Home/Contractors/The Aerospace Corporation/contracts

Federal Contractor Profile

The Aerospace Corporation

$12B obligated·869 awards·9 agencies·12 NAICS

Federal Contracts

Showing contracts 2,6012,650 of 3,034 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Jun 1, 2017National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTERNNK17MA43T541712IGF::OT::IGF EM-2 SYSTEMS ENGINEERING&INTEGRATION AEROSPACE CONSULTING SERVICES$161K
Jun 1, 2017National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTERNNL17AA82T541330IGF::OT::IGF " MONITORING THE EVOLVING STATE OF CLOUDS AND AEROSOLS LAYERS (MESCAL) PAYLOAD INDEPENDENT COST ESTIMATE " - THE SCOPE OF THIS EFFORT IS FOR THE CONTRACTOR TO DEVELOP INDEPENDENT COST ESTIMATES FOR THREE MESCAL PAYLOAD CONCEPTS AND AN ADDITIONAL COST ESTIMATE OF A CLOUD-AEROSOL LIDAR WITH ORTHOGONAL POLARIZATION (CALIOP) TYPE PAYLOAD.$24K
Jun 1, 2017National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA20T541690IGF::OT::IGF THE AEROSPACE CORPORATION SHALL SUPPORT THE SPACE LAUNCH SYSTEM PROGRAM (SLSP) AS DEFINED IN THE STATEMENT OF WORK. AEROSPACE SHALL PROVIDE AN OBJECTIVE, NON-ADVOCATE ASSESSMENT OF THE INFORMATION REVIEWED IN SUPPORT OF THIS TASK ORDER. AEROSPACE SHALL PROVIDE TECHNICAL ANALYSIS, CONSULTATION AND EVALUATION IN SUPPORT OF THE SLSP.$100K
May 31, 2017Department of DefenseFA8802 INTEGRATION OPERATION PIKPKEFA880214C0001541712IGF::CL::IGF AEROSPACE FFRDC CONTRACT FROM 1 OCT 2013 TO 30 SEPT 2018$60M
May 31, 2017National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTERNNL15AA28T541330IGF::OT::IGF "NESC (NASA (NATIONAL AERONAUTICS AND SPACE ADMINISTRATION) ENGINEERING AND SAFETY CENTER) TECHNICAL ASSESSMENT - MPCV (MULTI-PURPOSE CREW VEHICHLE) AVCOAT STUDY " - THE SCOPE OF THIS EFFORT IS FOR THE CONTRACTOR TO PROVIDE TECHNICAL SUPPORT IN SEVERAL AREAS ASSOCIATED WITH THE ORION HEAT SHIELD FOR THE EFT-1 AND FUTURE MISSIONS. THE AEROSPACE CORPORATION WILL PROVIDE STATISTICAL EXPERIMENTAL DESIGN AND DATA ANALYSIS AND OTHER SUPPORT IN THIS TECHNICAL AREA AS A MEMBER OF THE AVCOAT STUDY TEAM.$20K
May 30, 2017Department of CommerceDEPT OF COMMERCE NOAADOCT0009541712IGF::OT::IGF FFRDC SUPPORT. TASK ORDER AWARD FOR THE HEADQUARTERS PROGRAM OFFICE.$88K
May 19, 2017National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTERNNL17AA51T541330IGF::OT::IGF "NESC (NATIONAL AERONAUTICS AND SPACE ADMINISTRATION ENGINEERING&SAFETY CENTER) MOLDED AVCOAT BLOCK BOND VERIFICATION " - THE SCOPE OF THIS EFFORT IS FOR THE CONTRACTOR TO PROVIDE ASSISTANCE IN THE DEVELOPMENT OF A BOND VERIFICATION PLAN FOR THE NEW ORION HEATSHIELD ARCHITECTURE WHICH USES INDIVIDUAL MOLDED BLOCKS OF ABLATOR MATERIAL (AVCOAT) ADHESIVELY BONDED TO THE CARRIER STRUCTURE. MAJOR ELEMENTS OF THE BOND VERIFICATION PLAN WILL INCLUDE 1) PROCESS CONTROLS; 2) EFFECTS OF DEFECTS; 3) PROOF TESTING; AND 4) NON-DESTRUCTIVE EVALUATION (NDE).$321K
May 18, 2017Department of JusticeCIVIL DIVISIONDJJ17LCIV020647541199IGF::CT::IGF- EXPERT WITNESS CONTRACT$56K
May 18, 2017National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTERNNJ11HD42T541712SPECIAL STUDIES/ANALYSIS- AERONAUTICAL/SPACE$970K
May 18, 2017National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTERNNK17MA41T541712IGF::OT::IGF GROUND SUPPORT DEVELOPMENT&OPERATIONS (GSDO) AEROSPACE EMBEDDED SUPPORT AND REACHBACK CAPABILITY.$120K
May 11, 2017National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTERNNA17BF76T541712IGF::OT::IGF SUPPORT TO DEVELOP A PLAN, INCLUDING COST AND SCHEDULE INFORMATION, WHICH ADDRESSES THE MIGRATION AND/OR INTERFACE OR MODIFICATION OF VARIOUS EXISTING AEROSPACE TOOLS AN DATA SETS TO SUPPORT THE GOALS OF THE S3VI.$25K
May 11, 2017National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTERNNK17MA40T541712IGF::OT::IGF SUPPORT FOR AGILE SOFTWARE PROCESS AND EVALUATION OF SERVER ARCHITECTURE PLATFORM AND APPLICATION TOOLSETS$531K
May 10, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG12VN14T541712TO PROVIDE DIRECT SUPPORT TO THE SPACE NETWORK GROUND SEGMENT SUSTAINMENT PROJECT - SERVICES: THE CONTRACTOR SHALL PROVIDE ON/OFF-SITE PROJECT AND MULTIDISCIPLINARY ENGINEERING SERVICES, INDEPENDENT TESTING, CONTRACTOR-ON-SITE MONITORING, AND INDEPENDENT EVALUATION OF PROJECTS AND/OR PROGRAMS, INCLUDING COST, SCHEDULE, AND AFFORDABILITY ANALYSES, IN ANY PHASE OF THE LIFE-CYCLE. THE CONTRACTOR SHALL ALSO PROVIDE LEADERSHIP OR STAFFING FOR FOCUSED SCIENCE AND TECHNOLOGY STUDIES, ADVANCED SYSTEMS ARCHITECTURE, SYSTEMS ENGINEERING AND INDEPENDENT REVIEWS OF ALL ABOVE ACTIVITIES PURSUANT TO TASK ORDERS ISSUED BY THE CONTRACTING OFFICER. THESE SERVICES SHALL INCLUDE THE PERSONNEL, FACILITIES, AND MATERIALS (UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT) TO ACCOMPLISH THE TASKS. TASKS ORDERS WILL BE ISSUED TO PERFORM SERVICES FOR ANY OF GSFC S OR ARC S ORGANIZATIONAL ENTITIES RELATED TO PARTS, COMPONENTS, SOFTWARE, SUBSYSTEMS, SYSTEMS, AND SYSTEMS OF SYSTEMS CIRCUMSCRIBED BY AEROSPACE S CORE FUNCTIONS. TYPES OF NASA ENDEAVORS MAY INCLUDE, BUT ARE NOT LIMITED TO, SPACECRAFT; INSTRUMENTS OR OTHER PAYLOADS; OBSERVATORIES; LAUNCH VEHICLES (FOR SUB-ORBITAL, ORBITAL, LUNAR, OR INTERPLANETARY MISSIONS); LAUNCH ABORT SYSTEMS; ROVERS, LANDERS, OR IMPACT VEHICLES; GROUND SYSTEMS (INCLUDING MISSION OPERATIONS, DATA PROCESSING AND DISSEMINATION, LAUNCH OPERATIONS, ETC.); FACILITIES (E.G. RESEARCH, TEST, LAUNCH); SPACE AND GROUND NETWORKS; BALLOONS; GROUND SUPPORT EQUIPMENT; SIMULATORS; AND NON-FLIGHT MODELS OR PROTOTYPES. ASSESSMENTS MAY INCLUDE SUPPORT (DIRECT OR INDIRECT) TO ARCHITECTURE AND SYSTEMS DEFINITION; STRATEGIC PLANNING AND TECHNOLOGY ROAD-MAPPING; PERFORMANCE EVALUATION OR TRADES STUDIES (INCLUDING TECHNICAL, COST, SCHEDULE, AND/OR RISK); ACQUISITION AND PROJECT MANAGEMENT; SYSTEMS ENGINEERING; DESIGN ANALYSIS (PRELIMINARY OR DETAILED DESIGN); ASSEMBLY, INTEGRATION, AND TEST; REQUIREMENTS VERIFICATION; TEST INSTRUMENTATION; DATA SYSTEMS MANAGEMENT; LAUNCH AND POST-LAUNCH OPERATIONS; MISSION ASSURANCE (INCLUDING LAUNCH VERIFICATION); SYSTEMS SAFETY; RESEARCH AND TECHNOLOGY; DOCUMENTATION; MAINTENANCE; SUSTAINING ENGINEERING; SPECTRUM MANAGEMENT; CONFIGURATION MANAGEMENT, AND OTHERS. INDEPENDENT INSPECTION, ANALYSIS (INCLUDING MODELING AND SIMULATION), AND/OR TEST SHALL BE USED IN EXECUTION OF THIS SUPPORT. THE CONTRACTOR SHALL ALSO ENSURE THAT SUPPORT IS PROVIDED THAT HAS SIGNIFICANT WORKING KNOWLEDGE OF CURRENT AND NEAR FUTURE TECHNOLOGIES THAT APPLY TO MODERNIZING THIS GROUND SYSTEM.$5K
