Federal Contractor Profile
The Aerospace Corporation
$12B obligated·869 awards·9 agencies·12 NAICS
Federal Contracts
Showing contracts 2,801–2,850 of 3,034 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Sep 29, 2016 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG15VN58T | 541712 | IGF::OT::IGF "OSIRIS-REX FLIGHT DYNAMICS TEAM NAVIGATION EXPERT SUPPORT": THE ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS- REX) MISSION S PRIMARY GOAL IS AN EARTH RETURN OF REGOLITH SAMPLE FROM A TYPE-B NEAR EARTH OBJECT (NEO) ASTEROID. THE OSIRIS-REX MISSION WILL GATHER THIS SAMPLE THROUGH A FLIGHT SYSTEM CONSISTING OF A SCIENCE INSTRUMENT SUITE, A TOUCH-AND-GO SAMPLE ACQUISITION MECHANISM (TAGSAM), AND A SAMPLE RETURN CAPSULE (SRC). THE FLIGHT SYSTEM WILL RENDEZVOUS WITH THE NEO, OBSERVE, CHARACTERIZE AND MAP THE ASTEROID, AND FINALLY APPROACH, PERFORM A TOUCH-AND-GO MANEUVER, RETRIEVE A REGOLITH SAMPLE AND DEPART FROM THE ASTEROID. THE OSIRIS-REX FLIGHT SYSTEM WILL THEN NAVIGATE BACK TO EARTH AND JETTISON THE SRC FOR A LANDING AT THE UTAH TEST AND TRAINING RANGE (UTTR). THE OBJECTIVES OF THE MISSION ARE TO RETURN A PRISTINE SAMPLE OF THE ASTEROID, UNDERSTAND THE ORIGINS OF PLANETARY MATERIALS AND THE INITIAL STAGES OF PLANETARY FORMATION. IDENTIFY THE SOURCES OF ORGANIC COMPOUNDS AND OTHER PREBIOTIC CHEMICALS THAT CONTRIBUTED TO THE EMERGENCE OF LIFE ON EARTH; EXPLORE A NEO TO GAIN A GREATER UNDERSTANDING OF POTENTIAL RESOURCES; AND ENABLE THE LONG TERM PREDICTION OF THE DYNAMICS OF NEOS THAT POSE AN IMPACT HAZARD TO EARTH. THE NASA GODDARD SPACE FLIGHT CENTER (GSFC) MANAGES THE OSIRIS-REX PROJECT FOR NASA AND FOR THE PRINCIPAL INVESTIGATOR, AT THE UNIVERSITY OF ARIZONA, LUNAR AND PLANETARY LABORATORY (LPL) IN TUCSON, AZ. THE GODDARD SPACE FLIGHT CENTER MANAGES THE FLIGHT DYNAMICS SYSTEM. KINETX, INC., IS UNDER CONTRACT TO NASA TO DESIGN, DEVELOP, TEST AND IMPLEMENT THE FLIGHT DYNAMICS SYSTEM FOR OSIRIS-REX. THE CONTRACTOR SHALL LEVERAGE EXPERIENCE WITH DEEP SPACE NAVIGATION ANALYSIS AND OPERATIONS TO SUPPORT DIRECTLY THE GSFC FLIGHT DYNAMICS SYSTEM MANAGER IN DAY-TO-DAY ADMINISTRATION OF THE FLIGHT DYNAMICS TEAM. THE CONTRACTOR SHALL PERFORM OVERALL COORDINATION OF FLIGHT DYNAMICS SYSTEM (FDS) ANALYSES ACTIVITIES PERFORMED BY GOVERNMENT AND CONTRACTOR PERSONNEL. EXAMPLES WOULD INCLUDE WORKING WITH THE NAVIGATION CONTRACTOR TO DEFINE AND PERFORM COVARIANCE ANALYSES AND NAVIGATION SIMULATIONS, AND SUPPORT THE DOCUMENTATION OF RESULTS FROM THESE ANALYSIS ACTIVITIES IN THE NAVIGATION PLAN. THE CONTRACTOR SHALL REVIEW OPERATIONAL INTERFACE AGREEMENTS (OIA) AND SYSTEM INTERFACE SPECIFICATIONS (SIS) FOR THE RELEVANT SUBSYSTEMS, SUPPORTING MEETINGS WITH FDS CONTRACTORS AND GROUND SYSTEM ELEMENTS. THE CONTRACTOR SHALL ASSIST IN THE PREPARATION OF REVIEW MATERIALS FOR THE GROUND MISSION OPERATIONS REVIEW AND MOR EPR. THE CONTRACTOR SHALL COORDINATE THE ACTIVITIES OF THE FLIGHT DYNAMICS EXTERNAL ADVISORY PANEL, COORDINATING TOPICS AND MATERIALS FOR REVIEW PANEL MEETINGS, AND CORRESPONDING WITH REVIEW PANEL MEMBERS REGARDING MEETING PREPARATION AND FOLLOW UP. THE CONTRACTOR SHALL PROVIDE A WRITTEN MONTHLY STATUS REPORT THAT SUMMARIZES ACCOMPLISHMENTS DURING THE PREVIOUS REPORTING PERIOD, AND A LIST OF PLANNED ACTIVITIES DURING THE NEXT REPORTING PERIOD. MONTHLY STATUS INPUTS WILL BE PROVIDED BY THE THIRD FRIDAY OF THE MONTH, UNLESS OTHERWISE SPECIFIED. THE CONTRACTOR SHALL PROVIDE AN ANNUAL REPORT AT THE END OF THE GOVERNMENT FISCAL YEAR SUMMARIZING THE ACCOMPLISHMENTS DURING THE PREVIOUS YEAR. | $37K |
| Sep 29, 2016 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | NNL16AB89T | 541330 | IGF::OT::IGF " AN INDUSTRIAL BASE STUDY ON THE WORLD WIDE FOUNDRY CAPABILITY FOR SPACE SYSTEMS TO INCLUDE BOTH TRUSTED AND RAD HARD CAPABILITY " - THE SCOPE OF THIS EFFORT IS FOR THE CONTRACTOR TO STUDY WILL IDENTIFY SUPPLIERS AND CAPABILITIES WORLDWIDE FOR SEMICONDUCTOR TECHNOLOGY. ONCE IDENTIFIED, THE CAPABILITY WILL BE BROKEN DOWN INTO CATEGORIES INCLUDING SUCH AREAS AS: TECHNOLOGY NODES, CAPACITY, WAFER SIZE, AMOUNT OF PRODUCT DELIVERED, RAD HARD CAPABILITY AND IF THIS CAPABILITY COULD BE UTILIZED FOR NASA AND DEPARTMENT OF DEFENSE (DOD) PROGRAMS. | $300K |
| Sep 29, 2016 | Department of StateACQUISITIONS - AQM MOMENTUM | SAQMMA16M2894 | 541611 | COUNTER SPACE TECHNOLOGIES LIST. IGF::OT::IGF | $358K |
| Sep 28, 2016 | National Aeronautics and Space AdministrationNASA HEADQUARTERS | NNH16CN02D | 541712 | IGF::OT::IGF THIRD TABLETOP EXERCISE (TTX#3)FOR NEO WARNING AND IMPACT EVENT IN SUPPORT OF THE PLANETARY SCIENCE DIVISION. PROVIDE THE FOLLOWING SERVICES: WORK WITH THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA ) TO DEVELOP THE LOGISTICS FOR THE TABLETOP EXERCISE. THIS INCLUDES ESTABLISHING THE GENERAL FLOW OF THE EXERCISE, THE LIST OF INDIVIDUALS TO BE INVITED TO PARTICIPATE, THE MATERIALS TO BE PROVIDED TO EACH PARTICIPANT BEFORE, DURING, AND AFTER THE EXERCISE, THE LOCATION AND TIME OF THE EXERCISE, AND THE INTEGRATION OF THE ASTEROID THREAT SCENARIO INTO THE EXERCISE PROGRAM. 2. LEAD AND COORDINATE EFFORTS OF THE EXPERTS TO DEVELOP AND SCRIPT A COMPLETE SCENARIO TO BE PRESENTED TO EXERCISE PARTICIPANTS. THE SCRIPT WILL INCLUDE PRE-EXERCISE MATERIALS, A KICK-OFF BRIEFING PROVIDING BASIC INFORMATION ON THE ASTEROID THREAT, AND UPDATES AS THE THREAT EVOLVES (TRACKING DATA ADDS NEW DETAIL, ETC.). PREPARE MINUTES FROM TELECONS OF THE GROUP DEVELOPING THE SCRIPT. 3. PARTICIPATE IN AND LEAD THE EXERCISE. 4. UPDATE THE APP WITH THE SCENARIO DETAILS AND EXISTING INFORMATION ON KINETIC IMPACTORS AND NUCLEAR EXPLOSIVES, AS WELL AS THE EFFECTS OF THESE TECHNIQUES ON AN ASTEROID. OUTPUT FROM THE APP WILL BE COMBINED WITH BEST JUDGMENT TO RESPOND TO QUESTIONS FROM PARTICIPANTS DURING THE EXERCISE. 5. KEEP A RECORD OF THE QUESTIONS ASKED BY PARTICIPANTS, THE INFORMATION REQUESTED, AND OTHER DETAILS AS THE EXERCISE PROGRESSES. 6. CONDUCT A HALF-DAY WRAP-UP SESSION WITH EXPERTS AND SELECTED TTX PARTICIPANTS THE DAY FOLLOWING THE EXERCISE TO CAPTURE THOUGHTS AND LESSONS LEARNED FROM THE EXERCISE. PRIMARY INTEREST IS IN LESSONS RELATED TO THE TYPES OF INFORMATION REQUESTED, WITH SPECIFIC INTEREST IN THE TECHNICAL INPUT REQUESTED ON MITIGATION MISSION AND CAMPAIGN DESIGN, IMPACT EFFECTS, AND CIVIL DEFENSE. 7. PREPARE AND COORDINATE A SUMMARY OF THE EXERCISE AND INFORMATION LEARNED FROM THE EXERCISE THAT WILL BE PROVIDED TO EXERCISE SPONSORS WITHIN 30 DAYS OF THE END OF THE EXERCISE. | $60K |
