Federal Contractor Profile
The Aerospace Corporation
$12B obligated·869 awards·9 agencies·12 NAICS
Federal Contracts
Showing contracts 1,601–1,650 of 3,034 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Aug 13, 2020 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC020F0309 | 541715 | HUMAN RESEARCH PROGRAM - MULTIDISCIPLINARY PROGRAM | $20K |
| Aug 12, 2020 | Department of DefenseFA8802 INTEGRATION OPERATION PIKPKE | FA880219C0001 | 541715 | FY19 ENGINEERING SERVICES | $51M |
| Aug 11, 2020 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC20F0117 | 541715 | NEW TASK ORDER FOR SCIENCE AND RESEARCH PROJECTS DIVISION (SRPD) PROJECT SUPPORT. | $50K |
| Aug 6, 2020 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC019F0088 | 541715 | THE CONTRACTOR SHALL PROVIDE ENGINEERING SERVICES IN SUPPORT OF SPECTRUM MANAGEMENT AND GLOBAL POSITIONING SYSTEM/POSITION NAVIGATION AND TIMING (GPS/PNT) PROJECT | $35K |
| Jul 30, 2020 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC19F0127 | 541715 | NASA-WIDE SPECIALIZED ENGINEERING, EVALUATION AND TEST SERVICES (NSEETS) | $2.7M |
| Jul 30, 2020 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC020F0214 | 541715 | TECHNICAL SUPPORT FOR GATEWAY&HLS ACTIVE THERMAL CONTROL SYSTEM (ATCS ) | $30K |
| Jul 29, 2020 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC019F0275 | 541715 | COMMERCIAL CREW PROGRAM (CCP) SAFETY&MISSION ASSURANCE (SMA) TASK ORDER (TO) | $162K |
| Jul 29, 2020 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC020F0275 | 541715 | ACQUISITION PLANNING, PREPARATION&EVALUATION SUPPORT - ISS RLLS SEB SUPPORT | $267K |
| Jul 28, 2020 | National Aeronautics and Space AdministrationNASA HEADQUARTERS | 80HQTR20F0182 | 541715 | THE NASA HELIOPHYSICS DIVISION (HPD) OF THE SCIENCE MISSION DIRECTORATE (SMD) IS SUPPORTING HELIOPHYSICS SYSTEM OBSERVATORY MISSIONS THAT ARE OPERATING BEYOND THEIR PRIME MISSION LIFETIMES. | $28K |
| Jul 27, 2020 | National Aeronautics and Space AdministrationNASA HEADQUARTERS | 80HQTR19F0283 | 541715 | PROGRAMMATIC ASSESSMENT&MONITORING FOR THE SCIENCE MISSION DIRECTORATE | $626K |
| Jul 27, 2020 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC020F0052 | 541715 | THE CONTRACTOR SHALL PROVIDE ENGINEERING/SCIENTIFIC SERVICES TO INCLUDE LABORATORY/CLEANROOM DESIGN EXPERTISE, PLANETARY PROTECTION, CONTAMINATION AND STERILITY CONTROL,INSTRUMENT INTEGRATION AND TEST PLANNING,SAFETY PLANNING,AND FACILITY ANALYSIS. | $30K |
| Jul 25, 2020 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | 80LARC19F0161 | 541715 | CRYOGENICS TECHNICAL DISCIPLINE TEAM (TDT) SUPPORT.THE NASA ENGINEERING AND SAFETY CENTER'S CRYOGENICS TECHNICAL DISCIPLINE TEAM PROVIDES TECHNICAL EXPERTISE TO THE AGENCY FOR ISSUES ASSOCIATED WITH THE IMPLEMENTATION OF CRYOGENICS SYSTEMS. . | $24K |
