Home/Contractors/United Infrastructure Projects Fzco

Federal Contractor Profile

United Infrastructure Projects Fzco

Federal contracting record: $39M obligated across 12 awards from 2 agencies, FY 20162022.

$39M
Total Obligated
12
Award Records
2
Agencies Served
2
NAICS Codes

Company Profile

UEI (Unique Entity Identifier)

J4JCMDM27SD3

CAGE Code

SBF93

Parent Organization

United Infrastructure Projects Fzco

Address

OFFICE 509, LOB 19,, DUBAI, 99999

First Federal Award

Nov 12, 2015

Most Recent Award

Sep 27, 2022

Federal Sales Analytics

Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.

Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).

Top Federal Agencies

  • Agency for International Development

    94.6% of total obligations

    $37M
  • Department of Defense

    5.4% of total obligations

    $2.1M

Top NAICS Activity

  • 236220

    COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION

    8 awards

    $38M
  • 238990

    ALL OTHER SPECIALTY TRADE CONTRACTORS

    4 awards

    $513K

Recent Federal Awards

DateAgencyNAICSDescriptionAmount
Jan 28, 2021Agency for International DevelopmentUSAID/LIBERIA236220IGF::OT::IGF NEW AWARD - THE PURPOSE OF THIS RFTOP IS TO PROVIDE CONSTRUCTION SERVICES FOR THE MEIN RIVER HYDRO PROJECT WHICH IS LOCATED 19 KM NORTH-WEST OF THE PHEBE JUNCTION IN BONG COUNTY, LIBERIA.$500K
Sep 1, 2020Agency for International DevelopmentUSAID/TANZANIA236220IGF::OT::IGF THE PUMP STATION UPGRADES COVERED BY THIS INSTRUMENT ARE INTENDED TO ADDRESS PROBLEMS WITH THE PUMP STATION THAT CAUSE INEFFICIENT WATER DISTRIBUTION, HIGH OPERATING AND MAINTENANCE COSTS, ESPECIALLY FOR ELECTRICITY, AND SAFETY RISKS DUE TO STRUCTURAL DAMAGE. THE ACTIVITIES TO BE CARRIED OUT ARE TO REPLACE AND INSTALL SIX NEW PUMPS, REHABILITATE THE ELECTRICAL AND MECHANICAL WORKS IN THE DAKAWA PUMPING STATION; AND REHABILITATE THE DAKAWA PUMPING STATION BUILDING. DETAILED TECHNICAL SPECIFICATIONS AND DESIGN DRAWINGS ARE ATTACHED. USAID WILL FINANCE AND PROCURE ALL CONSTRUCTION MATERIALS AND SERVICES FOR THE COMPLETION OF THESE ACTIVITIES: A. THE SUPPLY AND INSTALLATION OF SIX AXIAL FLOW SUBMERSIBLE PUMPS AND ASSOCIATED STARTERS, SWITCHGEAR AND CONTROL PANELS, TWO POWER TRANSFORMERS, PUMP RISER PIPES AND DISCHARGE PIPING, EQUIPMENT MONORAIL AND HOIST, INTAKE WELL GRATING AND HANDRAILS, RELOCATION OF SLUICE GATE OPERATING STANDS, AND NEW TRASH RACK. B. THE SIX EXISTING PUMPS, MOTORS, ELECTRIC TRANSFORMERS, ELECTRIC CONDUITS AND CABLES, AND DUCT BANKS SHALL REMAIN IN PLACE, ALTHOUGH THEY WILL BE DECOMMISSIONED FROM SERVICE. THE EXISTING PUMP SUCTION PIPING LOCATED IN THE INTAKE WELL, AND THE EXISTING PUMP DISCHARGE PIPING FROM THE PUMP UP TO AND INCLUDING THE EXISTING DISCHARGE ISOLATION VALVE SHALL BE REMOVED INTACT, AND DELIVERED TO UWAWAKUDA AT THE LOCATION DESIGNATED. C. ONLY PORTIONS OF THE EXISTING PUMP STATION ROOF REQUIRED FOR INSTALLATION OF THE NEW MONORAIL SUPPORT STRUCTURE SHALL BE REMOVED. CRACKS IN THE EXISTING BLOCK WALLS SHALL BE REPAIRED AND THE FACILITY EXTERIOR PAINTED.$72K
May 2, 2020Department of DefenseNAVFACSYSCOM EUROPE AFRICA CENTRAL236220VARIOUS DESIGN/BUILD AND REPAIR PROJECTS DJIBOUTI$4K
