| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Jun 29, 2018 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | 36C25218C0196 | 238220 | IGF::OT::IGF CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SUPERVISION, AND ALL OTHER RESOURCES NECESSARY TO CONSTRUCT PER PLANS AND SPECIFICATIONS PROJECT 550-15-107, REMEDIATE LEGIONELLA STATION-WIDE PHASE-1. THE SCOPE OF THIS PROJECT IS TO REPLACE THE DOMESTIC WATER DISTRIBUTION SYSTEM IN BUILDING 58 AND TO INSTALL A CONTINUOUS WATER MONITORING SYSTEM IN BUILDINGS 39, 58, 101, 103, 128, 129, 130 AND 131. | $4.6M |
| Jun 5, 2018 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | 36C25218C0164 | 238990 | IGF::OT::IGF CONTRACT 36C25218C0164, PROJECT 695-18-106, REPAIR ROAD SURFACE BLDG 20 AND VARIOUS AREAS AT THE CLEMENT J. ZABLOCKI VA MEDICAL CENTER IN MILWAUKEE, WI. | $682K |
| May 29, 2018 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | 36C25218C0183 | 236220 | EMERGENCY - AHU-5 CORRECTIONS | $817K |
| May 17, 2018 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | 36C25218P0137 | 238220 | BUILDING 5 EMERGENCY CONDENSATE PIPING REPAIRS | $14K |
| May 16, 2018 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | VA69D17C0169 | 236220 | IGF::OT::IGF UPGRADE FACILITY ELEVATORS | $11K |
| May 15, 2018 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | 36C25218P0131 | 238290 | REPLACE SMOKE DOOR | $16K |
| Apr 6, 2018 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | 36C25218P3428 | 561990 | IGF::OT::IGF UTILITIES LOCATE FOR BOILER PLANT | $30K |
| Mar 12, 2018 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | VA69D16C0175 | 238220 | IGF::OT::IGF - UPGRADE WATER TREATMENT/DISTRIBUTION AT THE WM S. MIDDLETON VA HOSPITAL, MADISON WI. | $52K |
| Mar 9, 2018 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | VA69D17C0204 | 236220 | IGF::OT::IGF REMOVE AND REPLACE EXISTING OBSOLETE SPRINKLER DEVICES AND ASSOCIATED FIRE PUMPS, PIPE, PIPING COMPONENTS, AND OTHER EQUIPMENT AT JESSE BROWN VA MEDICAL CENTER. | $1K |
| Feb 16, 2018 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | 36C25218P0071 | 238220 | EMERGENCY REPAIR OF EXISTING HOT WATER CONTROL VALVE ASSEMBLY | $12K |
| Feb 6, 2018 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | 36C25218P0051 | 238220 | IGF::OT::IGF EMERGENCY REPAIR OF AC21 | $16K |
| Feb 2, 2018 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | 36C25218C0009 | 236220 | MANAGEMENT, SUPERVISION, LABOR, EQUIPMENT, TOOLS, PARTS, MATERIAL, AND COMPONENTS, NECESSARY TO ACCOMPLISH AND PROVIDE THE REPAIRS TO THE FAILED SPRINKLERS IN ROOM 4499 AT THE JESSE BROWN VA MEDICAL CENTER BUILDING | $27K |
| Jan 4, 2018 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | 36C25218C0014 | 238220 | THE CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, TOOLS, PARTS, MATERIAL, COMPONENTS, LABOR, SUPERVISION AND MANAGEMENT NECESSARY TO ACCOMPLISH AND PROVIDE THE REPAIRS TO THE JESSE BROWN VA MEDICAL CENTER BED TOWER FAILED PUMP ISOLATORS HEATING LOOP AS DESCRIBED HEREIN. | $14K |
| Jan 2, 2018 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | 36C25218P0036 | 238290 | IGF::OT::IGF REPAIR OF REVOLVING DOOR | $52K |
| Dec 18, 2017 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | 36C25218P0034 | 238220 | IGF::OT::IGF EMERGENCY BOILER TESTING AND REPAIRS | $23K |
| Dec 13, 2017 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | VA69D17C0243 | 238220 | IGF::OT::IGF REPAIR STEAM&CONDENSATE BETWEEN B2&B16 | $9K |
| Nov 27, 2017 | Department of Veterans AffairsOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | VA101F16C2754 | 238330 | IGF::OT::IGF REPLACE EXISTING FLOORING AND SUBSTRUCTURE AT THE DATA CENTER OPERATION (DCO) FACILITY COMPUTER ROOM AT THE HINES INFORMATION TECHNOLOGY CENTER | $130K |
