Federal Contractor Profile
Triton Systems, INC.
$267M obligated·529 awards·8 agencies·19 NAICS
Federal Contracts
Showing contracts 651–696 of 696 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Dec 16, 2016 | Department of DefenseMISSILE DEFENSE AGENCY (MDA) | HQ014717C7255 | 541712 | IGF::OT::IGF SBIR/STTR PHASE I RESEARCH&DEVELOPMENT | $100K |
| Dec 7, 2016 | Department of DefenseW6QK AATD CONTR OFF | W911W616C0017 | 541712 | STRUCTURAL HEAT EXCHANGERS IGF::OT::IGF | $131K |
| Dec 5, 2016 | Department of DefenseMISSILE DEFENSE AGENCY (MDA) | HQ014717C7309 | 541712 | IGF::OT::IGF SBIR/STTR PHASE II R&D | $1000K |
| Nov 15, 2016 | Department of DefenseFA9550 AFRL AFOSR | FA955016C0037 | 541712 | IGF::OT::IGF "(STTR PHASE II) PARTICULATE COMPOSITE MIXING PROCESSES" | $375K |
| Oct 18, 2016 | Department of DefenseNAVSEA HQ | N0002417P4516 | 541712 | STATUS REPORT IGF::OT::IGF | $80K |
| Sep 21, 2016 | Department of DefenseW6QK ACC-RSA | W31P4Q16C0095 | 541712 | IGF::OT::IGF--"DARPA SBIR PHASE II" | $537K |
| Sep 14, 2016 | Department of DefenseFA9550 AFRL AFOSR | FA955016C0034 | 541712 | IGF::OT::IGF OSD (SBIR PHASE 1) POROUS THERMAL RADIATION INHIBITORS FOR HYPERSONICS | $150K |
| Sep 12, 2016 | Department of DefenseW4PZ USA MED RSCH ACQUIS ACT | W81XWH16C0091 | 541712 | IGF::OT::IGF DHP SBIR PHASE 1 PROPOSAL H161-002-0023 | $150K |
| Sep 7, 2016 | Department of DefenseOFFICE OF NAVAL RESEARCH | N0001416P3008 | 541712 | IGF::CT::IGF SBIRSOL2015.2 | $70K |
| Aug 16, 2016 | Department of DefenseW4PZ USA MED RSCH ACQUIS ACT | W81XWH13C0125 | 541712 | DHP 12.2 PHASE I SBIR H122-007-0028 | $102K |
| Aug 15, 2016 | Department of DefenseW6QK AATD CONTR OFF | W911W616C0031 | 541712 | IGF::OT::IGF FIRST MONTHLY PROGRESS REPORT | $100K |
| Aug 11, 2016 | Department of DefenseW4PZ USA MED RSCH ACQUIS ACT | W81XWH16C0098 | 541712 | IGF::OT::IGF-DHP PHASE I PROPOSAL #H161-007-0024 | $150K |
| Aug 1, 2016 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | 0001 | 541712 | RESEARCH AND DEVELOPMENT, SBIR PHASE III, IGF::OT::IGF | $700K |
| Jul 25, 2016 | Department of DefenseW6QK ACC-PICA | W15QKN13C0039 | 541712 | IGF::OT::IGF PHASE II SBIR FOR NANOSTRUCTURED HIGH PERFORMANCE, HIGH ANGLE OF INCIDENCE ANTI-REFLECTION. PROPOSAL A2-5309 | $540K |
| Jul 22, 2016 | Department of DefenseDCSO PHILADELPHIA | SP470115C0077 | 541611 | IGF::OT::IGF!8502502340!SERVICES - MANAG | $50K |
| Jul 18, 2016 | Department of DefenseNAVSEA HQ | N0002416P4066 | 541712 | STATUS REPORT IGF::OT::IGF | $80K |
| Jul 8, 2016 | Department of DefenseW6QK ACC-APG NATICK | W911QY16P0215 | 541712 | IGF::OT::IGF RESEARCH AND DEVELOPMENT - IN-EAR DOSIMETER | $150K |
| Jun 28, 2016 | Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZL | FA865016C5019 | 541712 | IGF::OT::IGF SBIR II "SURFACE TREATMENT OF TITANIUM FOR IMPROVED BONDING" | $563K |
| Jun 15, 2016 | Department of DefenseFA9550 AFRL AFOSR | FA955016C0010 | 541712 | IGF::OT::IGF (SBIR PHASE II) "SMART BANDAGE FOR MONITORING WOUND PERFUSION" | $563K |
