Federal Contractor Profile
Teledyne Brown Engineering, INC.
$1.7B obligated·255 awards·3 agencies·25 NAICS
Federal Contracts
Showing contracts 551–600 of 1,109 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Sep 6, 2019 | Department of DefenseW6QK ACC-RSA COS | 0003 | 541712 | FMS - BASE PERIOD | $109K |
| Sep 5, 2019 | Department of DefenseNAVAL MEDICAL LOGISTICS COMMAND | N6264518C4013 | 541715 | NHRC MODELING&SIMULATION SUPPORT | $1.6M |
| Sep 4, 2019 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC019F0065 | 541712 | PROVIDE MISSION INTEGRATION AND OPERATIONS (MI&O) AND SUSTAINING ENGINEERING (SE) FOR THE RING-SHEARED DROP (RSD) EXPERIMENT | $123K |
| Aug 30, 2019 | Department of DefenseNAVAL MEDICAL LOGISTICS COMMAND | N6264516C4016 | 541712 | IGF::OT::IGF MEDICAL MODELING SERVICES IN SUPPORT OF NAVAL HEALTH RESEARCH CENTER, SAN DIEGO, CA (RESEARCH AND DEVELOPMENT SERVICES) | $608K |
| Aug 29, 2019 | Department of DefenseMISSILE DEFENSE AGENCY (MDA) | HQ014719F0050 | 541511 | OSF SUSTAINMENT ACTIVITIES | $120K |
| Aug 22, 2019 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | NNM14AA89D | 541712 | IGF::OT::IGF LAUNCH VEHICLE/STAGES ADAPTER | $250K |
| Aug 7, 2019 | Department of DefenseW6QK ACC-RSA COS | 0003 | 541712 | FMS - BASE PERIOD | $274K |
| Aug 2, 2019 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC019F0229 | 541712 | LUNAR LANDING ELECTRICAL POWER SUBSYSTEM MARKEY SURVEY | $50K |
| Jul 31, 2019 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | NNM13AA29C | 541712 | IGF::CT::IGF MISSION OPERATIONS AND INTEGRATION (MO&I) CONTRACT. THIS CONTRACT INVOLVES OPERATIONS SUPPORT FOR ALL PHASES OF FLIGHT INCLUDING MISSION PREPARATION, CREW AND FLIGHT CONTROLLER TRAINING, AND REAL-TIME OPERATIONS REQUIREMENTS FOR SPACEFLIGHT OPERATIONS SUPPORT. THE CORE SERVICES PORTION OF THE CONTRACT ESTABLISHES REQUIREMENTS FOR PAYLOAD OPERATIONS IN SUPPORT OF THE INTERNATIONAL SPACE STATION (ISS) PROGRAM, WHILE TASK ORDERS ISSUED UNDER THE INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) COMPONENT WILL PROVIDE THE CAPABILITY TO ADD OPERATIONS SUPPORT FOR OTHER PROGRAM OR PROJECT REQUIREMENTS. | $2.5M |
| Jul 29, 2019 | Department of DefenseMISSILE DEFENSE AGENCY (MDA) | HQ014719F0050 | 541511 | OSF SUSTAINMENT ACTIVITIES | $928K |
| Jul 29, 2019 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | NNM16AB84D | 541712 | IGF::OT::IGF THIS CPFF DELIVERY ORDER TO TELEDYNE BROWN ENGINEERING (TBE) IS IN SUPPORT OF THE RING-SHEARED DROP PROJECT. | $125K |
| Jul 25, 2019 | Department of DefenseHQ USSOCOM | H9240518F0015 | 336611 | SWCS SYSTEMS BOAT 5 CLIN 0030 AND TRAVEL CLIN 0039 | $123K |