| Sep 27, 2016 | National Aeronautics and Space AdministrationNASA HEADQUARTERS | NNH13CI94D | 541712 | IGF::OT::IGF. FUNDS TO SUPPORT THE EXPLORATION SYSTEMS DEVELOPMENT DIVISION. THE EXPLORATION SYSTEMS DEVELOPMENT (ESD) DIVISION HAS REQUESTED AEROSPACE TO PROVIDE TECHNICAL AND PROGRAMMATIC ANALYSIS, CONSULTATION AND EVALUATION IN SUPPORT OF NASA S EXPLORATION ENTERPRISE. THIS SUPPORT WILL INCLUDE ASSISTANCE WITH INTEGRATED COST AND SCHEDULE DEVELOPMENT/ASSESSMENT ACTIVITIES AS WELL AS SYSTEMS ENGINEERING AND INTEGRATION (SE&I) ACTIVITIES FOR INTEGRATED EXPLORATION SYSTEMS AND MISSIONS. SPECIFIC ASSIGNMENTS WILL BE DIRECTED BY ESD AND WILL SPECIFY IN WHICH PROGRAMMATIC OR TECHNICAL AREAS AEROSPACE IS TO FOCUS ITS RESOURCES. AEROSPACE WILL PROVIDE SUBJECT MATTER EXPERTS, AND PERFORM INDEPENDENT ANALYSES, AS REQUESTED, IN SUPPORT OF THE GOVERNMENT'S DECISIONS. THE LEVEL OF FIDELITY FOR INDEPENDENT ASSESSMENTS WILL BE TAILORED ACCORDING TO THE INFORMATION AND TIME AVAILABLE. PRIORITIES AND SCHEDULES WILL BE ESTABLISHED BY MUTUAL AGREEMENT BETWEEN ESD AND AEROSPACE. SUPPORT TO INTEGRATED COST AND SCHEDULE DEVELOPMENT/ASSESSMENT ACTIVITIES INCLUDE BUT ARE NOT LIMITED TO: . BUDGET EVALUATION AND ASSESSMENT . COST AND SCHEDULE RISK DATA VALIDATION WITH HISTORICAL DATA. . IDENTIFICATION OF MAJOR COST AND SCHEDULE RISK DRIVERS . JOINT COST AND SCHEDULE CONFIDENCE LEVEL (JCL) METHODOLOGY DEVELOPMENT AND ASSESSMENT . TARGETED USE OF AEROSPACE PROGRAMMATIC ASSESSMENT PROCESSES AND TOOLS TO ENHANCE, SUPPLEMENT, OR VALIDATE ESD PROCESSES SUPPORT TO SE&I ACTIVITIES MAY INCLUDE BUT ARE NOT LIMITED TO: . VEHICLE ENVIRONMENTS . LOADS, DYNAMICS AND STRUCTURES . HARDWARE SYSTEMS AND SUBSYSTEMS . GROUND AND FLIGHT SOFTWARE . GUIDANCE, NAVIGATION AND CONTROL . MISSION ANALYSIS . FLIGHT SAFETY AND CREW RATING . MISSION, SYSTEM AND HARDWARE RISK . LAUNCH VEHICLE, PAYLOAD/SPACECRAFT AND GROUND SYSTEMS INTEGRATION . MANUFACTURING, ASSEMBLY, PROCESSING AND OPERATIONS . GROUND COMMAND, CONTROL, COMMUNICATION . RANGE SYSTEMS OPERATIONS AND INTEGRATION IN ADDITION TO FOCUSED ASSESSMENTS, AEROSPACE WILL PROVIDE THE FOLLOWING ADVISORY SERVICES FOR ESD: A. PROVIDE PERSONNEL AND EXPERTISE NECESSARY TO PERFORM ON-SITE NASA HQ SUPPORT AND OTHER REQUESTED SERVICES, AND PARTICIPATE IN REVIEWS AND MEETINGS B. COLLABORATE WITH NASA CIVIL SERVANTS AND SUPPORT CONTRACTORS C. PARTICIPATE IN MAJOR GOVERNMENT AND CONTRACTOR PROGRAM REVIEWS AND PROVIDE TECHNICAL ADVICE REGARDING DESIGNS, PRODUCTION, INTEGRATION, READINESS, RISK, OVERALL SYSTEMS ANALYSES, AND PROGRAMMATIC ISSUES D. PARTICIPATE IN RECURRING NASA AND CONTRACTOR TELECONFERENCES E. PARTICIPATE IN TECHNICAL INTERCHANGE MEETINGS IN SUPPORT OF SPECIFIC ISSUES WHEN AEROSPACE IS INVOLVED IN THE ASSESSMENT/RESOLUTION OF THAT ISSUE. | $165K |
| Sep 27, 2016 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | NNL16AB88T | 541330 | IGF::OT::IGF " NESC (NASA (NATIONAL AERONAUTICS AND SPACE ADMINISTRATION) ENGINEERING AND SAFETY CENTER). SENSORS AND INSTRUMENTATION TECHNICAL DISCIPLINE TEAM (TDT) SUPPORT " - THE SCOPE OF THIS EFFORT IS FOR THE CONTRACTOR TO PARTICIPATE AS A MEMBER OF THE NESC SENSORS AND INSTRUMENTATION TECHNICAL DISCIPLINE TEAM. AS MEMBERS OF THIS TEAM, TECHNICAL EXPERTS FROM THE CONTRACTOR SHALL PARTICIPATE IN TEAM MEETINGS, PROVIDE EXPERT ANALYSIS, ADVICE, CONSULTATION, AND GUIDANCE SUPPORT TO THE TEAM LEADER AND PREPARE APPROPRIATE SECTIONS OF TEAM REPORTS AND FINDINGS. | $82K |
| Sep 21, 2016 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG11VN08T | 541712 | ASTROPHYSICS PROGRAM ENGINEERING SUPPORT TASK PURPOSE:PROVIDE MISSION SYSTEMS ENGINEERING SUPPORT TO THE ASTROPHYSICS PROGRAM 1. PURPOSE, OBJECTIVE, AND BACKGROUND OF WORK TO BE PERFORMED: 1.1. PROVIDE MISSION SYSTEMS ENGINEERING SUPPORT TO THE ASTROPHYSICS PROGRAM. 2. DESCRIPTION OF WORK TO BE PERFORMED: REVIEW TECHNICAL RESULTS OF MAJOR SYSTEM TRADES AND STUDY EFFORTS FOR COMPLETENESS AND ACCURACY. FORWARD RECOMMENDATIONS FOR RESOLVING ISSUES UNCOVERED TO THE PARTIES RESPONSIBLE FOR THESE EFFORTS AND TO THE PROGRAM MANAGER AND HIS DEPUTY. WORK WITH THE RESPONSIBLE PARTIES TO IMPLEMENT THESE RECOMMENDATIONS AS REQUIRED. THE CONTRACTOR SHALL SUPPORT COORDINATION OF SYSTEM ENGINEERING ACTIVITIES, TOOLS AND PROCESSES, AMONG THE VARIOUS GOVERNMENT AGENCIES, CONTRACTORS, AND SUB-CONTRACTORS. THE CONTRACTOR SHALL REVIEW PROJECT DOCUMENTATION FOR THE PROGRAM MANAGER AND HIS DEPUTY AND PROVIDE INPUTS TO THE CCB PROCESS. THE CONTRACTOR SHALL SUPPORT THE DEVELOPMENT OF REQUIREMENTS AT ALL LEVELS. THE CONTRACTOR SHALL ATTEND TECHNICAL AND PROGRAMMATIC REVIEWS AS NECESSARY. THE CONTRACTOR SHALL PARTICIPATE IN THE RISK MANAGEMENT BOARD, THE CONFIGURATION CONTROL BOARD AND OTHER PROGRAM BOARDS AS NECESSARY. THE CONTRACTOR SHALL SUPPORT THE PREPARATION FOR MAJOR REVIEWS AND ASSIST IN THE RESPONSE TO ACTIONS GENERATED FROM THE REVIEWS. TO PROVIDE TECHNICAL PROGRESS REPORT: DUE MONTHLY, THE 15TH OF THE MONTH TO ATTEND TECHNICAL MEETINGS AS REQUESTED REVIEW REPORT: DUE 10 DAYS AFTER REVIEW COMPLETION ATTEND AND CONTRIBUTE TO THE WEEKLY AND/OR MONTHLY STATUS MEETINGS PROVIDE PRESENTATION MATERIALS FOR MAJOR PROJECT REVIEWS (INCLUDING BUT NOT LIMITED TO SSRS, SDRS, AND PDRS, AND CDRS) AS REQUESTED: DUE TEN DAYS PRIOR TO REVIEW. PARAMETRIC TRADE STUDIES AS REQUESTED INPUTS INTO THE DEVELOPMENT OF SYSTEM ENGINEERING PLANS, PROGRAM PLANS, RISK PLANS, REQUIREMENTS, TECHNICAL BUDGETS, RISKS AND TECHNICAL PERFORMANCE MEASURES AT ALL LEVELS OF THE PROGRAM AS REQUESTED. PROVIDE EVALUATIONS OF MAJOR REVIEWS: DUE 10 DAYS AFTER REVIEW COMPLETION. PROVIDE ANY ADDITIONAL ANALYSES AS REQUESTED BY THE ATR | $58K |
| Sep 16, 2016 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | NNJ11HD42T | 541712 | SPECIAL STUDIES/ANALYSIS- AERONAUTICAL/SPACE | $119K |
| Sep 15, 2016 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG12VN13T | 541712 | AWARD ENTITLED "SPACE NETWORK RELIABILITY AND LOADING ANALYSIS" RISK ANALYSIS AND SECURITY EVALUATION FOR SPACE NETWORK. THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER (GSFC) IS RESPONSIBLE FOR PROJECT MANAGEMENT OF THE NASA TRACKING AND DATA RELAY SATELLITE SYSTEM (TDRSS) INCLUDING DEVELOPMENT AND OPERATIONS OF THE SPACE CONSTELLATION ASSETS AS WELL AS THE GROUND SYSTEM ASSETS. THIS TASK ASSISTS THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) IN PREDICATING THE FUTURE HEALTH OF THE TDRS SATELLITES IN ORBIT, AND PREDICATING THE ABILITY OF THE SPACE NETWORK TO MEET FUTURE USER REQUIREMENTS. THIS IS AN ONGOING EFFORT THAT HAS OCCURRED YEARLY FOR AT LEAST THE LAST TEN YEARS. DESCRIPTION OF WORK TO BE PERFORMED 1. THE CONTRACTOR WILL UPDATE AND MAINTAIN THE TRACKING AND DATA RELAY SATELLITE SYSTEM (TDRS) FLEET RELIABILITY AND SERVICE AVAILABILITY MODEL; CONDUCT REPLENISHMENT ANALYSES (GAP ANALYSES) ON THE TDRSS CONSTELLATION; 2. THE CONTRACTOR WILL DEVELOP AND MAINTAIN THE USER MISSION MODEL; DEVELOP, UPDATE AND MAINTAIN LOADING ANALYSES BASED ON THE MISSION MODEL; 3. THE CONTRACTOR WILL SUPPORT THE SPACE COMMUNICATIONS CONTROL BOARD OF THE SPACE COMMUNICATIONS AND NAVIGATION OFFICE. THIS SUPPORT WILL REQUIRE ATTENDANCE AT MEETINGS AT GODDARD FACILITIES AS WELL AS OTHER GOVERNMENT FACILITIES, THUS TRAVEL IS AUTHORIZED. DELIVERABLES/MILESTONES THE CONTRACTOR WILL DELIVER RESULTS OF THE TRACKING AND DATA RELAY SATELLITE SYSTEM (TDRS) RELIABILITY ANALYSIS THE CONTRACTOR WILL DELIVER A UNCLASSIFIED FINAL REPORT FOR USER LOADING ANALYSIS THE CONTRACTOR WILL DELIVER A CLASSIFIED FINAL REPORT FOR USER LOADING ANALYSIS. TO THIS END, THE CONTRACTOR SHALL PROVIDE ON/OFF-SITE PROJECT AND MULTIDISCIPLINARY ENGINEERING SERVICES, INDEPENDENT TESTING, CONTRACTOR-ON-SITE MONITORING, AND INDEPENDENT EVALUATION OF PROJECTS AND/OR PROGRAMS, INCLUDING COST, SCHEDULE, AND AFFORDABILITY ANALYSES, IN ANY PHASE OF THE LIFE-CYCLE. INSPECTION,AND ANALYSIS (INCLUDING MODELING AND SIMULATION), AND/OR TEST SHALL BE USED IN EXECUTION OF THIS SUPPORT. | $25K |
