Federal Contractor Profile
United Infrastructure Projects Fzco
Federal contracting record: $39M obligated across 12 awards from 2 agencies, FY 2016–2022.
Company Profile
UEI (Unique Entity Identifier)
J4JCMDM27SD3
CAGE Code
SBF93
Parent Organization
United Infrastructure Projects Fzco
Address
OFFICE 509, LOB 19,, DUBAI, 99999
First Federal Award
Nov 12, 2015
Most Recent Award
Sep 27, 2022
Federal Sales Analytics
Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.
Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).
Top Federal Agencies
- $37M
Agency for International Development
94.6% of total obligations
- $2.1M
Department of Defense
5.4% of total obligations
Top NAICS Activity
- $38M
236220
COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION
8 awards
- $513K
238990
ALL OTHER SPECIALTY TRADE CONTRACTORS
4 awards
Recent Federal Awards
| Date | Agency | NAICS | Description | Amount |
|---|---|---|---|---|
| Jan 28, 2021 | Agency for International DevelopmentUSAID/LIBERIA | 236220 | IGF::OT::IGF NEW AWARD - THE PURPOSE OF THIS RFTOP IS TO PROVIDE CONSTRUCTION SERVICES FOR THE MEIN RIVER HYDRO PROJECT WHICH IS LOCATED 19 KM NORTH-WEST OF THE PHEBE JUNCTION IN BONG COUNTY, LIBERIA. | $500K |
| Sep 1, 2020 | Agency for International DevelopmentUSAID/TANZANIA | 236220 | IGF::OT::IGF THE PUMP STATION UPGRADES COVERED BY THIS INSTRUMENT ARE INTENDED TO ADDRESS PROBLEMS WITH THE PUMP STATION THAT CAUSE INEFFICIENT WATER DISTRIBUTION, HIGH OPERATING AND MAINTENANCE COSTS, ESPECIALLY FOR ELECTRICITY, AND SAFETY RISKS DUE TO STRUCTURAL DAMAGE. THE ACTIVITIES TO BE CARRIED OUT ARE TO REPLACE AND INSTALL SIX NEW PUMPS, REHABILITATE THE ELECTRICAL AND MECHANICAL WORKS IN THE DAKAWA PUMPING STATION; AND REHABILITATE THE DAKAWA PUMPING STATION BUILDING. DETAILED TECHNICAL SPECIFICATIONS AND DESIGN DRAWINGS ARE ATTACHED. USAID WILL FINANCE AND PROCURE ALL CONSTRUCTION MATERIALS AND SERVICES FOR THE COMPLETION OF THESE ACTIVITIES: A. THE SUPPLY AND INSTALLATION OF SIX AXIAL FLOW SUBMERSIBLE PUMPS AND ASSOCIATED STARTERS, SWITCHGEAR AND CONTROL PANELS, TWO POWER TRANSFORMERS, PUMP RISER PIPES AND DISCHARGE PIPING, EQUIPMENT MONORAIL AND HOIST, INTAKE WELL GRATING AND HANDRAILS, RELOCATION OF SLUICE GATE OPERATING STANDS, AND NEW TRASH RACK. B. THE SIX EXISTING PUMPS, MOTORS, ELECTRIC TRANSFORMERS, ELECTRIC CONDUITS AND CABLES, AND DUCT BANKS SHALL REMAIN IN PLACE, ALTHOUGH THEY WILL BE DECOMMISSIONED FROM SERVICE. THE EXISTING PUMP SUCTION PIPING LOCATED IN THE INTAKE WELL, AND THE EXISTING PUMP DISCHARGE PIPING FROM THE PUMP UP TO AND INCLUDING THE EXISTING DISCHARGE ISOLATION VALVE SHALL BE REMOVED INTACT, AND DELIVERED TO UWAWAKUDA AT THE LOCATION DESIGNATED. C. ONLY PORTIONS OF THE EXISTING PUMP STATION ROOF REQUIRED FOR INSTALLATION OF THE NEW MONORAIL SUPPORT STRUCTURE SHALL BE REMOVED. CRACKS IN THE EXISTING BLOCK WALLS SHALL BE REPAIRED AND THE FACILITY EXTERIOR PAINTED. | $72K |