| Jul 25, 2019 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | NNM14AA89D | 541712 | IGF::OT::IGF LAUNCH VEHICLE/STAGES ADAPTER | $2.0M |
| Jul 18, 2019 | Department of DefenseW6QK ACC-RSA | W9113M18FD007 | 541712 | TACTICAL RANGE AIR DEFENSE MISSILE (TACRAM) PROVIDES MISSILE DEFENSE TARGETS PRE AND POST TEST ANALYSIS MISSILE DEFENSE TARGET DESIGN MISSILE INTEGRATION TEST EXECUTION AND TARGET LAUNCH SERVICES IN SUPPORT OF MISSILE DEFENSE | $160K |
| Jul 18, 2019 | Department of DefenseW6QK ACC-RSA | W9113M18FD007 | 541712 | TACTICAL RANGE AIR DEFENSE MISSILE (TACRAM) PROVIDES MISSILE DEFENSE TARGETS PRE AND POST TEST ANALYSIS MISSILE DEFENSE TARGET DESIGN MISSILE INTEGRATION TEST EXECUTION AND TARGET LAUNCH SERVICES IN SUPPORT OF MISSILE DEFENSE | $102K |
| Jul 11, 2019 | Department of DefenseHQ USSOCOM | H9240518F0001 | 336611 | ENGINEERING SERVICES AND SYSTEM SUPPORT | $125K |
| Jun 25, 2019 | Department of DefenseMISSILE DEFENSE AGENCY (MDA) | HQ014719F0050 | 541511 | OSF SUSTAINMENT ACTIVITIES | $1.4M |
| Jun 24, 2019 | Department of DefenseNAVAL MEDICAL LOGISTICS COMMAND | N6264518C4013 | 541715 | NHRC MODELING&SIMULATION SUPPORT | $750K |
| Jun 19, 2019 | Department of DefenseHQ USSOCOM | H9240518F0004 | 336611 | AWARD FUNDING, $345,000, FOR CLIN 0025 TECHNICAL SUPPORT, CLIN 0026 UNPLANNED DLR MAINT, AND CLIN 0071 TRAVEL IN SUPPORT OF TECH SPT AND TRAINING | $180K |
| Jun 17, 2019 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | NNM13AA29C | 541712 | IGF::CT::IGF MISSION OPERATIONS AND INTEGRATION (MO&I) CONTRACT. THIS CONTRACT INVOLVES OPERATIONS SUPPORT FOR ALL PHASES OF FLIGHT INCLUDING MISSION PREPARATION, CREW AND FLIGHT CONTROLLER TRAINING, AND REAL-TIME OPERATIONS REQUIREMENTS FOR SPACEFLIGHT OPERATIONS SUPPORT. THE CORE SERVICES PORTION OF THE CONTRACT ESTABLISHES REQUIREMENTS FOR PAYLOAD OPERATIONS IN SUPPORT OF THE INTERNATIONAL SPACE STATION (ISS) PROGRAM, WHILE TASK ORDERS ISSUED UNDER THE INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) COMPONENT WILL PROVIDE THE CAPABILITY TO ADD OPERATIONS SUPPORT FOR OTHER PROGRAM OR PROJECT REQUIREMENTS. | $414K |
| Jun 13, 2019 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | NNM14AA89D | 541712 | IGF::OT::IGF LAUNCH VEHICLE/STAGES ADAPTER | $4.0M |
| Jun 7, 2019 | Department of DefenseNAVAL MEDICAL LOGISTICS COMMAND | N6264518C4013 | 541715 | NHRC MODELING&SIMULATION SUPPORT | $26K |
| Jun 6, 2019 | Department of DefenseW6QK ACC-RSA | W9113M18FD007 | 541712 | TACTICAL RANGE AIR DEFENSE MISSILE (TACRAM) PROVIDES MISSILE DEFENSE TARGETS PRE AND POST TEST ANALYSIS MISSILE DEFENSE TARGET DESIGN MISSILE INTEGRATION TEST EXECUTION AND TARGET LAUNCH SERVICES IN SUPPORT OF MISSILE DEFENSE | $4.0M |