May 9, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG13VN43T541712IGF::OT::IGF FUNDS FOR JPSS-GROUND DATA PRODUCTS ENGINEER SUPPORT. ACQUISITION OF SPECIALIZED ENGINEERING, EVALUATION AND TEST SERVICES FOR THE NASA JPSS DATA PRODUCTS GROUPS RELATED TO THE DEVELOPMENT AND VERIFICATION OF JPSS CGS OPERATIONAL ALGORITHMS UNDER DPA AND DPE. THE CONTRACTOR SHALL PROVIDE ENGINEERING SUBJECT MATTER EXPERTISE AND PROJECT MONITORING COMMUNICATION AND COORDINATION BOTH WITHIN THE JPSS PROJECT AND WITH EXTERNAL PROVIDERS TO ASSURE CORRECT PRODUCTION OF JPSS GROUND INTERFACE DATA PROCESSING SEGMENT (IDPS) AND FIELD TERMINAL SEGMENT (FTS) OPERATIONAL DATA PRODUCTS IN SUPPORT OF THE DATA PRODUCTS ENGINEERING (DPE) AND DPA ACTIVITIES PROVIDE ENGINEERING TECHNICAL SUBJECT MATTER EXPERTISE IN JPSS ALGORITHM INTEGRATION PROCESSES FOR THE IDPS/FTS OPERATIONAL SCIENCE ALGORITHMS. ASSESS SEVERITY OF REPORTED DISCREPANCIES AND ADVISE DATA PRODUCTS LEADERSHIP OF TECHNICAL IMPACT. ASSIST IN THE DOCUMENTATION OF ALGORITHMS AND TECHNICAL REPORTS SUCH AS ALGORITHM THEORETICAL BASIS DOCUMENTS (ATBDS), OPERATIONAL ALGORITHM DOCUMENTS (OADS), TECHNICAL REPORTS, AND DATA GUIDES. WORK WITH THE DPE ALGORITHM INTEGRATION TEAM (AIT) TO FACILITATE INTERACTION BETWEEN THE INVESTIGATORS AND THE JPSS GROUND PROJECT SYSTEMS AND PROCESSES AND ASSIST INVESTIGATORS IN THE USE OF JPSS GROUND PROJECT SYSTEMS AND PROCESSES. ASSIST THE ALGORITHM AND VALIDATION TEAMS IN INTEGRATION AND OPERATION OF ALGORITHM SUPPORT FUNCTION (ASF) AND CALIBRATION/VALIDATION AND LONG TERM MONITORING (LTM) TOOLS. ASSIST VALIDATING THE OPERATION SCIENCE PRODUCTS INCLUDING THE VIIRS CLOUD MASK, THE JPSS DIRECT READOUT PRODUCTS AND OTHER SOFTWARE DELIVERED FOR THE ALGORITHM SCIENCE TEAMS. DESIGN AND DEVELOP ANALYTICAL TECHNIQUES AND PROCEDURES TO PERFORM INDEPENDENT ASSESSMENT OF CONTRACTOR PERFORM. PROVIDE, AS NEEDED, EXPERTISE IN THE PHYSICAL SCIENCES INCLUDING ATMOSPHERIC AND SPACE PHYSICS, COMMUNICATIONS AND NETWORKING, COMPUTERS AND SOFTWARE, SYSTEMS ENGINEERING SENSOR MODELING SUPPORT. INTERFACE AS NEEDED, WITH INTEGRATED PRODUCT TEAMS, USERS LIAISONS AND INTERNATIONAL LIAISONS TO ASSIST IN THE CLARIFICATION OF REQUIREMENTS, SYSTEM INTERFACE DEFINITION, INTERFACE COMPLIANCE AND OVERALL SYSTEM REQUIREMENTS SATISFACTION.$150K
May 9, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG17VN79T541712IGF::OT::IGF SEETS II CONTRACT #NNG11VH00B, TASK ORDER #NNG17VN79T ENTITLED: "JOINT POLAR SATELLITE SYSTEM (JPSS) COMMAND, COMMUNICATION, AND CONTROL SEGMENT (C3S) SYSTEM ENGINEERING."$130K
May 7, 2017National Aeronautics and Space AdministrationNASA HEADQUARTERSNNH13CI94D541712IGF::OT::IGF. FUNDS TO SUPPORT THE EXPLORATION SYSTEMS DEVELOPMENT DIVISION. THE EXPLORATION SYSTEMS DEVELOPMENT (ESD) DIVISION HAS REQUESTED AEROSPACE TO PROVIDE TECHNICAL AND PROGRAMMATIC ANALYSIS, CONSULTATION AND EVALUATION IN SUPPORT OF NASA S EXPLORATION ENTERPRISE. THIS SUPPORT WILL INCLUDE ASSISTANCE WITH INTEGRATED COST AND SCHEDULE DEVELOPMENT/ASSESSMENT ACTIVITIES AS WELL AS SYSTEMS ENGINEERING AND INTEGRATION (SE&I) ACTIVITIES FOR INTEGRATED EXPLORATION SYSTEMS AND MISSIONS. SPECIFIC ASSIGNMENTS WILL BE DIRECTED BY ESD AND WILL SPECIFY IN WHICH PROGRAMMATIC OR TECHNICAL AREAS AEROSPACE IS TO FOCUS ITS RESOURCES. AEROSPACE WILL PROVIDE SUBJECT MATTER EXPERTS, AND PERFORM INDEPENDENT ANALYSES, AS REQUESTED, IN SUPPORT OF THE GOVERNMENT'S DECISIONS. THE LEVEL OF FIDELITY FOR INDEPENDENT ASSESSMENTS WILL BE TAILORED ACCORDING TO THE INFORMATION AND TIME AVAILABLE. PRIORITIES AND SCHEDULES WILL BE ESTABLISHED BY MUTUAL AGREEMENT BETWEEN ESD AND AEROSPACE. SUPPORT TO INTEGRATED COST AND SCHEDULE DEVELOPMENT/ASSESSMENT ACTIVITIES INCLUDE BUT ARE NOT LIMITED TO: . BUDGET EVALUATION AND ASSESSMENT . COST AND SCHEDULE RISK DATA VALIDATION WITH HISTORICAL DATA. . IDENTIFICATION OF MAJOR COST AND SCHEDULE RISK DRIVERS . JOINT COST AND SCHEDULE CONFIDENCE LEVEL (JCL) METHODOLOGY DEVELOPMENT AND ASSESSMENT . TARGETED USE OF AEROSPACE PROGRAMMATIC ASSESSMENT PROCESSES AND TOOLS TO ENHANCE, SUPPLEMENT, OR VALIDATE ESD PROCESSES SUPPORT TO SE&I ACTIVITIES MAY INCLUDE BUT ARE NOT LIMITED TO: . VEHICLE ENVIRONMENTS . LOADS, DYNAMICS AND STRUCTURES . HARDWARE SYSTEMS AND SUBSYSTEMS . GROUND AND FLIGHT SOFTWARE . GUIDANCE, NAVIGATION AND CONTROL . MISSION ANALYSIS . FLIGHT SAFETY AND CREW RATING . MISSION, SYSTEM AND HARDWARE RISK . LAUNCH VEHICLE, PAYLOAD/SPACECRAFT AND GROUND SYSTEMS INTEGRATION . MANUFACTURING, ASSEMBLY, PROCESSING AND OPERATIONS . GROUND COMMAND, CONTROL, COMMUNICATION . RANGE SYSTEMS OPERATIONS AND INTEGRATION IN ADDITION TO FOCUSED ASSESSMENTS, AEROSPACE WILL PROVIDE THE FOLLOWING ADVISORY SERVICES FOR ESD: A. PROVIDE PERSONNEL AND EXPERTISE NECESSARY TO PERFORM ON-SITE NASA HQ SUPPORT AND OTHER REQUESTED SERVICES, AND PARTICIPATE IN REVIEWS AND MEETINGS B. COLLABORATE WITH NASA CIVIL SERVANTS AND SUPPORT CONTRACTORS C. PARTICIPATE IN MAJOR GOVERNMENT AND CONTRACTOR PROGRAM REVIEWS AND PROVIDE TECHNICAL ADVICE REGARDING DESIGNS, PRODUCTION, INTEGRATION, READINESS, RISK, OVERALL SYSTEMS ANALYSES, AND PROGRAMMATIC ISSUES D. PARTICIPATE IN RECURRING NASA AND CONTRACTOR TELECONFERENCES E. PARTICIPATE IN TECHNICAL INTERCHANGE MEETINGS IN SUPPORT OF SPECIFIC ISSUES WHEN AEROSPACE IS INVOLVED IN THE ASSESSMENT/RESOLUTION OF THAT ISSUE.$500K
