Federal Contractor Profile
Schneider Electric Federal, INC.
$109M obligated·108 awards·10 agencies·25 NAICS
Federal Contracts
Showing contracts 151–200 of 214 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Mar 28, 2019 | Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS | 0019 | 236220 | IGF::CT::IGF DESCRIPTION OF CHANGE: DIRECT DIGITAL CONTROL SYSTEMS (DDCS) CONTROLLERS HAVE BEEN INSTALLED IN ALL OF THE ARTCC FACILITIES AS PART OF VARIOUS MODERNIZATION PROJECTS OVER THE LAST 20 YEARS AND ARE NEARING THE END OF THEIR USEFUL LIFE. IT HAS BECOME DIFFICULT TO PROCURE REPLACEMENT PARTS TO KEEP EXISTING SYSTEMS OPERATIONAL. FUTURE ENHANCEMENTS, EXPANSION AND MAINTENANCE OF THE LEGACY SYSTEMS WILL BECOME MORE PROBLEMATIC. ADDITIONALLY, DUE TO THE NATURE OF THE CONTROLS SYSTEMS AT THE TIME OF THE ORIGINAL INSTALLATION, EACH CONTROL SYSTEM UTILIZED PROPRIETARY TECHNOLOGY, SO FACILITIES ARE LOCKED INTO A SOLE SOURCE ARRANGEMENT WITH THE SPECIFIC VENDORS SYSTEM. THE CONTROLS INDUSTRY HAS MADE SIGNIFICANT IMPROVEMENTS TO PROVIDE FOR MORE OPEN ARCHITECTURE STANDARDS FOR COMMUNICATION OF CONTROL SYSTEMS AND COMPONENTS. THE ENROUTE FACILITIES AND BUILDING SYSTEM (EFABS) PRODUCT TEAM HAS APPROVED THE COMPLETE REPLACEMENT OF THE LEGACY SYSTEMS AT EACH ARTCC WITH A BACNET COMPLIANT, OPEN ARCHITECTURE SYSTEM. BACNET IS THE STANDARD DEVELOPED BY ASHRAE (AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS). A PORTION OF THE DIRECT DIGITAL CONTROL SYSTEMS (DDCS) CONTROLLERS ARE SCHEDULED TO BE REPLACED UNDER THE CONTROL WING BASEMENT, CHILLER, COOLING TOWER, BOILER, AND MAJOR MECHANICAL PROJECT, WITH A BACNET SYSTEM. THE REMAINING LEGACY DIRECT DIGITAL CONTROL SYSTEMS (DDCS) CONTROLLERS WILL NEED TO REPLACED AS PART OF A PHASE 2 APPROACH TO REPLACING THE CONTROLS WITH THE SAME BACNET SYSTEM USED UNDER THE CWB/MMS PROJECT. PROJECT: ZLC BLDG AUTO CONTROLS (JCN 1305277) PR REASON: NEW PR, DESIGN PHASE VENDOR POC: SCHNEIDER ELECTRIC PR ORIGINATOR, FAA CONTACT: ALEX AZADPOUR, 801-320-2030 FAA CONTRACT ADMINISTRATOR: ANTHONY HILL, 202-385-8417 IGF::CT::IGF | $21K |
| Mar 13, 2019 | Department of DefenseW2V6 USA ENG SPT CTR HUNTSVIL | 0001 | 236220 | REPAIR AND RENEWAL, FT. SHAFTER | $75K |
| Mar 7, 2019 | Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS | DTFAWA12D00043CALL0017 | 236220 | BUILDING AUTOMATION CONTROLS PROGRAM MANAGEMENT AND TRAINING TASK ORDER. SUPPORT THE ENROUTE FACILITIES MODERNIZATION PROGRAM; ENGINEERING AND CONSTRUCTION AND OTHER TECHNICAL SUPPORT AS REQUIRED. IGF::OT::IGF | $40K |