| May 2, 2020 | Department of DefenseNAVFACSYSCOM EUROPE AFRICA CENTRAL | 236220 | VARIOUS DESIGN/BUILD AND REPAIR PROJECTS DJIBOUTI | $4K |
| Mar 25, 2020 | Department of DefenseW2SD ENDIST EUROPE | 236220 | SOFA IAF-19-0015 SINGO CAMP CLASSROOM ROOF REPLACEMENT | $8K |
| Sep 29, 2019 | Department of DefenseNAVFACSYSCOM EUROPE AFRICA CENTRAL | 236220 | X001 MINIMUM GUARANTEE | $5K |
| Sep 11, 2019 | Department of DefenseNAVFACSYSCOM EUROPE AFRICA CENTRAL | 236220 | VARIOUS DESIGN/BUILD AND REPAIR PROJECTS DJIBOUTI | $1.4M |
| Jul 22, 2019 | Agency for International DevelopmentUSAID/LIBERIA | 236220 | IGF::OT::IGF NEW AWARD - THE PURPOSE OF THIS RFTOP IS TO PROVIDE CONSTRUCTION SERVICES FOR THE MEIN RIVER HYDRO PROJECT WHICH IS LOCATED 19 KM NORTH-WEST OF THE PHEBE JUNCTION IN BONG COUNTY, LIBERIA. | $7K |
| May 23, 2019 | Department of DefenseW2SD ENDIST EUROPE | 236220 | SOFA IAF-19-0015 SINGO CAMP CLASSROOM ROOF REPLACEMENT | $158K |
| Mar 25, 2019 | Department of DefenseW2SD ENDIST EUROPE | 238990 | IGF::OT::IGF RAPID DEVELOPMENT CTR. JINJA,UGANDA | $11K |
| Dec 14, 2018 | Agency for International DevelopmentUSAID/LIBERIA | 236220 | IGF::OT::IGF NEW AWARD - THE PURPOSE OF THIS RFTOP IS TO PROVIDE CONSTRUCTION SERVICES FOR THE MEIN RIVER HYDRO PROJECT WHICH IS LOCATED 19 KM NORTH-WEST OF THE PHEBE JUNCTION IN BONG COUNTY, LIBERIA. | $91K |
| Mar 1, 2018 | Department of DefenseW2SD ENDIST EUROPE | 238990 | IGF::OT::IGF RAPID DEVELOPMENT CTR. JINJA,UGANDA | $386 |
| Feb 2, 2018 | Agency for International DevelopmentUSAID/TANZANIA | 236220 | IGF::OT::IGF THE PUMP STATION UPGRADES COVERED BY THIS INSTRUMENT ARE INTENDED TO ADDRESS PROBLEMS WITH THE PUMP STATION THAT CAUSE INEFFICIENT WATER DISTRIBUTION, HIGH OPERATING AND MAINTENANCE COSTS, ESPECIALLY FOR ELECTRICITY, AND SAFETY RISKS DUE TO STRUCTURAL DAMAGE. THE ACTIVITIES TO BE CARRIED OUT ARE TO REPLACE AND INSTALL SIX NEW PUMPS, REHABILITATE THE ELECTRICAL AND MECHANICAL WORKS IN THE DAKAWA PUMPING STATION; AND REHABILITATE THE DAKAWA PUMPING STATION BUILDING. DETAILED TECHNICAL SPECIFICATIONS AND DESIGN DRAWINGS ARE ATTACHED. USAID WILL FINANCE AND PROCURE ALL CONSTRUCTION MATERIALS AND SERVICES FOR THE COMPLETION OF THESE ACTIVITIES: A. THE SUPPLY AND INSTALLATION OF SIX AXIAL FLOW SUBMERSIBLE PUMPS AND ASSOCIATED STARTERS, SWITCHGEAR AND CONTROL PANELS, TWO POWER TRANSFORMERS, PUMP RISER PIPES AND DISCHARGE PIPING, EQUIPMENT MONORAIL AND HOIST, INTAKE WELL GRATING AND HANDRAILS, RELOCATION OF SLUICE