Home/Contractors/Tikigaq Construction, LLC/contracts

Federal Contractor Profile

Tikigaq Construction, LLC

$171M obligated·168 awards·4 agencies·13 NAICS

Federal Contracts

Showing contracts 151200 of 308 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Jun 20, 2018Department of DefenseNAVFACSYSCOM MARIANASN4019218F4218236220IGF::OT::IGF WON 1569184 REPLACE EXISTING P‐130 CIRCUIT AT SHIP REPAIR FACILITY (SRF) OLD MAIN SUBSTATION NAVAL BASE GUAM APRA HARBOR (NBGAH. THIS PROJECT INTENDED TO REPLACE EXISTING P-130 CIRCUIT AT SRF OLD MAIN SUBSTATION, NBGAH. THE WORK SHALL INCLUDE CIVIL,ELECTRICAL SYSTEM, AND AS SPECIFIED ON UNIFIED FACILITIES CRITERIA (UFC) STANDARDS.$978K
Jun 19, 2018Department of DefenseNAVFACSYSCOM MARIANASN4019218F4232236220IGF::OT::IGF CONTRACT N4019216D2706-N4019218F4232 IS AWARDED TO REPLACE THE FREIGHT ELEVATOR AT B112. POP IS FROM 19 JUN 2018 TO 01 APR 2019.$1.1M
Jun 14, 2018General Services AdministrationPBS R7 NON-PROSPECTUS - BORDER47PH0418F0060236220CONTRACTOR SHALL PROVIDE ALL THE NECESSARY SUPPLIES, MATERIALS, EQUIPMENT, LABOR AND SUPERVISION TO DESIGN AND CONSTRUCT A NEW COMMERCIAL TRUCK FACILITIES FOR THE FEDERAL MOTOR CARRIER SAFETY ADMINISTRATION (FMCSA) AT COLUMBUS LAND PORT OF ENTRY, COLUMBUS, NEW MEXICO.$3.1M
Jun 6, 2018Department of DefenseNAVFACSYSCOM MARIANASN4019217F4062236220IGF::OT::IGF TASK ORDER N4019217F4062 FY16 MILCON AJJY16-3004, PAR-DISPERSED MAINTENANCE SPARES AND SE STORAGE FACILITY, AAFB, GUAM: PROJECT IS FOR CONSTRUCTION OF A REINFORCED CONCRETE STORAGE FACILITY AT AAFB, GUAM.$27K
May 25, 2018Department of DefenseNAVFACSYSCOM MARIANASN4019217F4062236220IGF::OT::IGF TASK ORDER N4019217F4062 FY16 MILCON AJJY16-3004, PAR-DISPERSED MAINTENANCE SPARES AND SE STORAGE FACILITY, AAFB, GUAM: PROJECT IS FOR CONSTRUCTION OF A REINFORCED CONCRETE STORAGE FACILITY AT AAFB, GUAM.$31K
May 8, 2018General Services AdministrationPBS R7 NON-PROSPECTUS - BORDERGSP0717UK0012236220::IGF::OT::IGF:: TORNILLO LAND PORT OF ENTRY, PHASE 3, 1400 LOWER ISLAND ROAD (FM 1109), TORNILLO, TX 79853-9998 THE PURPOSE OF THIS PROJECT IS TO COMPLETE THE DEMOLITION OF THE ROAD FROM THE OLD FABENS PORT TO THE NEW TORNILLO PORT AS WELL AS THE COMPLETION OF MISCELLANEOUS OPERATIONAL REQUIREMENTS INCLUDING PLUMBING, LANDSCAPING AND LIGHTING.$2K