| Sep 15, 2016 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG16VN75T | 541712 | IGF::OT::IGF SPECIALIZED ENGINEERING, EVALUATION AND TEST SERVICES (SEETS II) CONTRACT. TASK ORDER NUMBER SEVENTY-FIVE (75). TASK ORDER TITLE: AEROSPACE SUPPORT TO GOES-R GROUND FOR NAVY RADIO FREQUENCY (RF) SUPPORT. THE AEROSPACE CORPORATION WILL PERFORM A COMPREHENSIVE ASSESSMENT OF THE RADIO FREQUENCY (RF) ENVIRONMENT OF SELECTED UNITED STATES (U.S) NAVAL SITES IDENTIFIED IN THE DEPARTMENT OF DEFENSE (DOD) TRANSITION PLAN FROM BOTH A POTENTIAL FOR RADIO FREQUENCY INTERFERENCE (RFI) PERSPECTIVE AND FROM AN OPERATIONAL PERSPECTIVE TO EXAMINE POSSIBILITIES FOR REDUCING OR MITIGATING RADIO FREQUENCY INTERFERENCE (RFI). THE AEROSPACE CORPORATION WILL PERFORM AN ASSESSMENT OF THE PHYSICAL CHARACTERISTICS OF THE SELECTED SITES AND THE ASSOCIATED ANTENNAS AND THE POTENTIAL IMPACTS TO THE OPERATIONAL ENVIRONMENT FROM THE REALLOCATION OF THE 1695-1710 MEGAHERTZ BAND AND SHARING WITH THE LONG TERM EVOLUTION (LTE) WIRELESS CARRIERS. THE STUDY SHALL ADDRESS POTENTIAL METHODS FOR MITIGATING RADIO FREQUENCY INTERFERENCE (RFI) AND THE IMPLEMENTATION OF TECHNICAL SOLUTIONS, FOR EXAMPLE, HARDWARE AND/OR SOFTWARE SOLUTIONS. ADDITIONALLY, THE STUDY SHALL EVALUATE THE PROPOSED METHOD FOR MONITORING AS BEING DEVELOPED BY THE NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA) FOR UNWANTED RADIO FREQUENCY INTERFERENCE, AND PROVIDE RECOMMENDATIONS AS TO ITS UTILITY FOR THE UNITED STATES (U.S.) NAVY AND MARINE CORPS SITES AS WELL AS PROVIDING A ROUGH ORDER OF MAGNITUDE COST FOR SAID SYSTEM BY SITE IF REQUESTED. THE AEROSPACE CORPORATION WILL PERFORM A COMPREHENSIVE STUDY OF ALL ASPECTS THAT EFFECT THE SUCCESSFUL CONTINUED OPERATION OF THE DOWNLINKS IN 1695-1710 MEGAHERTZ BAND AS A RESULT OF SPECTRUM SHARING WITH WIRELESS CARRIERS AND RECOMMEND ACTION TO ADDRESS POTENTIAL RADIO FREQUENCY INTERFERENCE (RFI) MITIGATION AND THE IMPLEMENTATION OF A MONITORING CAPABILITY THAT WILL AUGMENT THE AWS-3 AUCTION COORDINATION GUIDELINES. THE AEROSPACE CORPORATION WILL COMPILE ALL INFORMATION INTO A FINAL REPORT FOR THE UNITED STATES (U.S.) NAVY PROGRAM MANAGER RESPONSIBLE FOR ADDRESSING ISSUES WITH THE AWS-3 SPECTRUM SHARING SCENARIOS, AND DELIVERED AS AN AEROSPACE TECHNICAL OPERATIONS REPORT (TOR). | $100K |
| Sep 15, 2016 | National Aeronautics and Space AdministrationNASA HEADQUARTERS | NNH14CL71D | 541712 | IGF::OT::IGF THIS REQUIREMENT IS FOR CONTINUED/FOLLOW-ON ORGANIZATIONAL SUPPORT AND ASSISTANCE TO SCAP PROGRAM MANAGERS IN SETTING UP AND MAKING FUNCTIONAL THE SPACE ENVIRONMENT TEST ASSETS GROUP (SETAG), IDENTIFY AND UNDERSTAND THE CAPABILITY PORTFOLIO CONTENTS WITHIN AND OUTSIDE THE AGENCY, AND PERFORM INDEPENDENT ASSET CONDITION ASSESSMENTS IN ORDER TO ASSIST SCAP PROGRAM TO MONITOR HEALTH AND SAFETY OF ITS PROGRAM ASSETS. SUPPORT SHALL INCLUDE, BUT NOT LIMITED TO, WORKING WITH THE SPECIFIED PORTFOLIO GROUPS, SETTING UP AND FACILITATING MEETINGS, DRAFTING AND FINALIZING AND PRESENTING STUDIES/BRIEFINGS, (SPACE ENVIRONMENTAL TEST ALLIANCE GROUP, THERMAL VACUUM CHAMBERS (TVC S), VIBRATION AND ACOUSTIC CHAMBERS, CLEAN ROOMS, MODELING AND SIMULATION TEST FACILITIES, ETC.). | $210K |
| Sep 15, 2016 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | NNL16AB86T | 541330 | IGF::OT::IGF " PARTICIPATION ON THE NESC PASSIVE THERMAL TECHNICAL DISCIPLINE TEAM (TDT) " - THE SCOPE OF THIS EFFORT IS FOR THE CONTRACTOR TO PROVIDE TECHNICAL CONSULTATIONS, INVESTIGATIONS AND ANALYSES AS REQUESTED BY THE NASA TECHNICAL FELLOW (NASA TF). | $97K |
| Sep 14, 2016 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | NNL15AC32T | 541330 | IGF::OT::IGF " NESC (NASA ENGINEERING AND SAFETY CENTER)EVALUATION OF THE EXPLORATION SYSTEMS DEVELOPMENT DIVISION (ESD) OFFICE'S VERIFICATION AND VALIDATION (V&V) PLANNING TO IDENTIFY GAPS AND AREAS FOR IMPROVEMENT " - THE SCOPE OF THIS EFFORT IS FOR THE CONTRACTOR TO PROVIDE EXPERTISE TO A SERIES OF ANALYSES OF V&V ADEQUACY AND REPORTS THAT COINCIDE WITH THE THREE ESD PROGRAMS (SLS, MPCV, AND GSDO) CRITICAL DESIGN REVIEWS (CDRS) AND A FINAL REPORT IN PARALLEL WITH THE ESD BUILD-TO SYNC (BTS) ACTIVITIES, TO BE COMPLETED IN THE 1ST QUARTER FY16. | $27K |
| Sep 13, 2016 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA12AA52T | 541712 | IGF::OT::IGF THE CONTRACTOR SHALL PROVIDE TECHNICAL EXPERTISE IN SPECTRUM COMMUNICATIONS ARCHITECTURE SOLUTIONS, CONSULTATION ON THE NATIONAL AVAILABILITY OF DE-CONFLICTED SPACE SPECTRUM, AND OTHER SPECTRUM RELATED EFFORTS IN SUPPORT OF THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AMES RADIO FREQUENCY (RF) SPECTRUM MANAGEMENT OFFICE, NETWORKS AND OPERATIONS DIVISION, INFORMATION TECHNOLOGY DIRECTORATE. | $29K |
| Sep 9, 2016 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG11VN08T | 541712 | ASTROPHYSICS PROGRAM ENGINEERING SUPPORT TASK PURPOSE:PROVIDE MISSION SYSTEMS ENGINEERING SUPPORT TO THE ASTROPHYSICS PROGRAM 1. PURPOSE, OBJECTIVE, AND BACKGROUND OF WORK TO BE PERFORMED: 1.1. PROVIDE MISSION SYSTEMS ENGINEERING SUPPORT TO THE ASTROPHYSICS PROGRAM. 2. DESCRIPTION OF WORK TO BE PERFORMED: REVIEW TECHNICAL RESULTS OF MAJOR SYSTEM TRADES AND STUDY EFFORTS FOR COMPLETENESS AND ACCURACY. FORWARD RECOMMENDATIONS FOR RESOLVING ISSUES UNCOVERED TO THE PARTIES RESPONSIBLE FOR THESE EFFORTS AND TO THE PROGRAM MANAGER AND HIS DEPUTY. WORK WITH THE RESPONSIBLE PARTIES TO IMPLEMENT THESE RECOMMENDATIONS AS REQUIRED. THE CONTRACTOR SHALL SUPPORT COORDINATION OF SYSTEM ENGINEERING ACTIVITIES, TOOLS AND PROCESSES, AMONG THE VARIOUS GOVERNMENT AGENCIES, CONTRACTORS, AND SUB-CONTRACTORS. THE CONTRACTOR SHALL REVIEW PROJECT DOCUMENTATION FOR THE PROGRAM MANAGER AND HIS DEPUTY AND PROVIDE INPUTS TO THE CCB PROCESS. THE CONTRACTOR SHALL SUPPORT THE DEVELOPMENT OF REQUIREMENTS AT ALL LEVELS. THE CONTRACTOR SHALL ATTEND TECHNICAL AND PROGRAMMATIC REVIEWS AS NECESSARY. THE CONTRACTOR SHALL PARTICIPATE IN THE RISK MANAGEMENT BOARD, THE CONFIGURATION CONTROL BOARD AND OTHER PROGRAM BOARDS AS NECESSARY. THE CONTRACTOR SHALL SUPPORT THE PREPARATION FOR MAJOR REVIEWS AND ASSIST IN THE RESPONSE TO ACTIONS GENERATED FROM THE REVIEWS. TO PROVIDE TECHNICAL PROGRESS REPORT: DUE MONTHLY, THE 15TH OF THE MONTH TO ATTEND TECHNICAL MEETINGS AS REQUESTED REVIEW REPORT: DUE 10 DAYS AFTER REVIEW COMPLETION ATTEND AND CONTRIBUTE TO THE WEEKLY AND/OR MONTHLY STATUS MEETINGS PROVIDE PRESENTATION MATERIALS FOR MAJOR PROJECT REVIEWS (INCLUDING BUT NOT LIMITED TO SSRS, SDRS, AND PDRS, AND CDRS) AS REQUESTED: DUE TEN DAYS PRIOR TO REVIEW. PARAMETRIC TRADE STUDIES AS REQUESTED INPUTS INTO THE DEVELOPMENT OF SYSTEM ENGINEERING PLANS, PROGRAM PLANS, RISK PLANS, REQUIREMENTS, TECHNICAL BUDGETS, RISKS AND TECHNICAL PERFORMANCE MEASURES AT ALL LEVELS OF THE PROGRAM AS REQUESTED. PROVIDE EVALUATIONS OF MAJOR REVIEWS: DUE 10 DAYS AFTER REVIEW COMPLETION. PROVIDE ANY ADDITIONAL ANALYSES AS REQUESTED BY THE ATR | $73K |
| Sep 9, 2016 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG12VN15T | 541712 | THE JOINT POLAR SATELLITE SYSTEM (JPSS) C3S SYSTEMS ENGINEERING: SPECIALIZED ENGINEERING, ENGINEERING AND TECHNICAL SERVICES TO JPSS GROUND TO SUPPORT ACQUISITION AND OPERATIONS. TECHNICAL SUPPORT TO THE JPSS COMMAND, CONTROL, AND COMMUNICATIONS SEGMENT (C3S) FUNCTIONAL AREA AS DIRECTED BY THE JPSS GROUND PROJECT C3 LEAD. SPECIALIZED ENGINEERING, ENGINEERING AND TECHNICAL SERVICES TO THE JOINT POLAR SATELLITE SYSTEM (JPSS) GROUND TO SUPPORT ACQUISITION AND OPERATIONS. TECHNICAL SUPPORT TO OTHER FUNCTIONAL AREAS OF THE JPSS GROUND PROJECT AS DIRECTED BY THE JPSS PROJECT MANAGER AND/OR DEPUTY PROJECT MANAGER(S). THE CONTRACTOR SHALL PROVIDE ON/OFF-SITE PROJECT AND MULTIDISCIPLINARY ENGINEERING SERVICES, INDEPENDENT TESTING, CONTRACTOR-ON-SITE MONITORING, AND INDEPENDENT EVALUATION OF PROJECTS AND/OR PROGRAMS, INCLUDING COST, SCHEDULE, AND AFFORDABILITY ANALYSES, IN ANY PHASE OF THE LIFE-CYCLE. THE CONTRACTOR SHALL ALSO PROVIDE LEADERSHIP OR STAFFING FOR FOCUSED SCIENCE AND TECHNOLOGY STUDIES, ADVANCED SYSTEMS ARCHITECTURE, SYSTEMS ENGINEERING AND INDEPENDENT REVIEWS OF ALL ABOVE ACTIVITIES PURSUANT TO TASK ORDERS ISSUED BY THE CONTRACTING OFFICER. THESE SERVICES SHALL INCLUDE THE PERSONNEL, FACILITIES, AND MATERIALS (UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT) TO ACCOMPLISH THE