| Jul 25, 2020 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | 80LARC19F0118 | 541715 | PASSIVE THERMAL TECHNICAL DISCIPLINE TEAM (TDT) SUPPORT.THE NASA ENGINEERING AND SAFETY CENTER'S PASSIVE THERMAL TECHNICAL DISCIPLINE TEAM (TDT) PROVIDES TECHNICAL EXPERTISE TO THE AGENCY FOR PASSIVE THERMAL CONTROL AND THERMAL PROTECTION SYSTEMS.. | $24K |
| Jul 25, 2020 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | 80LARC19F0124 | 541715 | SPACE ENVIRONMENTS TECHNICAL DISCIPLINE TEAM (TDT) SUPPORT.THE NASA ENGINEERING AND SAFETY CENTER'S SPACE ENVIRONMENTS TECHNICAL DISCIPLINE TEAM PROVIDES TECHNICAL EXPERTISE ON SPACE ENVIRONMENTS AND THEIR EFFECTS ON SPACE SYSTEMS TO THE AGENCY.. | $12K |
| Jul 25, 2020 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | 80LARC19F0115 | 541715 | MECHANICAL SYSTEMS TECHNICAL DISCIPLINE TEAM SUPPORT. THE NASA ENGINEERING AND SAFETY CENTER'S MECHANICAL SYSTEMS TECHNICAL DISCIPLINE TEAM PROVIDES TECHNICAL EXPERTISE FOR THE RESOLUTION OF AGENCY-WIDE ISSUES RELATED TO MECHANICAL SYSTEMS. | $46K |
| Jul 25, 2020 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | 80LARC19F0130 | 541715 | NON-DESTRUCTIVE EVALUATION (NDE) TECHNICAL DISCIPLINE TEAM SUPPORT. THIS NASA ENGINEERING AND SAFETY CENTER'S TECHNICAL DISCIPLINE TEAM PROVIDES TECHNICAL EXPERTISE TO THE AGENCY FOR ISSUES RELATED TO THE APPLICATION OF RESULTS FROM NDE TECHNIQUES... | $12K |
| Jul 24, 2020 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC020F0051 | 541715 | THE CONTRACTOR SHALL PROVIDE ENGINEERING/SCIENTIFIC SERVICES IN SUPPORT OF THE SMALL SPACECRAFT SYSTEMS VIRTUAL INSTITUTE (S3VI) SMALL SATELLITE TECHNOLOGY STATE OF THE ART (SOTA) REPORT. | $7K |
| Jul 23, 2020 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC019F0294 | 541715 | EXPLORATION GROUND SYSTEMS (EGS) EMBEDDED SUPPORT&MODELING AND ANALYSIS | $85K |
| Jul 23, 2020 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC19F0225 | 541715 | NEW TASK ORDER FOR SUPPORT OF THE SPACE LAUNCH SYSTEM (SLS) SPACECRAFT/PAYLOAD INTEGRATION AND EVOLUTION OFFICE (SPIE) | $575K |
| Jul 22, 2020 | National Aeronautics and Space AdministrationNASA HEADQUARTERS | 80HQTR19F0280 | 541715 | COST/TECHNICAL DATA PACKAGE (CTDP) DEVELOPMENT FOR HQ'S STRATEGIC INVESTMENT DIVISION | $20K |
| Jul 21, 2020 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC019F0284 | 541715 | NASA-WIDE SPECIALIZED ENGINEERING, EVALUATION AND TEST SERVICES (NSEETS) TO PROVIDE ON/OFF-SITE PROJECT INDEPENDENT MULTIDISCIPLINARY ENGINEERING SERVICE | $275K |
| Jul 21, 2020 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC019F0195 | 541715 | NASA GRC SPACE LAUNCH SYSTEMS (SLS) SUPPORT | $75K |
| Jul 20, 2020 | Department of CommerceDEPT OF COMMERCE NOAA | 1332KP20FNEEP0015 | 541712 | AERONAUTICAL ENGINEERING | $807K |