May 8, 2018Department of DefenseNAVFACSYSCOM MARIANASN4019217C1305562212IGF::OT::IGF FY16 MILCON P-635, MUNICIPAL SOLID WASTE LANDFILL CLOSURE, AAFB, GUAM. THIS IS A DESIGN-BID-BUILD PROJECT TO CONSTRUCT A LANDFILL CLOSURE CAPPING SYSTEM FOR THE MUNICIPAL SOLID WASTE LANDFILL AREA AT AAFB ON GUAM.$779K
Apr 26, 2018General Services AdministrationPBS R7 - NON-PROSPECTUS - NORTHERNGSP0717UF0002236220IGF::OT::IGF CONTRACTOR SHALL PROVIDE ALL LABOR, SUPERVISION, MATERIALS, SUPPLIES, PARTS, TOOLS, AND EQUIPMENT NECESSARY TO SUCCESSFULLY COMPLETE THE PROJECT KNOWN AS CAMPUS PARKING IMPROVEMENTS, FEDERAL CAMPUS, 301 NW 6TH STREET, OKLAHOMA CITY, OKLAHOMA 73102.$53K
Apr 18, 2018General Services AdministrationPBS R7 NON-PROSPECTUS - EASTERN47PH0518F0056236220SMALL BUSINESS ADMINISTRATION INITIAL SPACE ALTERATIONS @ HALE BOGGS FEDERAL COURTHOUSE, 8TH FLOOR, 500 POYDRAS STREET, NEW ORLEANS, LA 70130$578K
Mar 26, 2018General Services AdministrationPBS R10 CONSTRUCTION ACQUISITIONS BRANCH47PL0118C0013236220IGF::OT::IGF OTHER REMODEL OF FAA OFFICES IN THE NEW ANCHORAGE, ALASKA FEDERAL BUILDING$461K
Mar 19, 2018Department of Homeland SecurityADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISIONHSBP1016C00026237990IGF::CT::IGF COMPREHENSIVE TACTICAL INFRASTRUCTURE MAINTENANCE AND REPAIR$5.4M
Mar 14, 2018General Services AdministrationPBS R7 NON-PROSPECTUS - BORDERGSP0715UK7009236220IGF::OT::IGF CONSTRUCTION TASK ORDER FOR MODERNIZATION OF 2 PASSENGER AND 1 SERVICE ELEVATOR AT THE HISTORIC COURTHOUSE (TX0069ZZ(, EL PASO, TX.$69K
Mar 8, 2018Department of DefenseNAVFACSYSCOM MARIANASN4019218F4096236220IGF::OT::IGF COMPREHENSIVE REPAIR PROJECT, B2116 NBG$814K
Feb 22, 2018Department of DefenseNAVFACSYSCOM MARIANASN4019218F4120236220IGF::OT::IGF CONTRACT N4019218F4120 IS ISSUED TO REPLACE THE ELEVATOR AT B4175. POP IS FROM 22 FEB TO 31 DEC 2018.$1.3M
Feb 21, 2018General Services AdministrationPBS R7 NON-PROSPECTUS - EASTERN47PH0518F0034236220IGF::OT::IGF THE PURPOSE OF THIS PROJECT IS TO DESIGN THE DEMO EXISTING SUPPLEMENTAL AIR SYSTEM AND REPLACE WITH 3 TON SUPPLEMENTAL SYSTEM, AND ADD SIX (6) EACH DEDICATED CIRCUITS TO SUPPORT NEW VSU EQUIPMENT$44K
Feb 14, 2018General Services AdministrationPBS R7 NON-PROSPECTUS - BORDERGSP0717UK0012236220::IGF::OT::IGF:: TORNILLO LAND PORT OF ENTRY, PHASE 3, 1400 LOWER ISLAND ROAD (FM 1109), TORNILLO, TX 79853-9998 THE PURPOSE OF THIS PROJECT IS TO COMPLETE THE DEMOLITION OF THE ROAD FROM THE OLD FABENS PORT TO THE NEW TORNILLO PORT AS WELL AS THE COMPLETION OF MISCELLANEOUS OPERATIONAL REQUIREMENTS INCLUDING PLUMBING, LANDSCAPING AND LIGHTING.$5K