| Mar 6, 2019 | Department of CommerceDEPT OF COMMERCE NIST | DOCSB134116CN0019 | 334512 | IGF::OT::IGF PREVENTATIVE MAINTENANCE SERVICES | $98K |
| Dec 17, 2018 | Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS | 0018 | 236220 | BUILDING AUTOMATION CONTROLS SYSTEM AT THE WASHINGTON (ZDC) AIR ROUTE TRAFFIC CONTROL CENTER (ARTCC IN LEESBURG, VA.DTFAWA-12-D-00043DESIGN TASK ORDER ZDC TASK ORDER SOW REVISED 11/01/2016. ARTCC BACNET BMS -BOA TASK ORDER - PH-2A DESIGN - ZDC / LEESBURG, VA | $27K |
| Oct 22, 2018 | Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS | DTFAWA12D00043CALL0015 | 236220 | BASIC ORDERING AGREEMENT - INDIANAPOLIS IGF::OT::IGF | $82K |
| Sep 26, 2018 | Department of Health and Human ServicesNATIONAL INSTITUTES OF HEALTH OLAO | 75N98018P01023 | 561621 | IGF::OT::IGF PROVISION OF 40 CYBER KEYS IN THE 40 WORK STATIONS FOR THE CAMPUS WIDE ACCESS CONTROL SYSTEM. THIS IS AN UPGRADE OF EXISTING CONTINUUM SECURITY KEYS FROM V1.94 TO V2.02. | $44K |
| Sep 14, 2018 | Department of Veterans AffairsSAC FREDERICK (36C10X) | 36C10X18P0191 | 334220 | PELCO CLOSED CIRCUIT TELEVISION SYSTEM HEAD END SERVER EQUIPMENT | $89K |
| Sep 11, 2018 | Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS | 0019 | 236220 | IGF::CT::IGF DESCRIPTION OF CHANGE: DIRECT DIGITAL CONTROL SYSTEMS (DDCS) CONTROLLERS HAVE BEEN INSTALLED IN ALL OF THE ARTCC FACILITIES AS PART OF VARIOUS MODERNIZATION PROJECTS OVER THE LAST 20 YEARS AND ARE NEARING THE END OF THEIR USEFUL LIFE. IT HAS BECOME DIFFICULT TO PROCURE REPLACEMENT PARTS TO KEEP EXISTING SYSTEMS OPERATIONAL. FUTURE ENHANCEMENTS, EXPANSION AND MAINTENANCE OF THE LEGACY SYSTEMS WILL BECOME MORE PROBLEMATIC. ADDITIONALLY, DUE TO THE NATURE OF THE CONTROLS SYSTEMS AT THE TIME OF THE ORIGINAL INSTALLATION, EACH CONTROL SYSTEM UTILIZED PROPRIETARY TECHNOLOGY, SO FACILITIES ARE LOCKED INTO A SOLE SOURCE ARRANGEMENT WITH THE SPECIFIC VENDORS SYSTEM. THE CONTROLS INDUSTRY HAS MADE SIGNIFICANT IMPROVEMENTS TO PROVIDE FOR MORE OPEN ARCHITECTURE STANDARDS FOR COMMUNICATION OF CONTROL SYSTEMS AND COMPONENTS. THE ENROUTE FACILITIES AND BUILDING SYSTEM (EFABS) PRODUCT TEAM HAS APPROVED THE COMPLETE REPLACEMENT OF THE LEGACY SYSTEMS AT EACH ARTCC WITH A BACNET COMPLIANT, OPEN ARCHITECTURE SYSTEM. BACNET IS THE STANDARD DEVELOPED BY ASHRAE (AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS). A PORTION OF THE DIRECT DIGITAL CONTROL SYSTEMS (DDCS) CONTROLLERS ARE SCHEDULED TO BE REPLACED UNDER THE CONTROL WING BASEMENT, CHILLER, COOLING TOWER, BOILER, AND MAJOR MECHANICAL PROJECT, WITH A BACNET SYSTEM. THE REMAINING LEGACY DIRECT DIGITAL CONTROL SYSTEMS (DDCS) CONTROLLERS WILL NEED TO REPLACED AS PART OF A PHASE 2 APPROACH TO REPLACING THE CONTROLS WITH THE SAME BACNET SYSTEM USED UNDER THE CWB/MMS PROJECT. PROJECT: ZLC BLDG AUTO CONTROLS (JCN 1305277) PR REASON: NEW PR, DESIGN PHASE VENDOR POC: SCHNEIDER ELECTRIC PR ORIGINATOR, FAA CONTACT: ALEX AZADPOUR, 801-320-2030 FAA CONTRACT ADMINISTRATOR: ANTHONY HILL, 202-385-8417 IGF::CT::IGF | $10K |