TASKS. TYPES OF NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) ENDEAVORS MAY INCLUDE, BUT ARE NOT LIMITED TO, SPACECRAFT; INSTRUMENTS OR OTHER PAYLOADS; OBSERVATORIES; LAUNCH VEHICLES (FOR SUB-ORBITAL, ORBITAL, LUNAR, OR INTERPLANETARY MISSIONS); LAUNCH ABORT SYSTEMS; ROVERS, LANDERS, OR IMPACT VEHICLES; GROUND SYSTEMS (INCLUDING MISSION OPERATIONS, DATA PROCESSING AND DISSEMINATION, LAUNCH OPERATIONS, ETC.); FACILITIES (E.G. RESEARCH, TEST, LAUNCH); SPACE AND GROUND NETWORKS; BALLOONS; GROUND SUPPORT EQUIPMENT; SIMULATORS; AND NON-FLIGHT MODELS OR PROTOTYPES. ASSESSMENTS MAY INCLUDE SUPPORT (DIRECT OR INDIRECT) TO ARCHITECTURE AND SYSTEMS DEFINITION; STRATEGIC PLANNING AND TECHNOLOGY ROAD-MAPPING; PERFORMANCE EVALUATION OR TRADES STUDIES (INCLUDING TECHNICAL, COST, SCHEDULE, AND/OR RISK); ACQUISITION AND PROJECT MANAGEMENT; SYSTEMS ENGINEERING; DESIGN ANALYSIS (PRELIMINARY OR DETAILED DESIGN); ASSEMBLY, INTEGRATION, AND TEST; REQUIREMENTS VERIFICATION; TEST INSTRUMENTATION; DATA SYSTEMS MANAGEMENT; LAUNCH AND POST-LAUNCH OPERATIONS; MISSION ASSURANCE (INCLUDING LAUNCH VERIFICATION); SYSTEMS SAFETY; RESEARCH AND TECHNOLOGY; DOCUMENTATION; MAINTENANCE; SUSTAINING ENGINEERING; SPECTRUM MANAGEMENT; CONFIGURATION MANAGEMENT, AND OTHERS. INDEPENDENT INSPECTION, ANALYSIS (INCLUDING MODELING AND SIMULATION), AND/OR TEST SHALL BE USED IN EXECUTION OF THIS SUPPORT. BOTH DOMESTIC AND INTERNATIONAL TRAVEL MAY BE REQUIRED IN SUPPORT OF COMPLETING THESE TASK. | $180K |
| Sep 9, 2016 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14VN53T | 541712 | IGF::OT::IGF EARTH SCIENCE MISSION OPERATIONS (ESMO) MISSION DIRECTOR SUPPORT. THIS TASK IS IN SUPPORT OF THE APPLIED ENGINEERING AND TECHNOLOGY DIRECTORATE (AETD), SOFTWARE ENGINEERING DIVISION (SED), MISSION VALIDATION AND OPERATIONS BRANCH. THE SUPPORT WILL BE A FULL-TIME CONTRACTOR EMPLOYEE TO SERVE AS MISSION DIRECTOR SUPPORT FOR THE ESMO PROJECT. THE ESMO PROJECT MANAGER WILL PROVIDE DAY-TO-DAY DIRECTION AND THE CONTRACTOR WILL BE ON-SITE LOCATED IN ESMO PROJECT OFFICE. THE CONTRACTOR WILL WORK UNDER THE AUTHORITY OF THE LEAD MISSION DIRECTOR, LOCATED IN THE MISSION VALIDATION AND OPERATIONS BRANCH, CODE 584. NASA POLICY DIRECTIVE (NPD) 1000 WILL GOVERN THE ENGINEERING TECHNICAL AUTHORITY. THE WORK INVOLVES DEVELOPING OR ANALYZING OPERATIONAL CONCEPTS, REQUIREMENTS, PLANS, SCHEDULES, OR DOCUMENTATION FOR PLANNING, CONDUCTING, AND EVALUATING SPACEFLIGHT OPERATIONS. THE WORK MAY INCLUDE MISSION CONTROL, PAYLOAD OPERATIONS CONTROL, FLIGHT CONTROL, MISSION AND CREW OPERATIONAL REQUIREMENTS, DATA ACQUISITION REQUIREMENTS, GROUND SUPPORT SYSTEMS REQUIREMENTS, OR INTEGRATED HARDWARE AND SOFTWARE SYSTEMS USED TO EVALUATE MISSION REQUIREMENTS. DUTIES MAY ALSO INCLUDE MONITORING NON-AEROSPACE CORPORATION CONTRACTORS ENGAGED IN THIS WORK. THE CONTRACTOR SHALL ASSURE THAT SPACECRAFT OPERATIONS ACTIVITIES ARE EXECUTED SAFELY AND EFFECTIVELY. THE CONTRACTOR SHALL ASSURE THAT THE FLIGHT OPERATIONS TEAM (FOT) FOR THE ASSIGNED MISSION IS APPROPRIATELY TRAINED, AND THAT ALL ACTIVITIES ARE WELL PLANNED AND EXECUTED. THE CONTRACTOR SHALL SUPPORT NASA MANAGEMENT OVERSIGHT OF SATELLITE OPERATIONS ACTIVITIES. THE CONTRACTOR SHALL ACT AS A LIAISON BETWEEN NASA AND OTHER ENGINEERING AND/OR SUPPORT TEAMS INVOLVED IN STUDIES, ANALYSES, ANOMALY RESOLUTION, AND/OR OTHER MISSION SUPPORT ACTIVITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OVERSIGHT AND CONTROL OF FACILITIES UTILIZED FOR MULTI-PROGRAM MISSION OPERATIONS AS WELL AS FACILITIES FOR SPACECRAFT COMMAND AND CONTROL AND SIMULATIONS AND TRAINING. THE CONTRACTOR SHALL LEAD MAJOR SPACECRAFT REVIEWS AS REQUIRED. THE CONTRACTOR SHALL SUPPORT MAJOR EARTH OBSERVING SYSTEM (EOS) GROUND SYSTEM REVIEWS AND SHALL STAY INFORMED OF ALL MAJOR CHANGES. THE CONTRACTOR SHALL CONCEIVE AND DEVELOP NEW METHODS THAT CAN PROVIDE SIGNIFICANT TECHNICAL OR OPERATIONAL IMPACT IN AN ASSIGNED AREA AND SHALL MANAGE NEW, ADVANCED, AND UPGRADED SYSTEMS TECHNOLOGY AND CAPABILITY DEVELOPMENT. THE CONTRACTOR SHALL STAY INFORMED OF CURRENT AQUA, AURA, TERRA, TROPICAL RAINFALL MEASURING MISSION (TRMM), AND GLOBAL PRECIPITATION MEASUREMENT (GPM) SPACECRAFT STATUSES AND ON-GOING ANOMALIES. THE CONTRACTOR SHALL FORMULATE AND PROVIDE GUIDANCE FOR COMPLEX SPACECRAFT MISSION PLANNING AND OPERATIONS DESIGNED TO VERIFY SPACECRAFT SUBSYSTEM AND INSTRUMENT PERFORMANCE, WHICH WILL INVOLVE MULTI-DISCIPLINARY MISSION ELEMENTS, INSTRUMENT TEAMS, AND SUBSYSTEM ENGINEERING SUPPORT. | $87K |
| Sep 8, 2016 | Department of JusticeFBI-JEH | DJF151200P0009431 | 541712 | IGF::CL::IGF CONTRACT# J-FBI-12-174 AEROSPACE CORPORATION, OPTION YEAR 3, POP: 7/30/15 - 7/29/2016 INCREMENTAL FUNDING | $500K |
| Sep 8, 2016 | Department of DefenseFA8802 INTEGRATION OPERATION PIKPKE | FA880214C0001 | 541712 | IGF::CL::IGF AEROSPACE FFRDC CONTRACT FROM 1 OCT 2013 TO 30 SEPT 2018 | $40M |
| Sep 7, 2016 | National Aeronautics and Space AdministrationNASA HEADQUARTERS | NNH16CN00D | 541712 | IGF::OT::IGF SCIENCE MISSION DIRECTORATE (SMD) PROGRAMMATIC ASSESSMENT AND MONITORING. THE CONTRACTOR SHALL PROVIDE INDEPENDENT PROGRAMMATIC AND TECHNICAL ASSESSMENT FUNCTIONS THAT CAN:(1) IDENTIFY AND ASSESS PROJECT RISKS WHETHER TECHNICAL, COST AND SCHEDULE RELATED AND PREDICT THE PROBABILITIES AND CONSEQUENCES OF THEIR REALIZATION; (2) PREDICT THE GROWTH OF PROJECT COSTS AND SCHEDULES OVER TIME DUE TO RISKS AND UNCERTAINTY; AND (3) COMMUNICATE RESULTS AND FINDINGS IN A CLEAR, CONCISE MANNER TO SMD PROGRAM EXECUTIVES (PES), PROGRAM ANALYSTS (PAS), THEME DIRECTORS, THE SCIENCE MISSION DIRECTORATE (SMD) ASSOCIATE ADMINISTRATOR (AA) AND STAFF MEMBERS AS NEEDED, THE CONTRACTOR SHALL ALSO: (1) CONDUCT MONTHLY MONITORING OF A DESIGNATED SUBSET OF THE MOST CHALLENGING AND COMPLEX FLIGHT PROJECTS AS THEY PROCEED THROUGH DESIGN, DEVELOPMENT, AND IMPLEMENTATION IN TERMS OF THE EVOLUTION OF THEIR PROGRAMMATIC AND TECHNICAL RISKS, COST AT COMPLETION AND DELIVERY MILESTONES; (2) CONDUCT SPECIAL STUDIES AND ASSESSMENTS OF THE PAST PERFORMANCE OF FLIGHT PROGRAMS IN ORDER TO PREDICT BETTER SMDS FUTURE PERFORMANCE; AND (3) PROVIDE TECHNICAL AND PROGRAMMATIC ASSESSMENTS OF NON-FLIGHT SMD PROGRAMS AND PROJECTS.THE CONTRACTOR SHALL SUPPORT THE MISSION ANALYSIS ENGINEERING FUNCTION FOR SMD PROJECTS TO INCLUDE EXPERIENCED PERSONNEL, ANALYSIS AND ASSESSMENT TOOLS, PROCESSES AND REPORTING FUNCTIONS. ITS EFFORTS SHALL BE STRUCTURED TO ENSURE THAT THE NEEDED DATA, FINDINGS AND INSIGHTS ARE AVAILABLE IN A TIMELY MANNER TO SUPPORT SMD REVIEWS AND DECISION MAKING. THE CONTRACTOR SHALL DESIGNATE FOR EACH ASSIGNED SMD DIVISION OR THEME A MISSION ANALYSIS ENGINEER (MAE) WHO SHALL BE RESPONSIBLE FOR COORDINATING ALL ANALYSES REQUIRED FOR THE ASSESSMENT AND MONITORING FUNCTIONS OF THE DIVISION OR THEMES PROJECTS. EACH MAE SHALL: (1) MAINTAIN THE KNOWLEDGE BASE FOR THE DIVISIONS PROJECTS, INCLUDING FULL KNOWLEDGE OF ALL ON-GOING PROGRAMMATIC AND TECHNICAL ASSESSMENTS; (2) ENSURE THAT KEY ANALYSTS AND SUBJECT MATTER EXPERTS ATTEND MAJOR MILESTONE AND SELECTED PROJECT REVIEWS; AND (3) PRESENT ANALYSES, FINDINGS AND INSIGHTS TO AUDIENCES IDENTIFIED BY SMD DECISION MAKERS. | $400K |
| Sep 7, 2016 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | NNL15AA72T | 541330 | IGF::OT::IGF " LOADS AND DYNAMICS TECHNICAL DISCIPLINE TEAM (TDT) PARTICIPATION " - THE SCOPE OF THIS EFFORT IS FOR THE CONTRACTOR TO PARTICIPATE ON THE LOADS AND DYNAMICS (L&D) TDT AND ON MULTIPLE NESC TECHNICAL CONSULTATIONS OR INVESTIGATIONS RELATED TO L&D. | $49K |