| Jul 16, 2020 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | 80LARC19F0126 | 541715 | SENSORS AND INSTRUMENTATION TECHNICAL DISCIPLINE TEAM (TDT) SUPPORT.THE NASA ENGINEERING AND SAFETY CENTER'S SENSORS AND INSTRUMENTATION TECHNICAL DISCIPLINE TEAM PROVIDES TECHNICAL EXPERTISE TO THE AGENCY FOR ISSUES RELATED TO COMPONENTS,. | $50K |
| Jul 16, 2020 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC19F0127 | 541715 | NASA-WIDE SPECIALIZED ENGINEERING, EVALUATION AND TEST SERVICES (NSEETS) | $1.3M |
| Jul 15, 2020 | Department of CommerceDEPT OF COMMERCE NOAA | DOCT0007 | 541712 | IGF::OT::IGF FFRDC SUPPORT. AWARD OF TASK ORDER FOR OSGS. | $924K |
| Jul 14, 2020 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC020F0122 | 541715 | NASA-WIDE SPECIALIZED ENGINEERING, EVALUATION AND TEST SERVICES (NSEETS) TO PROVIDE ON/OFF-SITE PROJECT INDEPENDENT MULTIDISCIPLINARY ENGINEERING SERVICES, TESTING, CONSULTING, CONTRACTOR-ON-SITE MONITORING, AND EVALUATION OF PROJECT AND/OR PROGRAMS | $62K |
| Jul 14, 2020 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC020F0089 | 541715 | NASA-WIDE SPECIALIZED ENGINEERING, EVALUATION AND TEST SERVICES (NSEETS) TO PROVIDE ON/OFF-SITE PROJECT INDEPENDENT MULTIDISCIPLINARY ENGINEERING SERVICES, TESTING, CONSULTING, CONTRACTOR-ON-SITE MONITORING, AND EVALUATION OF PROJECT AND/OR PROGRAMS | $64K |
| Jul 14, 2020 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC019F0287 | 541715 | NASA-WIDE SPECIALIZED ENGINEERING, EVALUATION AND TEST SERVICES (NSEETS) TO PROVIDE ON/OFF-SITE PROJECT INDEPENDENT MULTIDISCIPLINAR | $15K |
| Jul 13, 2020 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC020F0061 | 541715 | NASA-WIDE SPECIALIZED ENGINEERING, EVALUATION AND TEST SERVICES (NSEETS) TO PROVIDE ON/OFF-SITE PROJECT INDEPENDENT MULTIDISCIPLINARY | $60K |
| Jul 10, 2020 | Department of DefenseFA8802 INTEGRATION OPERATION PIKPKE | FA880219C0001 | 541715 | FY19 ENGINEERING SERVICES | $93M |
| Jul 10, 2020 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC20F0170 | 541715 | THE AEROSPACE CORPORATION SHALL PROVIDE INDEPENDENT ASSESSMENTS AND SYSTEMS ANALYSIS OF GOVERNMENT LED STUDIES RELATED TO HUMAN LANDING SYSTEM (HLS) SPACE VEHICLE SYSTEMS (SVS)CONCEPTS AND DESIGNS. | $281K |
| Jul 9, 2020 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC019F0285 | 541715 | NASA-WIDE SPECIALIZED ENGINEERING, EVALUATION AND TEST SERVICES (NSEETS) TO PROVIDE ON/OFF-SITE PROJECT INDEPENDENT MULTIDISCIPLINARY ENGINEERING SERVICES, TESTING, CONSULTING, CONTRACTOR-ON-SITE MONITORING, AND EVALUATION OF PROJECT AND/OR PROGRAMS. | $98K |
| Jul 9, 2020 | Department of CommerceDEPT OF COMMERCE NOAA | 1332KQ18FNEEG0028 | 541712 | IGF::OT::IGF SUPPORT SERVICES | $398K |
| Jul 8, 2020 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC019F0292 | 541715 | COMMAND&DATA HANDLING BRANCH (C&DH) NETWORK ARCHITECTURE (NSEETS) | $54K |