| Jun 9, 2016 | Department of DefenseFA9453 AFRL RVK | FA945316M0520 | 541712 | IGF::OT::IGF IMPROVED MULTI-MATERIAL ADDITIVE MANUFACTURED COMPONENTS | $150K |
| Jun 8, 2016 | National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER | NNX16CJ20P | 541712 | IGF::OT::IGF TRITON SYSTEMS IS CURRENTLY DEVELOPING AN UNPOWERED, SWITCHABLE EMISSIVITY FILM FOR APPLICATION TO SPACECRAFT SURFACES. WE CALL OUR APPROACH PHASE CHANGE THERMOCHROMIC RADIATOR (PCTR); IT SELF-SWITCHES FROM LOW TO HIGH EMISSIVITY ABOVE A DESIGNED TEMPERATURE SETPOINT, CAUSING A SURFACE IN SPACE TO RADIATE HEAT ONLY WHEN IT BECOMES TOO WARM AND CONSERVING HEAT OTHERWISE. KEY TO THE OPERATION OF PCTR IS THE PHASE CHANGE MATERIAL VANADIUM DIOXIDE, INTEGRATED INTO A MULTILAYER THIN FILM STRUCTURE TO PRODUCE A DEVICE WHICH IS REFLECTIVE OVER THE 3-35 UM IR BAND BELOW A TRANSITION TEMPERATURE TC BUT STRONGLY ABSORPTIVE ABOVE TC. PCTR HAS ADVANTAGES OVER COMPETING APPROACHES TO DYNAMIC EMISSIVITY SUCH AS ELECTROCHROMICS, IN THAT IT REQUIRES NO ELECTRICAL DRIVE POWER, IS RELATIVELY SIMPLE TO FABRICATE, AND CONTAINS ONLY STABLE, RUGGED, WELL UNDERSTOOD MATERIALS. THE PROPOSED PROGRAM WILL SIGNIFICANTLY UPGRADE THE PERFORMANCE OF PCTR TO APPROACH THE SYSTEM REQUIREMENTS OF PLANETARY EXPLORATION PROBES AND LANDERS, MANNED AND UNMANNED. PERFORMANCE TARGETS INCLUDE HIGH EMISSIVITY OF 0.9, LOW EMISSIVITY OF 0.15, TURNDOWN RATIO OF AT LEAST 6:1 AND POTENTIALLY 10:1, AND SOLAR ALPHA 0.1 OR LESS. THESE ADVANCES WILL BE ACHIEVED BY A NEW DESIGN APPROACH USING NANOSTRUCTURAL ENHANCEMENT. FABRICATION METHODS WILL BE DEVELOPED WHICH CAN BE SCALED UP TO PRODUCE 10'S OF SQUARE METERS OF FILM. BEYOND THERMAL PERFORMANCE TESTS (TURNDOWN, ETC.), KEY QUALIFICATION TESTS INCLUDE THERMAL CYCLING, VIBRATION, PEEL TESTS, SURFACE CHARGE AND LIFE DEGRADATION. | $125K |
| Jun 7, 2016 | Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZL | FA865016M5031 | 541712 | IGF::OT::IGF ARMAMENT MONITORING SYSTEM | $150K |
| Jun 7, 2016 | Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZL | FA865016M5028 | 541712 | IGF::OT::IGF NOVEL POLYMER-DERIVED CARBIDE AND BORIDE REFRACTORY CERAMICS | $150K |
| May 20, 2016 | Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZL | FA865015C6673 | 541712 | IGF::OT::IGF ADAPTIVE PROJECTION SCREEN SBIR II | $181K |
| May 16, 2016 | Department of DefenseW6QK ACC-APG NATICK | W911QY16P0179 | 541712 | IGF::OT::IGF RESEARCH AND DEVELOPMENT FOR DURABLE AEROSOL AND LIQUID REPELLENT COATINGS | $100K |
| May 9, 2016 | Department of DefenseW6QK AATD CONTR OFF | W911W616C0017 | 541712 | STRUCTURAL HEAT EXCHANGERS IGF::OT::IGF | $193K |
| Apr 27, 2016 | Department of DefenseCOMMANDER | M6785416C6516 | 541712 | SBIR PHASE I RESEARCH AND DEVELOPMENT, TOPIC N153-126. IGF::OT::IGF | $80K |
| Apr 21, 2016 | Department of DefenseW4PZ USA MED RSCH ACQUIS ACT | W81XWH13C0125 | 541712 | DHP 12.2 PHASE I SBIR H122-007-0028 | $289K |
| Apr 21, 2016 | Department of DefenseW6QK ACC-APG DURHAM | W911NF16C0074 | 541712 | IGF::OT::IGF:: PHASE II SBIR | $1000K |