Jan 31, 2018Department of DefenseW6QM MICC-FDO FT SAM HOUSTONW9124J17C0019561210IGF::CT::IGF STRATFORD ARMY ENGINE PLANT CARETAKER SERVICES$2.4M
Jan 31, 2018Department of DefenseNAVFACSYSCOM MARIANASN4019218F4071236220IGF::OT::IGF WON 1568179 REPLACE EXISTING 12-INCH WATERLINE ON MARINE DRIVE NAVAL BASE GUAM APRA HARBOR IS A DESIGN BUILD CONSTRUCTION PROJECT LOCATED AT SANTA RITA, GUAM. POP 1/31/2018-9/28/2018, SECOND OPTION PERIOD.$921K
Jan 24, 2018General Services AdministrationPBS R10GSP1016XJ7048236220IGF::OT::IGF::REPLACE BALLISTIC DOOR USMC AFB, ANCHORAGE AK$2K
Jan 11, 2018Department of DefenseNAVFACSYSCOM MARIANASN4019218F4063236220IGF::OT::IGF WON 1554725 REPAIRS TO FENA RESERVOIR, NAVAL BASE GUAM MUNITIONS SITE IS A DESIGN BUILD CONSTRUCTION PROJECT LOCATED AT SANTA RITA, GUAM. POP 1/11/2018-7/10/2018, SECOND OPTION PERIOD.$419K
Dec 7, 2017General Services AdministrationPBS R7 NON-PROSPECTUS - BORDERGSP0717UK0012236220::IGF::OT::IGF:: TORNILLO LAND PORT OF ENTRY, PHASE 3, 1400 LOWER ISLAND ROAD (FM 1109), TORNILLO, TX 79853-9998 THE PURPOSE OF THIS PROJECT IS TO COMPLETE THE DEMOLITION OF THE ROAD FROM THE OLD FABENS PORT TO THE NEW TORNILLO PORT AS WELL AS THE COMPLETION OF MISCELLANEOUS OPERATIONAL REQUIREMENTS INCLUDING PLUMBING, LANDSCAPING AND LIGHTING.$619K
Dec 7, 2017Department of DefenseNAVFACSYSCOM MARIANASN4019218F4055236220IGF::OT::IGF WO1445516 THIS IS A DESIGN BUILD MULTIPLE AWARD CONSTRUCTION CONTRACT PROJECT INTENDED TO PROVIDE FACILITIES AND SITE INFRASTRUCTURE IN SUPPORT OF ELECTRONIC HARBOR SECURITY SYSTEMS (EHSS) EQUIPMENT INSTALLATIONS. THIS INCLUDES INSTALLATION OF FOUNDATIONS, BUILDINGS, FENCING, COMMUNICATIONS DUCTBANK, ELECTRICAL SERVICES AND DUCTBANK, AND OTHER ANCILLARY INFRASTRUCTURE. THE WORK ALSO INCLUDES MODIFICATIONS TO EXISTING ELECTRICAL DISTRIBUTION AND A GUARD TOWER. SPECIALIZED EHSS EQUIPMENT, SUCH AS TOWERS, RADARS, SERVER RACKS, AND GENERATORS, WILL BE INSTALLED AFTER COMPLETION OF THE CORRESPONDING CONSTRUCTION ELEMENTS.$1.4M
Dec 6, 2017Department of Defense0413 AQ HQ RCO-AK WAINWRIGW912D017P0047236220IGF::OT::IGF GCD-00015-4J, REPLACE THEATER CHAIRS/FL$9K
Nov 30, 2017General Services AdministrationPBS R10 CONSTRUCTION ACQUISITIONS BRANCH47PL0118F0012236220IGF::OT::IGF ~ HFB LIBRARY SHELL PROJECT. ANCHORAGE, AK$45K