| Sep 5, 2018 | Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS | 0019 | 236220 | IGF::CT::IGF DESCRIPTION OF CHANGE: DIRECT DIGITAL CONTROL SYSTEMS (DDCS) CONTROLLERS HAVE BEEN INSTALLED IN ALL OF THE ARTCC FACILITIES AS PART OF VARIOUS MODERNIZATION PROJECTS OVER THE LAST 20 YEARS AND ARE NEARING THE END OF THEIR USEFUL LIFE. IT HAS BECOME DIFFICULT TO PROCURE REPLACEMENT PARTS TO KEEP EXISTING SYSTEMS OPERATIONAL. FUTURE ENHANCEMENTS, EXPANSION AND MAINTENANCE OF THE LEGACY SYSTEMS WILL BECOME MORE PROBLEMATIC. ADDITIONALLY, DUE TO THE NATURE OF THE CONTROLS SYSTEMS AT THE TIME OF THE ORIGINAL INSTALLATION, EACH CONTROL SYSTEM UTILIZED PROPRIETARY TECHNOLOGY, SO FACILITIES ARE LOCKED INTO A SOLE SOURCE ARRANGEMENT WITH THE SPECIFIC VENDORS SYSTEM. THE CONTROLS INDUSTRY HAS MADE SIGNIFICANT IMPROVEMENTS TO PROVIDE FOR MORE OPEN ARCHITECTURE STANDARDS FOR COMMUNICATION OF CONTROL SYSTEMS AND COMPONENTS. THE ENROUTE FACILITIES AND BUILDING SYSTEM (EFABS) PRODUCT TEAM HAS APPROVED THE COMPLETE REPLACEMENT OF THE LEGACY SYSTEMS AT EACH ARTCC WITH A BACNET COMPLIANT, OPEN ARCHITECTURE SYSTEM. BACNET IS THE STANDARD DEVELOPED BY ASHRAE (AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS). A PORTION OF THE DIRECT DIGITAL CONTROL SYSTEMS (DDCS) CONTROLLERS ARE SCHEDULED TO BE REPLACED UNDER THE CONTROL WING BASEMENT, CHILLER, COOLING TOWER, BOILER, AND MAJOR MECHANICAL PROJECT, WITH A BACNET SYSTEM. THE REMAINING LEGACY DIRECT DIGITAL CONTROL SYSTEMS (DDCS) CONTROLLERS WILL NEED TO REPLACED AS PART OF A PHASE 2 APPROACH TO REPLACING THE CONTROLS WITH THE SAME BACNET SYSTEM USED UNDER THE CWB/MMS PROJECT. PROJECT: ZLC BLDG AUTO CONTROLS (JCN 1305277) PR REASON: NEW PR, DESIGN PHASE VENDOR POC: SCHNEIDER ELECTRIC PR ORIGINATOR, FAA CONTACT: ALEX AZADPOUR, 801-320-2030 FAA CONTRACT ADMINISTRATOR: ANTHONY HILL, 202-385-8417 IGF::CT::IGF | $18K |
| Sep 5, 2018 | Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS | DTFAWA12D00043CALL0015 | 236220 | BASIC ORDERING AGREEMENT - INDIANAPOLIS IGF::OT::IGF | $30K |