| Jul 8, 2020 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | 80LARC19F0113 | 541715 | LOADS AND DYNAMICS TECHNICAL DISCIPLINE TEAM (TDT) SUPPORT.THE NASA ENGINEERING AND SAFETY CENTER'S (NESC) LOADS AND DYNAMICS (L&D) TECHNICAL DISCIPLINE TEAM (TDT) PROVIDES EXPERTISE TO THE AGENCY FOR STRUCTURAL DYNAMICS AND LOADS ANALYSIS AND TEST | $33K |
| Jul 8, 2020 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC19F0226 | 541715 | NEW TASK ORDER FOR NUCLEAR THERMAL PROPULSION (NTP) PROJECT SUPPORT. | $500K |
| Jul 8, 2020 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC019F0292 | 541715 | DEEP SPACE GATEWAY (DSG) LOGISTICS ELEMENT PROJECT MANAGEMENT AND SYSTEMS' ENGINEERING SUPPORT IN THE AREAS OF INTEGRATION AND ANALYSIS AND ELEMENT ARCHITECTURE. | $119K |
| Jul 2, 2020 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC019F0276 | 541715 | THE COMMERCIAL CREW PROGRAM IS REQUESTING TECHNICAL SUPPORT TO CCP SYSTEMS ENGINEERING AND INTEGRATION (SE&I) FOR BOEING AND SPACEX LED CERTIFICATION TEAMS IN EVALUATION AND REFINEMENT OF PROVIDER CERTIFICATION PRODUCTS. | $159K |
| Jul 2, 2020 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC019F0282 | 541715 | SYSTEMS ENGINEERING AND INTEGRATION (SE&I) FOR EXTRA VEHICULAR ACTIVITY (EVA) EXPLORATION OFFICE SERVICES (NSEETS) | $50K |
| Jul 1, 2020 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | 80LARC19F0141 | 541715 | THE NASA ENGINEERING AND SAFETY CENTER'S (NESC) MOLDED AVCOAT BLOCK HEATSHIELD DESIGN BOND VERIFICATION TEAM WILL PROVIDE ASSISTANCE IN THE DEVELOPMENT OF A BOND VERIFICATION PLAN FOR THE NEW ORION HEATSHIELD ARCHITECTURE. | $55K |
| Jun 26, 2020 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC020F0029 | 541715 | NASA-WIDE SPECIALIZED ENGINEERING, EVALUATION AND TEST SERVICES (NSEETS) COMMERCIAL CREW PROGRAM (CCP) INDEPENDENT ASSESSMENT (IA) AND EVALUATION OF THE BOEING CST 100 PROPULSION SYSTEM | $28K |
| Jun 25, 2020 | National Aeronautics and Space AdministrationNASA HEADQUARTERS | 80HQTR19F0281 | 541715 | ON-SITE TECHINCAL SUPPORT SERVICES FOR SPACE TECHNOLOGY MISSION DIRECTORATE (STMD) | $350K |
| Jun 24, 2020 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | 80LARC19F0117 | 541715 | PROPULSION TECHNICAL DISCIPLINE TEAM SUPPORT. THE NASA ENGINEERING AND SAFETY CENTER'S PROPULSION TECHNICAL DISCIPLINE TEAM PROVIDES TECHNICAL EXPERTISE TO NASA FOR ISSUES RELATED TO THE OPERATION OF PROPULSION SYSTEMS. | $37K |
| Jun 24, 2020 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC019F0110 | 541712 | LAUNCH SERVICES PROGRAM (LSP) CUBESAT SUPPORT | $37K |
| Jun 24, 2020 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC020F0294 | 541715 | NASA-WIDE SPECIALIZED ENGINEERING, EVALUATION AND TEST SERVICES (NSEETS) TO PROVIDE ON/OFF-SITE PROJECT INDEPENDENT MULTIDISCIPLINARY ENGINEERING SERVICES, TESTING, CONSULTING, CONTRACTOR-ON-SITE MONITORING, AND EVALUATION OF PROJECT AND/OR PROGRAMS. | $315K |