May 4, 2017Department of CommerceDEPT OF COMMERCE NOAADOCT0006541712IGF::OT::IGF FFRDC SUPPORT. AWARD OF TASK ORDER FOR OSGS / PETD.$593K
May 4, 2017National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTERNNC17TA53T541712IGF::OT::IGF TASK ORDER FOR SPACECRAFT POWER SYSTEMS HERITAGE STUDY PHASE I.$30K
May 4, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG12VN28T541712SPECIALIZED ENGINEERING SUPPORT TO JOINT POLAR SATELLITE SYSTEM (JPSS) FLIGHT SEGMENT RESTRUCTURING OF THE NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL SATELLITE SYSTEM (NPOESS) HAS RESULTED IN NOAA AND NASA ASSUMING ACQUISITION RESPONSIBILITY FOR THE AFTERNOON ORBIT OF THE CONSTELLATION. THESE SATELLITES, RENAMED THE JOINT POLAR SATELLITE SYSTEM (JPSS) FLIGHT SEGMENT, WILL BE DEVELOPED BY NASA GODDARD SPACE FLIGHT CENTER (GSFC) FOR NOAA. IN ORDER TO ASSURE THE SUCCESS OF THE JPSS DEVELOPMENT, GSFC REQUIRES SUPPORT FROM STAFF FROM THE AEROSPACE CORPORATION WHO HAD PREVIOUSLY WORKED ON NPOESS AS WELL AS SPECIALIZED ENGINEERING SUPPORT SERVICES PARTICULARLY IN THE AREA OF OPTICAL FOCAL PLANE DEVELOPMENTS IN SUPPORT OF INSTRUMENT DEVELOPMENT/TESTING AND EVALUATION ACTIVITIES. THE CONTRACTOR SHALL PROVIDE ELECTRICAL SYSTEMS ENGINEERING SUPPORT FOR JPSS. THIS SUPPORT SHALL INCLUDE, BUT NOT BE LIMITED TO, DEVELOPING JPSS PROGRAM AND MISSION SPECIFICATIONS, REVISING AND/OR DEVELOPING JPSS INTERFACE DOCUMENTS, CONDUCTING TRADE STUDIES IN SUPPORT OF JPSS ARCHITECTURE DEFINITION AND EVOLUTION, MANAGING MISSION- AND OBSERVATORY-LEVEL TECHNICAL BUDGETS, MONITORING SPACECRAFT CONTRACTOR IN DESIGN AND PROCUREMENT ACTIVITIES, PARTICIPATING IN SPACECRAFT PROGRESS MEETINGS; DESIGN REVIEWS; TEST READINESS REVIEWS; ANOMALY BOARDS; PARTS/MATERIAL BOARDS; ETC., AND ASSISTING IN PROBLEM RESOLUTION THE CONTRACTOR SHALL PROVIDE INSTRUMENT SYSTEMS ENGINEERING SERVICES TO JPSS. THESE SERVICES SHALL INCLUDE, BUT NOT BE LIMITED TO, SUPPORTING NPOESS TO JPSS INSTRUMENT TRANSITION BY PREPARING TECHNICAL DOCUMENTATION FOR INSTRUMENT CONTRACTS, COORDINATING INSTRUMENT REQUIREMENTS WITH MISSION- AND OBSERVATORY-LEVEL REQUIREMENTS, EVALUATING INSTRUMENT COMPLIANCE WITH NASA TECHNICAL STANDARDS, CONDUCTING TRADE STUDIES IN SUPPORT OF INSTRUMENT ACCOMMODATION, SUPPORTING THE INSTRUMENT SYSTEMS ENGINEERING STAFF, MANAGING INSTRUMENT RISK PROCESSES, ASSISTING WITH CONFIGURATION CHANGE PROCESS FOR INSTRUMENTS, AND PARTICIPATING IN INSTRUMENT DESIGN REVIEWS; TEST READINESS REVIEWS; ETC. THE CONTRACTOR SHALL PROVIDE ENGINEERING SERVICES TO OVERSEE THE JPSS INSTRUMENT DEVELOPMENT. THESE SERVICES SHALL INCLUDE, BUT NOT BE LIMITED TO, SUPPORTING NPOESS TO JPSS INSTRUMENT TRANSITION BY PREPARING TECHNICAL DOCUMENTATION FOR INSTRUMENT CONTRACTS, COORDINATING INSTRUMENT REQUIREMENTS WITH MISSION- AND OBSERVATORY-LEVEL REQUIREMENTS, MONITORING THE OMPS AND CRIS CONTRACTOR IN EXECUTION OF INSTRUMENT BUILD AND TEST, PARTICIPATING IN INSTRUMENT PROGRESS MEETINGS; DESIGN REVIEWS; TEST READINESS REVIEWS; ANOMALY BOARDS; PARTS/MATERIAL BOARDS; ETC., REVIEWING PLANS AND PROCEDURES, ASSISTING IN PROBLEM RESOLUTION, AND REVIEWING TEST DATA FOR SPECIFICATION COMPLIANCE.$775K
May 4, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG15VN58T541712IGF::OT::IGF "OSIRIS-REX FLIGHT DYNAMICS TEAM NAVIGATION EXPERT SUPPORT": THE ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS- REX) MISSION S PRIMARY GOAL IS AN EARTH RETURN OF REGOLITH SAMPLE FROM A TYPE-B NEAR EARTH OBJECT (NEO) ASTEROID. THE OSIRIS-REX MISSION WILL GATHER THIS SAMPLE THROUGH A FLIGHT SYSTEM CONSISTING OF A SCIENCE INSTRUMENT SUITE, A TOUCH-AND-GO SAMPLE ACQUISITION MECHANISM (TAGSAM), AND A SAMPLE RETURN CAPSULE (SRC). THE FLIGHT SYSTEM WILL RENDEZVOUS WITH THE NEO, OBSERVE, CHARACTERIZE AND MAP THE ASTEROID, AND FINALLY APPROACH, PERFORM A TOUCH-AND-GO MANEUVER, RETRIEVE A REGOLITH SAMPLE AND DEPART FROM THE ASTEROID. THE OSIRIS-REX FLIGHT SYSTEM WILL THEN NAVIGATE BACK TO EARTH AND JETTISON THE SRC FOR A LANDING AT THE UTAH TEST AND TRAINING RANGE (UTTR). THE OBJECTIVES OF THE MISSION ARE TO RETURN A PRISTINE SAMPLE OF THE ASTEROID, UNDERSTAND THE ORIGINS OF PLANETARY MATERIALS AND THE INITIAL STAGES OF PLANETARY FORMATION. IDENTIFY THE SOURCES OF ORGANIC COMPOUNDS AND OTHER PREBIOTIC CHEMICALS THAT CONTRIBUTED TO THE EMERGENCE OF LIFE ON EARTH; EXPLORE A NEO TO GAIN A GREATER UNDERSTANDING OF POTENTIAL RESOURCES; AND ENABLE THE LONG TERM PREDICTION OF THE DYNAMICS OF NEOS THAT POSE AN IMPACT HAZARD TO EARTH. THE NASA GODDARD SPACE FLIGHT CENTER (GSFC) MANAGES THE OSIRIS-REX PROJECT FOR NASA AND FOR THE PRINCIPAL INVESTIGATOR, AT THE UNIVERSITY OF ARIZONA, LUNAR AND PLANETARY LABORATORY (LPL) IN TUCSON, AZ. THE GODDARD SPACE FLIGHT CENTER MANAGES THE FLIGHT DYNAMICS SYSTEM. KINETX, INC., IS UNDER CONTRACT TO NASA TO DESIGN, DEVELOP, TEST AND IMPLEMENT THE FLIGHT DYNAMICS SYSTEM FOR OSIRIS-REX. THE CONTRACTOR SHALL LEVERAGE EXPERIENCE WITH DEEP SPACE NAVIGATION ANALYSIS AND OPERATIONS TO SUPPORT DIRECTLY THE GSFC FLIGHT DYNAMICS SYSTEM MANAGER IN DAY-TO-DAY ADMINISTRATION OF THE FLIGHT DYNAMICS TEAM. THE CONTRACTOR SHALL PERFORM OVERALL COORDINATION OF FLIGHT DYNAMICS SYSTEM (FDS) ANALYSES ACTIVITIES PERFORMED BY GOVERNMENT AND CONTRACTOR PERSONNEL. EXAMPLES WOULD INCLUDE WORKING WITH THE NAVIGATION CONTRACTOR TO DEFINE AND PERFORM COVARIANCE ANALYSES AND NAVIGATION SIMULATIONS, AND SUPPORT THE DOCUMENTATION OF RESULTS FROM THESE ANALYSIS ACTIVITIES IN THE NAVIGATION PLAN. THE CONTRACTOR SHALL REVIEW OPERATIONAL INTERFACE AGREEMENTS (OIA) AND SYSTEM INTERFACE SPECIFICATIONS (SIS) FOR THE RELEVANT SUBSYSTEMS, SUPPORTING MEETINGS WITH FDS CONTRACTORS AND GROUND SYSTEM ELEMENTS. THE CONTRACTOR SHALL ASSIST IN THE PREPARATION OF REVIEW MATERIALS FOR THE GROUND MISSION OPERATIONS REVIEW AND MOR EPR. THE CONTRACTOR SHALL COORDINATE THE ACTIVITIES OF THE FLIGHT DYNAMICS EXTERNAL ADVISORY PANEL, COORDINATING TOPICS AND MATERIALS FOR REVIEW PANEL MEETINGS, AND CORRESPONDING WITH REVIEW PANEL MEMBERS REGARDING MEETING PREPARATION AND FOLLOW UP. THE CONTRACTOR SHALL PROVIDE A WRITTEN MONTHLY STATUS REPORT THAT SUMMARIZES ACCOMPLISHMENTS DURING THE PREVIOUS REPORTING PERIOD, AND A LIST OF PLANNED ACTIVITIES DURING THE NEXT REPORTING PERIOD. MONTHLY STATUS INPUTS WILL BE PROVIDED BY THE THIRD FRIDAY OF THE MONTH, UNLESS OTHERWISE SPECIFIED. THE CONTRACTOR SHALL PROVIDE AN ANNUAL REPORT AT THE END OF THE GOVERNMENT FISCAL YEAR SUMMARIZING THE ACCOMPLISHMENTS DURING THE PREVIOUS YEAR.$200K
