| Sep 13, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0453 | 541330 | 100% DESIGN LESS THAN $500,000: REPAIR/CONSTRUCT FINAL DENIAL BARRIER SYSTEM, EAKER GATE | $31K |
| Sep 10, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0442 | 541330 | IGF::CL,CT::IGF CLIN 1008 FULL CONTRACT: REPAIR INSULATION AROUND DUCTWORK, B2280 | $79K |
| Sep 10, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0445 | 541330 | PRELIMINARY 35% DESIGN (SABER OR MACC): REPAIR FIRE PROTECTION SYSTEM, B214 | $20K |
| Aug 28, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0385 | 541330 | 100% DESIGN $1,500,001 THRU $2,000,000; REPAIR HVAC SYSTEM MAIN FIRE STATION, B117 | $126K |
| Aug 28, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0386 | 541330 | IDIQ DESIGN (ROOFING OR PAVING); REPAIR EXPANSION JOINS AND ROOF SECTIONS, B3001 | $9K |
| Aug 23, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0374 | 541330 | CONCEPT (SOW) DESIGN; CONSTRUCT COVER OVER EQUIPMENT PAD, B989 | $17K |
| Aug 22, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0330 | 541330 | PRELIMINARY 35% DESIGN (SABER OR MACC); RENOVATE COMMANDER'S OFFICE POST 1AH1/114, B3001 | $20K |
| Aug 21, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0365 | 541330 | PRELIMINARY 35% DESIGN (SABER OR MACC) | $20K |
| Aug 21, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0366 | 541330 | LIAISON CONTRACT&CONSTRUCTION | $3K |
| Aug 21, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0368 | 541330 | 100% DESIGN $500,001 THROUGH $1,000,000; REPAIR FIRE PROTECTION EQUIPMENT, DINING HALL B5905 | $61K |
| Aug 17, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0361 | 541330 | FULL CONTRACT&CONSTRUCTION MGMT | $11K |
| Aug 17, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0363 | 541330 | 100% DESIGN $500,001 THROUGH $1,000,000 | $61K |
| Aug 13, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0338 | 541330 | LIAISON CONTRACT&CONSTRUCTION; WWYK130159&WWYK150049 | $228K |
| Aug 13, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0340 | 541330 | PRELIMINARY 35% DESIGN (SABER OR MACC)- WWYK190053, REPAIR ON NORTH WALL B3105 | $20K |
| Aug 13, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0341 | 541330 | PRELIMINARY 35% DESIGN (SABER OR MACC)- WWYK200012, WO58807 | $20K |
| Aug 7, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0318 | 541330 | IDIQ DESIGN (ROOFING OR PAVING); WWYK100021 | $9K |
| Aug 7, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0321 | 541330 | 100% DESIGN $500,001 THROUGH $1,000,000; WO037253 | $61K |
| Aug 7, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0310 | 541330 | CONCEPT (SOW) DESIGN - REPLACE 6" GAS BACK FEED LINE FROM ARNOLD TO SW OF 3RD HERD | $17K |
| Aug 7, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0313 | 541330 | 100% DESIGN $1,000,001 THRU $1,500,000 REPAIR SURFACE GRADE AT CDC EAST, B3904 | $90K |
| Aug 7, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0314 | 541330 | CONCEPT (SOW) DESIGN - REPAIR WATER LINE FROM B3113 TO B3102 | $17K |
| Aug 7, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0315 | 541330 | 100% DESIGN>$2,000,000 REPAIR INDUSTRIAL WASTE TREATMENT SYSTEM, TAC COMPLEX | $216K |
| Aug 7, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0316 | 541330 | 100% DESIGN $1,000,001 THRU $1,500,000; WO40919 | $90K |
| Aug 6, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0317 | 541330 | 100% DESIGN $500,001 THROUGH $1,000,000; WWYK180032 | $61K |
| Aug 6, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0319 | 541330 | IDIQ DESIGN (ROOFING OR PAVING); WWYK190037 | $9K |
| Aug 6, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0309 | 541330 | CONCEPT (SOW) DESIGN: SECURITY UPGRADES&ACCESS CONTROL B3001 | $17K |
| Aug 6, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0312 | 541330 | CONCEPT (SOW) DESIGN: SECURITY UPGRADES&ACCESS CONTROL B9001 | $17K |