| Jun 23, 2020 | Department of CommerceDEPT OF COMMERCE NOAA | DOCT0010 | 541712 | IGF::OT::IGF FFRDC SUPPORT. TASK ORDER AWARD FOR THE CLASS PROGRAM OFFICE. | $983K |
| Jun 18, 2020 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG16VN72T | 541712 | IGF::OT::IGF COST, SCHEDULE AND SYSTEMS ENGINEERING RESEARCH AND ANALYSIS SUPPORT. THE DEPUTY DIRECTOR FOR PLANNING AND BUSINESS MANAGEMENT FLIGHT PROJECTS DIRECTORATE (FPD) AT THE NASA GODDARD SPACE FLIGHT CENTER (GSFC) HAS BEEN DEVELOPING A SERIES OF BUSINESS CHANGE INITIATIVES (BCI) FOCUSED AT IMPROVING THE COST AND SCHEDULE PERFORMANCE OF MISSIONS EXECUTED AT THE CENTER. THIS POSITION HAS THE RESPONSIBILITY FOR MANAGING THE CENTERS DIVERSE AND COMPLEX FLIGHT PROJECT PORTFOLIO TO ENSURE THAT COST AND SCHEDULE CONSTRAINTS ARE MET WHILE MEETING REQUIRED TECHNICAL OBJECTIVES. TASK DESCRIPTION 1. CLASS D RESEARCH AND ANALYSIS A. SUMMARIZE LESSONS LEARNED FROM USAF AND NASA CLASS D MISSIONS; B. REVIEW NASA AND CENTER DOCUMENTATION REGARDING REQUIREMENTS FOR NASA CLASS D SCIENCE MISSIONS; AND C. DEVELOP RECOMMENDATIONS FOR CONSISTENT TERMINOLOGY AND PRACTICES FOR NASA CLASS D MISSIONS 2. ASSESS CONTRIBUTION OF SCHEDULE GROWTH TO COST GROWTH. A. IDENTIFY CONTRIBUTION OF SCHEDULE GROWTH TO COST GROWTH BY ASSESSING HISTORICAL NASA MISSION SCIENCE COST AND SCHEDULE DATA; B. WORK WITH GODDARD PERSONNEL TO IDENTIFY SPECIFIC EXAMPLES OF SCHEDULE GROWTH IMPACT ON COST GROWTH; AND C. DEVELOP BRIEFING/PAPER TO PRESENT RESULTS. 3. QUANTIFICATION OF THREAT ASSESSMENTS A. IDENTIFY THREAT ASSESSMENT QUANTIFICATION METRIC AND PROPOSE PROCESS TO PRESENT AT CODE 400 POST MONTHLY STATUS REVIEW (MSR) BRIEFING; B. ACTIVELY WORK WITH PROJECT(S) TO TAKE RISKS FROM EXISTING RISK LIST AND QUANTIFY COST AND SCHEDULE THREATS; C. DEFINE AND ESTABLISH A FRAMEWORK FOR IDENTIFYING ROBUST THREAT REPORTING COMMENSURATE WITH RISK REPORTING; AND D. STREAMLINE ACTIVE THREAT MITIGATION TO AVOID COST AND SCHEDULE GROWTH ACROSS THE FLIGHT PROJECTS PORTFOLIO. 4. HISTORICAL TECHNICAL AND PROGRAMMATIC GROWTH, AND CONTINGENCY ASSESSMENT A. LEVERAGING OFF OF EXISTING WORK, IDENTIFY SPACECRAFT MASS AND POWER, AND COST AND SCHEDULE GROWTH FOR HISTORICAL SCIENCE MISSIONS INCLUDING GSFC AND OTHER NASA CENTERS; B. IDENTIFY AVERAGES, VARIABILITY AND TRENDING DATA SEPARATED BY CENTER AND SCIENCE THEME; C. IDENTIFY THE HISTORIC SPACECRAFT MASS AND POWER CONTINGENCY AND COST AND SCHEDULE RESERVE POSTURE AT EACH MAJOR MILESTONE FOR THE MISSION INVESTIGATED; AND D. DEVELOP GUIDELINES TO BE USED FOR ASSESSMENT OF NEW SPACECRAFT AS A FUNCTION OF EACH MAJOR MILESTONE. 5. SUPPORT THE BCI ACTION TEAMS A. PARTICIPATE IN AND PROVIDE RESEARCH AND ANALYSIS SUPPORT TO EXISTING BCI ACTION TEAMS AS REQUESTED; B. LEVERAGE AEROSPACE CORPORATION TOOLS, METHODS, AND PROCESSES TO PERFORM ASSESSMENTS AND ANALYSIS TO SUPPORT PROJECT CONTROL, AS WELL AS ASSIST IN IDENTIFYING AND DEFINING PROJECT CONTROL BEST PRACTICES; AND C. SUPPORT PROGRAMMATIC ANALYSIS AS NEEDED FOR CENTER PROJECTS. | $98 |