May 4, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG17VN81T541712IGF::OT::IGF AUDIT AND CERTIFICATION ACTIVITIES TECHNICAL SUPPORT PURPOSE OBJECTIVE AND BACKGROUND OF WORK TO BE PERFORMED THIS ACTIVITY WILL ALLOW THE CONTRACTOR TO SUPPORT NASA DURING MANUFACTURER AUDITS WHICH MAY INCLUDE THOUGH IS NOT LIMITED TO QUALIFIED MANUFACTURERS LIST QML AND QUALIFIED PRODUCTS LIST QPL CERTIFICATION ACTIVITIES. THESE AUDITS ARE PART OF THE OVERALL DEFENSE LOGISTICS AGENCY DLA PROCESS THAT IS PERFORMED FOR AEROSPACE COMPONENT MANUFACTURERS ON AN ONGOING BASIS. THE CONTRACTOR HAS THE TECHNICAL EXPERTISE AND EXPERIENCE TO FIND PROBLEMS THAT MAY BE MISSED BY OTHERS IN THE AUDIT TEAMS. AS SEEN IN FIGURE 1 THE CONTRACTOR HAS PARTICIPATED IN AN AVERAGE OF FORTY AUDITS PER YEAR FROM FISCAL YEAR 2007 THROUGH FY2016. THE DIP IN FY2013 WAS DUE TO SEQUESTRATION. FY2016 IS LOW DUE TO AIR FORCE SPACE AND MISSILE SYSTEMS CENTER BUDGET CUTS AND THE SITUATION IS EVEN WORSE IN FY2017 WHERE THE CONTRACTOR HAS ZERO BUDGET FOR AUDIT SUPPORT. TRADITIONALLY THE CONTRACTOR SUPPORTS AUDITS AT MANUFACTURERS OF INTEREST TO SMC BUT THERE IS SIGNIFICANT OVERLAP BETWEEN SMCS AND NASAS AEROSPACE COMPONENT INTERESTS. NASA FUNDING FOR CONTRACTOR AUDIT SUPPORT WILL BROADEN THE NUMBER OF MANUFACTURES VISITED BY NASA AND SMC ALLOWING FOR MORE COMPANIES TO BE COVERED EACH FISCAL YEAR BENEFITTING NASAS MISSION. SUPPORT PROVIDED BY THE CONTRACTOR WILL GENERATE TECHNICAL KNOWLEDGE AND RECOMMENDATIONS ABOUT ELECTRICAL ELECTRONIC ELECTROMECHANICAL PART AS WELL AS SUPPLY CHAIN QUALITY WITHIN THE CONTEXT OF NASA SPACE FLIGHT MISSIONS AND HARDWARE. THIS INFORMATION CAN THEN BE MADE AVAILABLE TO THE NASA AND HIGH-RELIABILITY AEROSPACE COMMUNITY. PERFORMANCE UNDER THIS TASK ORDER INCLUDES ADVANCED DISCIPLINE ENGINEERING AND IS TIED TO IMPLEMENTATION PHASE SERVICES WHICH ARE OUTLINED IN SECTION 3.2 OF THE STATEMENT OF WORK FOR CONTRACT NNG11VH00B. IN THIS CASE THOSE SERVICES INCLUDE BUT ARE NOT LIMITED TO INDEPENDENT EVALUATION AND REVIEW AS WELL AS MISSION ASSURANCE. THE CONTRACTOR SHALL EXECUTE THE FOLLOWING TASK REQUIREMENTS PARTICIPATE IN AUDITS AND CERTIFICATIONS WITH DLA AND OTHERS AT MANUFACTURERS AGREED TO BY NASA. WRITE TECHNICAL OPERATING REPORTS TORS AS NEEDED ON THE AUDIT RESULTS AND SHARE WITH NASA SMC AND DLA. VERBALLY REPORT OUT ON AUDIT AND CERTIFICATION RESULTS AT MONTHLY MEETINGS OR AS DICTATED BY CUSTOMERS WITHIN NASA. SUPPORT AS REQUIRED THE DEVELOPMENT OF AND REVIEW OF ELECTRICAL ELECTRONIC AND ELECTROMECHANICAL COMPONENT QUALIFICATION STANDARDS VIA REMOTE AND OR DIRECT PARTICIPATION IN VARIOUS WORKING GROUP AND COMMITTEE MEETINGS. THE CONTRACTOR SHALL PARTICIPATE AS PART OF THE GOVERNMENT TEAM TO AUDIT MANUFACTURERS PROCESSES AND PRODUCTS TO THE REQUIREMENTS OF THE SPECIFICATIONS PROVIDED BY DLA. THE GOVERNMENT TEAM MAY INCLUDE GOVERNMENT PERSONNEL AND OR DESIGNATED AGENTS. THE LEAD AUDITOR SHALL BE COPIED ON ANY REQUESTS FOR INFORMATION MADE TO THE SUPPLIER BY THE AGENCY AUDIT PARTICIPANTS.$25K
May 3, 2017National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTERNNC15TA91T541712IGF::OT::IGF NASA'S EVOLUTIONARY XENON THRUSTER COMMERCIAL (NEXT-C) INDEPENDENT REVIEW BOARD (IRB) MEMBERSHIP SAP PURCHASE REQUISITION: 4200558544$25K
May 2, 2017National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTERNNJ11HD42T541712SPECIAL STUDIES/ANALYSIS- AERONAUTICAL/SPACE$137K
Apr 27, 2017Department of DefenseFA8802 INTEGRATION OPERATION PIKPKEFA880214C0001541712IGF::CL::IGF AEROSPACE FFRDC CONTRACT FROM 1 OCT 2013 TO 30 SEPT 2018$55M
Apr 27, 2017National Aeronautics and Space AdministrationNASA HEADQUARTERSNNH16CN00D541712IGF::OT::IGF SCIENCE MISSION DIRECTORATE (SMD) PROGRAMMATIC ASSESSMENT AND MONITORING. THE CONTRACTOR SHALL PROVIDE INDEPENDENT PROGRAMMATIC AND TECHNICAL ASSESSMENT FUNCTIONS THAT CAN:(1) IDENTIFY AND ASSESS PROJECT RISKS WHETHER TECHNICAL, COST AND SCHEDULE RELATED AND PREDICT THE PROBABILITIES AND CONSEQUENCES OF THEIR REALIZATION; (2) PREDICT THE GROWTH OF PROJECT COSTS AND SCHEDULES OVER TIME DUE TO RISKS AND UNCERTAINTY; AND (3) COMMUNICATE RESULTS AND FINDINGS IN A CLEAR, CONCISE MANNER TO SMD PROGRAM EXECUTIVES (PES), PROGRAM ANALYSTS (PAS), THEME DIRECTORS, THE SCIENCE MISSION DIRECTORATE (SMD) ASSOCIATE ADMINISTRATOR (AA) AND STAFF MEMBERS AS NEEDED, THE CONTRACTOR SHALL ALSO: (1) CONDUCT MONTHLY MONITORING OF A DESIGNATED SUBSET OF THE MOST CHALLENGING AND COMPLEX FLIGHT PROJECTS AS THEY PROCEED THROUGH DESIGN, DEVELOPMENT, AND IMPLEMENTATION IN TERMS OF THE EVOLUTION OF THEIR PROGRAMMATIC AND TECHNICAL RISKS, COST AT COMPLETION AND DELIVERY MILESTONES; (2) CONDUCT SPECIAL STUDIES AND ASSESSMENTS OF THE PAST PERFORMANCE OF FLIGHT PROGRAMS IN ORDER TO PREDICT BETTER SMDS FUTURE PERFORMANCE; AND (3) PROVIDE TECHNICAL AND PROGRAMMATIC ASSESSMENTS OF NON-FLIGHT SMD PROGRAMS AND PROJECTS.THE CONTRACTOR SHALL SUPPORT THE MISSION ANALYSIS ENGINEERING FUNCTION FOR SMD PROJECTS TO INCLUDE EXPERIENCED PERSONNEL, ANALYSIS AND ASSESSMENT TOOLS, PROCESSES AND REPORTING FUNCTIONS. ITS EFFORTS SHALL BE STRUCTURED TO ENSURE THAT THE NEEDED DATA, FINDINGS AND INSIGHTS ARE AVAILABLE IN A TIMELY MANNER TO SUPPORT SMD REVIEWS AND DECISION MAKING. THE CONTRACTOR SHALL DESIGNATE FOR EACH ASSIGNED SMD DIVISION OR THEME A MISSION ANALYSIS ENGINEER (MAE) WHO SHALL BE RESPONSIBLE FOR COORDINATING ALL ANALYSES REQUIRED FOR THE ASSESSMENT AND MONITORING FUNCTIONS OF THE DIVISION OR THEMES PROJECTS. EACH MAE SHALL: (1) MAINTAIN THE KNOWLEDGE BASE FOR THE DIVISIONS PROJECTS, INCLUDING FULL KNOWLEDGE OF ALL ON-GOING PROGRAMMATIC AND TECHNICAL ASSESSMENTS; (2) ENSURE THAT KEY ANALYSTS AND SUBJECT MATTER EXPERTS ATTEND MAJOR MILESTONE AND SELECTED PROJECT REVIEWS; AND (3) PRESENT ANALYSES, FINDINGS AND INSIGHTS TO AUDIENCES IDENTIFIED BY SMD DECISION MAKERS.$1.4M