| Aug 14, 2018 | Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS | 0019 | 236220 | IGF::CT::IGF DESCRIPTION OF CHANGE: DIRECT DIGITAL CONTROL SYSTEMS (DDCS) CONTROLLERS HAVE BEEN INSTALLED IN ALL OF THE ARTCC FACILITIES AS PART OF VARIOUS MODERNIZATION PROJECTS OVER THE LAST 20 YEARS AND ARE NEARING THE END OF THEIR USEFUL LIFE. IT HAS BECOME DIFFICULT TO PROCURE REPLACEMENT PARTS TO KEEP EXISTING SYSTEMS OPERATIONAL. FUTURE ENHANCEMENTS, EXPANSION AND MAINTENANCE OF THE LEGACY SYSTEMS WILL BECOME MORE PROBLEMATIC. ADDITIONALLY, DUE TO THE NATURE OF THE CONTROLS SYSTEMS AT THE TIME OF THE ORIGINAL INSTALLATION, EACH CONTROL SYSTEM UTILIZED PROPRIETARY TECHNOLOGY, SO FACILITIES ARE LOCKED INTO A SOLE SOURCE ARRANGEMENT WITH THE SPECIFIC VENDORS SYSTEM. THE CONTROLS INDUSTRY HAS MADE SIGNIFICANT IMPROVEMENTS TO PROVIDE FOR MORE OPEN ARCHITECTURE STANDARDS FOR COMMUNICATION OF CONTROL SYSTEMS AND COMPONENTS. THE ENROUTE FACILITIES AND BUILDING SYSTEM (EFABS) PRODUCT TEAM HAS APPROVED THE COMPLETE REPLACEMENT OF THE LEGACY SYSTEMS AT EACH ARTCC WITH A BACNET COMPLIANT, OPEN ARCHITECTURE SYSTEM. BACNET IS THE STANDARD DEVELOPED BY ASHRAE (AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS). A PORTION OF THE DIRECT DIGITAL CONTROL SYSTEMS (DDCS) CONTROLLERS ARE SCHEDULED TO BE REPLACED UNDER THE CONTROL WING BASEMENT, CHILLER, COOLING TOWER, BOILER, AND MAJOR MECHANICAL PROJECT, WITH A BACNET SYSTEM. THE REMAINING LEGACY DIRECT DIGITAL CONTROL SYSTEMS (DDCS) CONTROLLERS WILL NEED TO REPLACED AS PART OF A PHASE 2 APPROACH TO REPLACING THE CONTROLS WITH THE SAME BACNET SYSTEM USED UNDER THE CWB/MMS PROJECT. PROJECT: ZLC BLDG AUTO CONTROLS (JCN 1305277) PR REASON: NEW PR, DESIGN PHASE VENDOR POC: SCHNEIDER ELECTRIC PR ORIGINATOR, FAA CONTACT: ALEX AZADPOUR, 801-320-2030 FAA CONTRACT ADMINISTRATOR: ANTHONY HILL, 202-385-8417 IGF::CT::IGF | $5K |
| Aug 10, 2018 | Department of Homeland SecurityNPPD ACQ DIV | HSHQDC16C00086 | 335999 | THE PURPOSE OF THIS AWARD IS TO PURCHASE A SERVICE AGREEMENT FOR EMS WORK STATION. | $10K |
| Jul 19, 2018 | Department of CommerceDEPT OF COMMERCE NIST | DOCSB134116CN0019 | 334512 | IGF::OT::IGF PREVENTATIVE MAINTENANCE SERVICES | $6K |
| Jul 2, 2018 | Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS | 0021 | 236220 | PROVIDE ENGINEERING SERVICES FOR THE DESIGN OF PHASE II BACNET CONTROLS AT THE SEATTLE ARTCC, 3101 AUBURN WAY SOUTH, AUBURN, WA 98092 IN ACCORDANCE WITH THE APPLICABLE TASK ORDER. PERIOD OF PERFORMANCE: 8/15/2017 TO 8/31/2018 ATTN: KEN BLOOM 253-351-3776IGF::CT::IGFIGF::CT::IGFIGF::CT::IGF | $2.5M |
| Jun 29, 2018 | Department of CommerceDEPT OF COMMERCE NIST | DOCSB134116CN0019 | 334512 | IGF::OT::IGF PREVENTATIVE MAINTENANCE SERVICES | $84K |
