ADMINISTRATIVE OFFICES IN BUILDING 310.$2.0M
Dec 31, 2018Department of Veterans Affairs255-NETWORK CONTRACT OFFICE 15 (36C255)36C25518C0015236220IGF::OT::IGF 589-15-610- RENOVATE RESEARCH BUILDIN 15$32K
Dec 20, 2018Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200019236220IGF::OT::IGF OTHER FUNCTIONS: (REQ#4296969) (WR#C102177) DESIGN-BUILD SERVICES BUILDING 10 (CRC) TO PROVIDE LAMINATED GLASS TO ENCLOSE CRC ATRIUM, 2ND FLOOR SOUTH AND STAINLESS STEEL GRATING TO ENCLOSE 1ST FLOOR SOUTH HOWARD DROGIN HHSN292201500006ITASK ORDER READ AS FOLLOWS:TITLE: DESIGN-BUILD SERVICES BUILDING 10 (CRC) TO PROVIDE LAMINATED GLASS TO ENCLOSE CRC ATRIUM, 2ND FLOOR SOUTH AND STAINLESS STEEL GRATING TO ENCLOSE 1ST FLOOR SOUTH DESIGN SUBMITTALS: THE DESIGN PROCESS CAN BE FAST TRACKED. THE DBC SHALL DELIVER TWO (2) COMPLETE DESIGN SUBMISSIONS AS FOLLOWS: 95% CONSTRUCTION DOCUMENTS, AND 100% (FINAL) CONSTRUCTION DOCUMENTS. A. CONSTRUCTION DOCUMENTS 95% PHASE CONSTRUCTION DOCUMENTS CONSTITUTING 95% OF DESIGN COMPLETION CONSIST OF ALL ITEMS REQUIRED DURING CONSTRUCTION. IF ALL REVIEW COMMENTS CANNOT BE SATISFACTORILY ANSWERED AT THE 95% SUBMISSION, THEN A 95% REV.1 SHALL BE ISSUED. THE 100% SUBMISSION SHALL INCORPORATE ALL COMMENTS AND SHALL BE THE STAMPED CONSTRUCTION DOCUMENTS ONLY. 1. ALL DRAWINGS, SPECIFICATIONS, CALCULATIONS AND REPORTS SHALL BE INCORPORATED INCLUDING ALL PREVIOUSLY ACCEPTED AND RECONCILED DESIGN REVIEW COMMENTS. THE DBC SHALL PROVIDE ELECTRONIC COPY OF SPECIFICATIONS ENGINEERING CALCULATIONS, STUDIES AND REPORTS, AND OTHER PERTINENT INFORMATION REQUIRED BY CONTRACT (SEE APPROPRIATE SECTION FOR REQUIRED DELIVERABLES). 2. SEE NIH DRM FOR DETAILED REQUIREMENTS FOR THIS SUBMITTAL PHASE. B. CONSTRUCTION DOCUMENTS 100% PHASE (FINAL) 1. THE FINAL AE SEALED AND SIGNED CONSTRUCTION DOCUMENTS (PERMIT SET) SHALL BE THE 100% CONSTRUCTION DOCUMENTS INCORPORATING ALL RECONCILED REVIEW COMMENTS, REPRESENTING COMPLETION OF ALL DESIGN WORK. 2. SEE NIH DRM FOR DETAILED REQUIREMENTS FOR THIS SUBMITTAL PHASE.CONSTRUCTION: 1. PROVIDE MATERIAL, LABOR AND EQUIPMENT TO COMPLETE SELECTIVE DEMO FOR EXISTING NON-STRUCTURAL ELEMENTS WITHIN THE PROJECT SITE AS INDICATED WITHIN THE CONTRACT DRAWINGS. 2. EXISTING CAMERAS LOCATED AT THE ELEVATOR LOBBY ON THE 2ND FLOOR WILL BE REQUIRED TO BE RELOCATED. 3. COORDINATE AND CONSTRUCT TEMPORARY PLASTIC CONSTRUCTION WALLS AS NECESSARY FOR OCCUPANTS SURROUNDING THE AREA OF CONSTRUCTION HAVE ADEQUATE MEANS OF EGRESS AT ALL TIMES. 4. EXISTING FINISHES WILL BE REPAIRED AS NECESSARY. 5. RELOCATE EXISTING SPRINKLER HEADS THROUGHOUT THE CONSTRUCTION AREA TO MEET THE MINIMUM COVERAGE IN ACCORDANCE WITH NFPA-13. ALL HEADS ARE TO BE LOCATED WITHIN THE CENTER OF THE TILES. POP: WORK TO BE PERFORMED: NTP TO 05/20/2017 TASK ORDER: NTP TO 08/24/2017DELIVER TO: NIH CAMPUS PRODUCT SERVICE CODE: YIJZPRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGSCAN 8025829 NIAID OD OFC DIRTAS::75-16-0886::TAS 08028520161DA0PERFORMANCE CONSTITUTES ACCEPTANCE$46K
Dec 17, 2018Department of Veterans Affairs245-NETWORK CONTRACT OFFICE 5 (36C245)VA24517J0982236220IGF::OT::IGF DC JOB ORDER CONTRACT IDIQ CONSTRUCTION SINGLE AWARD$40K
Dec 13, 2018Department of Veterans Affairs245-NETWORK CONTRACT OFFICE 5 (36C245)VA24516J2543236220IGF::CL::IGF VISN 5 MULTIPLE AWARD CONSTRUCTION TASK ORDER CONTRACT$49K
Dec 13, 2018Department of DefenseW074 ENDIST MOBILEW9127817F0322236220IGF::OT::IGF REPLACE CONDENSATE RETURN TANK$141K
Dec 6, 2018Smithsonian InstitutionSMITHSONIAN INSTITUTION33330218FF0010437236220**IGF::OT::IGF** NPM: KITCHENETTE REFURBISHMENT.$15K