| May 30, 2019 | Department of DefenseW6QK ACC-RSA COS | 0003 | 541712 | FMS - BASE PERIOD | $510K |
| May 30, 2019 | Department of DefenseFA7022 AMIC DET 2 OL PATRICK PKA | FA702218F0019 | 541380 | ARCS EMD | $119K |
| May 21, 2019 | Department of DefenseNAVAL INFORMATION WARFARE SYSTEMS | N0003915C0013 | 334511 | ENGINEERING, MAINTENANCE,&SUPPORT SVCS IGF::OT::IGF | $3.1M |
| May 15, 2019 | Department of DefenseHQ USSOCOM | H9240519F0022 | 336611 | PACK UP KIT (PUK) PROVISIONING ITEMS CLIN 0033 SPARES | $2.4M |
| May 2, 2019 | Department of DefenseW6QK ACC-RSA | W9113M18FD007 | 541712 | TACTICAL RANGE AIR DEFENSE MISSILE (TACRAM) PROVIDES MISSILE DEFENSE TARGETS PRE AND POST TEST ANALYSIS MISSILE DEFENSE TARGET DESIGN MISSILE INTEGRATION TEST EXECUTION AND TARGET LAUNCH SERVICES IN SUPPORT OF MISSILE DEFENSE | $8.5M |
| May 1, 2019 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | NNM15AC63D | 541712 | IGF::OT::IGF SAP PURCHASE REQUISITION: 4200548958 THE REFURBISHMENT OF THE SUBSA HARDWARE WILL REQUIRE BOTH HARDWARE AND SOFTWARE UPDATES TO RESTORE THE HARDWARE TO A FLIGHT READY STATE. THE PRIME CONTRACTOR WILL UTILIZE THEIR COMMERCIAL APPROACH TO PROVIDE BOTH THE INTEGRATION AND MISSION OPERATIONS SUPPORT FOR SUSBA. | $5K |
| May 1, 2019 | Department of DefenseHQ USSOCOM | H9240518F0001 | 336611 | ENGINEERING SERVICES AND SYSTEM SUPPORT | $322K |
| Apr 30, 2019 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | NNM15AA62D | 541712 | IGF::OT::IGF THE NASA MARSHALL SPACE FLIGHT CENTER (MSFC) SPACE SYSTEMS DEPARTMENT, SENSORS, IMAGING&OPTICS BRANCH IS SEEKING A VENDOR TO DEVELOP PRE-PHASE-A DESIGNS AND THE SUPPORT STRUCTURES FOR ULTRAVIOLET/OPTICAL/NEAR-INFRARED (UVOIR) MIRROR CONCEPTS THAT ARE CONSISTENT WITH THE PRIMARY MIRROR SUBSTRATE DESIGNS BEING DEVELOPED FOR THE ADVANCED MIRROR TECHNOLOGY DEVELOPMENT (AMTD) PROJECT. THE AMTD PROJECT HAS THE GOAL OF MATURING THE TECHNICAL READINESS LEVEL (TRL) OF KEY TECHNOLOGIES FOR THE PRIMARY MIRROR OF POTENTIAL LARGE-APERTURE COSMIC ORIGIN UVOIR SPACE TELESCOPES. | $44K |
| Apr 26, 2019 | Department of DefenseMISSILE DEFENSE AGENCY (MDA) | 0010 | 541511 | ODC - HARDWARE, SOFTWARE, AND MAINTENANCE AGREEMENT PURCHASES IGF::OT::IGF | $501K |
| Apr 25, 2019 | Department of DefenseFA7022 AMIC DET 2 OL PATRICK PKA | FA702219FA021 | 541380 | ATMOSPHERIC GAS ANALYSIS SERVICES (AGAS) TO 12: THE SMALL VOLUME APPARATUS 4 (SVA4) UNIT IS BEING BUILT TO SUPPORT AFTAC'S HARKINS LABORATORY COMPLEX (HLC). SERVICES SHALL INCLUDE THE FOLLOWING: BUILD OF THE SVA4 INSTRUMENT, TESTING OF THE SVA4 INSTRUMENT AND INSTALLATION OF THE INSTRUMENT AT THE HARKINS LABORATORY COMPLEX IN COLORADO SPRINGS, CO. | $446K |
