| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Feb 14, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH20F01264 | 238210 | CONDUCT SITE SURVEY AND DEVELOP SITE SPECIFIC DESIGN FOR FY21 FST INSTALLATIONS AT VARIOUS LOCATIONS PER CONTRACT AND ATTACHED SOW. | $9K |
| Feb 2, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH20F01242 | 238210 | CONDUCT SITE SURVEY AND DEVELOP SITE SPECIFIC DESIGN FOR FY21 FST INSTALLATIONS AT VARIOUS LOCATIONS PER CONTRACT AND ATTACHED SOW. | $17K |
| Feb 2, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH20F01268 | 238210 | CONDUCT SITE SURVEY AND DEVELOP SITE SPECIFIC DESIGN FOR FY21 FST INSTALLATIONS AT VARIOUS LOCATIONS PER CONTRACT AND ATTACHED SOW. | $3K |
| Feb 1, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21F00798 | 238210 | CONDUCT SITE SURVEY FOR THE FY22 ENGINE GENERATOR WITH SUBBASE TANK INSTALLATION PER CONTRACT AND ATTACHED SOW AT ALTON, IL (ALN ATCT) JCN: 1500395 | $26K |
| Feb 1, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH20F01266 | 238210 | CONDUCT SITE SURVEY AND DEVELOP SITE SPECIFIC DESIGN FOR FY21 FST INSTALLATIONS AT VARIOUS LOCATIONS PER CONTRACT AND ATTACHED SOW. | $3K |
| Feb 1, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21F00800 | 238210 | CONDUCT SITE SURVEY FOR THE FY22 ENGINE GENERATOR WITH SUBBASE TANK INSTALLATION PER CONTRACT AND ATTACHED SOW AT BLOOMINGTON, IL (BMIA ATCT) JCN: 1500452 | $32K |
| Jan 31, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH20F01269 | 238210 | CONDUCT SITE SURVEY AND DEVELOP SITE SPECIFIC DESIGN FOR FY21 FST INSTALLATIONS AT VARIOUS LOCATIONS PER CONTRACT AND ATTACHED SOW. | $27K |
| Dec 17, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH20F01267 | 238210 | CONDUCT SITE SURVEY AND DEVELOP SITE SPECIFIC DESIGN FOR FY21 FST INSTALLATIONS AT VARIOUS LOCATIONS PER CONTRACT AND ATTACHED SOW. | $11K |
| Dec 15, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH19F01375 | 238210 | CONDUCT SITE SURVEY FOR FST INSTALLATION AT LEXINGTON, KY (LEXB TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF AUGUST 2019** | $8K |
| Dec 10, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH19F01753 | 238210 | GREAT LAKES GROUP SITE SURVEY AND DESIGN FOR EG REPLACEMENT / MULTIPLE LOCATIONS | $5K |
| Dec 8, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH19F01379 | 238210 | CONDUCT SITE SURVEY FOR FST INSTALLATION AT RED TABLE MTN, CO (DBL TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF AUGUST 2019** | $35K |
| Dec 2, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH18F00927 | 238210 | OAKLAND, CA (OAKG) SX JCN:1105973 - DESIGN SITE SURVEY FOR EG REPLACEMENT | $4K |
| Nov 18, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH18F00927 | 238210 | OAKLAND, CA (OAKG) SX JCN:1105973 - DESIGN SITE SURVEY FOR EG REPLACEMENT | $10K |
| Nov 17, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH19F01765 | 238210 | GREAT LAKES GROUP SITE SURVEY AND DESIGN FOR EG REPLACEMENT / MULTIPLE LOCATIONS | $20K |
| Nov 5, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21F00796 | 238210 | CONDUCT SITE SURVEY FOR THE FY22 ENGINE GENERATOR WITH SUBBASE TANK INSTALLATION PER CONTRACT AND ATTACHED SOW AT MONTEREY, CA (MRY ATCT) JCN: 18027194 | $18K |
| Nov 5, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21F00795 | 238210 | CONDUCT SITE SURVEY FOR THE FY22 ENGINE GENERATOR AND PROPANE FUEL STORAGE TANK INSTALLATION PER CONTRACT AND ATTACHED SOW AT DEATH VALLEY, CA (L06 AST) JCN: 18027108 | $17K |
| Sep 20, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH19F01765 | 238210 | GREAT LAKES GROUP SITE SURVEY AND DESIGN FOR EG REPLACEMENT / MULTIPLE LOCATIONS | $6K |
| Sep 16, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH18F01891 | 238210 | CONDUCT FST SITE SURVEYS AND FST INSTALLATIONS AT VARIOUS LOCATIONS. | $120K |