Dec 4, 2018Department of Veterans Affairs245-NETWORK CONTRACT OFFICE 5 (36C245)36C24518N3685236220IGF::OT::IGF MARINSBURG VAMC IDIQ JOC$15K
Dec 4, 2018Department of Veterans Affairs255-NETWORK CONTRACT OFFICE 15 (36C255)36C25518N2826236220IGF::OT::IGF NCO 15 JOC IDIQ CONTRACT - LEAVENWORTH$18K
Dec 3, 2018Department of DefenseW6QK ACC-APG DIRW56ZTN19F0013236220THE PURPOSE OF THIS TASK ORDER IS TO CONSTRUCT AND INSTALL A BRONZE FALLEN SOLDIER STATUE.$41K
Dec 3, 2018Department of DefenseW071 ENDIST KANSAS CITYW912DQ17F4013236220IGF::OT::IGF THE ARMY CORPS OF ENGINEERS AWARDS A CONSTRUCTION FIRM-FIXED-PRICE DESIGN-BID-BUILD TASK ORDER FOR THE CONVERT HISTORICAL WWII BUILDING 2101 AT FORT LEONARD WOOD, MO.$10K
Nov 27, 2018Department of DefenseW071 ENDIST KANSAS CITYW912DQ18F4003236220IGF::OT::IGF RENOVATION OF BUILDING 224 AT FORT LEAVENWORTH, KS$688
Nov 20, 2018Department of Veterans Affairs245-NETWORK CONTRACT OFFICE 5 (36C245)VA24517J0982236220IGF::OT::IGF DC JOB ORDER CONTRACT IDIQ CONSTRUCTION SINGLE AWARD$29K
Nov 13, 2018Department of DefenseW071 ENDIST KANSAS CITYW912DQ17F4013236220IGF::OT::IGF THE ARMY CORPS OF ENGINEERS AWARDS A CONSTRUCTION FIRM-FIXED-PRICE DESIGN-BID-BUILD TASK ORDER FOR THE CONVERT HISTORICAL WWII BUILDING 2101 AT FORT LEONARD WOOD, MO.$24K
Nov 8, 2018Department of DefenseW071 ENDIST KANSAS CITYW912DQ17F4013236220IGF::OT::IGF THE ARMY CORPS OF ENGINEERS AWARDS A CONSTRUCTION FIRM-FIXED-PRICE DESIGN-BID-BUILD TASK ORDER FOR THE CONVERT HISTORICAL WWII BUILDING 2101 AT FORT LEONARD WOOD, MO.$6K
Nov 7, 2018Department of Veterans Affairs255-NETWORK CONTRACT OFFICE 15 (36C255)36C25519N0044236220IGF::OT::IGF NCO 15 JOC IDIQ CONTRACT - KANSAS CITY$493K
Nov 7, 2018Department of DefenseW071 ENDIST KANSAS CITYW912DQ18F4003236220IGF::OT::IGF RENOVATION OF BUILDING 224 AT FORT LEAVENWORTH, KS$7K
Nov 2, 2018Department of Veterans Affairs255-NETWORK CONTRACT OFFICE 15 (36C255)36C25519N0050236220IGF::OT::IGF NCO 15 JOC IDIQ CONTRACT - KANSAS CITY$453K
Oct 26, 2018Department of DefenseW074 ENDIST MOBILEW9127817F0397236220IGF::OT::IGF MOLD REMEDIATION$141K
Oct 25, 2018Department of DefenseW071 ENDIST KANSAS CITYW912DQ18F4003236220IGF::OT::IGF RENOVATION OF BUILDING 224 AT FORT LEAVENWORTH, KS$3K
Oct 24, 2018Smithsonian InstitutionSMITHSONIAN INSTITUTION33330219FF0010006236220SHF REMOVE GARBER COLD STORAGE BOXES AND PAINT BOOTH.$185K
Oct 23, 2018Department of DefenseW2SD ENDIST NORFOLKW9123615C0050237110IGF::OT::IGF ARLINGTON NATIONAL CEMETERY - CONSTRUCTION - PHASE 6 WATERLINE REPLACEMENT PROJECT$300K
Oct 17, 2018Department of Veterans Affairs255-NETWORK CONTRACT OFFICE 15 (36C255)36C25519N0034236220IGF::OT::IGF NCO 15 JOC IDIQ CONTRACT - KANSAS CITY 589-18-300 - INSTALL SPS SINKS/CORRECT COMPLIANCE DEFICIENCIES$189K
Oct 12, 2018Department of Veterans Affairs255-NETWORK CONTRACT OFFICE 15 (36C255)36C25519N0028236220IGF::OT::IGF NCO 15 JOC IDIQ CONTRACT - KANSAS CITY$417K
Oct 11, 2018Department of DefenseW071 ENDIST KANSAS CITYW912DQ18F4003236220IGF::OT::IGF RENOVATION OF BUILDING 224 AT FORT LEAVENWORTH, KS$22K
Oct 9, 2018Department of DefenseW071 ENDIST KANSAS CITYW912DQ18F4003236220IGF::OT::IGF RENOVATION OF BUILDING 224 AT FORT LEAVENWORTH, KS$24K
Sep 30, 2018Department of DefenseW071 ENDIST KANSAS CITYW912DQ18F4014236220BLDG. 320 HISTORIC RENOVATION, AT FT. LEAVENWORTH, KS$9.9M
Sep 29, 2018Department of DefenseW074 ENDIST MOBILEW9127818F0830236220INSTALL HVAC IN HUB CLOSETS$1.1M

Get Alerted Before Patriot Construction, LLC's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free