| Nov 7, 2017 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | VA69D17C0307 | 237310 | IGF::OT::IGF MILL AND PAVE IOWA LOT | $4K |
| Oct 27, 2017 | Department of Veterans AffairsOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | VA101F16C2754 | 238330 | IGF::OT::IGF REPLACE EXISTING FLOORING AND SUBSTRUCTURE AT THE DATA CENTER OPERATION (DCO) FACILITY COMPUTER ROOM AT THE HINES INFORMATION TECHNOLOGY CENTER | $18K |
| Oct 27, 2017 | Department of Veterans AffairsOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | VA101F16C2754 | 238330 | IGF::OT::IGF REPLACE EXISTING FLOORING AND SUBSTRUCTURE AT THE DATA CENTER OPERATION (DCO) FACILITY COMPUTER ROOM AT THE HINES INFORMATION TECHNOLOGY CENTER | $248 |
| Oct 23, 2017 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | VA69D17C0323 | 236220 | IGF::OT::IGF REPLACEMENT OF PATIENT LIFT ELEVATOR LOCATED AT THE 2030 TAYLOR STREET ENTRANCE OF JESSE BROWN VA MEDICAL CENTER. | $4K |
| Oct 13, 2017 | Department of Veterans AffairsOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | VA101F16C2754 | 238330 | IGF::OT::IGF REPLACE EXISTING FLOORING AND SUBSTRUCTURE AT THE DATA CENTER OPERATION (DCO) FACILITY COMPUTER ROOM AT THE HINES INFORMATION TECHNOLOGY CENTER | $51K |
| Sep 25, 2017 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | VA69D17C0314 | 238220 | IGF::OT::IGF: PROJECT 537-16-130 SITE PREP INFECTIOUS WASTE DISPOSAL - CONTRACTOR SHALL PROVIDE FULLY FUNCTIONAL CONNECTION OF THE BUILDING STEAM, ELECTRIC, COMMUNICATIONS AND PLUMBING INCLUDING ALL TOOLS, MATERIALS, COMPONENTS, LABOR AND SUPERVISION FOR CONSTRUCTION TO COMPLETE SITE PREP FOR THE OUTDOOR STEAM INFECTIOUS DISPOSAL EQUIPMENT SAN-I-PAK SYSTEM. THE SAN-I-PAK SYSTEM WILL BE INSTALLED BY THE VENDOR AND ALL FINAL UTILITY TERMINATIONS AND UTILITY SERVICE EXTENSIONS OF ELECTRICAL, STEAM, TELE-DATA SHALL BE PROVIDED BY THE CONTRACTOR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL WORK INCLUDING ALL EQUIPMENT REQUIREMENTS WITH THE VENDOR AND JESSE BROWN PRIOR TO THE FABRICATION AND INSTALLATION OF THE NEW SAN-I-PAK SYSTEM. | $252K |
| Sep 25, 2017 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | VA69D17C0323 | 236220 | IGF::OT::IGF REPLACEMENT OF PATIENT LIFT ELEVATOR LOCATED AT THE 2030 TAYLOR STREET ENTRANCE OF JESSE BROWN VA MEDICAL CENTER. | $29K |
| Sep 25, 2017 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | VA69D17C0215 | 237310 | IGF::OT::IGF REPLACE ROADS AND CURBS AT THE JAMES A. LOVELL FEDERAL HEALTH CARE CENTER IN NORTH CHICAGO, IL. | $16K |
| Sep 21, 2017 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | VA69D17C0307 | 237310 | IGF::OT::IGF MILL AND PAVE IOWA LOT | $147K |
| Sep 15, 2017 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | VA69D16C0175 | 238220 | IGF::OT::IGF - UPGRADE WATER TREATMENT/DISTRIBUTION AT THE WM S. MIDDLETON VA HOSPITAL, MADISON WI. | $779K |
| Sep 15, 2017 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | VA69D17C0243 | 238220 | IGF::OT::IGF REPAIR STEAM&CONDENSATE BETWEEN B2&B16 | $9K |
| Sep 8, 2017 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | VA69D17C0070 | 236220 | IGF::OT::IGF PROJECT NUMBER 578-16-012 TO RENOVATE MRI IN C SECTION, 1ST FLOOR BUILDING 200 AT THE EDWARD HINES JR. VA HOSPITAL | $45K |
| Aug 15, 2017 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | VA69D17C0243 | 238220 | IGF::OT::IGF REPAIR STEAM&CONDENSATE BETWEEN B2&B16 | $388K |
| Jul 28, 2017 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | VA69D17C0070 | 236220 | IGF::OT::IGF PROJECT NUMBER 578-16-012 TO RENOVATE MRI IN C SECTION, 1ST FLOOR BUILDING 200 AT THE EDWARD HINES JR. VA HOSPITAL | $58K |