Mar 25, 2020Department of DefenseW2SD ENDIST EUROPE236220SOFA IAF-19-0015 SINGO CAMP CLASSROOM ROOF REPLACEMENT$8K
Sep 29, 2019Department of DefenseNAVFACSYSCOM EUROPE AFRICA CENTRAL236220X001 MINIMUM GUARANTEE$5K
Sep 11, 2019Department of DefenseNAVFACSYSCOM EUROPE AFRICA CENTRAL236220VARIOUS DESIGN/BUILD AND REPAIR PROJECTS DJIBOUTI$1.4M
Jul 22, 2019Agency for International DevelopmentUSAID/LIBERIA236220IGF::OT::IGF NEW AWARD - THE PURPOSE OF THIS RFTOP IS TO PROVIDE CONSTRUCTION SERVICES FOR THE MEIN RIVER HYDRO PROJECT WHICH IS LOCATED 19 KM NORTH-WEST OF THE PHEBE JUNCTION IN BONG COUNTY, LIBERIA.$7K
May 23, 2019Department of DefenseW2SD ENDIST EUROPE236220SOFA IAF-19-0015 SINGO CAMP CLASSROOM ROOF REPLACEMENT$158K
Mar 25, 2019Department of DefenseW2SD ENDIST EUROPE238990IGF::OT::IGF RAPID DEVELOPMENT CTR. JINJA,UGANDA$11K
Dec 14, 2018Agency for International DevelopmentUSAID/LIBERIA236220IGF::OT::IGF NEW AWARD - THE PURPOSE OF THIS RFTOP IS TO PROVIDE CONSTRUCTION SERVICES FOR THE MEIN RIVER HYDRO PROJECT WHICH IS LOCATED 19 KM NORTH-WEST OF THE PHEBE JUNCTION IN BONG COUNTY, LIBERIA.$91K
Mar 1, 2018Department of DefenseW2SD ENDIST EUROPE238990IGF::OT::IGF RAPID DEVELOPMENT CTR. JINJA,UGANDA$386
Feb 2, 2018Agency for International DevelopmentUSAID/TANZANIA236220IGF::OT::IGF THE PUMP STATION UPGRADES COVERED BY THIS INSTRUMENT ARE INTENDED TO ADDRESS PROBLEMS WITH THE PUMP STATION THAT CAUSE INEFFICIENT WATER DISTRIBUTION, HIGH OPERATING AND MAINTENANCE COSTS, ESPECIALLY FOR ELECTRICITY, AND SAFETY RISKS DUE TO STRUCTURAL DAMAGE. THE ACTIVITIES TO BE CARRIED OUT ARE TO REPLACE AND INSTALL SIX NEW PUMPS, REHABILITATE THE ELECTRICAL AND MECHANICAL WORKS IN THE DAKAWA PUMPING STATION; AND REHABILITATE THE DAKAWA PUMPING STATION BUILDING. DETAILED TECHNICAL SPECIFICATIONS AND DESIGN DRAWINGS ARE ATTACHED. USAID WILL FINANCE AND PROCURE ALL CONSTRUCTION MATERIALS AND SERVICES FOR THE COMPLETION OF THESE ACTIVITIES: A. THE SUPPLY AND INSTALLATION OF SIX AXIAL FLOW SUBMERSIBLE PUMPS AND ASSOCIATED STARTERS, SWITCHGEAR AND CONTROL PANELS, TWO POWER TRANSFORMERS, PUMP RISER PIPES AND DISCHARGE PIPING, EQUIPMENT MONORAIL AND HOIST, INTAKE WELL GRATING AND HANDRAILS, RELOCATION OF SLUICE GATE OPERATING STANDS, AND NEW TRASH RACK. B. THE SIX EXISTING PUMPS, MOTORS, ELECTRIC TRANSFORMERS, ELECTRIC CONDUITS AND CABLES, AND DUCT BANKS SHALL REMAIN IN PLACE, ALTHOUGH THEY WILL BE DECOMMISSIONED FROM SERVICE. THE EXISTING PUMP SUCTION PIPING LOCATED IN THE INTAKE WELL, AND THE EXISTING PUMP DISCHARGE PIPING FROM THE PUMP UP TO AND INCLUDING THE EXISTING DISCHARGE ISOLATION VALVE SHALL BE REMOVED INTACT, AND DELIVERED TO UWAWAKUDA AT THE LOCATION DESIGNATED. C. ONLY PORTIONS OF THE EXISTING PUMP STATION ROOF REQUIRED FOR INSTALLATION OF THE NEW MONORAIL SUPPORT STRUCTURE SHALL BE REMOVED. CRACKS IN THE EXISTING BLOCK WALLS SHALL BE REPAIRED AND THE FACILITY EXTERIOR PAINTED.$220K