GATE OPERATING STANDS, AND NEW TRASH RACK. B. THE SIX EXISTING PUMPS, MOTORS, ELECTRIC TRANSFORMERS, ELECTRIC CONDUITS AND CABLES, AND DUCT BANKS SHALL REMAIN IN PLACE, ALTHOUGH THEY WILL BE DECOMMISSIONED FROM SERVICE. THE EXISTING PUMP SUCTION PIPING LOCATED IN THE INTAKE WELL, AND THE EXISTING PUMP DISCHARGE PIPING FROM THE PUMP UP TO AND INCLUDING THE EXISTING DISCHARGE ISOLATION VALVE SHALL BE REMOVED INTACT, AND DELIVERED TO UWAWAKUDA AT THE LOCATION DESIGNATED. C. ONLY PORTIONS OF THE EXISTING PUMP STATION ROOF REQUIRED FOR INSTALLATION OF THE NEW MONORAIL SUPPORT STRUCTURE SHALL BE REMOVED. CRACKS IN THE EXISTING BLOCK WALLS SHALL BE REPAIRED AND THE FACILITY EXTERIOR PAINTED. | $220K |
| Aug 15, 2017 | Agency for International DevelopmentUSAID/TANZANIA | 236220 | IGF::OT::IGF THE PUMP STATION UPGRADES COVERED BY THIS INSTRUMENT ARE INTENDED TO ADDRESS PROBLEMS WITH THE PUMP STATION THAT CAUSE INEFFICIENT WATER DISTRIBUTION, HIGH OPERATING AND MAINTENANCE COSTS, ESPECIALLY FOR ELECTRICITY, AND SAFETY RISKS DUE TO STRUCTURAL DAMAGE. THE ACTIVITIES TO BE CARRIED OUT ARE TO REPLACE AND INSTALL SIX NEW PUMPS, REHABILITATE THE ELECTRICAL AND MECHANICAL WORKS IN THE DAKAWA PUMPING STATION; AND REHABILITATE THE DAKAWA PUMPING STATION BUILDING. DETAILED TECHNICAL SPECIFICATIONS AND DESIGN DRAWINGS ARE ATTACHED. USAID WILL FINANCE AND PROCURE ALL CONSTRUCTION MATERIALS AND SERVICES FOR THE COMPLETION OF THESE ACTIVITIES: A. THE SUPPLY AND INSTALLATION OF SIX AXIAL FLOW SUBMERSIBLE PUMPS AND ASSOCIATED STARTERS, SWITCHGEAR AND CONTROL PANELS, TWO POWER TRANSFORMERS, PUMP RISER PIPES AND DISCHARGE PIPING, EQUIPMENT MONORAIL AND HOIST, INTAKE WELL GRATING AND HANDRAILS, RELOCATION OF SLUICE GATE OPERATING STANDS, AND NEW TRASH RACK. B. THE SIX EXISTING PUMPS, MOTORS, ELECTRIC TRANSFORMERS, ELECTRIC CONDUITS AND CABLES, AND DUCT BANKS SHALL REMAIN IN PLACE, ALTHOUGH THEY WILL BE DECOMMISSIONED FROM SERVICE. THE EXISTING PUMP SUCTION PIPING LOCATED IN THE INTAKE WELL, AND THE EXISTING PUMP DISCHARGE PIPING FROM THE PUMP UP TO AND INCLUDING THE EXISTING DISCHARGE ISOLATION VALVE SHALL BE REMOVED INTACT, AND DELIVERED TO UWAWAKUDA AT THE LOCATION DESIGNATED. C. ONLY PORTIONS OF THE EXISTING PUMP STATION ROOF REQUIRED FOR INSTALLATION OF THE NEW MONORAIL SUPPORT STRUCTURE SHALL BE REMOVED. CRACKS IN THE EXISTING BLOCK WALLS SHALL BE REPAIRED AND THE FACILITY EXTERIOR PAINTED. | $97K |