| Apr 23, 2019 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | NNM13AA29C | 541712 | IGF::CT::IGF MISSION OPERATIONS AND INTEGRATION (MO&I) CONTRACT. THIS CONTRACT INVOLVES OPERATIONS SUPPORT FOR ALL PHASES OF FLIGHT INCLUDING MISSION PREPARATION, CREW AND FLIGHT CONTROLLER TRAINING, AND REAL-TIME OPERATIONS REQUIREMENTS FOR SPACEFLIGHT OPERATIONS SUPPORT. THE CORE SERVICES PORTION OF THE CONTRACT ESTABLISHES REQUIREMENTS FOR PAYLOAD OPERATIONS IN SUPPORT OF THE INTERNATIONAL SPACE STATION (ISS) PROGRAM, WHILE TASK ORDERS ISSUED UNDER THE INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) COMPONENT WILL PROVIDE THE CAPABILITY TO ADD OPERATIONS SUPPORT FOR OTHER PROGRAM OR PROJECT REQUIREMENTS. | $27K |
| Apr 16, 2019 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | NNM14AA89D | 541712 | IGF::OT::IGF LAUNCH VEHICLE/STAGES ADAPTER | $500K |
| Apr 16, 2019 | Department of DefenseW6QK ACC-RSA | W9113M18FD007 | 541712 | TACTICAL RANGE AIR DEFENSE MISSILE (TACRAM) PROVIDES MISSILE DEFENSE TARGETS PRE AND POST TEST ANALYSIS MISSILE DEFENSE TARGET DESIGN MISSILE INTEGRATION TEST EXECUTION AND TARGET LAUNCH SERVICES IN SUPPORT OF MISSILE DEFENSE | $113K |
| Apr 12, 2019 | Department of DefenseW6QK ACC-RSA COS | 0003 | 541712 | FMS - BASE PERIOD | $116K |
| Apr 10, 2019 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | NNM14AB60D | 541712 | IGF::OT::IGF ENGINEERING AND INTEGRATION WORK FOR MATERIAL SCIENCE RESEARCH RACK (MSRR), MICROGRAVITY SCIENCE GLOVEBOX (MSG) AND INTERNATIONAL SPACE STATION SERVIR ENVIRONMENTAL RESEARCH AND VISUALIZATION SYSTEM (ISERV) THIS DELIVERY ORDER COVERS WORK FOR MSFC MANAGED FACILITIES AND PAYLOADS. THE FACILITIES CONSIST OF THE MICROGRAVITY SCIENCES GLOVEBOX (MSG) AND THE MATERIALS SCIENCE RESEARCH RACK 1 (MSRR-1). THE PAYLOADS CONSIST OF THE INTERNATIONAL SPACE STATION (ISS) SERVIR ENVIRONMENTAL RESEARCH AND VISUALIZATION (ISERV) PATHFINDER, WHICH IS CURRENTLY OPERATING IN THE WINDOW OBSERVATIONAL RESEARCH FACILITY (WORF). THE MICROGRAVITY SCIENCE GLOVEBOX (MSG), LOCATED IN THE UNITED STATES (U.S.) DESTINY LABORATORY MODULE, ENABLES SCIENTISTS FROM MULTIPLE DISCIPLINES TO PARTICIPATE ACTIVELY IN THE ASSEMBLY AND OPERATION OF EXPERIMENTS IN SPACE WITH MUCH THE SAME DEGREE OF INVOLVEMENT THEY HAVE IN THEIR OWN RESEARCH LABORATORIES. DEVELOPED BY THE EUROPEAN SPACE AGENCY (ESA) AND MANAGED BY THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION S (NASA'S) MARSHALL SPACE FLIGHT CENTER (MSFC). THE MSG WAS LAUNCHED ON THE SPACE SHUTTLE ENDEAVOR, STS-111, ISS FLIGHT UF2, IN JUNE 2002. THIS FACILITY OFFERS AN ENCLOSED 255-LITER (9 CUBIC FOOT) WORK AREA ACCESSIBLE TO THE CREW THROUGH GLOVE PORTS AND TO GROUND-BASED SCIENTISTS THROUGH REAL-TIME DATA LINKS AND VIDEO. BECAUSE THE WORK AREA IS SEALED AND