| Jul 26, 2017 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | VA69D17C0215 | 237310 | IGF::OT::IGF REPLACE ROADS AND CURBS AT THE JAMES A. LOVELL FEDERAL HEALTH CARE CENTER IN NORTH CHICAGO, IL. | $313K |
| Jul 21, 2017 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | VA69D17C0220 | 236220 | IGF::OT::IGF REPLACE SPS WASHER DISINFECTORS AT JESSE BROWN VAMC, CHICAGO, ILLINOIS | $209K |
| Jul 11, 2017 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | VA69D17C0216 | 236220 | IGF::OT::IGF REPLACE SPS CART WASHER AT JESSE BROWN VAMC, CHICAGO, IL. REMOVE AND REPLACE ONE CART WASHER-DISINFECTOR BEING PURCHASED BY VA TO BE INSTALLED WITHIN THE STERILE PROCESSING SERVICE, INCLUDING UTILITY CONNECTIONS, ALL WITHIN BUILDING 40 - THE BED TOWER, IN COLLABORATION WITH VA AND ITS EQUIPMENT VENDOR PER THE STATEMENT OF WORK, SPECS AND DRAWINGS. | $91K |
| Jul 10, 2017 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | VA69D17C0070 | 236220 | IGF::OT::IGF PROJECT NUMBER 578-16-012 TO RENOVATE MRI IN C SECTION, 1ST FLOOR BUILDING 200 AT THE EDWARD HINES JR. VA HOSPITAL | $10K |
| Jun 28, 2017 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | VA69D17C0204 | 236220 | IGF::OT::IGF REMOVE AND REPLACE EXISTING OBSOLETE SPRINKLER DEVICES AND ASSOCIATED FIRE PUMPS, PIPE, PIPING COMPONENTS, AND OTHER EQUIPMENT AT JESSE BROWN VA MEDICAL CENTER. | $4.1M |
| Jun 12, 2017 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | VA69D17C0183 | 238220 | IGF::OT::IGF REPLACE FAILED HEAT EXCHANGERS AT JESSE BROWN VAMC, CHICAGO, ILLINOIS | $191K |
| May 23, 2017 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | VA69D17C0169 | 236220 | IGF::OT::IGF UPGRADE FACILITY ELEVATORS | $3.1M |
| Feb 16, 2017 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | VA69D16C0175 | 238220 | IGF::OT::IGF - UPGRADE WATER TREATMENT/DISTRIBUTION AT THE WM S. MIDDLETON VA HOSPITAL, MADISON WI. | $17K |
| Feb 10, 2017 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | VA69D17C0070 | 236220 | IGF::OT::IGF PROJECT NUMBER 578-16-012 TO RENOVATE MRI IN C SECTION, 1ST FLOOR BUILDING 200 AT THE EDWARD HINES JR. VA HOSPITAL | $1.5M |
| Oct 5, 2016 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | VA69D16C0321 | 237310 | IGF::OT::IGF DIESEL GENERATOR FUEL COVER REPAIR | $12K |
| Sep 29, 2016 | Department of Veterans AffairsOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | VA101F16C2754 | 238330 | IGF::OT::IGF REPLACE EXISTING FLOORING AND SUBSTRUCTURE AT THE DATA CENTER OPERATION (DCO) FACILITY COMPUTER ROOM AT THE HINES INFORMATION TECHNOLOGY CENTER | $956K |
| Sep 28, 2016 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | VA69D16C0175 | 238220 | IGF::OT::IGF - UPGRADE WATER TREATMENT/DISTRIBUTION AT THE WM S. MIDDLETON VA HOSPITAL, MADISON WI. | $42K |
| Sep 21, 2016 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | VA69D16C0022 | 238220 | IGF::OT::IGF REPLACE HOT WATER BINDLES TANK IN BUILDING 200 AT THE EDWARD J. HINE VAH | $431K |
| Sep 20, 2016 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | VA69D16C0175 | 238220 | IGF::OT::IGF - UPGRADE WATER TREATMENT/DISTRIBUTION AT THE WM S. MIDDLETON VA HOSPITAL, MADISON WI. | $19K |
| Aug 29, 2016 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | VA69D16C0175 | 238220 | IGF::OT::IGF - UPGRADE WATER TREATMENT/DISTRIBUTION AT THE WM S. MIDDLETON VA HOSPITAL, MADISON WI. | $14K |
| Jun 2, 2016 | Department of Veterans Affairs252-NETWORK CONTRACT OFFICE 12 (36C252) | VA69D16C0175 | 238220 | IGF::OT::IGF - UPGRADE WATER TREATMENT/DISTRIBUTION AT THE WM S. MIDDLETON VA HOSPITAL, MADISON WI. | $4.3M |