Home/Contractors/Perini Management Services, INC./contracts

Federal Contractor Profile

Perini Management Services, INC.

$671M obligated·55 awards·3 agencies·6 NAICS

Federal Contracts

Showing contracts 251269 of 269 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Jul 12, 2016Department of the InteriorDSC CONTRACTING SERVICES DIVISIONINP15PD01278236210IGF::OT::IGF PROVIDE DESIGN BUILD SERVICES TO REPLACE FOUR FLOOD DAMAGED ELEVATORS AND REPAIR ESCALATORS AT ELLIS ISLAND, STATUE OF LIBERTY NATIONAL MONUMENT PMIS 195342$60K
Jul 1, 2016Department of the InteriorFWS NORTHEAST REGIONAL OFFICEINF15PD00003236210IGF::OT::IGF - TAS 14 0102 - HURRICANE SANDY - SALT MARSH RESTORATION AND ENHANCEMENT PROJECT AT SEATUCK, WERTHEIM, AND LIDO BEACH NATIONAL WILDLIFE REFUGES, LONG ISLAND, NEW YORK.$80K
Jun 21, 2016Department of the InteriorDSC CONTRACTING SERVICES DIVISIONINP15PD00776236210IGF::OT::IGF, OTHER, CONSTRUCTION, CARTER WOODSON HOME RESTORATION&STABILIZATION, NACE 159654 / 185127, SECTION 016700 P2$115K
May 23, 2016Department of the InteriorDSC CONTRACTING SERVICES DIVISIONINP15PD00776236210IGF::OT::IGF, OTHER, CONSTRUCTION, CARTER WOODSON HOME RESTORATION&STABILIZATION, NACE 159654 / 185127, SECTION 016700 P2$67K
May 16, 2016Department of the InteriorDSC CONTRACTING SERVICES DIVISIONINP15PD01278236210IGF::OT::IGF PROVIDE DESIGN BUILD SERVICES TO REPLACE FOUR FLOOD DAMAGED ELEVATORS AND REPAIR ESCALATORS AT ELLIS ISLAND, STATUE OF LIBERTY NATIONAL MONUMENT PMIS 195342$40K
Apr 26, 2016Department of the InteriorFWS NORTHEAST REGIONAL OFFICEINF14PD01692236210IGF::OT::IGF HURRICANE SANDY TAS 14-0102 LIVING SHORELINE WORK SMITH ISLAND, MARTIN NWR DESIGN AND CONSTRUCTION OF AREA 2 HURRICANE SANDY TAS 14-1612 LIVING SHORELINE WORK SMITH ISLAND, MARTIN NWR CONSTRUCTION OF AREA 1$43K
Apr 22, 2016Department of the InteriorDSC CONTRACTING SERVICES DIVISIONINP15PD00776236210IGF::OT::IGF, OTHER, CONSTRUCTION, CARTER WOODSON HOME RESTORATION&STABILIZATION, NACE 159654 / 185127, SECTION 016700 P2$113K
Mar 10, 2016Department of the InteriorDSC CONTRACTING SERVICES DIVISIONINP14PD00557236210IGF::OT::IGF STATUE OF LIBERTY NATIONAL MONUMENT AND ELLIS ISLAND, REPAIR DAMAGE TO MULTIPLE PARK BUILDINGS AND LANDSCAPES AT STATUE OF LIBERTY AND ELLIS ISLAND, HUDSON COUNTY, NJ AND NEW YORK COUNTY, NY, STLI-195342 MECHANICAL WORK WILL CONSISTING OF: 1) REMOVAL AND REPLACEMENT OF SEVERAL CHILLERS (EXISTING - TWO 500 TON AND ONE 750 TON, NEW - THREE 550 TON) AND APPURTENANCES 2) REMOVAL AND REPLACEMENT OF SEVERAL LARGE BOILERS (EXISTING - TWO 500 HP AND ONE 200 HP (SCOTCH MARINE), NEW - FIVE 6000 MBH (FLEXIBLE WATER TUBE STEAM BOILERS)) 3) REMOVAL AND REPLACEMENT OF PIPING NECESSARY TO RAISE CHILLERS AND BOILERS UP TO MEZZANINE LEVEL 4) REMOVAL AND REPLACEMENT OF ABOUT 30,000 SQUARE FEET OF DUCT WORK (16 SQUARE FT. AND DOWN) 5) PLACEMENT OF 9 AIR HANDLING UNITS (DOUBLE WALLED, GALVANIZED) 6) NEW (2 TO 3) HEATING AND VENTILATING UNITS B. ELECTRICAL