| Jun 6, 2018 | General Services AdministrationPBS R11 SPECIAL PROGRAMS DIVISION WHITE HOUSE BRANCH | GS11P16NWD7025 | 334512 | BUILDING AUTOMATION SYSTEM MAINTENANCE FOR THE WHITE HOUSE COMPLEX. IGF::OT::IGF | $627K |
| May 31, 2018 | Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS | 697DCK18F00078 | 236220 | ZDV ARTCC BACNET BMS | $155K |
| May 31, 2018 | Department of CommerceDEPT OF COMMERCE NIST | DOCSB134116CN0019 | 334512 | IGF::OT::IGF PREVENTATIVE MAINTENANCE SERVICES | $7K |
| May 29, 2018 | Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS | 0018 | 236220 | BUILDING AUTOMATION CONTROLS SYSTEM AT THE WASHINGTON (ZDC) AIR ROUTE TRAFFIC CONTROL CENTER (ARTCC IN LEESBURG, VA.DTFAWA-12-D-00043DESIGN TASK ORDER ZDC TASK ORDER SOW REVISED 11/01/2016. ARTCC BACNET BMS -BOA TASK ORDER - PH-2A DESIGN - ZDC / LEESBURG, VA | $2.1M |
| Apr 18, 2018 | Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS | 697DCK18F00051 | 236220 | ZLA LOS ANGELES ARTCC BAS PHASE 2 DESIGN | $188K |
| Apr 18, 2018 | Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS | DTFAWA12D00043CALL0011 | 236220 | BASIC ORDERING AGREEMENT IGF::OT::IGF | $33K |
| Mar 29, 2018 | Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS | 0019 | 236220 | IGF::CT::IGF DESCRIPTION OF CHANGE: DIRECT DIGITAL CONTROL SYSTEMS (DDCS) CONTROLLERS HAVE BEEN INSTALLED IN ALL OF THE ARTCC FACILITIES AS PART OF VARIOUS MODERNIZATION PROJECTS OVER THE LAST 20 YEARS AND ARE NEARING THE END OF THEIR USEFUL LIFE. IT HAS BECOME DIFFICULT TO PROCURE REPLACEMENT PARTS TO KEEP EXISTING SYSTEMS OPERATIONAL. FUTURE ENHANCEMENTS, EXPANSION AND MAINTENANCE OF THE LEGACY SYSTEMS WILL BECOME MORE PROBLEMATIC. ADDITIONALLY, DUE TO THE NATURE OF THE CONTROLS SYSTEMS AT THE TIME OF THE ORIGINAL INSTALLATION, EACH CONTROL SYSTEM UTILIZED PROPRIETARY TECHNOLOGY, SO FACILITIES ARE LOCKED INTO A SOLE SOURCE ARRANGEMENT WITH THE SPECIFIC VENDORS SYSTEM. THE CONTROLS INDUSTRY HAS MADE SIGNIFICANT IMPROVEMENTS TO PROVIDE FOR MORE OPEN ARCHITECTURE STANDARDS FOR COMMUNICATION OF CONTROL SYSTEMS AND COMPONENTS. THE ENROUTE FACILITIES AND BUILDING SYSTEM (EFABS) PRODUCT TEAM HAS APPROVED THE COMPLETE REPLACEMENT OF THE LEGACY SYSTEMS AT EACH ARTCC WITH A BACNET COMPLIANT, OPEN ARCHITECTURE SYSTEM. BACNET IS THE STANDARD DEVELOPED BY ASHRAE (AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS). A PORTION OF THE DIRECT DIGITAL CONTROL SYSTEMS (DDCS) CONTROLLERS ARE SCHEDULED TO BE REPLACED UNDER THE CONTROL WING BASEMENT, CHILLER, COOLING TOWER, BOILER, AND MAJOR MECHANICAL PROJECT, WITH A BACNET SYSTEM. THE REMAINING LEGACY DIRECT DIGITAL CONTROL SYSTEMS (DDCS) CONTROLLERS WILL NEED TO REPLACED AS PART OF A PHASE 2 APPROACH TO REPLACING THE CONTROLS WITH THE SAME BACNET SYSTEM USED UNDER THE CWB/MMS PROJECT. PROJECT: ZLC BLDG AUTO CONTROLS (JCN 1305277) PR REASON: NEW PR, DESIGN PHASE VENDOR POC: SCHNEIDER ELECTRIC PR ORIGINATOR, FAA CONTACT: ALEX AZADPOUR, 801-320-2030 FAA CONTRACT ADMINISTRATOR: ANTHONY HILL, 202-385-8417 IGF::CT::IGF | $2.7M |