Nov 15, 2017General Services AdministrationPBS R7 NON-PROSPECTUS - BORDERGSP0715UK7009236220IGF::OT::IGF CONSTRUCTION TASK ORDER FOR MODERNIZATION OF 2 PASSENGER AND 1 SERVICE ELEVATOR AT THE HISTORIC COURTHOUSE (TX0069ZZ(, EL PASO, TX.$68K
Nov 15, 2017Department of DefenseNAVFACSYSCOM MARIANASN4019218F4035236220N40192-16-D-2706-N4019218F4035, WON 1388249 REPLACE CHILLER 36MXG B17000, ANDERSEN AIR FORCE BASE, GUAM$2.0M
Oct 1, 2017Department of DefenseNAVAL OCEANOGRAPHIC OFFICEN6230618P0001561210GENERAL FACILITY SERVICES$172K
Sep 30, 2017Department of DefenseNAVFACSYSCOM MARIANAS0008236220IGF::OT::IGF N40192-16-D-2706-0008, PROJECT AJJY 14-8002, REPLACE VARIOUS SWITCHGEARS OPTIONS PHASE I, ANDERSEN AIR FORCE BASE, GUAM$198K
Sep 28, 2017Department of DefenseW2SN ENDIST ALASKAW911KB16C0030562910IGF::OT::IGF JBER ELECTRONIC DOCUMENT REPOSITORY$75K
Sep 28, 2017Department of DefenseNAVFACSYSCOM MARIANASN4019217F4143236220IGF::OT::IGF WON 1585839 RENOVATE COMPUTER SERVER ROOM, BUILDING 3190, NBGAH$682K
Sep 27, 2017Department of DefenseNAVFACSYSCOM MARIANASN4019217F4125236220IGF::OT::IGF X183 ENCLOSE EXISTING STORAGE ROOM WITH CMU WALL, BUILDING 558 CAMP COVINGTON NBGAH$493K
Sep 27, 2017General Services AdministrationPBS R10 CONSTRUCTION ACQUISITIONS BRANCH47PL0117F0042236220IGF::OT::IGF REPLACE TILES IN STAIRWELL, HISTORIC FEDERAL BUILDING, ANCHORAGE, ALASKA$17K
Sep 27, 2017Department of DefenseNAVFACSYSCOM MID-ATLANTICN4008517F5426236220IGF::OT::IGF MODERNIZE TASK UNIT SPACE BUILDING 3806 JEBLCFS (LITTLE CREEK SITE) VIRGINIA BEACH VIRGINIA$253K
Sep 26, 2017General Services AdministrationPBS R1047PL0117F0041236220IGF::OT::IGF REPLACE STANCHIONS ON HANDRAIL AT HISTORIC FEDERAL BUILDING, ANCHORAGE, ALASKA$25K
Sep 25, 2017Department of DefenseNAVFACSYSCOM MID-ATLANTICN4008517F5307562910IGF::OT::IGF X003 PSC 16 PCB REMOVAL ACTION$416K
Sep 22, 2017Department of DefenseNAVFACSYSCOM MARIANASN4019217F4112236220IGF::OT::IGF N4019217F4112 REPLACE SEWER LINE AND SEWER MANHOLE FORM FARENHOLT AVE TO SNAKE RD (RT. 7) NBGAH$1.2M
Sep 19, 2017General Services AdministrationPBS R7 - NON-PROSPECTUS PROJECTS47PH0717F0023236220IGF::OT::IGF FOR OTHER FUNCTIONS - TEMPLE SSA OFFICE RENOVATION, 511 N. MAIN STREET, TEMPLE, TEXAS 76501$21K
Sep 17, 2017Department of DefenseNAVFACSYSCOM MARIANASN4019217F4102236220IGF::OT::IGF X181 WON 1377701 - CONSTRUCT SATCOM/LOS/HF ANTENNA P$137K
Sep 15, 2017General Services AdministrationPBS R10 CONSTRUCTION ACQUISITIONS BRANCH47PL0117F0032236220IGF::OT::IGF - INSTALL CEILING TILES IN USDC JUDGES CHAMBERS, ANCHORAGE, AK$16K