WORK WILL CONSIST OF: 1) RELOCATING MEDIUM VOLTAGE (UP TO 13.2 KV AND 480 V) SWITCH GEAR FROM POWER HOUSE FIRST FLOOR TO SECOND FLOOR 2) RELOCATING ALL ELECTRICAL EQUIPMENT INCLUDING SWITCH BOARDS AND PANEL BOARDS (480 V AND 208 V) FROM BASEMENT OF MAIN IMMIGRATION BUILDING (MIB) TO NEW ELECTRICAL ROOMS ON FIRST FLOOR 3) REPLACING ALL ELECTRICAL WIRING, OUTLETS, CONDUIT, ETC. IN MIB BASEMENT (INCLUDING FIRE ALARM) 4) REPLACING 750 KW GENERATOR ONTO OUTSIDE PLATFORM C. STRUCTURAL WORK WILL CONSIST OF: 1) CONSTRUCTING A STEEL FRAMED MEZZANINE IN THE POWER HOUSE BUILDING TO SUPPORT CHILLERS, BOILERS, ETC. 2) CONSTRUCT EXTERIOR PLATFORM FOR NEW GENERATOR$39K
Feb 29, 2016Department of StateOFFICE OF ACQUISITION MGMT - MASAQMMA14F1124236220IGF::OT::IGF CONSTRUCUTION AND INSTALLATION OF HARDENED ALTERNATIVE TRAILER SYSTEMS$275K
Feb 25, 2016Department of StateOFFICE OF ACQUISITION MGMT - MASAQMMA14F1124236220IGF::OT::IGF CONSTRUCUTION AND INSTALLATION OF HARDENED ALTERNATIVE TRAILER SYSTEMS$133K
Feb 16, 2016Department of the InteriorDSC CONTRACTING SERVICES DIVISIONINP15PD00776236210IGF::OT::IGF, OTHER, CONSTRUCTION, CARTER WOODSON HOME RESTORATION&STABILIZATION, NACE 159654 / 185127, SECTION 016700 P2$28K
Feb 11, 2016Department of the InteriorDSC CONTRACTING SERVICES DIVISIONINP15PD00114236210IGF::OT::IGF CAVE-161439 - REPLACE OLD AND UNSAFE LIGHTING AND ELECTRICAL AT CARLSBAD CAVERNS NATIONAL PARK, EDDY COUNTY, CARLSBAD NEW MEXICO$181K
Jan 11, 2016Department of the InteriorDSC CONTRACTING SERVICES DIVISIONINP15PD00776236210IGF::OT::IGF, OTHER, CONSTRUCTION, CARTER WOODSON HOME RESTORATION&STABILIZATION, NACE 159654 / 185127, SECTION 016700 P2$23K
Dec 22, 2015Department of the InteriorDSC CONTRACTING SERVICES DIVISIONINP15PD00776236210IGF::OT::IGF, OTHER, CONSTRUCTION, CARTER WOODSON HOME RESTORATION&STABILIZATION, NACE 159654 / 185127, SECTION 016700 P2$101K
Dec 3, 2015Department of the InteriorDSC CONTRACTING SERVICES DIVISIONINP14PD00557236210IGF::OT::IGF STATUE OF LIBERTY NATIONAL MONUMENT AND ELLIS ISLAND, REPAIR DAMAGE TO MULTIPLE PARK BUILDINGS AND LANDSCAPES AT STATUE OF LIBERTY AND ELLIS ISLAND, HUDSON COUNTY, NJ AND NEW YORK COUNTY, NY, STLI-195342 MECHANICAL WORK WILL CONSISTING OF: 1) REMOVAL AND REPLACEMENT OF SEVERAL CHILLERS (EXISTING - TWO 500 TON AND ONE 750 TON, NEW - THREE 550 TON) AND APPURTENANCES 2) REMOVAL AND REPLACEMENT OF SEVERAL LARGE BOILERS (EXISTING - TWO 500 HP AND ONE 200 HP (SCOTCH MARINE), NEW - FIVE 6000 MBH (FLEXIBLE WATER TUBE STEAM BOILERS)) 3) REMOVAL AND REPLACEMENT OF PIPING NECESSARY TO RAISE CHILLERS AND BOILERS UP TO MEZZANINE LEVEL 4) REMOVAL AND REPLACEMENT OF ABOUT 30,000 SQUARE FEET OF DUCT WORK (16 SQUARE FT. AND DOWN) 5) PLACEMENT OF 9 AIR HANDLING UNITS (DOUBLE WALLED, GALVANIZED) 6) NEW (2 TO 3) HEATING AND VENTILATING UNITS B. ELECTRICAL WORK WILL CONSIST OF: 1) RELOCATING MEDIUM VOLTAGE (UP TO 13.2 KV AND 480 V) SWITCH GEAR FROM POWER HOUSE FIRST FLOOR TO SECOND FLOOR 2) RELOCATING