| Sep 7, 2016 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | NNM16AA19T | 541690 | IGF::OT::IGF THE AEROSPACE CORPORATION SHALL PROVIDE SUBJECT MATTER EXPERTISE WITH A BROAD DEPTH OF KNOWLEDGE REGARDING FLIGHT SOFTWARE TO PERFORM AN INDEPENDENT ASSESSMENT OF SPACE LAUNCH SYSTEM SOFTWARE CLASSIFICATIONS AND PROCESSES. | $115K |
| Sep 6, 2016 | National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER | NNX16TG23P | 541712 | IGF::OT::IGF INTERNAL PURCHASES COURSE TITLE: SMARTER BUYER 1: INDUSTRY PERSPECTIVE | $24K |
| Sep 1, 2016 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | NNM16AA12T | 541690 | IGF::OT::IGF THE AEROSPACE CORPORATION WILL PROVIDE TECHNICAL ANALYSIS AND ASSESSMENT SERVICES TO ASSIST IN TECHNICALLY EVALUATING UNITED LAUNCH ALLIANCE (ULA) WORK ON THE SPACE LAUNCH SYSTEMS (SLS) INTERIM CRYOGENIC PROPULSIONS SYSTEM (ICPS). SPECIFICALLY, AEROSPACE WILL PROVIDE SPACECRAFT/PAYLOAD INTEGRATION AND EVOLUTION (SPIE) WITH TECHNICAL EVALUATIONS PERTAINING TO THE READINESS OF ULA ICPS FLIGHT SOFTWARE. | $30K |
| Aug 31, 2016 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG13VN38T | 541712 | IGF::OT::IGF STUDIES AND ANALYSIS OF GODDARD SPACE FLIGHT CENTER (GSFC)PROJECTS. THE CENTER DIRECTOR AND THE DEPUTY DIRECTOR FOR SCIENCE, OPERATIONS AND PROGRAM PERFORMANCE AT THE NASA GODDARD SPACE FLIGHT CENTER (GSFC) ARE RESPONSIBLE FOR MANAGING THE CENTER S DIVERSE AND COMPLEX RESEARCH AND DEVELOPMENT PORTFOLIO; FORMULATING THE CENTER S FUTURE SCIENCE AND TECHNOLOGY GOALS; AND LEADING AN INTEGRATED PROGRAM OF INVESTMENTS AND INITIATIVES ALIGNED TO MEET THOSE GOALS. ACCORDINGLY, THE CONTRACTOR SHALL PROVIDE QUALIFIED TECHNICAL EXPERTISE TO GODDARD CENTER MANAGEMENT TO CONDUCT ASSESSMENTS OF NASA PROGRAMS AND PROJECTS, PROJECT MANAGEMENT, SCIENCE, ENGINEERING AND TECHNOLOGY. THIS TASK IS ENVISIONED AS THE FIRST PHASE OF A MULTI-YEAR EFFORT TO PERFORM: AT THE DIRECTION OF THE CENTER DIRECTOR OR THE DEPUTY CENTER DIRECTOR FOR SCIENCE, OPERATIONS AND PROGRAM PERFORMANCE, THE CONTRACTOR WILL CONDUCT SPECIAL STUDIES AND ANALYSES TO SUPPORT CENTER LEADERSHIP DECISION-MAKING. THESE MAY INCLUDE, BUT ARE NOT LIMITED TO: A) ANALYSIS OF ALTERNATIVES AND COST ESTIMATES FOR THE GSFC SCIENCE PORTFOLIO B) ANALYSIS OF ALTERNATIVES FOR MEASURING PERFORMANCE MANAGEMENT AND SUCCESS FACTOR INDICATORS C) EVALUATIONS OF SYSTEM ARCHITECTURES AND MISSION DEFINITIONS THE CONTRACTOR WILL BE INVITED TO HIGH LEVEL MEETINGS INVOLVING CENTER OR AGENCY SENIOR MANAGEMENT; MEETINGS WILL BE SCHEDULED UPON THE APPROVAL OF THIS TASK. THE MEETINGS MAY BE REGULARLY SCHEDULED AND/OR AD HOC BASED ON SENIOR MANAGEMENT S SCHEDULE. THIS TASK IS AUTHORIZED THROUGH SEPTEMBER 30 2013. THE CONTRACTOR SHALL PROVIDE TO THE CENTER DIRECTOR OR DEPUTY CENTER DIRECTOR FOR SCIENCE, OPERATIONS AND PROGRAM PERFORMANCE THE RESULTS OF TASK ANALYSES AND RECOMMENDATIONS. THEY ARE EXPECTED TO BE ACTIVE PARTICIPANTS, AS APPROPRIATE, IN MEETINGS AND OTHER FORUMS AND PROVIDE INPUT AND RECOMMENDATIONS VERBALLY OR IN WRITING. THE CONTRACTOR SHALL PROVIDE MONTHLY WRITTEN STATUS REPORTS TO THE CENTER DIRECTOR OR DIRECTOR FOR SCIENCE, OPERATIONS AND PROGRAM PERFORMANCE. THE CONTRACTOR SHALL ATTEND MEETINGS AS REQUIRED. | $34K |
| Aug 30, 2016 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG16VN74T | 541712 | IGF::OT::IGF TASK ORDER TITLE IS THE MARS ORGANIC MOLECULE ANALYZER MOMA WRP SUPPORT PURPOSE, OBJECTIVE, AND BACKGROUND OF WORK TO BE PERFORMED: THE MARS ORGANIC MOLECULE ANALYZER MOMA INSTRUMENT IS A COMBINED GAS CHROMATOGRAPH MASS SPECTROMETER GC MS PAYLOAD ON A LANDED MARS ROVER BEING DEVELOPED BY THE EUROPEAN SPACE AGENCY ESA AND IS PART OF THE EXOMARS PROGRAM. MOMA IS A JOINT COLLABORATION BETWEEN THE US AND THE MAX PLANCK INSTITUTE FOR SOLAR SYSTEM RESEARCH MPS IN GERMANY, WITH MPS AS THE LEAD INSTITUTION RESPONSIBLE FOR DELIVERING MOMA TO ESA. THE US MOMA FLIGHT HARDWARE IS CURRENTLY SCHEDULED FOR DELIVERY TO MPS IN DEC 2017, WITH LAUNCH CURRENTLY SCHEDULED IN JULY 2020. THE NASA GODDARD SPACE FLIGHT CENTER GSFC MANAGES THE DEVELOPMENT OF THE U.S. HARDWARE PORTION OF THE MOMA INSTRUMENT FOR THE PROJECT SCIENTIST, DR. WILL BRINCKERHOFF, ALSO OF GSFC. THE ROLE OF THE CONTRACTOR ON THE MOMA INSTRUMENT IS TO PROVIDE ENGINEERING CONSULTATION ON BEARINGS USED IN THE WIDE RANGE PUMP WRP WHICH IS BEING DEVELOPED BY CREARE, INC OF NEW HAMPSHIRE. DESCRIPTION OF WORK TO BE PERFORMED THE CONTRACTOR SHALL PARTICIPATE IN WRP STATUS TELECONS AND SPECIAL TOPIC TELECONS AS NEEDED, EVALUATE&INSPECT BEARINGS AT VARIOUS STAGES OF WRP DEVELOPMENT AT CREARES FACILITY, AND PROVIDE A TECHNICAL INTERFACE FOR THE MOMA PROJECT AT THE BEARING VENDORS. THE EFFORT SHALL BE COORDINATED WITH THE MOMA INSTRUMENT. THE CONTRACTOR SHALL PROVIDE ENGINEERING ASSESSMENT AND RECOMMENDATIONS ON THE DESIGN, DEVELOPMENT, FABRICATION AND TESTING OF BEARINGS PROCURED BY CREARE AND USED IN THE WRP FOR MOMA. IN ADDITION, THE CONTRACTOR SHALL PERFORM TESTING, EVALUATION AND INSPECTION ON THE BEARINGS USED IN THE VARIOUS TEST AND FLIGHT UNIT WRPS. THE CONTRACTOR SHALL PROVIDE WRITTEN REPORTS ON THE OUTCOME OF ANY TESTS, EVALUATIONS, AND INSPECTIONS. DELIVERABLES: THE CONTRACTOR SHALL DELIVER MONTHLY PROGRESS AND FINANCIAL REPORTS. | $14K |
| Aug 29, 2016 | Department of the InteriorOFC OF ACQUSITION GRANTS-NATIONAL | ING16PC00011 | 541330 | IGF::OT::IGF ENGINEERING SUPPORT FOR LANDSAT 7, 8, AND 9 | $65K |
| Aug 29, 2016 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA12AC40T | 541712 | IGF::OT::IGF SUBSYSTEM FLIGHT VALIDATION MISSION TO TEST COTS COMPONENTS AND SUBSYSTEMS THAT WILL ENABLE NEW PROXIMITY OPERATIONS AND COMMUNICATIONS CAPABILITIES FOR CUBESATS AND OTHER SPACECRAFT. | $138K |
| Aug 29, 2016 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA15BB65T | 541712 | IGF::OT::IGF SUPPORT AND ANALYSIS FOR EARTH VENTURE-MISSION, SPACECRAFT RELIABILITY ASSESSMENT | $45K |
| Aug 26, 2016 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG12VN14T | 541712 | TO PROVIDE DIRECT SUPPORT TO THE SPACE NETWORK GROUND SEGMENT SUSTAINMENT PROJECT - SERVICES: THE CONTRACTOR SHALL PROVIDE ON/OFF-SITE PROJECT AND MULTIDISCIPLINARY ENGINEERING SERVICES, INDEPENDENT TESTING, CONTRACTOR-ON-SITE MONITORING, AND INDEPENDENT EVALUATION OF PROJECTS AND/OR PROGRAMS, INCLUDING COST, SCHEDULE, AND AFFORDABILITY ANALYSES, IN ANY PHASE OF THE LIFE-CYCLE. THE CONTRACTOR SHALL ALSO PROVIDE LEADERSHIP OR STAFFING FOR FOCUSED SCIENCE AND TECHNOLOGY STUDIES, ADVANCED SYSTEMS ARCHITECTURE, SYSTEMS ENGINEERING AND INDEPENDENT REVIEWS OF ALL ABOVE ACTIVITIES PURSUANT TO TASK ORDERS ISSUED BY THE CONTRACTING OFFICER. THESE SERVICES SHALL INCLUDE THE PERSONNEL, FACILITIES, AND MATERIALS (UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT) TO ACCOMPLISH THE TASKS. TASKS ORDERS WILL BE ISSUED TO PERFORM SERVICES FOR ANY OF GSFC S OR ARC S ORGANIZATIONAL ENTITIES RELATED TO PARTS, COMPONENTS, SOFTWARE, SUBSYSTEMS, SYSTEMS, AND SYSTEMS OF SYSTEMS CIRCUMSCRIBED BY AEROSPACE S CORE FUNCTIONS. TYPES OF NASA ENDEAVORS MAY INCLUDE, BUT ARE NOT LIMITED TO, SPACECRAFT; INSTRUMENTS OR OTHER PAYLOADS; OBSERVATORIES; LAUNCH VEHICLES (FOR SUB-ORBITAL, ORBITAL, LUNAR, OR INTERPLANETARY MISSIONS); LAUNCH ABORT SYSTEMS; ROVERS, LANDERS, OR IMPACT VEHICLES; GROUND SYSTEMS (INCLUDING MISSION OPERATIONS, DATA PROCESSING AND DISSEMINATION, LAUNCH OPERATIONS, ETC.); FACILITIES (E.G. RESEARCH, TEST, LAUNCH); SPACE AND GROUND NETWORKS; BALLOONS; GROUND SUPPORT EQUIPMENT; SIMULATORS; AND NON-FLIGHT MODELS OR PROTOTYPES. ASSESSMENTS MAY INCLUDE SUPPORT (DIRECT OR INDIRECT) TO ARCHITECTURE AND SYSTEMS DEFINITION; STRATEGIC PLANNING AND TECHNOLOGY ROAD-MAPPING; PERFORMANCE EVALUATION OR TRADES STUDIES (INCLUDING TECHNICAL, COST, SCHEDULE, AND/OR RISK); ACQUISITION AND PROJECT MANAGEMENT; SYSTEMS ENGINEERING; DESIGN ANALYSIS (PRELIMINARY OR DETAILED DESIGN); ASSEMBLY, INTEGRATION, AND TEST; REQUIREMENTS VERIFICATION; TEST INSTRUMENTATION; DATA SYSTEMS MANAGEMENT; LAUNCH AND POST-LAUNCH OPERATIONS; MISSION ASSURANCE (INCLUDING LAUNCH VERIFICATION); SYSTEMS SAFETY; RESEARCH AND TECHNOLOGY; DOCUMENTATION; MAINTENANCE; SUSTAINING ENGINEERING; SPECTRUM MANAGEMENT; CONFIGURATION MANAGEMENT, AND OTHERS. INDEPENDENT INSPECTION, ANALYSIS (INCLUDING MODELING AND SIMULATION), AND/OR TEST SHALL BE USED IN EXECUTION OF THIS SUPPORT. THE CONTRACTOR SHALL ALSO ENSURE THAT SUPPORT IS PROVIDED THAT HAS SIGNIFICANT WORKING KNOWLEDGE OF CURRENT AND NEAR FUTURE TECHNOLOGIES THAT APPLY TO MODERNIZING THIS GROUND SYSTEM. | $74K |