Sep 13, 2017General Services AdministrationPBS R7 NON-PROSPECTUS - BORDERGSP0717UK0012236220::IGF::OT::IGF:: TORNILLO LAND PORT OF ENTRY, PHASE 3, 1400 LOWER ISLAND ROAD (FM 1109), TORNILLO, TX 79853-9998 THE PURPOSE OF THIS PROJECT IS TO COMPLETE THE DEMOLITION OF THE ROAD FROM THE OLD FABENS PORT TO THE NEW TORNILLO PORT AS WELL AS THE COMPLETION OF MISCELLANEOUS OPERATIONAL REQUIREMENTS INCLUDING PLUMBING, LANDSCAPING AND LIGHTING.$9K
Sep 13, 2017Department of DefenseNAVFACSYSCOM MID-ATLANTICN4008517F4884562910IGF::OT::IGF X002 FORMER MARINE CORPS RESERVE TRAINING CENTER, WILMINGTON, NC ASBESTOS ABATEMENT$88K
Sep 11, 2017Department of the InteriorFWS ALASKA REGIONAL OFFICEINF17PD01978236220IGF::OT::IGF INN CONTAMINATED SOILS REMOVAL$175K
Sep 11, 2017Department of the InteriorFWS ALASKA REGIONAL OFFICEINF17PD01981236220IGF::OT::IGF KEN VAULT TOILET RELOCATION$131K
Sep 10, 2017Department of DefenseW07V ENDIST MEMPHISW912EQ15C0007237990IGF::OT::IGF A52340-FY15 FED BAYOU METO PH1(WTR)CONSTRUCT$99K
Aug 31, 2017Department of DefenseNAVFACSYSCOM MARIANASN4019217F4046236220IGF::OT::IGF CONTRACT NUMBER N4019216D2706-N4019217F4046 PROJECT AJJY 17-1026 REPLACE EXISTING STANDBY GENERATOR, MULTIPLE BUILDINGS, ANDERSEN AIR FORCE BASE, GUAM$1.7M
Aug 31, 2017Department of DefenseNAVFACSYSCOM MARIANASN4019217F4062236220IGF::OT::IGF TASK ORDER N4019217F4062 FY16 MILCON AJJY16-3004, PAR-DISPERSED MAINTENANCE SPARES AND SE STORAGE FACILITY, AAFB, GUAM: PROJECT IS FOR CONSTRUCTION OF A REINFORCED CONCRETE STORAGE FACILITY AT AAFB, GUAM.$13M
Aug 30, 2017General Services AdministrationPBS R7 NON-PROSPECTUS - BORDER47PH0417F0006236220IGF::OT::IGF TASK ORDER FOR THE REMOVAL AND REPLACEMENT OF THE PRIMARY/SECONDARY INSPECTION CANOPY ROOF FOR BROWNSVILLE AND MATAMOROS LAND PORTS OF ENTRY.$1.8M
Aug 30, 2017General Services AdministrationPBS R7 NON-PROSPECTUS - BORDER47PH0417F0008236220IGF::OT::IGF TASK ORDER FOR THE REMOVAL AND REPLACEMENT OF THE PRIMARY/SECONDARY INSPECTION CANOPY ROOF LOCATED AT THE LOS INDIOS LAND PORT OF ENTRY IN LOS INDIOS, TEXAS.$2.2M
Aug 29, 2017Department of the InteriorFWS ALASKA REGIONAL OFFICEINF17PD01783236220IGF::OT::IGFSEL HQ PARKING REHAB CONSTRUCTION$4K
Aug 23, 2017Department of DefenseNAVFACSYSCOM MID-ATLANTICN4008517F4807236220IGF::OT::IGF X001 HUBZONE MACC, MINIMUM GUARANTEE$5K

Get Alerted Before Tikigaq Construction, LLC's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free