| Mar 14, 2018 | Department of Transportation697DCC SOUTHWEST REGION, LOGISTICS | 697DCK18F00031 | 236220 | ZTL (ATLANTA ARTCC) BAS PHASE 2 | $166K |
| Mar 8, 2018 | Department of Transportation697DCC SOUTHWEST REGION, LOGISTICS | DTFAWA12D00043CALL0014 | 236220 | BASIC ORDERING AGREEMENT - OAKLAND BACNET IGF::OT::IGF | $2.7M |
| Mar 7, 2018 | Department of Transportation697DCC SOUTHWEST REGION, LOGISTICS | 697DCK18F00030 | 236220 | ZUA GUAM BAS COMBINED PHASE 1&2 DESIGN | $170K |
| Jan 2, 2018 | Department of Transportation693JF9 HEADQUARTERS | DTFAWA12D00043CALL0015 | 236220 | BASIC ORDERING AGREEMENT - INDIANAPOLIS IGF::OT::IGF | $2.5M |
| Aug 30, 2017 | Department of Transportation693JF9 HEADQUARTERS | 0022 | 236220 | IGF::CT::IGF ZMP ARTCC/MAJOR MOD : REPLACE BUILDING AUTOMATION CONTROL (BACNET) - DESIGN ONLY PERIOD OF PERFORMANCE 7/11/2017 TO 7/06/2018 | $195K |
| Aug 23, 2017 | Department of Homeland SecurityNPPD ACQ DIV | HSHQDC16C00086 | 335999 | THE PURPOSE OF THIS AWARD IS TO PURCHASE A SERVICE AGREEMENT FOR EMS WORK STATION. | $9K |
| Aug 21, 2017 | Department of StateU.S. EMBASSY SARAJEVO | SBK80017M0632 | 238290 | IGF::OT::IGF INSTALLATION OF PUBLIC MONITORING EXPERT SYSTEM. | $65K |
| Aug 4, 2017 | Department of Transportation693JF9 HEADQUARTERS | 0020 | 236220 | IGF::CT::IGF TASK ORDER NUMBER 20. TO FURNISH SPARE PARTS FOR SCNEIDER STRUXUREWARE/ANDOVER BACNET BUILDING AUTOMATION SYSTEM (BAS) AT SAN JUAN (ZSU) PUERTO RICO AIR TRAFFIC CONTROL CENTER (ARTCC) SUPPORT THE ENROUTE FACILITIES MODERNIZATION PROGRAM; ENGINEERING AND CONSTRUCTION AND OTHER TECHNICAL SUPPORT AS REQUIRED. | $11K |
| Aug 4, 2017 | Department of Transportation693JF9 HEADQUARTERS | 0021 | 236220 | PROVIDE ENGINEERING SERVICES FOR THE DESIGN OF PHASE II BACNET CONTROLS AT THE SEATTLE ARTCC, 3101 AUBURN WAY SOUTH, AUBURN, WA 98092 IN ACCORDANCE WITH THE APPLICABLE TASK ORDER. PERIOD OF PERFORMANCE: 8/15/2017 TO 8/31/2018 ATTN: KEN BLOOM 253-351-3776IGF::CT::IGFIGF::CT::IGFIGF::CT::IGF | $173K |
| Jul 31, 2017 | General Services AdministrationPBS R11 SPECIAL PROGRAMS DIVISION WHITE HOUSE BRANCH | 47PM1017F0015 | 334512 | BUILDING AUTOMATION SYSTEM (BAS) INET CONTROLLER BOARDS FOR THE WHITE HOUSE SERVICE CENTER. IGF::OT::IGF | $10K |