| Sep 13, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH19F01509 | 238210 | CONDUCT SITE SURVEY FOR FST INSTALLATION AT CHICAGO, IL (ORDL TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF SEPTEMBER 2019** | $27K |
| Sep 13, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH19F01518 | 238210 | CONDUCT SITE SURVEY FOR FST INSTALLATION AT MCCOOK, IL (ORDX TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF SEPTEMBER 2019** | $47K |
| Sep 13, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH18F01630 | 238210 | CONDUCT SITE SURVEYS FOR FST INSTALLATIONS AT VARIOUS LOCATIONS PER CONTRACT AND ATTACHED SOW. | $34K |
| Sep 10, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21P05587 | 561790 | DESIGN OF CPDS UPGRADE AT F11 TRACON | $121K |
| Sep 7, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH18F00927 | 238210 | OAKLAND, CA (OAKG) SX JCN:1105973 - DESIGN SITE SURVEY FOR EG REPLACEMENT | $238K |
| Sep 7, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH19F01767 | 238210 | GREAT LAKES GROUP SITE SURVEY AND DESIGN FOR EG REPLACEMENT / MULTIPLE LOCATIONS | $7K |
| Aug 25, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH19F01385 | 238210 | CONDUCT SITE SURVEY FOR FST INSTALLATION AT RED TABLE MTN, CO (DBLA TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF AUGUST 2019** | $142K |
| Aug 24, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH19F01379 | 238210 | CONDUCT SITE SURVEY FOR FST INSTALLATION AT RED TABLE MTN, CO (DBL TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF AUGUST 2019** | $58K |
| Jul 23, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH19F01509 | 238210 | CONDUCT SITE SURVEY FOR FST INSTALLATION AT CHICAGO, IL (ORDL TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF SEPTEMBER 2019** | $30K |
| Jul 12, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH19F01521 | 238210 | CONDUCT SITE SURVEY FOR FST INSTALLATION AT RAEFORD, NC (FAYB TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF SEPTEMBER 2019** | $5K |
| Jul 7, 2021 | Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS | 697DCK20C00050 | 237990 | CONSTRUCTION SERVICES FOR THE ESTABLISHMENT OF A DISTANCE MEASURING EQUIPMENT (DME)SYSTEM AT BELEN REGIONAL AIRPORT, BELEN, NEW MEXICO | $21K |
| Jun 16, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH18F01639 | 238210 | CONDUCT SITE SURVEYS FOR FST INSTALLATIONS AT VARIOUS LOCATIONS PER CONTRACT AND ATTACHED SOW. | $22K |
| Jun 10, 2021 | Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS | 697DCK20C00193 | 236220 | ATW RVR - FOUNDATION REPAIR. SYSTEM SUPPORT CENTER GREEN BAY (GRB), WISCONSIN UIS FUNDS | $19K |
| May 19, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH19F01375 | 238210 | CONDUCT SITE SURVEY FOR FST INSTALLATION AT LEXINGTON, KY (LEXB TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF AUGUST 2019** | $12K |
| May 10, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH20F01706 | 238210 | REPLACE HVAC SYSTEM AT QCF ARSR (CLEARFIELD, PA) MODIFICATION ADDITIONAL FUNDS IN THE AMOUNT OF $119,300.80 NEEDED TO COMPLETE MODIFICATIONS | $4K |
| May 10, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21C00057 | 237130 | REPLACE 2 GFM ANTENNA POLES AT THE APPLETON, OH VOR SITE & REPLACE 1 GFM ANTENNA POLE AT THE GRATIOT, OH BUEC SITE IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS | $147K |
| Apr 20, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21F00839 | 238210 | CONDUCT SITE SURVEY FOR THE FY22 ENGINE GENERATOR WITH SUBBASE TANK INSTALLATION PER CONTRACT AND ATTACHED SOW AT NEW CASTLE, DE (ILG ATCT) JCN: 1400684 | $6K |
| Apr 16, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH20F01706 | 238210 | REPLACE HVAC SYSTEM AT QCF ARSR (CLEARFIELD, PA) MODIFICATION ADDITIONAL FUNDS IN THE AMOUNT OF $119,300.80 NEEDED TO COMPLETE MODIFICATIONS | $13K |