Apr 27, 2017National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM13AA12T541690SERVICE CODE IGF::OT::IGF AEROSPACE TASK # 16,"STATE OF THE ART AND STATE OF IMPLEMENTATION OF COST AND SCHEDULE ANALYSIS ENGINEERING SUPPORT)"$113K
Apr 27, 2017National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM17AA18T541690IGF::OT::IGF LYNX PROJECT$102K
Apr 26, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG13VN45T541712IGF::OT::IGF FUNDS FOR AEROSPACE SUPPORT TO JPSS MISSION 1 (J1) VISIBLE INFRARED IMAGING RADIOMETER SUITE (VIIRS) TEST PROGRAM. THIS TASK PROVIDES EXPERIENCED, SPECIALIZED SUPPORT TO THE JPSS PROGRAM. THE TASK PROVIDES INDEPENDENT ANALYSIS OF THE VIIRS FLIGHT MODEL (FM)-2 PERFORMANCE TESTS, PROVIDING THE JPSS FLIGHT PROJECT WITH THE ASSURANCE THAT VIIRS FM-2 INSTRUMENT MEETS ITS PERFORMANCE REQUIREMENTS. THE CONTRACTOR SHALL PERFORM REQUESTED TEST DATA ANALYSIS ON THE PLANNED J1 VIIRS SYSTEM LEVEL PERFORMANCE TESTS. THE CONTRACTOR WILL ANALYSIS ACTIVITIES INCLUDE COMPARISONS WITH REQUIREMENTS AND ANY REQUESTED ACTIVITIES NEEDED TO RESOLVE ANY DISCREPANCIES THAT ARISE. THE CONTRACTOR SHALL ANALYZE DATA FROM ANY SPECIAL TEST REQUESTS (STR). THE CONTRACTOR SHALL MAKE ALL PREPARATIONS NECESSARY TO ANALYZE DATA, INCLUDING TEST DATA ACQUISITION, TEST PROCEDURE REVIEW, AND DATA ANALYSIS TOOL REFINEMENTS. THE CONTACTOR SHALL PERFORM ANY TEST ANOMALY RESOLUTION ACTIVITIES REQUESTED BY CUSTOMER. THE CONTRACTOR SHALL PARTICIPATE IN GOVERNMENT TEAM TEST DATA ANALYSIS TELECONS. THE CONTRACTOR WILL ATTEND MEETING OR CALL IN TO TELECONS. DURING PRE-THERMAL VACUUM (TVAC) AND TVAC TESTING THE VENDOR WILL PROVIDE TEST OBSERVATION SUPPORT. THE CONTRACTOR SHALL PROVIDE TEST DATA ANALYSIS FINDING IN POWERPOINT PACKAGES AND BRIEF THESE FINDING TO THE GOVERNMENT TEAM IN TEST DATA ANALYSIS TELECONS. THE CONTRACTOR SHALL ALSO PROVIDE TEST DATA ANALYSIS FINDING IN OTHER FORMATS AS REQUEST BY THE CUSTOMER. THE CONTRACTOR SHALL PROVIDE ON/OFF-SITE PROJECT AND MULTIDISCIPLINARY ENGINEERING SERVICES, INDEPENDENT TESTING, CONTRACTOR-ON-SITE MONITORING, AND INDEPENDENT EVALUATION OF PROJECTS AND/OR PROGRAMS, INCLUDING COST, SCHEDULE, AND AFFORDABILITY ANALYSES, IN ANY PHASE OF THE LIFE-CYCLE. THE CONTRACTOR SHALL ALSO PROVIDE LEADERSHIP OR STAFFING FOR FOCUSED SCIENCE AND TECHNOLOGY STUDIES, ADVANCED SYSTEMS ARCHITECTURE, SYSTEMS ENGINEERING AND INDEPENDENT REVIEWS OF ALL ABOVE ACTIVITIES PURSUANT TO TASK ORDERS ISSUED BY THE CONTRACTING OFFICER. THESE SERVICES SHALL INCLUDE THE PERSONNEL, FACILITIES, AND MATERIALS (UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT) TO ACCOMPLISH THE TASKS$38K
Apr 26, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG16VN70T541712IGF::OT::IGF ICESAT 2 STAR CATALOG REVISION SPECIALIZED ENGINEERING, EVALUATION AND TEST SERVICES (SEETS II) TO SELECT AN IMPROVED SPECTRAL MODEL FOR THE LASER REFERENCE SYSTEM (LRS) SENSITIVITY TO STARS IN THE SOURCE CATALOG. THE SELECTED MODEL SHOULD BE DOCUMENTED IN A SHORT TECHNICAL NOTE. THE ICESAT-2 PROJECT HAS DECIDED TO REVISE THE LASER REFERENCE SYSTEM (LRS) SPECIFIC STAR CATALOG, IMPLEMENTING SOME OF THE REVIEWERS RECOMMENDATIONS TO MITIGATE ASSOCIATED RISKS TO GROUND PROCESSING OF FLIGHT DATA. TO PROVIDE SUPPORT TO INVESTIGATE POTENTIAL IMPROVEMENTS IN THE STAR MAGNITUDES TO SUPPORT SECONDARY CONFIRMATION OF STAR IDENTIFICATION. TO PROVIDE SUPPORT TO SELECT AN IMPROVED BLENDING MODEL FOR THE LASER REFERENCE SYSTEM (LRS) HE WINDOWING EFFECTS. TO PROVIDE SUPPORT TO REGENERATE THE LASER REFERENCE SYSTEM (LRS) STAR CATALOG . TO PROVIDE SUPPORT TO COMPARE THE RESULTING NEW LASER REFERENCE SYSTEM (LRS) STAR CATALOG. THE CONTRACTOR SHALL PROVIDE ON/OFF-SITE PROJECT AND MULTIDISCIPLINARY ENGINEERING SERVICES, INDEPENDENT TESTING, CONTRACTOR-ON-SITE MONITORING, AND INDEPENDENT EVALUATION OF PROJECTS AND/OR PROGRAMS, INCLUDING COST, SCHEDULE, AND AFFORDABILITY ANALYSES, IN ANY PHASE OF THE LIFE-CYCLE. THE CONTRACTOR SHALL ALSO PROVIDE LEADERSHIP OR STAFFING FOR FOCUSED SCIENCE AND TECHNOLOGY STUDIES, ADVANCED SYSTEMS ARCHITECTURE, SYSTEMS ENGINEERING AND INDEPENDENT REVIEWS OF ALL ABOVE ACTIVITIES PURSUANT TO TASK ORDERS ISSUED BY THE CONTRACTING OFFICER. THESE SERVICES SHALL INCLUDE THE PERSONNEL, FACILITIES, AND MATERIALS (UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT) TO ACCOMPLISH THE TASKS.$16K