HELD AT A NEGATIVE PRESSURE, THE CREW CAN MANIPULATE EXPERIMENT HARDWARE AND SAMPLES WITHOUT THE DANGER OF SMALL PARTS, PARTICULATES, FLUIDS, OR GASSES ESCAPING INTO THE OPEN LABORATORY MODULE. THE MATERIALS SCIENCE RESEARCH RACK (MSRR) LAUNCHED ABOARD SPACE SHUTTLE ATLANTIS ON STS -128 ON AUGUST 28, 2009. MSRR ALLOWS FOR STUDY OF A VARIETY OF MATERIALS INCLUDING METALS, CERAMICS, SEMICONDUCTOR CRYSTALS AND GLASS ABOARD THE ISS. MSRR IS HOUSED IN THE U.S. DESTINY LABORATORY MODULE. MATERIALS SCIENCE IS AN INTEGRAL PART OF DEVELOPMENT OF NEW MATERIALS FOR EVERYDAY LIFE HERE ON EARTH. THE DEVELOPMENT OF THE RESEARCH RACK WAS A COOPERATIVE EFFORT BETWEEN THE MARSHALL CENTER AND THE EUROPEAN SPACE AGENCY. THE MATERIALS BEING STUDIED ARE FLOWN AND PROCESSED IN SAMPLE CARTRIDGE ASSEMBLIES (SCAS). DEVELOPMENT OF NEW SCAS IS CURRENTLY UNDERWAY. THE ISERV PATHFINDER LAUNCHED ON JULY 21, 2012 ABOARD HTV-3. THE ISERV SUB-RACK PAYLOAD IS AN EARTH OBSERVING HIGH-RESOLUTION SYSTEM BASED PRIMARILY ON MODIFIED COMMERCIAL OFF-THE-SHELF (COTS) COMPONENTS, WHICH WERE DEVELOPED BY THE NASA-SERVIR PROJECT FOR OPERATION IN THE WORF RACK. THE NASA-SERVIR PROJECT SUPPORTS HUMANITARIAN AID AND DISASTER RESPONSE FOR DEVELOPING NATIONS BY PROVIDING EARTH SCIENCE INFORMATION AND DECISION SUPPORT DATA PRODUCTS. CURRENTLY, SERVIR DOES NOT OWN/CONTROL ANY EARTH OBSERVATION RESOURCES AND MUST TASK COMMERCIAL AND PUBLIC ASSETS FOR DATA ACQUISITION RESULTING IN DELAYS AND MISSED OPPORTUNITIES. THE ISERV PAYLOAD IS THE FIRST STEP IN MITIGATING THIS SITUATION. ISERV IS A PATHFINDER PAYLOAD CHARACTERIZED AS A DEVELOPMENTAL FLIGHT TEST WITH THE PRIMARY PURPOSE OF DEVELOPING OPERATIONAL EXPERIENCE WITH AN ISS-BASED REMOTE SENSING SYSTEM. THE EXPERIENCE GAINED WITH ISERV WILL FACILITATE THE DEVELOPMENT AND IMPLEMENTATION OF AN OPERATIONAL EXTERNALLY MOUNTED IMAGING SYSTEM ABOARD THE ISS. THE PRIMARY OBJECTIVES OF THE ISERV PATHFINDER PAYLOAD INCLUDE: A. DEVELOPMENT OF GENERAL TASKING, UTILIZATION, GROUND COMMANDING, DATA ACQUISITION, AND PROCESSING EXPERIENCE. B. DEVELOPMENT OF IMAGE ACQUISITION, PROCESSING, AND ANALYSIS CAPABILITIES. C. DEVELOPMENT OF FULL COMMANDING, ACQUISITION, AND PROCESSING OPERATIONS CAPABILITIES FOR ISERV HUMANITARIAN AID AND DISASTER MONITORING AND ASSESSMENT OPERATIONAL REQUIREMENTS. D. INFORMING THE DEFINITION OF REQUIREMENTS APPLICABLE FOR A POTENTIAL EXTERNALLY MOUNTED ISERV IMAGING SYSTEM. E. APPLICATION OF ACQUIRED IMAGES FOR SERVIR PURPOSES. | $90K |