| Apr 14, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21F00796 | 238210 | CONDUCT SITE SURVEY FOR THE FY22 ENGINE GENERATOR WITH SUBBASE TANK INSTALLATION PER CONTRACT AND ATTACHED SOW AT MONTEREY, CA (MRY ATCT) JCN: 18027194 | $6K |
| Apr 14, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21F00798 | 238210 | CONDUCT SITE SURVEY FOR THE FY22 ENGINE GENERATOR WITH SUBBASE TANK INSTALLATION PER CONTRACT AND ATTACHED SOW AT ALTON, IL (ALN ATCT) JCN: 1500395 | $6K |
| Apr 14, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21F00800 | 238210 | CONDUCT SITE SURVEY FOR THE FY22 ENGINE GENERATOR WITH SUBBASE TANK INSTALLATION PER CONTRACT AND ATTACHED SOW AT BLOOMINGTON, IL (BMIA ATCT) JCN: 1500452 | $6K |
| Apr 14, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH20F01268 | 238210 | CONDUCT SITE SURVEY AND DEVELOP SITE SPECIFIC DESIGN FOR FY21 FST INSTALLATIONS AT VARIOUS LOCATIONS PER CONTRACT AND ATTACHED SOW. | $216K |
| Apr 14, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21F00795 | 238210 | CONDUCT SITE SURVEY FOR THE FY22 ENGINE GENERATOR AND PROPANE FUEL STORAGE TANK INSTALLATION PER CONTRACT AND ATTACHED SOW AT DEATH VALLEY, CA (L06 AST) JCN: 18027108 | $6K |
| Apr 13, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH18F00455 | 238210 | SITE SURVEY FOR MCO ATCT CPDS | $2.4M |
| Apr 9, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21F00747 | 238210 | CONDUCT SITE SURVEY AND DEVELOP SITE SPECIFIC DESIGN FOR THE FY22 DIESEL FUEL STORAGE TANK INSTALLATION PER CONTRACT AND ATTACHED SOW AT CENTRALIA, IL (ENL VOR) JCN: 1500636 SITE SURVEY @ $6,161 DESIGN @ $7,450 (BASELINE) | $14K |
| Apr 9, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21F00737 | 238210 | CONDUCT SITE SURVEY AND DEVELOP SITE SPECIFIC DESIGN FOR THE FY22 PROPANE FUEL STORAGE TANK INSTALLATION PER CONTRACT AND ATTACHED SOW AT SALISBURY, MD (SBY VOR) JCN: 1503694 SITE SURVEY @ $6,161 DESIGN @ $7,450 (BASELINE) | $14K |
| Apr 9, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21F00739 | 238210 | CONDUCT SITE SURVEY AND DEVELOP SITE SPECIFIC DESIGN FOR THE FY22 DIESEL FUEL STORAGE TANK INSTALLATION PER CONTRACT AND ATTACHED SOW AT FAYETTEVILLE, AR (FYV ASR) JCN: 1402166 SITE SURVEY @ $6,161 DESIGN @ $7,450 (BASELINE) | $14K |
| Apr 9, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21F00740 | 238210 | CONDUCT SITE SURVEY AND DEVELOP SITE SPECIFIC DESIGN FOR THE FY22 DIESEL FUEL STORAGE TANK INSTALLATION PER CONTRACT AND ATTACHED SOW AT NAPA, CA (APC ATCT) JCN: 1302790 SITE SURVEY @ $6,161 DESIGN @ $7,450 (BASELINE) | $14K |
| Apr 9, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21F00743 | 238210 | CONDUCT SITE SURVEY AND DEVELOP SITE SPECIFIC DESIGN FOR THE FY22 DIESEL FUEL STORAGE TANK INSTALLATION PER CONTRACT AND ATTACHED SOW AT PALM SPRINGS, CA (PSPD ASR) JCN: 1502278 SITE SURVEY @ $6,161 DESIGN @ $7,450 (BASELINE) | $14K |
| Apr 9, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21F00745 | 238210 | CONDUCT SITE SURVEY AND DEVELOP SITE SPECIFIC DESIGN FOR THE FY22 DIESEL FUEL STORAGE TANK INSTALLATION PER CONTRACT AND ATTACHED SOW AT DENVER, CO (OUF ALS) JCN: 18026947 SITE SURVEY @ $6,161 DESIGN @ $7,450 (BASELINE) | $14K |
| Apr 9, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21F00744 | 238210 | CONDUCT SITE SURVEY AND DEVELOP SITE SPECIFIC DESIGN FOR THE FY22 DIESEL FUEL STORAGE TANK INSTALLATION PER CONTRACT AND ATTACHED SOW AT SAN FRANCISCO, CA (SFOC AST) JCN: 18027544 SITE SURVEY @ $6,161 DESIGN @ $7,450 (BASELINE) | $14K |
| Apr 9, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21F00741 | 238210 | CONDUCT SITE SURVEY AND DEVELOP SITE SPECIFIC DESIGN FOR THE FY22 DIESEL FUEL STORAGE TANK INSTALLATION PER CONTRACT AND ATTACHED SOW AT FORT JONES, CA (FJS VOR) JCN: 1501856 SITE SURVEY @ $6,161 DESIGN @ $7,450 (BASELINE) | $14K |