| Aug 1, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0303 | 541330 | FULL CONTRACT&CONSTRUCTION MGMT: INSTALL REHEAT COILS AND HUMIDIFIERS ROOM 119, B3220 | $7K |
| Aug 1, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0304 | 541330 | CONCEPT (SOW) DESIGN: REPAIR FIRE WATER LINE REFUELER VEHICLE SHOP, B2110 | $17K |
| Aug 1, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0308 | 541330 | CONCEPT (SOW) DESIGN: REPAIR NATURAL GAS MAIN, AREA B | $17K |
| Jul 18, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0294 | 541330 | IDIQ DESIGN (ROOFING OR PAVING): REPAIR ROOF, B989 ALERT FACILITY | $9K |
| May 7, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0200 | 541330 | FULL CONTRACT&CONSTRUCTION MGMT: REPAIR HVAC CONTROLS AHU-1&AHU-2, B2136 | $21K |
| May 7, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0201 | 541330 | FULL CONTRACT&CONSTRUCTION MGMT: REPAIR ROOF SECTION 62, B3001 | $15K |
| May 1, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0197 | 541330 | 100% DESIGN>$2,000,000: REPAIR HVAC B3707 | $216K |
| May 1, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0198 | 541330 | 100% DESIGN>$2,000,000: REPAIR OLD CMM AREA B9001 FOR QVC/DMIF SHOP | $216K |
| Apr 27, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0193 | 541330 | FULL CONTRACT&CONSTRUCTION MGMT: REPLACE SECURITY GATES B3902&3907 | $12K |
| Apr 25, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0187 | 541330 | FULL CONTRACT&CONSTRUCTION MGMT: REPLACE ELECTRICAL&FIRE ALARM SYSTEM, B985 | $4K |
| Apr 13, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0178 | 541330 | FULL CONTRACT&CONSTRUCTION MGMT: REPAIR ROOF AND FLASHING B260 | $13K |
| Apr 13, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0179 | 541330 | FULL CONTRACT&CONSTRUCTION MGMT: REPAIR HANGAR DOOR SAFETY FEATURES | $21K |
| Apr 11, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0177 | 541330 | A&E DESIGN REQUIREMENTS AND DESIGN MGMT: RENOVATE NW CORNER AREA OF B3220 | $21K |
| Mar 28, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0145 | 541330 | PRELIMINARY 35% DESIGN : WWYK180072 RENOVATE AFPC AREA, B3001 | $20K |
| Mar 20, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0134 | 541330 | LIAISON CONTRACT&CONSTRUCTION: CONSTRUCT T9 TEST CELL PAD AND INFRASTRUCTURE | $11K |
| Mar 20, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0135 | 541330 | PRELIMINARY 35% DESIGN (SABER OR MACC): REPAIR FIRE DETECTION AND ALARM SYSTEMS IN THE FOUNDRY OF B9001 | $20K |
| Mar 8, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0123 | 541330 | PRELIMINARY 35% DESIGN (SABER OR MACC) REPLACE TWO RECIP 80-TON CHILLERS, B3220. | $20K |
| Mar 2, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0119 | 541330 | FULL CONTRACT&CONSTRUCTION MGMT: CONSTRUCT FINAL PREP VENTILATION&ROOF RUNOFF SYSTEM, B3703 | $5K |
| Mar 2, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0121 | 541330 | 100% DESIGN $500,001 THROUGH $1,000,000: REPAIR B-1&B-52 DIVISION OFFICES, B3001 | $60K |
| Feb 23, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0111 | 541330 | 100% DESIGN>$2,000,000 | $210K |
| Feb 21, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0106 | 541330 | CORE WORKLOAD OPTION YEAR 1 FUNDING (1APR18 - 31MAR19) | $5.0M |
| Feb 20, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0112 | 541330 | 100% DESIGN>$2,000,000: REPLACE EXISTING MDP1&MPD2 SWITCHGEAR ELECTRICAL VAULT RM123, B3220 | $210K |
| Feb 2, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0100 | 541330 | A&E DESIGN REQUIREMENTS AND DESIGN MGMT: FIRE PROTECTION DESIGN ANALYSIS | $20K |
| Jan 29, 2018 | Department of DefenseFA8101 AFSC PZIOA | FA810118F0098 | 541330 | 100% DESIGN>$2,000,000: CONSTRUCT&REPAIR PERIMETER FENCE | $210K |