| Mar 22, 2017 | Agency for International DevelopmentUSAID/TANZANIA | 236220 | IGF::OT::IGF THE PUMP STATION UPGRADES COVERED BY THIS INSTRUMENT ARE INTENDED TO ADDRESS PROBLEMS WITH THE PUMP STATION THAT CAUSE INEFFICIENT WATER DISTRIBUTION, HIGH OPERATING AND MAINTENANCE COSTS, ESPECIALLY FOR ELECTRICITY, AND SAFETY RISKS DUE TO STRUCTURAL DAMAGE. THE ACTIVITIES TO BE CARRIED OUT ARE TO REPLACE AND INSTALL SIX NEW PUMPS, REHABILITATE THE ELECTRICAL AND MECHANICAL WORKS IN THE DAKAWA PUMPING STATION; AND REHABILITATE THE DAKAWA PUMPING STATION BUILDING. DETAILED TECHNICAL SPECIFICATIONS AND DESIGN DRAWINGS ARE ATTACHED. USAID WILL FINANCE AND PROCURE ALL CONSTRUCTION MATERIALS AND SERVICES FOR THE COMPLETION OF THESE ACTIVITIES: A. THE SUPPLY AND INSTALLATION OF SIX AXIAL FLOW SUBMERSIBLE PUMPS AND ASSOCIATED STARTERS, SWITCHGEAR AND CONTROL PANELS, TWO POWER TRANSFORMERS, PUMP RISER PIPES AND DISCHARGE PIPING, EQUIPMENT MONORAIL AND HOIST, INTAKE WELL GRATING AND HANDRAILS, RELOCATION OF SLUICE GATE OPERATING STANDS, AND NEW TRASH RACK. B. THE SIX EXISTING PUMPS, MOTORS, ELECTRIC TRANSFORMERS, ELECTRIC CONDUITS AND CABLES, AND DUCT BANKS SHALL REMAIN IN PLACE, ALTHOUGH THEY WILL BE DECOMMISSIONED FROM SERVICE. THE EXISTING PUMP SUCTION PIPING LOCATED IN THE INTAKE WELL, AND THE EXISTING PUMP DISCHARGE PIPING FROM THE PUMP UP TO AND INCLUDING THE EXISTING DISCHARGE ISOLATION VALVE SHALL BE REMOVED INTACT, AND DELIVERED TO UWAWAKUDA AT THE LOCATION DESIGNATED. C. ONLY PORTIONS OF THE EXISTING PUMP STATION ROOF REQUIRED FOR INSTALLATION OF THE NEW MONORAIL SUPPORT STRUCTURE SHALL BE REMOVED. CRACKS IN THE EXISTING BLOCK WALLS SHALL BE REPAIRED AND THE FACILITY EXTERIOR PAINTED. | $7K |
| Dec 27, 2016 | Agency for International DevelopmentUSAID/LIBERIA | 236220 | IGF::OT::IGF NEW AWARD - THE PURPOSE OF THIS RFTOP IS TO PROVIDE CONSTRUCTION SERVICES FOR THE MEIN RIVER HYDRO PROJECT WHICH IS LOCATED 19 KM NORTH-WEST OF THE PHEBE JUNCTION IN BONG COUNTY, LIBERIA. | $70K |
| Dec 6, 2016 | Department of DefenseW2SD ENDIST EUROPE | 238990 | IGF::OT::IGF RAPID DEVELOPMENT CTR. JINJA,UGANDA | $506K |
| Aug 18, 2016 | Agency for International DevelopmentUSAID/LIBERIA | 236220 | IGF::OT::IGF NEW AWARD - THE PURPOSE OF THIS RFTOP IS TO PROVIDE CONSTRUCTION SERVICES FOR THE MEIN RIVER HYDRO PROJECT WHICH IS LOCATED 19 KM NORTH-WEST OF THE PHEBE JUNCTION IN BONG COUNTY, LIBERIA. | $22K |
| Feb 1, 2016 | Agency for International DevelopmentAGENCY FOR INTERNATIONAL DEVELOPMENT | 236220 | IGF::OT::IGF | $27M |
| Dec 14, 2015 | Agency for International DevelopmentAGENCY FOR INTERNATIONAL DEVELOPMENT | 236220 | IGF::OT::IGF NEW AWARD - THE PURPOSE OF THIS RFTOP IS TO PROVIDE CONSTRUCTION SERVICES FOR THE MEIN RIVER HYDRO PROJECT WHICH IS LOCATED 19 KM NORTH-WEST OF THE PHEBE JUNCTION IN BONG COUNTY, LIBERIA. | $220K |
| Dec 8, 2015 | Agency for International DevelopmentAGENCY FOR INTERNATIONAL DEVELOPMENT | 236220 | IGF::OT::IGF NEW AWARD - THE PURPOSE OF THIS RFTOP IS TO PROVIDE CONSTRUCTION SERVICES FOR THE MEIN RIVER HYDRO PROJECT WHICH IS LOCATED 19 KM NORTH-WEST OF THE PHEBE JUNCTION IN BONG COUNTY, LIBERIA. | $10M |