| Aug 26, 2016 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG16VN70T | 541712 | IGF::OT::IGF ICESAT 2 STAR CATALOG REVISION SPECIALIZED ENGINEERING, EVALUATION AND TEST SERVICES (SEETS II) TO SELECT AN IMPROVED SPECTRAL MODEL FOR THE LASER REFERENCE SYSTEM (LRS) SENSITIVITY TO STARS IN THE SOURCE CATALOG. THE SELECTED MODEL SHOULD BE DOCUMENTED IN A SHORT TECHNICAL NOTE. THE ICESAT-2 PROJECT HAS DECIDED TO REVISE THE LASER REFERENCE SYSTEM (LRS) SPECIFIC STAR CATALOG, IMPLEMENTING SOME OF THE REVIEWERS RECOMMENDATIONS TO MITIGATE ASSOCIATED RISKS TO GROUND PROCESSING OF FLIGHT DATA. TO PROVIDE SUPPORT TO INVESTIGATE POTENTIAL IMPROVEMENTS IN THE STAR MAGNITUDES TO SUPPORT SECONDARY CONFIRMATION OF STAR IDENTIFICATION. TO PROVIDE SUPPORT TO SELECT AN IMPROVED BLENDING MODEL FOR THE LASER REFERENCE SYSTEM (LRS) HE WINDOWING EFFECTS. TO PROVIDE SUPPORT TO REGENERATE THE LASER REFERENCE SYSTEM (LRS) STAR CATALOG . TO PROVIDE SUPPORT TO COMPARE THE RESULTING NEW LASER REFERENCE SYSTEM (LRS) STAR CATALOG. THE CONTRACTOR SHALL PROVIDE ON/OFF-SITE PROJECT AND MULTIDISCIPLINARY ENGINEERING SERVICES, INDEPENDENT TESTING, CONTRACTOR-ON-SITE MONITORING, AND INDEPENDENT EVALUATION OF PROJECTS AND/OR PROGRAMS, INCLUDING COST, SCHEDULE, AND AFFORDABILITY ANALYSES, IN ANY PHASE OF THE LIFE-CYCLE. THE CONTRACTOR SHALL ALSO PROVIDE LEADERSHIP OR STAFFING FOR FOCUSED SCIENCE AND TECHNOLOGY STUDIES, ADVANCED SYSTEMS ARCHITECTURE, SYSTEMS ENGINEERING AND INDEPENDENT REVIEWS OF ALL ABOVE ACTIVITIES PURSUANT TO TASK ORDERS ISSUED BY THE CONTRACTING OFFICER. THESE SERVICES SHALL INCLUDE THE PERSONNEL, FACILITIES, AND MATERIALS (UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT) TO ACCOMPLISH THE TASKS. | $48K |
| Aug 26, 2016 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG16VN71T | 541712 | IGF::OT::IGF PLANKTON, AEROSOLS, CLOUD, OCEAN ECOSYSTEM (PACE) SYSTEMS ENGINEERING SUPPORT. TO PROVIDE SYSTEM ENGINEERING, OPERATIONS AND TECHNICAL MANAGEMENT SUPPORT AS WELL AS SPECIALIZED ENGINEERING SUPPORT SERVICES FOR TECHNICAL AND SCIENCE DEVELOPMENTS IN SUPPORT OF THE INSTRUMENT PROCUREMENT, INTEGRATION, TESTING AND ANOMALY INVESTIGATION ACTIVITIES. TO PROVIDE THE FOLLOWING ONSITE SYSTEMS ENGINEERING SUPPORT TO THE PLANKTON, AEROSOLS, CLOUD, OCEAN ECOSYSTEMS (PACE) PROJECT: TO PROVIDE SUPPORT TO SATELLITE AND GROUND SYSTEM DEVELOPMENT AND IMPLEMENTATION ACTIVITIES INCLUDING ARCHITECTURE DEVELOPMENT AND DOCUMENTATION, REQUIREMENTS DEVELOPMENT AND DOCUMENTATION, EXTERNAL AND INTERNAL INTERFACE DEFINITION, RISK ASSESSMENT AND RISK MANAGEMENT PLANNING, SCHEDULE AND COST ESTIMATE DEVELOPMENT, AND TEST PLANNING AND EXECUTION MONITORING. TO PROVIDE SUPPORT TO OVERALL SYSTEMS AND INSTRUMENT SYSTEMS ENGINEERING, INCLUDING, BUT NOT LIMITED TO: MONITORING CONTRACTORS IN EXECUTION OF BUILD AND TEST, PARTICIPATING IN PROGRESS MEETINGS; DESIGN REVIEWS; TEST READINESS REVIEWS; ANOMALY BOARDS; PARTS/MATERIAL BOARDS; ETC., REVIEWING PLANS AND PROCEDURES ASSISTING IN PROBLEM RESOLUTION, AND REVIEWING TEST DATA FOR SPECIFICATION COMPLIANCE. ADDITIONALLY THE SUPPORT WILL REQUIRE EVALUATING COMPLIANCE WITH THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) TECHNICAL STANDARDS, CONDUCTING TRADE STUDIES, MANAGING RISK PROCESSES, ASSISTING WITH CONFIGURATION CHANGE PROCESS AND TEST READINESS REVIEWS; ETC. TO PROVIDE ENGINEERING SERVICES TO EVALUATE SPECIFIC INSTRUMENT PERFORMANCE ITEMS INCLUDING, BUT NOT LIMITED TO: SUPPORTING ENGINEERING SERVICES, INSTRUMENT CALIBRATION ACCURACY, OPTICAL AND THERMAL COATING, AND ANOMALY RESOLUTION. THE CONTRACTOR SHALL PROVIDE ON/OFF-SITE PROJECT AND MULTIDISCIPLINARY ENGINEERING SERVICES, INDEPENDENT TESTING, CONTRACTOR-ON-SITE MONITORING, AND INDEPENDENT EVALUATION OF PROJECTS AND/OR PROGRAMS, INCLUDING COST, SCHEDULE, AND AFFORDABILITY ANALYSES, IN ANY PHASE OF THE LIFE-CYCLE. THE CONTRACTOR SHALL ALSO PROVIDE LEADERSHIP OR STAFFING FOR FOCUSED SCIENCE AND TECHNOLOGY STUDIES, ADVANCED SYSTEMS ARCHITECTURE, SYSTEMS ENGINEERING AND INDEPENDENT REVIEWS OF ALL ABOVE ACTIVITIES PURSUANT TO TASK ORDERS ISSUED BY THE CONTRACTING OFFICER. THESE SERVICES SHALL INCLUDE THE PERSONNEL, FACILITIES, AND MATERIALS (UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT) TO ACCOMPLISH THE TASKS. | $60K |
| Aug 26, 2016 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | NNM15AA49T | 541690 | IGF::OT::IGF "NASA SPACE LAUNCH SYSTEMS" | $60K |
| Aug 24, 2016 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA12AA52T | 541712 | IGF::OT::IGF THE CONTRACTOR SHALL PROVIDE TECHNICAL EXPERTISE IN SPECTRUM COMMUNICATIONS ARCHITECTURE SOLUTIONS, CONSULTATION ON THE NATIONAL AVAILABILITY OF DE-CONFLICTED SPACE SPECTRUM, AND OTHER SPECTRUM RELATED EFFORTS IN SUPPORT OF THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AMES RADIO FREQUENCY (RF) SPECTRUM MANAGEMENT OFFICE, NETWORKS AND OPERATIONS DIVISION, INFORMATION TECHNOLOGY DIRECTORATE. | $11K |
| Aug 24, 2016 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG13VN45T | 541712 | IGF::OT::IGF FUNDS FOR AEROSPACE SUPPORT TO JPSS MISSION 1 (J1) VISIBLE INFRARED IMAGING RADIOMETER SUITE (VIIRS) TEST PROGRAM. THIS TASK PROVIDES EXPERIENCED, SPECIALIZED SUPPORT TO THE JPSS PROGRAM. THE TASK PROVIDES INDEPENDENT ANALYSIS OF THE VIIRS FLIGHT MODEL (FM)-2 PERFORMANCE TESTS, PROVIDING THE JPSS FLIGHT PROJECT WITH THE ASSURANCE THAT VIIRS FM-2 INSTRUMENT MEETS ITS PERFORMANCE REQUIREMENTS. THE CONTRACTOR SHALL PERFORM REQUESTED TEST DATA ANALYSIS ON THE PLANNED J1 VIIRS SYSTEM LEVEL PERFORMANCE TESTS. THE CONTRACTOR WILL ANALYSIS ACTIVITIES INCLUDE COMPARISONS WITH REQUIREMENTS AND ANY REQUESTED ACTIVITIES NEEDED TO RESOLVE ANY DISCREPANCIES THAT ARISE. THE CONTRACTOR SHALL ANALYZE DATA FROM ANY SPECIAL TEST REQUESTS (STR). THE CONTRACTOR SHALL MAKE ALL PREPARATIONS NECESSARY TO ANALYZE DATA, INCLUDING TEST DATA ACQUISITION, TEST PROCEDURE REVIEW, AND DATA ANALYSIS TOOL REFINEMENTS. THE CONTACTOR SHALL PERFORM ANY TEST ANOMALY RESOLUTION ACTIVITIES REQUESTED BY CUSTOMER. THE CONTRACTOR SHALL PARTICIPATE IN GOVERNMENT TEAM TEST DATA ANALYSIS TELECONS. THE CONTRACTOR WILL ATTEND MEETING OR CALL IN TO TELECONS. DURING PRE-THERMAL VACUUM (TVAC) AND TVAC TESTING THE VENDOR WILL PROVIDE TEST OBSERVATION SUPPORT. THE CONTRACTOR SHALL PROVIDE TEST DATA ANALYSIS FINDING IN POWERPOINT PACKAGES AND BRIEF THESE FINDING TO THE GOVERNMENT TEAM IN TEST DATA ANALYSIS TELECONS. THE CONTRACTOR SHALL ALSO PROVIDE TEST DATA ANALYSIS FINDING IN OTHER FORMATS AS REQUEST BY THE CUSTOMER. THE CONTRACTOR SHALL PROVIDE ON/OFF-SITE PROJECT AND MULTIDISCIPLINARY ENGINEERING SERVICES, INDEPENDENT TESTING, CONTRACTOR-ON-SITE MONITORING, AND INDEPENDENT EVALUATION OF PROJECTS AND/OR PROGRAMS, INCLUDING COST, SCHEDULE, AND AFFORDABILITY ANALYSES, IN ANY PHASE OF THE LIFE-CYCLE. THE CONTRACTOR SHALL ALSO PROVIDE LEADERSHIP OR STAFFING FOR FOCUSED SCIENCE AND TECHNOLOGY STUDIES, ADVANCED SYSTEMS ARCHITECTURE, SYSTEMS ENGINEERING AND INDEPENDENT REVIEWS OF ALL ABOVE ACTIVITIES PURSUANT TO TASK ORDERS ISSUED BY THE CONTRACTING OFFICER. THESE SERVICES SHALL INCLUDE THE PERSONNEL, FACILITIES, AND MATERIALS (UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT) TO ACCOMPLISH THE TASKS | $91K |