| Jul 19, 2017 | Department of Transportation693JF9 HEADQUARTERS | 0019 | 236220 | IGF::CT::IGF DESCRIPTION OF CHANGE: DIRECT DIGITAL CONTROL SYSTEMS (DDCS) CONTROLLERS HAVE BEEN INSTALLED IN ALL OF THE ARTCC FACILITIES AS PART OF VARIOUS MODERNIZATION PROJECTS OVER THE LAST 20 YEARS AND ARE NEARING THE END OF THEIR USEFUL LIFE. IT HAS BECOME DIFFICULT TO PROCURE REPLACEMENT PARTS TO KEEP EXISTING SYSTEMS OPERATIONAL. FUTURE ENHANCEMENTS, EXPANSION AND MAINTENANCE OF THE LEGACY SYSTEMS WILL BECOME MORE PROBLEMATIC. ADDITIONALLY, DUE TO THE NATURE OF THE CONTROLS SYSTEMS AT THE TIME OF THE ORIGINAL INSTALLATION, EACH CONTROL SYSTEM UTILIZED PROPRIETARY TECHNOLOGY, SO FACILITIES ARE LOCKED INTO A SOLE SOURCE ARRANGEMENT WITH THE SPECIFIC VENDORS SYSTEM. THE CONTROLS INDUSTRY HAS MADE SIGNIFICANT IMPROVEMENTS TO PROVIDE FOR MORE OPEN ARCHITECTURE STANDARDS FOR COMMUNICATION OF CONTROL SYSTEMS AND COMPONENTS. THE ENROUTE FACILITIES AND BUILDING SYSTEM (EFABS) PRODUCT TEAM HAS APPROVED THE COMPLETE REPLACEMENT OF THE LEGACY SYSTEMS AT EACH ARTCC WITH A BACNET COMPLIANT, OPEN ARCHITECTURE SYSTEM. BACNET IS THE STANDARD DEVELOPED BY ASHRAE (AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS). A PORTION OF THE DIRECT DIGITAL CONTROL SYSTEMS (DDCS) CONTROLLERS ARE SCHEDULED TO BE REPLACED UNDER THE CONTROL WING BASEMENT, CHILLER, COOLING TOWER, BOILER, AND MAJOR MECHANICAL PROJECT, WITH A BACNET SYSTEM. THE REMAINING LEGACY DIRECT DIGITAL CONTROL SYSTEMS (DDCS) CONTROLLERS WILL NEED TO REPLACED AS PART OF A PHASE 2 APPROACH TO REPLACING THE CONTROLS WITH THE SAME BACNET SYSTEM USED UNDER THE CWB/MMS PROJECT. PROJECT: ZLC BLDG AUTO CONTROLS (JCN 1305277) PR REASON: NEW PR, DESIGN PHASE VENDOR POC: SCHNEIDER ELECTRIC PR ORIGINATOR, FAA CONTACT: ALEX AZADPOUR, 801-320-2030 FAA CONTRACT ADMINISTRATOR: ANTHONY HILL, 202-385-8417 IGF::CT::IGF | $192K |
| Jul 6, 2017 | Department of Transportation693JF9 HEADQUARTERS | DTFAWA12D00043CALL0011 | 236220 | BASIC ORDERING AGREEMENT IGF::OT::IGF | $2.6M |
| Jun 23, 2017 | Department of Transportation693JF9 HEADQUARTERS | DTFAWA12D00043CALL0013 | 236220 | BASIC ORDERING AGREEMENT - CLEVELAND IGF::OT::IGF | $2.4M |
| Jun 22, 2017 | Department of DefenseW6QK ACC-RSA | W31P4Q17P0105 | 238220 | IGF::CL::IGF THE PURPOSE OF THIS FIRM FIXED PRICE PURCHASE ORDER IS TO RATIFY AN UNAUTHORIZED COMMITMENT, IN THE AMOUNT OF $2,941. | $3K |
| Jun 20, 2017 | Department of Transportation693JF9 HEADQUARTERS | DTFAWA12D00043CALL0016 | 236220 | SUPPORT THE ENROUTE FACILITIES MODERNIZATION PROGRAM; ENGINEERING AND CONSTRUCTION AND OTHER TECHNICAL SUPPORT AS REQUIRED. IGF::OT::IGF | $2.7M |