Apr 20, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG17VN82T541712IGF::OT::IGF LANDSAT 9 OBSERVATORY MANAGEMENT SUPPORT PURPOSE, OBJECTIVE, AND BACKGROUND OF WORK TO BE PERFORMED THE LANDSAT 9 L9 MISSION IS THE SUCCESSOR MISSION TO LANDSAT DATA CONTINUITY MISSION LDCM RENAMED LANDSAT 8 AFTER COMMISSIONING IN MAY 2013. LANDSAT SATELLITES HAVE CONTINUOUSLY ACQUIRED MULTISPECTRAL IMAGES OF THE GLOBAL LAND SURFACE SINCE THE LAUNCH OF LANDSAT 1 IN 1972. THE LANDSAT DATA ARCHIVE CONSTITUTES THE LONGEST CONTINUOUS MODERATE-RESOLUTION RECORD OF THE GLOBAL LAND SURFACE AS VIEWED FROM SPACE. THE LANDSAT 9 MISSION OBJECTIVE IS TO EXTEND THE ABILITY TO DETECT AND QUANTITATIVELY CHARACTERIZE CHANGES ON THE GLOBAL LAND SURFACE AT A SCALE WHERE NATURAL AND HUMAN-INDUCED CAUSES OF CHANGE CAN BE DETECTED AND DIFFERENTIATED. ONCE OPERATIONAL, DATA ACQUISITION, REPORTING, OPERATIONS, AND ARCHIVAL WILL BE ACCOMPLISHED AT THE U.S. GEOLOGICAL SURVEY (USGS) EARTH RESOURCES OBSERVATION SYSTEMS EROS FACILITY IN SOUTH DAKOTA WHERE THE CURRENT DATA IS MANAGED. THE L9 OBSERVATORY INSTRUMENT SUITE CONSISTS OF TWO MATURE INSTRUMENTS, WHICH ARE NEAR-COPIES OF THE INSTRUMENTS FLOWN ON LANDSAT 8. THEY ARE THE OPERATIONAL LAND IMAGER OLI AND THE THERMAL INFRARED SENSOR TIRS. THESE INSTRUMENTS WILL BE DESIGNATED OLI 2 AND TIRS 2 FOR LANDSAT 9, AND THE TIRS 2 INSTRUMENT WILL BE UPGRADED TO RISK CLASS B TIRS IS CLASS C ON LANDSAT 8. THE OLI 2 WILL BE BUILT BY BALL AEROSPACE TECHNOLOGY CORPORATION BATC OF BOULDER, CO. THE TIRS 2 IS BEING DEVELOPED AS A GSFC IN-HOUSE EFFORT. THE L9 SPACECRAFT BUS WILL BE BUILT BY ORBITAL ATK IN GILBERT, AZ. L9 INSTRUMENT DEVELOPMENT ACTIVITIES ARE WELL UNDERWAY, WITH BOTH INSTRUMENTS PAST CDR. THE L9 SPACECRAFT BUS IS BEING BUILT BY ORBITAL ATK IN GILBERT, AZ, UNDER A RAPID SPACECRAFT DEVELOPMENT OFFICE-III DELIVERY ORDER AWARDED IN OCTOBER 2016. ORBITAL ATK IS ALSO RESPONSIBLE FOR INSTRUMENT INTEGRATION, OBSERVATORY-LEVEL TESTING, LAUNCH SITE SUPPORT, AND OPERATIONS SUPPORT. THE TARGETED LANDSAT 9 LAUNCH READINESS DATE (LRD) IS CURRENTLY DECEMBER 2020 THE PURPOSE OF THIS TASK IT TO SUPPORT MANAGING THE DEVELOPMENT OF THE LANDSAT 9 SPACECRAFT AND OBSERVATORY. 3. DESCRIPTION OF WORK TO BE PERFORMED: 3.1. THE CONTRACTOR SHALL PROVIDE SYSTEM ENGINEERING AND TECHNICAL MANAGEMENT SUPPORT TO OBSERVATORY MANAGEMENT ACTIVITIES. THIS INCLUDES: INTEGRATED BASELINE ESTABLISHMENT AND MAINTENANCE, STATUS ASSESSMENT AND REPORTING OF COST, SCHEDULE AND TECHNICAL PERFORMANCE IDENTIFICATION, ASSESSMENT, AND MANAGEMENT OF ISSUES AND RISKS, AND ESTIMATION OF PROJECT COST/SCHEDULE IMPACTS PROVIDING PROJECT CONTROL SUPPORT, INCLUDING BUDGET AND SCHEDULE DEVELOPMENT, EXECUTION AND TRACKING, AND PROJECT MANAGEMENT PREPARATIONS FOR INTERNAL AND EXTERNAL REPORTING, REVIEWS, AND MILESTONE ACTIVITIES PROVIDING TECHNICAL AND PROGRAMMATIC OVERSIGHT/INSIGHT INTO SPACECRAFT/OBSERVATORY DEVELOPMENT CONTRACTOR TECHNICAL PROGRESS AND STATUS, SCHEDULE, AND RISKS ASSESSING PERFORMANCE OF THE SPACECRAFT/OBSERVATORY DEVELOPMENT CONTRACTOR INCLUDING ASSESSMENT OF PERFORMANCE AGAINST PAYMENT MILESTONE CRITERIA SUPPORTING EVALUATION OF CHANGE PROPOSAL MATERIALS RELATED TO EXISTING PROCUREMENTS SUPPORTING REVIEW OF SPACECRAFT/OBSERVATORY CONTRACTOR DELIVERABLE DOCUMENTS AND MATERIALS PLANNING AND PREPARATIONS FOR PROJECT AND OBSERVATORY LIFE CYCLE MILESTONE REVIEWS AND KEY DECISION MEETINGS PROVIDING SPACECRAFT/OBSERVATORY TECHNICAL AND SYSTEM ENGINEERING SUPPORT INCLUDING MISSION CONCEPT DEVELOPMENT, REQUIREMENTS DEVELOPMENT AND MANAGEMENT, DESIGN SOLUTION EVALUATION AND TRADES ANALYSES, INTERFACE MANAGEMENT, SPACECRAFT AND OBSERVATORY INTEGRATION AND TESTING, LAUNCH VEHICLE INTEGRATION, VERIFICATION AND VALIDATION, RISK MANAGEMENT, TECHNICAL DATA AND CONFIGURATION MANAGEMENT, TECHNICAL REVIEWS, REQUIREMENTS COMPLIANCE, SOFTWARE ENGINEERING MANAGEMENT, OPERATIONS READINESS/TESTING, MISSION ASSURANCE, PRE- AND POST-LAUNCH CALIBRATION, AND TECHNICAL OVERSIGHT/INSIGHT ASSISTING THE L9 OBSERVATORY MANAGER$30K
Apr 19, 2017National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTERNNJ11HD42T541712SPECIAL STUDIES/ANALYSIS- AERONAUTICAL/SPACE$165K
Apr 19, 2017National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM17AA14T541690IGF::OT::IGF INDEPENDENT MODELING VERIFICATION$760K
Apr 17, 2017National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTERNNL17AA65T541330IGF::OT::IGF " NASA ENGINEERING AND SAFETY CENTER ELECTRICAL, ELECTRONIC, AND ELECTROMECHANICAL (EEE) PARTS TESTING FOR COMMERCIAL CREW PROGRAM (CCP) SUPPORT " - THE SCOPE OF THIS EFFORT IS FOR THE CONTRACTOR TO ASSIST IN EVALUATING THE COMMERCIAL AND AUTOMOTIVE GRADE EEE PARTS IDENTIFIED FROM THE NESC AVIONICS ARCHITECTURE ASSESSMENT AND REVIEWING TEST DATA FROM DESTRUCTIVE PHYSICAL ANALYSIS (DPA) REPORTS, ENVIRONMENTAL AND RADIATION TESTING REPORTS AND PRODUCTION PARTS APPROVAL PROCESS (PPSP) DOCUMENTS.$34K
Apr 14, 2017National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTERNNJ11HD42T541712SPECIAL STUDIES/ANALYSIS- AERONAUTICAL/SPACE$150K
Apr 14, 2017National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM17AA19T541690IGF::OT::IGF SCINTILLATION PREDICTION OBSERVATION RESEARCH$15K
Apr 13, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG17VN80T541712IGF::OT::IGF TASK ORDER TITLE ASTROPHYSICS DECADAL MISSION CONCEPT STUDY SUPPORT PHASE II PROVIDE INDEPENDENT GUIDANCE AND SUPPORT FOR LARGE MISSION CONCEPTS STUDIES TO PREPARE FOR THE NATIONAL ACADEMICS ASTROPHYSICS DECADAL SURVEY 2020. THE CONTRACTOR SHALL PROVIDE SUPPORT TO 4 SEPARATE SCIENCE AND TECHNOLOGY DEFINITION TEAMS STDTS.$90K
Apr 12, 2017National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA20T541690IGF::OT::IGF THE AEROSPACE CORPORATION SHALL SUPPORT THE SPACE LAUNCH SYSTEM PROGRAM (SLSP) AS DEFINED IN THE STATEMENT OF WORK. AEROSPACE SHALL PROVIDE AN OBJECTIVE, NON-ADVOCATE ASSESSMENT OF THE INFORMATION REVIEWED IN SUPPORT OF THIS TASK ORDER. AEROSPACE SHALL PROVIDE TECHNICAL ANALYSIS, CONSULTATION AND EVALUATION IN SUPPORT OF THE SLSP.$30K
Apr 12, 2017National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM17AA17T541690IGF::OT::IGF IN SUPPORT OF SAFETY ASSURANCE AND MISSION OFFICE.$10K