| Jun 18, 2020 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG17VN76T | 541712 | IGF::OT::IGF THE CENTER DIRECTOR AT THE NASA GODDARD SPACE FLIGHT CENTER (GSFC) IS RESPONSIBLE FOR MANAGING THE CENTERS DIVERSE AND COMPLEX RESEARCH AND DEVELOPMENT PORTFOLIO; FORMULATING THE CENTERS FUTURE SCIENCE AND TECHNOLOGY GOALS AND LEADING AN INTEGRATED PROGRAM OF INVESTMENTS AND INITIATIVES ALIGNED TO MEET THOSE GOALS. ACCORDINGLY, AEROSPACE SHALL PROVIDE QUALIFIED TECHNICAL EXPERTISE TO THE GODDARD CENTER DIRECTOR TO CONDUCT ASSESSMENTS OF NASA PROGRAMS AND PROJECTS, PROJECT MANAGEMENT, SCIENCE, ENGINEERING AND TECHNOLOGY IN ACCORDANCE WITH THE PRIORITIES AS ESTABLISHED BY THE CENTER DIRECTOR. THE PRIORITIES MAY CHANGE AS THE CENTER DIRECTORS DISCRETION. AEROSPACE IS TASKED TO PROVIDE KNOWLEDGEABLE OBSERVATIONS IN AREAS REQUESTED BY THE GSFC CENTER DIRECTOR WITH A FOCUS ON PROGRAM EXECUTION AND POTENTIAL RISKS. JWST IS THE PLANNED SUCCESSOR TO THE HUBBLE SPACE TELESCOPE, AND IS A TECHNICALLY CHALLENGING PROJECT TO BUILD A SPACECRAFT CONSISTING OF A 6.5 METER PRIMARY MIRROR AND FOUR PRIMARY INSTRUMENTS OPERATING IN THE INFRARED SPECTRUM AT VERY LOW TEMPERATURES, WHILE ORBITING APPROXIMATELY 1.5 MILLION KILOMETERS FROM THE EARTH. BECAUSE OF THE COMPLEXITY OF THE PROJECT, JWST IS ALREADY SUBJECT TO INDEPENDENT EXTERNAL REVIEWS, AND THIS TEAM IS NOT INTENDED TO DUPLICATE OR CONFIRM THE FINDINGS OF THOSE REVIEWS. THE CONTRACTOR WILL BE A MEMBER OF THE TEAM THAT WILL PROVIDE AN AD HOC ASSESSMENT OF THE PROGRAM FOR THE CENTER DIRECTOR, ANALYZE THE BUDGET, AND WILL IDENTIFY THREATS THAT ARE NOT BEING ASSESSED, IF ANY. EXAMPLES OF THE EFFORTS THAT THE CONTRACTOR WILL PERFORM INCLUDE THE LIST BELOW, BUT WILL NOT BE LIMITED TO: 1. CONDUCT SPECIAL STUDIES AND ANALYSES TO SUPPORT CENTER LEADERSHIP DECISION MAKING. THESE MAY INCLUDE, BUT ARE NOT LIMITED TO: A. ANALYSIS OF ALTERNATIVES AND COST ESTIMATES; AND B. ANALYSIS OF ALTERNATIVES FOR MEASURING PERFORMANCE MANAGEMENT AND SUCCESS FACTOR INDICATORS. 2. ASSESS PROGRAM AND PROJECT SCHEDULES 3. MEETINGS SUPPORTING CLASS C/D MISSIONS 4. DEVELOP AND PRESENT FINDING ON FUTURE LAUNCH VEHICLES 5. SUPPORT THE CENTER ON PRESIDENTIAL TRANSITION ACTIVITIES | $195 |
| Jun 18, 2020 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG17VN79T | 541712 | IGF::OT::IGF SEETS II CONTRACT #NNG11VH00B, TASK ORDER #NNG17VN79T ENTITLED: "JOINT POLAR SATELLITE SYSTEM (JPSS) COMMAND, COMMUNICATION, AND CONTROL SEGMENT (C3S) SYSTEM ENGINEERING." | $13 |
Get Alerted Before The Aerospace Corporation's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free