| Aug 24, 2016 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14VN47T | 541712 | IGF::OT::IGF THE CONTRACTOR SHALL PROVIDE ON/OFF-SITE PROJECT AND MULTIDISCIPLINARY ENGINEERING SERVICES, INDEPENDENT TESTING, CONTRACTOR-ON-SITE MONITORING, AND INDEPENDENT EVALUATION OF PROJECTS AND/OR PROGRAMS, INCLUDING COST, SCHEDULE, AND AFFORDABILITY ANALYSES, IN ANY PHASE OF THE LIFE-CYCLE. THE CONTRACTOR SHALL ALSO PROVIDE LEADERSHIP OR STAFFING FOR FOCUSED SCIENCE AND TECHNOLOGY STUDIES, ADVANCED SYSTEMS ARCHITECTURE, SYSTEMS ENGINEERING AND INDEPENDENT REVIEWS OF ALL ABOVE ACTIVITIES PURSUANT TO TASK ORDERS ISSUED BY THE CONTRACTING OFFICER. THESE SERVICES SHALL INCLUDE THE PERSONNEL, FACILITIES, AND MATERIALS (UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT) TO ACCOMPLISH THE TASKS. TASKS ORDERS WILL BE ISSUED TO PERFORM SERVICES FOR ANY OF GSFC S OR ARC S ORGANIZATIONAL ENTITIES RELATED TO PARTS, COMPONENTS, SOFTWARE, SUBSYSTEMS, SYSTEMS, AND SYSTEMS OF SYSTEMS CIRCUMSCRIBED BY AEROSPACE S CORE FUNCTIONS. TYPES OF NASA ENDEAVORS MAY INCLUDE, BUT ARE NOT LIMITED TO, SPACECRAFT; INSTRUMENTS OR OTHER PAYLOADS; OBSERVATORIES; LAUNCH VEHICLES (FOR SUB-ORBITAL, ORBITAL, LUNAR, OR INTERPLANETARY MISSIONS); LAUNCH ABORT SYSTEMS; ROVERS, LANDERS, OR IMPACT VEHICLES; GROUND SYSTEMS (INCLUDING MISSION OPERATIONS, DATA PROCESSING AND DISSEMINATION, LAUNCH OPERATIONS, ETC.); FACILITIES (E.G. RESEARCH, TEST, LAUNCH); SPACE AND GROUND NETWORKS; BALLOONS; GROUND SUPPORT EQUIPMENT; SIMULATORS; AND NON-FLIGHT MODELS OR PROTOTYPES. ASSESSMENTS MAY INCLUDE SUPPORT (DIRECT OR INDIRECT) TO ARCHITECTURE AND SYSTEMS DEFINITION; STRATEGIC PLANNING AND TECHNOLOGY ROAD-MAPPING; PERFORMANCE EVALUATION OR TRADES STUDIES (INCLUDING TECHNICAL, COST, SCHEDULE, AND/OR RISK); ACQUISITION AND PROJECT MANAGEMENT; SYSTEMS ENGINEERING; DESIGN ANALYSIS (PRELIMINARY OR DETAILED DESIGN); ASSEMBLY, INTEGRATION, AND TEST; REQUIREMENTS VERIFICATION; TEST INSTRUMENTATION; DATA SYSTEMS MANAGEMENT; LAUNCH AND POST-LAUNCH OPERATIONS; MISSION ASSURANCE (INCLUDING LAUNCH VERIFICATION); SYSTEMS SAFETY; RESEARCH AND TECHNOLOGY; DOCUMENTATION; MAINTENANCE; SUSTAINING ENGINEERING; SPECTRUM MANAGEMENT; CONFIGURATION MANAGEMENT, AND OTHERS. INDEPENDENT INSPECTION, ANALYSIS (INCLUDING MODELING AND SIMULATION), AND/OR TEST SHALL BE USED IN EXECUTION OF THIS SUPPORT. THE CONTRACTOR S RESPONSIBILITIES SHALL INCLUDE THE MANAGEMENT OF PERSONNEL, TIMELY AND EFFECTIVE IMPLEMENTATION OF TASK ORDERS, CONTROL AND MONITORING OF CONTRACT PERFORMANCE, MANAGEMENT OF SCHEDULED DELIVERIES, AND TIMELY AND EFFECTIVE REPORTING TO THE GOVERNMENT. THESE RESPONSIBILITIES SHALL ALSO INCLUDE EFFICIENT COST MANAGEMENT METHODS AS WELL AS PROCEDURES TO ENSURE THAT THE GOVERNMENT IS AWARE OF TASK ASSIGNMENT STATUS AND PROGRESS ACHIEVED. | $30K |
| Aug 24, 2016 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG16VN68T | 541712 | IGF::OT::IGF ASTROPHYSICS DECADAL MISSION CONCEPT STUDY SUPPORT. THE PURPOSE, OBJECTIVE, BACKGROUND OF WORK TO BE PERFORMED INCLUDES PROVIDE INDEPENDENT GUIDANCE AND SUPPORT FOR LARGE MISSION CONCEPTS TO PREPARE FOR THE NATIONAL ACADEMICS ASTROPHYSICS DECADAL SURVEY 2020. DESCRIPTION OF WORK TO BE PERFORMED INCLUDES THAT THE CONTRACTOR SHALL SUPPORT THE SCIENCE AND TECHNOLOGY DEFINITION TEAMS (STDT) TO IDENTIFY KEY SCIENCE REQUIREMENTS AND POTENTIAL IMPACT ON CONCEPT DESIGN. RISK AND COST DRIVER IDENTIFICATION - THE CONTRACTOR SHALL IDENTIFY RISK AND COST DRIVERS FOR EACH OF THE FOUR STDT INDIVIDUAL TEAMS. THE CONTRACTOR SHALL SUPPORT STDT MEETINGS AND TELECONFERENCES TO FACILITATE THE IDENTIFICATION AND UNDERSTANDING OF A KEY SCIENCE REQUIREMENTS AND A POTENTIAL IMPACT ON THE CONCEPT DESIGN. THE CONTRACTOR SHALL PROVIDE TRADE STUDY SUPPORT. THE CONTRACTOR WILL ASSESS TRADE STUDIES FOR A BASELINE CONCEPT DESIGN, POSSIBLY MULTIPLE OPTIONS FOR EACH OF THE FOUR TEAMS. THE CONTRACTOR SHALL SUPPORT IN DEPTH REVIEWS AT SUGGESTED DEEP DIVE SESSIONS IN TOP TECHNICAL RISK AREAS AND ASSIST IN TRADE STUDIES TO PROVIDE FOCUS IN DEVELOPMENT OF MORE MATURE POINT DESIGNS. IN THESE REVIEWS, THE CONTRACTOR SHALL FOCUS ON THE IDENTIFICATION OF WHERE TECHNOLOGY MUST BE MATURED FOR THE MISSION CONCEPT. THE CONTRACTOR SHALL PROVIDE PERIODIC ASSESSMENTS OF TOP TECHNICAL AND PROGRAMMATIC RISKS AND IDENTIFY KEY COST DRIVERS. IN THE TRADE STUDIES AND DEEP DIVE REVIEWS, THE CONTRACTOR SHALL FOCUS ON THE IDENTIFICATION OF WHERE TECHNOLOGY MUST BE MATURED FOR A SPECIFIC MISSION CONCEPT. PREPARE FOR COST AND TECHNICAL EVALUATION (CATE). THE CONTRACTOR SHALL PROVIDE A QUESTIONNAIRE WITH DETAILED TABLES TO BE FILLED OUT BY THE INDIVIDUAL STDT MISSION CONCEPT TEAMS. THE CONTRACTOR SHALL WORK WITH EXISTING TEAM DOCUMENTATION TO MINIMIZE ADDITIONAL EFFORT BY THE TEAMS. DELIVERABLES - TECHNICAL PROGRESS REPORTS ARE DUE MONTHLY ON THE FIFTEENTH OF EACH MONTH. ATTEND SCIENCE AND TECHNOLOGY DEFINITION TEAM MEETINGS AS REQUESTED. NO GOVERNMENT FURNISHED ITEMS. TRAVEL. THE CONTRACTOR SHALL TRAVEL FOR EFFORTS IN SUPPORT OF FACE TO FACE STDT MEETINGS. ASSUMES UP TO TWO MEETINGS FOR TWO TO FOUR EXPERTS FOR EACH TEAM IN FISCAL YEAR 16 AND UP TO FOUR MEETINGS, FOR TWO TO FOUR EXPERTS, FOR EACH TEAM BETWEEN IN FISCAL YEAR 17. | $48K |
| Aug 24, 2016 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | NNM16AA17T | 541690 | IGF::OT::IGF TASK ORDER NNM16AA17T ENTITLED, "X-RAY POLARIMETRY EXPLORER PROJECT". SEE ATTACHED STATEMENT OF WORK FOR COMPLETE DESCRIPTION. | $62K |
| Aug 22, 2016 | Department of JusticeFBI-JEH | DJF151200P0009431 | 541712 | IGF::CL::IGF CONTRACT# J-FBI-12-174 AEROSPACE CORPORATION, OPTION YEAR 3, POP: 7/30/15 - 7/29/2016 INCREMENTAL FUNDING | $130K |
| Aug 22, 2016 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | NNJ11HD42T | 541712 | SPECIAL STUDIES/ANALYSIS- AERONAUTICAL/SPACE | $257K |
| Aug 18, 2016 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG16VN68T | 541712 | IGF::OT::IGF ASTROPHYSICS DECADAL MISSION CONCEPT STUDY SUPPORT. THE PURPOSE, OBJECTIVE, BACKGROUND OF WORK TO BE PERFORMED INCLUDES PROVIDE INDEPENDENT GUIDANCE AND SUPPORT FOR LARGE MISSION CONCEPTS TO PREPARE FOR THE NATIONAL ACADEMICS ASTROPHYSICS DECADAL SURVEY 2020. DESCRIPTION OF WORK TO BE PERFORMED INCLUDES THAT THE CONTRACTOR SHALL SUPPORT THE SCIENCE AND TECHNOLOGY DEFINITION TEAMS (STDT) TO IDENTIFY KEY SCIENCE REQUIREMENTS AND POTENTIAL IMPACT ON CONCEPT DESIGN. RISK AND COST DRIVER IDENTIFICATION - THE CONTRACTOR SHALL IDENTIFY RISK AND COST DRIVERS FOR EACH OF THE FOUR STDT INDIVIDUAL TEAMS. THE CONTRACTOR SHALL SUPPORT STDT MEETINGS AND TELECONFERENCES TO FACILITATE THE IDENTIFICATION AND UNDERSTANDING OF A KEY SCIENCE REQUIREMENTS AND A POTENTIAL IMPACT ON THE CONCEPT DESIGN. THE CONTRACTOR SHALL PROVIDE TRADE STUDY SUPPORT. THE CONTRACTOR WILL ASSESS TRADE STUDIES FOR A BASELINE CONCEPT DESIGN, POSSIBLY MULTIPLE OPTIONS FOR EACH OF THE FOUR TEAMS. THE CONTRACTOR SHALL SUPPORT IN DEPTH REVIEWS AT SUGGESTED DEEP DIVE SESSIONS IN TOP TECHNICAL RISK AREAS AND ASSIST IN TRADE STUDIES TO PROVIDE FOCUS IN DEVELOPMENT OF MORE MATURE POINT DESIGNS. IN THESE