Apr 11, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG13VN41T541712IGF::OT::IGF FUNDS FOR GOES-R GROUND PROJECT CHIEF ENGINEER AND GOES-R PROGRAM SUPPORT. AEROSPACE WILL PROVIDE SENIOR TECHNICAL SUPPORT TO THE DEVELOPMENT, INTEGRATION, AND VERIFICATION OF THE GOES-R GROUND SYSTEM ACROSS SEVERAL NASA-GSFC ENGINEERING MANAGEMENT TEAMS. THESE TEAMS WILL INCLUDE CHIEF ENGINEERING, GROUND SYSTEM PROJECT, AND PROGRAM MANAGEMENT TEAMS. WHEREAS NASA HAS OVERALL SYSTEM ENGINEERING RESPONSIBILITY FOR THE DELIVERY OF THIS LARGE SPECIALIZED GOES-R GROUND SYSTEM, CONTRACTOR SUPPORT WILL REQUIRE A STRONG BACKGROUND IN NASA PRODUCED SYSTEMS INCLUDING A THOROUGH KNOWLEDGE OF NASA PROCESSES, PROCEDURES, ENGINEERING TECHNIQUES AND APPROACHES, SPECIFICALLY RELEVANT TO NASA AND GSFC ENGINEERING INFRASTRUCTURE AND CAPABILITIES. THIS SUPPORT WILL BE NEEDED TO PRODUCE SPECIFIC ENGINEERING AND TECHNICAL PRODUCTS TO SUPPORT GROUND SYSTEM ACQUISITION, DELIVERY, LAUNCH SUPPORT, AND SUCCESSFUL ON-ORBIT OPERATIONS TO INCLUDE, BUT NOT BE LIMITED TO, THE FOLLOWING AREAS: (A) PROVIDE EXPERIENCED LAUNCH PROVEN SUPPORT OF ALL PHASE C/D MISSION DEVELOPMENT TO INCLUDE SYSTEM ACQUISITION, HARDWARE AND SOFTWARE AS WELL AS ON-ORBIT PROCEDURE DEVELOPMENT, AND ENGINEERING SUSTAINMENT PLANS. B) PROVIDE SUPPORT FOR A CORRESPONDING SYSTEM-LEVEL INTEGRATED PRODUCT THAT INCLUDES SYSTEM LEVEL TROUBLESHOOTING AND THE CORRESPONDING RESOLUTION OF GROUND SYSTEM DISCREPANCIES THROUGH A YET TO BE DERIVED GROUND SYSTEM VERIFICATION PROCESS. C) SUPPORT TO DEVISE AND IMPLEMENT A GROUND SYSTEM CONFIGURATION CONTROL PROCESS. D) SUPPORT TO PRODUCE A NEW TIMELINE FOR A SERIES OF MISSION-LEVEL REVIEWS TO INCLUDE EVENTS FROM RELEASE RMM THROUGH TO LAUNCH. FOR THESE REVIEWS, CONTRACTOR IS TO SUPPLY TECHNICAL REVIEW CONTENT WHERE APPLICABLE. PROJECT AND PROGRAM REVIEWS INCLUDE, BUT ARE NOT LIMITED, TO: ORRS, PMRS, FORR, AND LAUNCH REVIEWS USING THE SNPP MISSION AS A SUCCESS MODEL. E) SUPPORT TO PRODUCE A FULLY INTEGRATED TEST PROCESS THAT INCLUDES ALL GROUND SYSTEM REQUIREMENTS LEVELS 6 THROUGH 2, FLIGHT AND INSTRUMENT SYSTEMS ESPECIALLY THOSE RELATIVE TO THERMAL VAC AND GROUND TO SPACECRAFT PRE-SHIPMENT TESTING, AS WELL AS A TEST PROCESS THAT INCLUDES A YET EVOLVING NATIONAL AND INTERNATIONAL WEATHER SERVICE CUSTOMER BASE. F) PROVIDE MAJOR TECHNICAL INPUT AND MULTI-MISSION COORDINATION BETWEEN THE GOES GROUND PROJECT, FLIGHT PROJECT, AS WELL AS COORDINATION AND PROBLEM RESOLUTION BETWEEN COMPETING RESOURCES OF THE GOES-R, SNPP, AND JPSS MISSIONS. G) PROVIDE SIGNIFICANT DESIGN SUPPORT TO THE FORMING OF A NEW MASTER GROUND SYSTEM SCHEDULE, TO INCLUDE THE GENERATION OF A NEAR-REAL TIME SCHEDULE MONITORING PROCESS THAT WILL BE USED TO ASSESS AND CORRECT TECHNICAL AND SCHEDULE RISKS AT THE PROJECT AND PROGRAM LEVELS, THE RESULTS OF WHICH WILL RESULT IN SOLUTIONS THAT WILL BE USED TO RESOLVE AND MITIGATE RISKS. H) LEVERAGE CROSS PROGRAM SUPPORT BETWEEN GOES-R, SNPP, JPSS, OTHER NASA ENTITIES, THE DEPARTMENT OF DEFENSE (DOD) AND OTHER INTELLIGENCE COMMUNITY (IC) PROGRAMS AS NEEDED. I) ASSIST THE CHIEF GSP ENGINEER IN LAUNCH ASSET REQUIREMENT ANALYSIS.$1.1M
Apr 6, 2017Department of CommerceDEPT OF COMMERCE NOAADOCT0008541712IGF::OT::IGF FFRDC SUPPORT. TASK ORDER AWARD FOR THE OSAAP PROGRAM OFFICE.$365K
Apr 6, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG12VN14T541712TO PROVIDE DIRECT SUPPORT TO THE SPACE NETWORK GROUND SEGMENT SUSTAINMENT PROJECT - SERVICES: THE CONTRACTOR SHALL PROVIDE ON/OFF-SITE PROJECT AND MULTIDISCIPLINARY ENGINEERING SERVICES, INDEPENDENT TESTING, CONTRACTOR-ON-SITE MONITORING, AND INDEPENDENT EVALUATION OF PROJECTS AND/OR PROGRAMS, INCLUDING COST, SCHEDULE, AND AFFORDABILITY ANALYSES, IN ANY PHASE OF THE LIFE-CYCLE. THE CONTRACTOR SHALL ALSO PROVIDE LEADERSHIP OR STAFFING FOR FOCUSED SCIENCE AND TECHNOLOGY STUDIES, ADVANCED SYSTEMS ARCHITECTURE, SYSTEMS ENGINEERING AND INDEPENDENT REVIEWS OF ALL ABOVE ACTIVITIES PURSUANT TO TASK ORDERS ISSUED BY THE CONTRACTING OFFICER. THESE SERVICES SHALL INCLUDE THE PERSONNEL, FACILITIES, AND MATERIALS (UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT) TO ACCOMPLISH THE TASKS. TASKS ORDERS WILL BE ISSUED TO PERFORM SERVICES FOR ANY OF GSFC S OR ARC S ORGANIZATIONAL ENTITIES RELATED TO PARTS, COMPONENTS, SOFTWARE, SUBSYSTEMS, SYSTEMS, AND SYSTEMS OF SYSTEMS CIRCUMSCRIBED BY AEROSPACE S CORE FUNCTIONS. TYPES OF NASA ENDEAVORS MAY INCLUDE, BUT ARE NOT LIMITED TO, SPACECRAFT; INSTRUMENTS OR OTHER PAYLOADS; OBSERVATORIES; LAUNCH VEHICLES (FOR SUB-ORBITAL, ORBITAL, LUNAR, OR INTERPLANETARY MISSIONS); LAUNCH ABORT SYSTEMS; ROVERS, LANDERS, OR IMPACT VEHICLES; GROUND SYSTEMS (INCLUDING MISSION OPERATIONS, DATA PROCESSING AND DISSEMINATION, LAUNCH OPERATIONS, ETC.); FACILITIES (E.G. RESEARCH, TEST, LAUNCH); SPACE AND GROUND NETWORKS; BALLOONS; GROUND SUPPORT EQUIPMENT; SIMULATORS; AND NON-FLIGHT MODELS OR PROTOTYPES. ASSESSMENTS MAY INCLUDE SUPPORT (DIRECT OR INDIRECT) TO ARCHITECTURE AND SYSTEMS DEFINITION; STRATEGIC PLANNING AND TECHNOLOGY ROAD-MAPPING; PERFORMANCE EVALUATION OR TRADES STUDIES (INCLUDING TECHNICAL, COST, SCHEDULE, AND/OR RISK); ACQUISITION AND PROJECT MANAGEMENT; SYSTEMS ENGINEERING; DESIGN ANALYSIS (PRELIMINARY OR DETAILED DESIGN); ASSEMBLY, INTEGRATION, AND TEST; REQUIREMENTS VERIFICATION; TEST INSTRUMENTATION; DATA SYSTEMS MANAGEMENT; LAUNCH AND POST-LAUNCH OPERATIONS; MISSION ASSURANCE (INCLUDING LAUNCH VERIFICATION); SYSTEMS SAFETY; RESEARCH AND TECHNOLOGY; DOCUMENTATION; MAINTENANCE; SUSTAINING ENGINEERING; SPECTRUM MANAGEMENT; CONFIGURATION MANAGEMENT, AND OTHERS. INDEPENDENT INSPECTION, ANALYSIS (INCLUDING MODELING AND SIMULATION), AND/OR TEST SHALL BE USED IN EXECUTION OF THIS SUPPORT. THE CONTRACTOR SHALL ALSO ENSURE THAT SUPPORT IS PROVIDED THAT HAS SIGNIFICANT WORKING KNOWLEDGE OF CURRENT AND NEAR FUTURE TECHNOLOGIES THAT APPLY TO MODERNIZING THIS GROUND SYSTEM.$36K
Apr 5, 2017Department of CommerceDEPT OF COMMERCE NOAADOCT0022541712IGF::OT::IGF FFRDC SUPPORT. FOLLOW-ON TASK ORDER AWARD.$5K