| Apr 21, 2016 | Department of DefenseW6QK ACC-APG | W911SR16C0020 | 541711 | IGF::OT::IGF PHASE I SBIR - TRITON SYSTEMS | $100K |
| Apr 15, 2016 | Department of DefenseFA9550 AFRL AFOSR | FA955016C0037 | 541712 | IGF::OT::IGF "(STTR PHASE II) PARTICULATE COMPOSITE MIXING PROCESSES" | $375K |
| Apr 15, 2016 | Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZL | FA865016C5242 | 541712 | IGF::OT::IGF ADDITIVE MANUFACTURING OF MASKING TO SUPPORT TURBINE ENGINE SUSTAINMENT | $900K |
| Apr 11, 2016 | Department of DefenseW4PZ USA MED RSCH ACQUIS ACT | W81XWH10C0228 | 541712 | SBIR PHASE I USACHER #O093-H24-3010 | $200K |
| Apr 7, 2016 | Department of DefenseCOMMANDER | M6785416C6518 | 541712 | IGF::OT::IGF SBIR PHASE I RESEARCH AND DEVELOPMENT | $80K |
| Mar 18, 2016 | Department of DefenseW6QK ACC-RSA | W31P4Q16C0057 | 541712 | IGF::OT::IGF DARPA SBIR PHASE I EFFORT ENTITLED, "SOFT BIO-INTERFACES FOR PHYSIOLOGICAL SENSING AND MODULATION" | $105K |
| Mar 14, 2016 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N6833515C0035 | 541712 | RESEARCH AND DEVELOPMENT | $250K |
| Mar 11, 2016 | Department of DefenseDCSO PHILADELPHIA | SP470116C0025 | 541611 | IGF::OT::IGF!8503009215!SERVICES - MANAG | $100K |
| Mar 8, 2016 | Department of DefenseW4PZ USA MED RSCH ACQUIS ACT | W81XWH12C0172 | 541712 | SBIR PHASE III CONTRACT FOR TRITON BEDNET RESEARCH | $304K |
| Feb 3, 2016 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N6833515C0343 | 541712 | SBIR PHASE II RESEARCH AND DEVELOPMENT IGF::OT::IGF | $356K |
| Jan 22, 2016 | Department of DefenseW6QK ACC-APG | W911SR16C0006 | 541712 | IGF::OT::IGF - PHASE I SBIR (BASE PERIOD)-TOPIC CBD 152-002 | $100K |
| Jan 14, 2016 | Department of DefenseW6QK ACC-APG NATICK | W911QY16P0034 | 541712 | IGF::OT::IGF EXEMPT STTR I R&D | $150K |
| Jan 5, 2016 | Department of DefenseW6QK ACC-APG DURHAM | W911NF16P0007 | 541711 | IGF::OT::IGF SBIR PHASE I - TRITON PROPOSES TO DEVELOP A SIMULATION-BASED SYSTEM TO PROVIDE PSYCHOMOTOR SKILLS TRAINING TO ADVANCED HEALTH CARE PROVIDERS IN THE PERFORMANCE OF A LATERAL CANTHOTOMY AND CANTHOLYSIS (LCC) PROCEDURE, A METHOD OF PRESERVING EYESIGHT. THERE IS A TRAINING VOID IN THE US ARMY IN PART BECAUSE NO LCC TRAINING DEVICE MODEL CURRENTLY EXISTS. THE MEDICAL TRAINER THAT TRITON PROPOSES WILL FILL THIS VOID WORLDWIDE. | $150K |
| Dec 7, 2015 | Department of DefenseMISSILE DEFENSE AGENCY (MDA) | HQ014715C7177 | 541712 | SBIR PHASE I RESEARCH&DEVELOPMENT - "LIGHTWEIGHT LIGHTNING PROTECTION SYSTEM FOR MISSILES" IGF::OT::IGF | $25K |
| Nov 3, 2015 | Department of DefenseW6QK ACC-RSA | W31P4Q15C0092 | 541712 | IGF::OT::IGF DARPA SBIR PHASE I ENTITLED, "ENERGY HARVESTING FOR NEXT GENERATION NEUROTECHNOLOGY." | $50K |
| Nov 3, 2015 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | 0001 | 541712 | RESEARCH AND DEVELOPMENT, SBIR PHASE III, IGF::OT::IGF | $1.4M |
| Oct 28, 2015 | Department of DefenseOFFICE OF NAVAL RESEARCH | N0001416P3008 | 541712 | IGF::CT::IGF SBIRSOL2015.2 | $80K |
Get Alerted Before Triton Systems, INC.'s Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free