| May 30, 2017 | General Services AdministrationPBS R11 SPECIAL PROGRAMS DIVISION WHITE HOUSE BRANCH | GS11P16NWD7025 | 334512 | BUILDING AUTOMATION SYSTEM MAINTENANCE FOR THE WHITE HOUSE COMPLEX. IGF::OT::IGF | $609K |
| May 24, 2017 | Department of Transportation693JF9 HEADQUARTERS | DTFAWA12D00043CALL0011 | 236220 | BASIC ORDERING AGREEMENT IGF::OT::IGF | $129K |
| May 3, 2017 | Department of DefenseW2V6 USA ENG SPT CTR HUNTSVIL | 0001 | 236220 | REPAIR AND RENEWAL, FT. SHAFTER | $984K |
| Apr 25, 2017 | Department of CommerceDEPT OF COMMERCE NIST | DOCSB134116CN0019 | 334512 | IGF::OT::IGF PREVENTATIVE MAINTENANCE SERVICES | $98K |
| Apr 10, 2017 | Department of Health and Human ServicesNATIONAL INSTITUTES OF HEALTH NIDA | HHSN271201700006PC | 561621 | IGF::CT::IGF FOR CRITICAL FUNCTIONS CONTINUUM MODULE PIV PIN CARD READER | $6K |
| Apr 4, 2017 | Department of Transportation693JF9 HEADQUARTERS | DTFAWA12D00043CALL0010 | 236220 | BASIC ORDERING AGREEMENT IGF::OT::IGF | $1.1M |
| Mar 24, 2017 | Export-Import Bank of the United StatesEXPORT IMPORT BANK OF THE US | EXIM17P0013 | 334512 | TURNSTILE LICENSE UPGRADE | $9K |
| Feb 8, 2017 | General Services AdministrationPBS R11 SPECIAL PROGRAMS DIVISION WHITE HOUSE BRANCH | GS11P16NWC7065 | 334512 | PROVIDE ELECTRICAL MONITORING SERVICES. IGF::OT::IGF | $1.1M |
| Jan 26, 2017 | Department of Transportation693JF9 HEADQUARTERS | 0018 | 236220 | BUILDING AUTOMATION CONTROLS SYSTEM AT THE WASHINGTON (ZDC) AIR ROUTE TRAFFIC CONTROL CENTER (ARTCC IN LEESBURG, VA.DTFAWA-12-D-00043DESIGN TASK ORDER ZDC TASK ORDER SOW REVISED 11/01/2016. ARTCC BACNET BMS -BOA TASK ORDER - PH-2A DESIGN - ZDC / LEESBURG, VA | $2.6M |
| Dec 29, 2016 | Department of Health and Human ServicesNIH A E CONSTRUCTION | HHSN292201700009P | 561621 | IGF::OT::IGF - AUTOMATIC DOOR CLOSER; PUSH PLATE; CONDUCTOR CABLE; MISCELLANEOUS MATERIALS; INSTALLATION LABOR - LA VERN JAMES | $6K |
| Dec 20, 2016 | Department of Transportation693JF9 HEADQUARTERS | 0018 | 236220 | BUILDING AUTOMATION CONTROLS SYSTEM AT THE WASHINGTON (ZDC) AIR ROUTE TRAFFIC CONTROL CENTER (ARTCC IN LEESBURG, VA.DTFAWA-12-D-00043DESIGN TASK ORDER ZDC TASK ORDER SOW REVISED 11/01/2016. ARTCC BACNET BMS -BOA TASK ORDER - PH-2A DESIGN - ZDC / LEESBURG, VA | $195K |
| Dec 6, 2016 | Export-Import Bank of the United StatesEXPORT IMPORT BANK OF THE US | EXIM17P0013 | 334512 | TURNSTILE LICENSE UPGRADE | $229K |
Get Alerted Before Schneider Electric Federal, INC.'s Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free