Apr 5, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG15VN61T541712IGF::OT::IGF PRE-AEROSOL, CLOUDS, AND OCEAN ECOSYSTEMS (PACE) OCEAN COLOR INSTRUMENT (OCI) MODERATE SPEED MECHANISMS BEARING SUPPORT.$73K
Apr 5, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG16VN67T541712IGF::OT::IGF THE NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA) HAS PARTNERED WITH THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) TO IMPLEMENT THE JOINT POLAR SATELLITE SYSTEM (JPSS) PROGRAM. NASAS ROLE IS TO SERVE AS NOAAS ACQUISITION AND SYSTEM INTEGRATION AGENT IN THE DEVELOPMENT OF THE FLIGHT AND GROUND SYSTEMS OF JPSS, WHICH NOAA THEN OPERATES. THE JPSS PROGRAM WILL IMPLEMENT NOAAS REQUIREMENTS FOR COLLECTION OF GLOBAL MULTI SPECTRAL RADIOMETRY AND OTHER SPECIALIZED METEOROLOGICAL, AND OCEANOGRAPHIC DATA VIA REMOTE SENSING OF LAND, SEA, AND ATMOSPHERIC DATA. THESE DATA WILL SUPPORT NOAAS MISSION FOR CONTINUOUS OBSERVATION OF THE EARTHS ENVIRONMENT NECESSARY TO UNDERSTAND AND PREDICT CHANGES IN WEATHER, CLIMATE, OCEANS AND COASTS, WHICH SUPPORT THE NATIONS ECONOMY, AND PROTECT LIVES AND PROPERTY. 2.1. THE JPSS WILL ALSO PROVIDE OPERATIONAL CONTINUITY OF SATELLITE BASED OBSERVATIONS AND PRODUCTS FOR NOAAS POLAR ORBITING OPERATIONAL ENVIRONMENTAL SATELLITES (POES) AND THE SUOMI NATIONAL POLAR ORBITING PARTNERSHIP (S-NPP) SATELLITE. JPSS WILL CONSIST OF A SERIES OF MISSIONS INVOLVING ENVIRONMENTAL SENSING SATELLITES IN THE 1330 LOCAL TIME ASCENDING NODE (LTAN) SUN SYNCHRONOUS POLAR ORBIT, AND THE GROUND SYSTEM REQUIRED TO SUPPORT THEM. 2.2. THE FLIGHT PROJECT CONSISTS OF THE SPACECRAFT, INSTRUMENTS AND LAUNCH VEHICLE. PLANNED FOR A 7 YEAR MISSION LIFETIME, EACH JPSS MISSION SATELLITE WILL OPERATE IN A POLAR, SUN SYNCHRONOUS MISSION ORBIT AT A NOMINAL ALTITUDE OF 824 KM AND 1330 LOCAL TIME OF ASCENDING NODE CROSSING (LTAN). THE JPSS-1 MISSION INSTRUMENT COMPLEMENT INCLUDES THE VISIBLE INFRARED IMAGING RADIOMETER SUITE (VIIRS), THE CROSS TRACK INFRARED SOUNDER (CRIS), THE ADVANCED TECHNOLOGY MICROWAVE SOUNDER (ATMS), THE OZONE MAPPING PROFILER SUITE NADIR PROFILER (OMPS-N), AND THE CLOUDS AND THE EARTHS RADIANT ENERGY SYSTEM (CERES) INSTRUMENT. ON JPSS-2/3/4 THE CERES INSTRUMENT IS REPLACED BY THE RADIATION BUDGET INSTRUMENT (RBI). THE LAUNCH SEGMENT PROVIDES THOSE ASSETS AND SERVICES ASSOCIATED WITH THE LAUNCH VEHICLE (LV) AND THE PAYLOAD INTEGRATION NECESSARY TO PLACE THE JPSS SATELLITE INTO THE MISSION ORBIT. 2.3. IN ORDER TO ASSURE THE SUCCESS OF THE JPSS DEVELOPMENT, GSFC REQUIRES SYSTEMS ENGINEERING, OPERATIONS AND TECHNICAL MANAGEMENT SUPPORT STAFF FROM THE AEROSPACE CORPORATION AS WELL AS SPECIALIZED ENGINEERING SUPPORT SERVICES FOR TECHNICAL AND SCIENCE DEVELOPMENTS IN SUPPORT OF INSTRUMENT PROCUREMENT, INTEGRATION, TESTING AND ANOMALY INVESTIGATION ACTIVITIES.$250K
Apr 5, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG17VN76T541712IGF::OT::IGF THE CENTER DIRECTOR AT THE NASA GODDARD SPACE FLIGHT CENTER (GSFC) IS RESPONSIBLE FOR MANAGING THE CENTERS DIVERSE AND COMPLEX RESEARCH AND DEVELOPMENT PORTFOLIO; FORMULATING THE CENTERS FUTURE SCIENCE AND TECHNOLOGY GOALS AND LEADING AN INTEGRATED PROGRAM OF INVESTMENTS AND INITIATIVES ALIGNED TO MEET THOSE GOALS. ACCORDINGLY, AEROSPACE SHALL PROVIDE QUALIFIED TECHNICAL EXPERTISE TO THE GODDARD CENTER DIRECTOR TO CONDUCT ASSESSMENTS OF NASA PROGRAMS AND PROJECTS, PROJECT MANAGEMENT, SCIENCE, ENGINEERING AND TECHNOLOGY IN ACCORDANCE WITH THE PRIORITIES AS ESTABLISHED BY THE CENTER DIRECTOR. THE PRIORITIES MAY CHANGE AS THE CENTER DIRECTORS DISCRETION. AEROSPACE IS TASKED TO PROVIDE KNOWLEDGEABLE OBSERVATIONS IN AREAS REQUESTED BY THE GSFC CENTER DIRECTOR WITH A FOCUS ON PROGRAM EXECUTION AND POTENTIAL RISKS. JWST IS THE PLANNED SUCCESSOR TO THE HUBBLE SPACE TELESCOPE, AND IS A TECHNICALLY CHALLENGING PROJECT TO BUILD A SPACECRAFT CONSISTING OF A 6.5 METER PRIMARY MIRROR AND FOUR PRIMARY INSTRUMENTS OPERATING IN THE INFRARED SPECTRUM AT VERY LOW TEMPERATURES, WHILE ORBITING APPROXIMATELY 1.5 MILLION KILOMETERS FROM THE EARTH. BECAUSE OF THE COMPLEXITY OF THE PROJECT, JWST IS ALREADY SUBJECT TO INDEPENDENT EXTERNAL REVIEWS, AND THIS TEAM IS NOT INTENDED TO DUPLICATE OR CONFIRM THE FINDINGS OF THOSE REVIEWS. THE CONTRACTOR WILL BE A MEMBER OF THE TEAM THAT WILL PROVIDE AN AD HOC ASSESSMENT OF THE PROGRAM FOR THE CENTER DIRECTOR, ANALYZE THE BUDGET, AND WILL IDENTIFY THREATS THAT ARE NOT BEING ASSESSED, IF ANY. EXAMPLES OF THE EFFORTS THAT THE CONTRACTOR WILL PERFORM INCLUDE THE LIST BELOW, BUT WILL NOT BE LIMITED TO: 1. CONDUCT SPECIAL STUDIES AND ANALYSES TO SUPPORT CENTER LEADERSHIP DECISION MAKING. THESE MAY INCLUDE, BUT ARE NOT LIMITED TO: A. ANALYSIS OF ALTERNATIVES AND COST ESTIMATES; AND B. ANALYSIS OF ALTERNATIVES FOR MEASURING PERFORMANCE MANAGEMENT AND SUCCESS FACTOR INDICATORS. 2. ASSESS PROGRAM AND PROJECT SCHEDULES 3. MEETINGS SUPPORTING CLASS C/D MISSIONS 4. DEVELOP AND PRESENT FINDING ON FUTURE LAUNCH VEHICLES 5. SUPPORT THE CENTER ON PRESIDENTIAL TRANSITION ACTIVITIES$175K
Apr 3, 2017Department of CommerceDEPT OF COMMERCE NOAADOCT0001541712IGF::OT::IGF FFRDC SUPPORT. TASK ORDER AWARD.$195K
Mar 30, 2017Department of CommerceDEPT OF COMMERCE NOAADOCT0008541712IGF::OT::IGF FFRDC SUPPORT. TASK ORDER AWARD FOR THE OSAAP PROGRAM OFFICE.$463K
Mar 30, 2017Department of CommerceDEPT OF COMMERCE NOAADOCT0010541712IGF::OT::IGF FFRDC SUPPORT. TASK ORDER AWARD FOR THE CLASS PROGRAM OFFICE.$385K
Mar 30, 2017Department of DefenseFA8802 INTEGRATION OPERATION PIKPKEFA880214C0001541712IGF::CL::IGF AEROSPACE FFRDC CONTRACT FROM 1 OCT 2013 TO 30 SEPT 2018$71M
Mar 29, 2017Department of CommerceDEPT OF COMMERCE NOAADOCT0009541712IGF::OT::IGF FFRDC SUPPORT. TASK ORDER AWARD FOR THE HEADQUARTERS PROGRAM OFFICE.$600K

Get Alerted Before The Aerospace Corporation's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free