| Nov 12, 2015 | Agency for International DevelopmentAGENCY FOR INTERNATIONAL DEVELOPMENT | 236220 | IGF::OT::IGF THE PUMP STATION UPGRADES COVERED BY THIS INSTRUMENT ARE INTENDED TO ADDRESS PROBLEMS WITH THE PUMP STATION THAT CAUSE INEFFICIENT WATER DISTRIBUTION, HIGH OPERATING AND MAINTENANCE COSTS, ESPECIALLY FOR ELECTRICITY, AND SAFETY RISKS DUE TO STRUCTURAL DAMAGE. THE ACTIVITIES TO BE CARRIED OUT ARE TO REPLACE AND INSTALL SIX NEW PUMPS, REHABILITATE THE ELECTRICAL AND MECHANICAL WORKS IN THE DAKAWA PUMPING STATION; AND REHABILITATE THE DAKAWA PUMPING STATION BUILDING. DETAILED TECHNICAL SPECIFICATIONS AND DESIGN DRAWINGS ARE ATTACHED. USAID WILL FINANCE AND PROCURE ALL CONSTRUCTION MATERIALS AND SERVICES FOR THE COMPLETION OF THESE ACTIVITIES: A. THE SUPPLY AND INSTALLATION OF SIX AXIAL FLOW SUBMERSIBLE PUMPS AND ASSOCIATED STARTERS, SWITCHGEAR AND CONTROL PANELS, TWO POWER TRANSFORMERS, PUMP RISER PIPES AND DISCHARGE PIPING, EQUIPMENT MONORAIL AND HOIST, INTAKE WELL GRATING AND HANDRAILS, RELOCATION OF SLUICE GATE OPERATING STANDS, AND NEW TRASH RACK. B. THE SIX EXISTING PUMPS, MOTORS, ELECTRIC TRANSFORMERS, ELECTRIC CONDUITS AND CABLES, AND DUCT BANKS SHALL REMAIN IN PLACE, ALTHOUGH THEY WILL BE DECOMMISSIONED FROM SERVICE. THE EXISTING PUMP SUCTION PIPING LOCATED IN THE INTAKE WELL, AND THE EXISTING PUMP DISCHARGE PIPING FROM THE PUMP UP TO AND INCLUDING THE EXISTING DISCHARGE ISOLATION VALVE SHALL BE REMOVED INTACT, AND DELIVERED TO UWAWAKUDA AT THE LOCATION DESIGNATED. C. ONLY PORTIONS OF THE EXISTING PUMP STATION ROOF REQUIRED FOR INSTALLATION OF THE NEW MONORAIL SUPPORT STRUCTURE SHALL BE REMOVED. CRACKS IN THE EXISTING BLOCK WALLS SHALL BE REPAIRED AND THE FACILITY EXTERIOR PAINTED. | $115K |
Top Compensated Officers
From FFATA executive compensation disclosures. Reported when federal contract activity exceeds the statutory threshold.
- $180K
WAIL SADIQ
Rank 1 · Reported Sep 27, 2022
- $160K
MAZEN EL BABA
Rank 2 · Reported Sep 27, 2022
- $140K
ALAA YOUSSEF
Rank 3 · Reported Sep 27, 2022
- $100K
KHALID SADIQ
Rank 4 · Reported Sep 27, 2022
- $120K
KAMAL MUHIEDDINE
Rank 5 · Reported Dec 31, 2018
- $120K
SAMIR HAMAD
Rank 5 · Reported Sep 27, 2022
Related Contractors
Other companies active in NAICS 236220 — COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION.
Track United Infrastructure Projects Fzco Recompetes Before They Post
Mindy monitors United Infrastructure Projects Fzco's active contracts and alerts you 12 months before they expire — so you can position to compete on recompete.
Get Free Recompete Alerts