REVIEWS, THE CONTRACTOR SHALL FOCUS ON THE IDENTIFICATION OF WHERE TECHNOLOGY MUST BE MATURED FOR THE MISSION CONCEPT. THE CONTRACTOR SHALL PROVIDE PERIODIC ASSESSMENTS OF TOP TECHNICAL AND PROGRAMMATIC RISKS AND IDENTIFY KEY COST DRIVERS. IN THE TRADE STUDIES AND DEEP DIVE REVIEWS, THE CONTRACTOR SHALL FOCUS ON THE IDENTIFICATION OF WHERE TECHNOLOGY MUST BE MATURED FOR A SPECIFIC MISSION CONCEPT. PREPARE FOR COST AND TECHNICAL EVALUATION (CATE). THE CONTRACTOR SHALL PROVIDE A QUESTIONNAIRE WITH DETAILED TABLES TO BE FILLED OUT BY THE INDIVIDUAL STDT MISSION CONCEPT TEAMS. THE CONTRACTOR SHALL WORK WITH EXISTING TEAM DOCUMENTATION TO MINIMIZE ADDITIONAL EFFORT BY THE TEAMS. DELIVERABLES - TECHNICAL PROGRESS REPORTS ARE DUE MONTHLY ON THE FIFTEENTH OF EACH MONTH. ATTEND SCIENCE AND TECHNOLOGY DEFINITION TEAM MEETINGS AS REQUESTED. NO GOVERNMENT FURNISHED ITEMS. TRAVEL. THE CONTRACTOR SHALL TRAVEL FOR EFFORTS IN SUPPORT OF FACE TO FACE STDT MEETINGS. ASSUMES UP TO TWO MEETINGS FOR TWO TO FOUR EXPERTS FOR EACH TEAM IN FISCAL YEAR 16 AND UP TO FOUR MEETINGS, FOR TWO TO FOUR EXPERTS, FOR EACH TEAM BETWEEN IN FISCAL YEAR 17. | $243K |
| Aug 16, 2016 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG12VN31T | 541712 | IGF::OT::IGF OTHER FUNCTIONS. ENGINEERING AND SERVICES. 2. PURPOSE, OBJECTIVE, AND BACKGROUND OF WORK TO BE PERFORMED: NASA'S OBJECTIVE IS TO OBTAIN AN INDEPENDENT ASSESSMENT OF THE SECURITY RISKS INHERENT IN THE DESIGN, OPERATION AND MAINTENANCE OF SPACE NETWORK GROUND SYSTEMS LOCATED AT THE WHITE SANDS COMPLEX (WSC) IN LAS CRUCES, NEW MEXICO. THESE SYSTEMS HANDLE SENSITIVE BUT UNCLASSIFIED DATA FOR VARIOUS NASA CUSTOMERS HAVING A DESIRE TO ENSURE ADEQUATE CONTROL AND PROTECTION OF THEIR MISSION CRITICAL DATA. 3. DESCRIPTION OF THE WORK TO BE PERFORMED: AEROSPACE WILL PERFORM THE FOLLOWING SUBTASKS: 3.1. AEROSPACE WILL CONDUCT AN ANNUAL PENETRATION TEST OF THE ANCC AT THE GSFC WHITE SANDS COMPLEX. AEROSPACE WILL COORDINATE THE TIME AND PROCEDURES FOR THE PENETRATION TEST WITH THE WHITE SANDS COMPLEX IT SECURITY PERSONNEL. (NOTE: PENETRATION TEST PROCEDURES ARE BUILT BY THE CONTRACTOR AND APPROVED BY NASA). 3.2. AEROSPACE WILL INVESTIGATE, EVALUATE, AND PROVIDE RECOMMENDED SOLUTIONS TO IT SECURITY ISSUES ASSOCIATED WITH UPGRADES TO SN SYSTEMS. AEROSPACE WILL EVALUATE SGSS APPROACHES WITH RESPECT TO INFORMATION ASSURANCE FOR THE SPACE NETWORK PROJECT, AND PERFORM OTHER INFORMATION ASSURANCE RELATED TASKS IN SUPPORT OF THE SPACE NETWORK AS DIRECTED BY THE GOVERNMENT NASA SPONSOR. 4. DELIVERABLES/MILESTONES: AEROSPACE WILL PROVIDE THE FOLLOWING DELIVERABLES FOR THEIR ASSOCIATED SUBTASK: SUBTASK 3.1 A) AN EXIT BRIEFING TO WSC SECURITY IMMEDIATELY FOLLOWING THE PERFORMANCE OF THE ON-SITE PORTION OF THE PENETRATION TEST B) A SUMMARY SLIDE PACKAGE FOR THE PURPOSE OF BRIEFING MANAGEMENT AND SECURITY ORGANIZATIONS. (1 MONTH AFTER TEST) C) A FINAL WRITTEN REPORT DELINEATING THE PROCESS AND FINDINGS. (3 MONTH AFTER TEST) SUBTASK 3.2 A) A SUMMARY OF FINDINGS TO THE TM FOLLOWING EACH MAJOR REVIEW WITHIN 2 WEEKS AFTER THE REVIEW. B) AS NEEDED, A SUMMARY BRIEFING, SUITABLE FOR MANAGEMENT, DETAILING SPECIFIC ISSUES AND CONCERNS AS THEY ARE UNCOVERED. C) AN INFORMAL SUMMARY OF ACTIVITIES AND FINDINGS TO THE TM EACH MONTH. | $75K |
| Aug 16, 2016 | National Aeronautics and Space AdministrationNASA HEADQUARTERS | NNH16CP23D | 541712 | IGF::OT::IGF THE CONTRACTOR SHALL PROVIDE COST/TECHNICAL DATA PACKAGE (CTDP) DEVELOPMENT SERVICES. THESE SERVICES SHALL INCLUDE THE RESOURCES, PERSONNEL, FACILITIES,(UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT) TO ACCOMPLISH TASKS. | $261K |
| Aug 12, 2016 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | NNM16AA18T | 541690 | IGF::OT::IGF IGF::OT::IGF AEROSPACE SHALL PROVIDE SUBJECT MATTER EXPERTISE (SME) AND TECHNICAL INPUT TO THE PROJECT AND SUPPORT PROJECT MEETINGS AND TECHNICAL INTERCHANGE MEETINGS (TIM) AS AGREED TO BY AEROSPACE AND THE PROJECT MANAGER OR HIS DELEGATE | $35K |
| Aug 11, 2016 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG12VN13T | 541712 | AWARD ENTITLED "SPACE NETWORK RELIABILITY AND LOADING ANALYSIS" RISK ANALYSIS AND SECURITY EVALUATION FOR SPACE NETWORK. THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER (GSFC) IS RESPONSIBLE FOR PROJECT MANAGEMENT OF THE NASA TRACKING AND DATA RELAY SATELLITE SYSTEM (TDRSS) INCLUDING DEVELOPMENT AND OPERATIONS OF THE SPACE CONSTELLATION ASSETS AS WELL AS THE GROUND SYSTEM ASSETS. THIS TASK ASSISTS THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) IN PREDICATING THE FUTURE HEALTH OF THE TDRS SATELLITES IN ORBIT, AND PREDICATING THE ABILITY OF THE SPACE NETWORK TO MEET FUTURE USER REQUIREMENTS. THIS IS AN ONGOING EFFORT THAT HAS OCCURRED YEARLY FOR AT LEAST THE LAST TEN YEARS. DESCRIPTION OF WORK TO BE PERFORMED 1. THE CONTRACTOR WILL UPDATE AND MAINTAIN THE TRACKING AND DATA RELAY SATELLITE SYSTEM (TDRS) FLEET RELIABILITY AND SERVICE AVAILABILITY MODEL; CONDUCT REPLENISHMENT ANALYSES (GAP ANALYSES) ON THE TDRSS CONSTELLATION; 2. THE CONTRACTOR WILL DEVELOP AND MAINTAIN THE USER MISSION MODEL; DEVELOP, UPDATE AND MAINTAIN LOADING ANALYSES BASED ON THE MISSION MODEL; 3. THE CONTRACTOR WILL SUPPORT THE SPACE COMMUNICATIONS CONTROL BOARD OF THE SPACE COMMUNICATIONS AND NAVIGATION OFFICE. THIS SUPPORT WILL REQUIRE ATTENDANCE AT MEETINGS AT GODDARD FACILITIES AS WELL AS OTHER GOVERNMENT FACILITIES, THUS TRAVEL IS AUTHORIZED. DELIVERABLES/MILESTONES THE CONTRACTOR WILL DELIVER RESULTS OF THE TRACKING AND DATA RELAY SATELLITE SYSTEM (TDRS) RELIABILITY ANALYSIS THE CONTRACTOR WILL DELIVER A UNCLASSIFIED FINAL REPORT FOR USER LOADING ANALYSIS THE CONTRACTOR WILL DELIVER A CLASSIFIED FINAL REPORT FOR USER LOADING ANALYSIS. TO THIS END, THE CONTRACTOR SHALL PROVIDE ON/OFF-SITE PROJECT AND MULTIDISCIPLINARY ENGINEERING SERVICES, INDEPENDENT TESTING, CONTRACTOR-ON-SITE MONITORING, AND INDEPENDENT EVALUATION OF PROJECTS AND/OR PROGRAMS, INCLUDING COST, SCHEDULE, AND AFFORDABILITY ANALYSES, IN ANY PHASE OF THE LIFE-CYCLE. INSPECTION,AND ANALYSIS (INCLUDING MODELING AND SIMULATION), AND/OR TEST SHALL BE USED IN EXECUTION OF THIS SUPPORT. | $50K |
| Aug 10, 2016 | Department of CommerceDEPT OF COMMERCE NOAA | DOCT0022 | 541712 | IGF::OT::IGF FFRDC SUPPORT. FOLLOW-ON TASK ORDER AWARD. | $25K |
| Aug 10, 2016 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA16BE39T | 541712 | IGF::OT::IGF PROVIDE TECHNICAL EXPERTISE TO AMES RESEARCH CENTER IN PERFORMING AN INDEPENDENT COST ESTIMATE OF TWO SIMILAR DESIGN VARIANTS OF THE RESOURCE PROSPECTOR (RP) SURFACE SEGMENT. | $40K |
| Aug 9, 2016 | Department of CommerceDEPT OF COMMERCE NOAA | DOCT0027 | 541712 | IGF::OT::IGF FFRDC SUPPORT. FOLLOW-ON TASK ORDER AWARD. | $166K |
| Aug 8, 2016 | Department of CommerceDEPT OF COMMERCE NOAA | DOCT0025 | 541712 | IGF::OT::IGF FFRDC SUPPORT. FOLLOW-ON TASK ORDER AWARD. | $1.5M |
| Aug 5, 2016 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | NNL16AB77T | 541330 | IGF::OT::IGF " NESC NON-DESTRUCTIVE EVALUATION OUTER MOLD LINE ULTRASONIC TESTING " - THE SCOPE OF THIS EFFORT IS FOR THE CONTRACTOR TO PROVIDE ASSISTANCE IN THE DEVELOPMENT OF A BOND VERIFICATION PLAN FOR THE NEW ORION HEATSHIELD ARCHITECTURE WHICH USES INDIVIDUAL MOLDED BLOCKS OF ABLATOR MATERIAL (AVCOAT) ADHESIVELY BONDED TO THE CARRIER STRUCTURE. MAJOR ELEMENTS OF THE BOND VERIFICATION PLAN WILL INCLUDE 1) PROCESS CONTROLS; 2) EFFECTS OF DEFECTS; 3) PROOF TESTING; AND 4) NON-DESTRUCTIVE EVALUATION (NDE). | $89K |
Get Alerted Before The Aerospace Corporation's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free