Federal Contractor Profile
Teledyne Scientific & Imaging, LLC
$254M obligated·112 awards·7 agencies·9 NAICS
Federal Contracts
Showing contracts 251–268 of 268 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Mar 30, 2016 | Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZL | FA865015C7555 | 541712 | IGF::OT::IGF TARGET RECOGNITION AND ADAPTION IN CONTESTED ENVIR (TRACE) | $761K |
| Mar 23, 2016 | National Aeronautics and Space AdministrationGODDARD SPACE FLIGHT CENTER | NNG16PP73P | 334413 | SIDECAR ASIC ROOM TEMPERATURE DEVELOPMENT KIT. | $25K |
| Mar 1, 2016 | Department of DefenseFA8651 AFRL RWK | FA865116C0338 | 541712 | IGF::OT::IGF DEEP CONVOLUTIONAL MODELS AND NONPARAMETRIC TRACKING FOR LOW-COST MISSILE SEEKERS | $842K |
| Feb 17, 2016 | Department of DefenseW6QK ACC-APG ADELPHI | W911QX15C0017 | 541712 | IGF::OT::IGF SUPER-SCALABLE PLANAR REFLECT ARRAY (SUPRA) | $2.0M |
| Jan 24, 2016 | Department of DefenseDEF ADVANCED RESEARCH PROJECTS AGCY | HR001115C0033 | 541712 | IGF::OT::IGF MATERIALS DEVELOPMENT FOR PLATFORMS (MDP) PROGRAM | $919K |
| Jan 15, 2016 | Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZL | FA865015C5403 | 541712 | IGF::OT::IGF HYPERSPECTRAL LONG WAVE INFRARED (LWIR) MATERIALS DEVELOPMENT FOR AIRBORNE ISR | $150K |
| Jan 5, 2016 | Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZL | FA865015C7555 | 541712 | IGF::OT::IGF TARGET RECOGNITION AND ADAPTION IN CONTESTED ENVIR (TRACE) | $374K |
| Jan 1, 2016 | Department of DefenseDEF ADVANCED RESEARCH PROJECTS AGCY | HR001115C0033 | 541712 | IGF::OT::IGF MATERIALS DEVELOPMENT FOR PLATFORMS (MDP) PROGRAM | $299K |
| Dec 21, 2015 | Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZL | FA865013C7313 | 541712 | DAHI- TELEDYNE TA 1 | $1.7M |
| Dec 21, 2015 | Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZL | FA865015C5403 | 541712 | IGF::OT::IGF HYPERSPECTRAL LONG WAVE INFRARED (LWIR) MATERIALS DEVELOPMENT FOR AIRBORNE ISR | $110K |
| Dec 7, 2015 | Department of DefenseFA8651 AFRL RWK | FA865116C0338 | 541712 | IGF::OT::IGF DEEP CONVOLUTIONAL MODELS AND NONPARAMETRIC TRACKING FOR LOW-COST MISSILE SEEKERS | $300K |
| Dec 7, 2015 | Department of DefenseW6QK ACC-APG ADELPHI | W911QX15C0017 | 541712 | IGF::OT::IGF SUPER-SCALABLE PLANAR REFLECT ARRAY (SUPRA) | $439K |
| Nov 20, 2015 | Department of DefenseDEF ADVANCED RESEARCH PROJECTS AGCY | HR001112C0092 | 541712 | PROGRAMMABLE MILLIMETER-WAVE INTEGRATED CIRCUITS (PMICS), PHASE 1 | $199K |