| Apr 10, 2019 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | NNM13AA29C | 541712 | IGF::CT::IGF MISSION OPERATIONS AND INTEGRATION (MO&I) CONTRACT. THIS CONTRACT INVOLVES OPERATIONS SUPPORT FOR ALL PHASES OF FLIGHT INCLUDING MISSION PREPARATION, CREW AND FLIGHT CONTROLLER TRAINING, AND REAL-TIME OPERATIONS REQUIREMENTS FOR SPACEFLIGHT OPERATIONS SUPPORT. THE CORE SERVICES PORTION OF THE CONTRACT ESTABLISHES REQUIREMENTS FOR PAYLOAD OPERATIONS IN SUPPORT OF THE INTERNATIONAL SPACE STATION (ISS) PROGRAM, WHILE TASK ORDERS ISSUED UNDER THE INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) COMPONENT WILL PROVIDE THE CAPABILITY TO ADD OPERATIONS SUPPORT FOR OTHER PROGRAM OR PROJECT REQUIREMENTS. | $16M |
| Apr 9, 2019 | Department of DefenseFA7022 AMIC DET 2 OL PATRICK PKA | FA702219FA014 | 541380 | ATMOSPHERIC GAS ANALYSIS SERVICES (AGAS) TO 10:THE OBJECTIVE OF THIS PROJECT IS TO PROVIDE EMD TESTING AND DOCUMENTATION SUPPORT OF THE PNNL XENON INTERNATIONAL AUTOMATED RADIOXENON CONCENTRATOR AND SPECTROMETER (ARCS) SYSTEM. | $499K |
| Mar 30, 2019 | Department of DefenseMISSILE DEFENSE AGENCY (MDA) | HQ014719F0051 | 541511 | LABOR AND PRODUCT DEVELOPMENT | $1.6M |
| Mar 30, 2019 | Department of DefenseMISSILE DEFENSE AGENCY (MDA) | HQ014719F0050 | 541511 | OSF SUSTAINMENT ACTIVITIES | $4.5M |
| Mar 30, 2019 | Department of DefenseMISSILE DEFENSE AGENCY (MDA) | 0010 | 541511 | ODC - HARDWARE, SOFTWARE, AND MAINTENANCE AGREEMENT PURCHASES IGF::OT::IGF | $175K |
| Mar 29, 2019 | Department of DefenseNAVAL INFORMATION WARFARE SYSTEMS | N0003915C0013 | 334511 | ENGINEERING, MAINTENANCE,&SUPPORT SVCS IGF::OT::IGF | $1.4M |
| Mar 27, 2019 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | NNM16AB84D | 541712 | IGF::OT::IGF THIS CPFF DELIVERY ORDER TO TELEDYNE BROWN ENGINEERING (TBE) IS IN SUPPORT OF THE RING-SHEARED DROP PROJECT. | $274K |
| Mar 22, 2019 | Department of DefenseW6QK ACC-RSA | W9113M18FD007 | 541712 | TACTICAL RANGE AIR DEFENSE MISSILE (TACRAM) PROVIDES MISSILE DEFENSE TARGETS PRE AND POST TEST ANALYSIS MISSILE DEFENSE TARGET DESIGN MISSILE INTEGRATION TEST EXECUTION AND TARGET LAUNCH SERVICES IN SUPPORT OF MISSILE DEFENSE | $1.7M |
| Mar 22, 2019 | Department of DefenseW6QK ACC-RSA | W9113M18FD007 | 541712 | TACTICAL RANGE AIR DEFENSE MISSILE (TACRAM) PROVIDES MISSILE DEFENSE TARGETS PRE AND POST TEST ANALYSIS MISSILE DEFENSE TARGET DESIGN MISSILE INTEGRATION TEST EXECUTION AND TARGET LAUNCH SERVICES IN SUPPORT OF MISSILE DEFENSE | $1.2M |
| Mar 20, 2019 | Department of DefenseW6QK ACC-RSA COS | 0003 | 541712 | FMS - BASE PERIOD | $1.3M |
| Mar 20, 2019 | Department of DefenseW6QK ACC-RSA COS | 0003 | 541712 | FMS - BASE PERIOD | $313K |
| Mar 19, 2019 | Department of DefenseHQ USSOCOM | H9240518F0001 | 336611 | ENGINEERING SERVICES AND SYSTEM SUPPORT | $200K |
Get Alerted Before Teledyne Brown Engineering, INC.'s Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free