ALL ELECTRICAL EQUIPMENT INCLUDING SWITCH BOARDS AND PANEL BOARDS (480 V AND 208 V) FROM BASEMENT OF MAIN IMMIGRATION BUILDING (MIB) TO NEW ELECTRICAL ROOMS ON FIRST FLOOR 3) REPLACING ALL ELECTRICAL WIRING, OUTLETS, CONDUIT, ETC. IN MIB BASEMENT (INCLUDING FIRE ALARM) 4) REPLACING 750 KW GENERATOR ONTO OUTSIDE PLATFORM C. STRUCTURAL WORK WILL CONSIST OF: 1) CONSTRUCTING A STEEL FRAMED MEZZANINE IN THE POWER HOUSE BUILDING TO SUPPORT CHILLERS, BOILERS, ETC. 2) CONSTRUCT EXTERIOR PLATFORM FOR NEW GENERATOR$99K
Nov 27, 2015Department of the InteriorDSC CONTRACTING SERVICES DIVISIONINP15PD00114236210IGF::OT::IGF CAVE-161439 - REPLACE OLD AND UNSAFE LIGHTING AND ELECTRICAL AT CARLSBAD CAVERNS NATIONAL PARK, EDDY COUNTY, CARLSBAD NEW MEXICO$24K
Nov 16, 2015Department of the InteriorDSC CONTRACTING SERVICES DIVISIONINP14PD00557236210IGF::OT::IGF STATUE OF LIBERTY NATIONAL MONUMENT AND ELLIS ISLAND, REPAIR DAMAGE TO MULTIPLE PARK BUILDINGS AND LANDSCAPES AT STATUE OF LIBERTY AND ELLIS ISLAND, HUDSON COUNTY, NJ AND NEW YORK COUNTY, NY, STLI-195342 MECHANICAL WORK WILL CONSISTING OF: 1) REMOVAL AND REPLACEMENT OF SEVERAL CHILLERS (EXISTING - TWO 500 TON AND ONE 750 TON, NEW - THREE 550 TON) AND APPURTENANCES 2) REMOVAL AND REPLACEMENT OF SEVERAL LARGE BOILERS (EXISTING - TWO 500 HP AND ONE 200 HP (SCOTCH MARINE), NEW - FIVE 6000 MBH (FLEXIBLE WATER TUBE STEAM BOILERS)) 3) REMOVAL AND REPLACEMENT OF PIPING NECESSARY TO RAISE CHILLERS AND BOILERS UP TO MEZZANINE LEVEL 4) REMOVAL AND REPLACEMENT OF ABOUT 30,000 SQUARE FEET OF DUCT WORK (16 SQUARE FT. AND DOWN) 5) PLACEMENT OF 9 AIR HANDLING UNITS (DOUBLE WALLED, GALVANIZED) 6) NEW (2 TO 3) HEATING AND VENTILATING UNITS B. ELECTRICAL WORK WILL CONSIST OF: 1) RELOCATING MEDIUM VOLTAGE (UP TO 13.2 KV AND 480 V) SWITCH GEAR FROM POWER HOUSE FIRST FLOOR TO SECOND FLOOR 2) RELOCATING ALL ELECTRICAL EQUIPMENT INCLUDING SWITCH BOARDS AND PANEL BOARDS (480 V AND 208 V) FROM BASEMENT OF MAIN IMMIGRATION BUILDING (MIB) TO NEW ELECTRICAL ROOMS ON FIRST FLOOR 3) REPLACING ALL ELECTRICAL WIRING, OUTLETS, CONDUIT, ETC. IN MIB BASEMENT (INCLUDING FIRE ALARM) 4) REPLACING 750 KW GENERATOR ONTO OUTSIDE PLATFORM C. STRUCTURAL WORK WILL CONSIST OF: 1) CONSTRUCTING A STEEL FRAMED MEZZANINE IN THE POWER HOUSE BUILDING TO SUPPORT CHILLERS, BOILERS, ETC. 2) CONSTRUCT EXTERIOR PLATFORM FOR NEW GENERATOR$196K
Nov 4, 2015Department of the InteriorDSC CONTRACTING SERVICES DIVISIONINP15PD00776236210IGF::OT::IGF, OTHER, CONSTRUCTION, CARTER WOODSON HOME RESTORATION&STABILIZATION, NACE 159654 / 185127, SECTION 016700 P2$101K
Oct 22, 2015Department of the InteriorCONTRACTING AND GENERAL SERVICES DIVINF15PD00003236210IGF::OT::IGF - TAS 14 0102 - HURRICANE SANDY - SALT MARSH RESTORATION AND ENHANCEMENT PROJECT AT SEATUCK, WERTHEIM, AND LIDO BEACH NATIONAL WILDLIFE REFUGES, LONG ISLAND, NEW YORK.$265K

Get Alerted Before Perini Management Services, INC.'s Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free