| Nov 19, 2015 | National Aeronautics and Space AdministrationGODDARD SPACE FLIGHT CENTER | NNG14PJ16C | 334413 | TELEDYNE SHALL PROVIDE FORTY TWO (42) FUNCTIONAL H4RG-10 SCA UNITS, AS DESCRIBED BELOW. THE CONTRACTOR SHALL PROVIDE, ACCORDING TO THE NOTIONAL SCHEDULE BELOW, THE FACILITIES, PERSONNEL, SERVICES, TOOLS, EQUIPMENT, AND MATERIALS NECESSARY TO: A) JUNE 2014 - JAN 2015, FABRICATE TWELVE (12) SCA UNITS FOR FULL ARRAY DEMONSTRATION LOT A. IN RECOGNITION THAT THE DCL WILL BE UTILIZED FOR TEST AND EVALUATION, THEY SHALL BE FUNCTIONAL. THE GOVERNMENT, AT ITS DISCRETION, MAY ALLOW SOME NUMBER OF NON-FUNCTIONAL SCA'S TO BE DELIVERED DEPENDING UPON YIELD AND ESTIMATES OF OVERALL COST. B) SCREEN AND TEST TWELVE (12) SCAS. THE SCOPE OF THE SCREEN TEST SHALL BE SUFFICIENT TO DIFFERENTIATE BETWEEN GENERALLY FUNCTIONAL AND NON-FUNCTIONAL SCAS AT OPERATING TEMPERATURE. C) NOV 2014 - JUN 2015, FABRICATE TWELVE (12) SCA UNITS FOR FULL ARRAY DEMONSTRATION LOT B. IN RECOGNITION THAT THE DCL WILL BE UTILIZED FOR TEST AND EVALUATION, THEY SHALL BE FUNCTIONAL. THE GOVERNMENT, AT ITS DISCRETION, MAY ALLOW SOME NUMBER OF NON-FUNCTIONAL SCA'S TO BE DELIVERED DEPENDING UPON YIELD AND ESTIMATES OF OVERALL COST. D) SCREEN AND TEST TWELVE (12) SCAS. THE SCOPE OF THE SCREEN TEST SHALL BE SUFFICIENT TO DIFFERENTIATE BETWEEN GENERALLY FUNCTIONAL AND NON-FUNCTIONAL SCAS AT OPERATING TEMPERATURE. E) OCT 2015 - MAY 2016, FABRICATE EIGHTEEN (18) SCA UNITS FOR THE YIELD DEMONSTRATION LOT. IN RECOGNITION THAT THE DCL WILL BE UTILIZED FOR TEST AND EVALUATION, THEY SHALL BE FUNCTIONAL. THE GOVERNMENT, AT ITS DISCRETION, MAY ALLOW SOME NUMBER OF NON-FUNCTIONAL SCA'S TO BE DELIVERED DEPENDING UPON YIELD AND ESTIMATES OF OVERALL COST. F) SCREEN AND TEST TWELVE (18) SCAS. THE SCOPE OF THE SCREEN TEST SHALL BE SUFFICIENT TO DIFFERENTIATE BETWEEN GENERALLY FUNCTIONAL AND NON-FUNCTIONAL SCAS AT OPERATING TEMPERATURE. G) PROVIDE DOCUMENTATION AND DELIVERABLE DATA PER CONTRACT. H) FLIGHT QUALIFICATION OF A FLIGHT REPRESENTATIVE DESIGN, INCLUDING BUT NOT LIMITED TO RADIATION TESTING (LIFETIME AND LATCHUP, PROTONS, ELECTRONS, AND HEAVY IONS), VIBRATION, THERMAL (EXTREMES AND CYCLING), POWER CYCLING, AND MATE/DEMATE CYCLES. A MINIMUM OF 3 PARTS SHALL BE TESTED. | $1.2M |
| Nov 18, 2015 | Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZL | FA865013C5212 | 541712 | IGF::OT::IGF BEHAVIOR AND LIFE PREDICTION OF SIC/SIC CMCS FOR TURBINE APPLICATIONS: DISCRETE DAMAGE BASED MODELING | $350K |
| Nov 13, 2015 | Department of DefenseW6QK ACC-RSA | W31P4Q13C0023 | 541712 | DARPA BAA 12-20 - EFFORT ENTITLED, "CUBIC BORON NITRIDE: A MODEL FOR EXTENDED SOLIDS PROCESSING". | $487K |
| Nov 10, 2015 | Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZL | FA865013C5212 | 541712 | IGF::OT::IGF BEHAVIOR AND LIFE PREDICTION OF SIC/SIC CMCS FOR TURBINE APPLICATIONS: DISCRETE DAMAGE BASED MODELING | $350K |
| Oct 30, 2015 | Department of DefenseW6QK ACC-ORLANDO | W900KK11C0042 | 541712 | BASE AWARD MORPH PHASE 1 | $544K |
Get Alerted Before Teledyne Scientific & Imaging, LLC's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free