Aug 15, 2017Agency for International DevelopmentUSAID/TANZANIA236220IGF::OT::IGF THE PUMP STATION UPGRADES COVERED BY THIS INSTRUMENT ARE INTENDED TO ADDRESS PROBLEMS WITH THE PUMP STATION THAT CAUSE INEFFICIENT WATER DISTRIBUTION, HIGH OPERATING AND MAINTENANCE COSTS, ESPECIALLY FOR ELECTRICITY, AND SAFETY RISKS DUE TO STRUCTURAL DAMAGE. THE ACTIVITIES TO BE CARRIED OUT ARE TO REPLACE AND INSTALL SIX NEW PUMPS, REHABILITATE THE ELECTRICAL AND MECHANICAL WORKS IN THE DAKAWA PUMPING STATION; AND REHABILITATE THE DAKAWA PUMPING STATION BUILDING. DETAILED TECHNICAL SPECIFICATIONS AND DESIGN DRAWINGS ARE ATTACHED. USAID WILL FINANCE AND PROCURE ALL CONSTRUCTION MATERIALS AND SERVICES FOR THE COMPLETION OF THESE ACTIVITIES: A. THE SUPPLY AND INSTALLATION OF SIX AXIAL FLOW SUBMERSIBLE PUMPS AND ASSOCIATED STARTERS, SWITCHGEAR AND CONTROL PANELS, TWO POWER TRANSFORMERS, PUMP RISER PIPES AND DISCHARGE PIPING, EQUIPMENT MONORAIL AND HOIST, INTAKE WELL GRATING AND HANDRAILS, RELOCATION OF SLUICE GATE OPERATING STANDS, AND NEW TRASH RACK. B. THE SIX EXISTING PUMPS, MOTORS, ELECTRIC TRANSFORMERS, ELECTRIC CONDUITS AND CABLES, AND DUCT BANKS SHALL REMAIN IN PLACE, ALTHOUGH THEY WILL BE DECOMMISSIONED FROM SERVICE. THE EXISTING PUMP SUCTION PIPING LOCATED IN THE INTAKE WELL, AND THE EXISTING PUMP DISCHARGE PIPING FROM THE PUMP UP TO AND INCLUDING THE EXISTING DISCHARGE ISOLATION VALVE SHALL BE REMOVED INTACT, AND DELIVERED TO UWAWAKUDA AT THE LOCATION DESIGNATED. C. ONLY PORTIONS OF THE EXISTING PUMP STATION ROOF REQUIRED FOR INSTALLATION OF THE NEW MONORAIL SUPPORT STRUCTURE SHALL BE REMOVED. CRACKS IN THE EXISTING BLOCK WALLS SHALL BE REPAIRED AND THE FACILITY EXTERIOR PAINTED.$97K
Mar 22, 2017Agency for International DevelopmentUSAID/TANZANIA236220IGF::OT::IGF THE PUMP STATION UPGRADES COVERED BY THIS INSTRUMENT ARE INTENDED TO ADDRESS PROBLEMS WITH THE PUMP STATION THAT CAUSE INEFFICIENT WATER DISTRIBUTION, HIGH OPERATING AND MAINTENANCE COSTS, ESPECIALLY FOR ELECTRICITY, AND SAFETY RISKS DUE TO STRUCTURAL DAMAGE. THE ACTIVITIES TO BE CARRIED OUT ARE TO REPLACE AND INSTALL SIX NEW PUMPS, REHABILITATE THE ELECTRICAL AND MECHANICAL WORKS IN THE DAKAWA PUMPING STATION; AND REHABILITATE THE DAKAWA PUMPING STATION BUILDING. DETAILED TECHNICAL SPECIFICATIONS AND DESIGN DRAWINGS ARE ATTACHED. USAID WILL FINANCE AND PROCURE ALL CONSTRUCTION MATERIALS AND SERVICES FOR THE COMPLETION OF THESE ACTIVITIES: A. THE SUPPLY AND INSTALLATION OF SIX AXIAL FLOW SUBMERSIBLE PUMPS AND ASSOCIATED STARTERS, SWITCHGEAR AND CONTROL PANELS, TWO POWER TRANSFORMERS, PUMP RISER PIPES AND DISCHARGE PIPING, EQUIPMENT MONORAIL AND HOIST, INTAKE WELL GRATING AND HANDRAILS, RELOCATION OF SLUICE GATE OPERATING STANDS, AND NEW TRASH RACK. B. THE SIX EXISTING PUMPS, MOTORS, ELECTRIC TRANSFORMERS, ELECTRIC CONDUITS AND CABLES, AND DUCT BANKS SHALL REMAIN IN PLACE, ALTHOUGH THEY WILL BE DECOMMISSIONED FROM SERVICE. THE EXISTING PUMP SUCTION PIPING LOCATED IN THE INTAKE WELL, AND THE EXISTING PUMP DISCHARGE PIPING FROM THE PUMP UP TO AND INCLUDING THE EXISTING DISCHARGE ISOLATION VALVE SHALL BE REMOVED INTACT, AND DELIVERED TO UWAWAKUDA AT THE LOCATION DESIGNATED. C. ONLY PORTIONS OF THE EXISTING PUMP STATION ROOF REQUIRED FOR INSTALLATION OF THE NEW MONORAIL SUPPORT STRUCTURE SHALL BE REMOVED. CRACKS IN THE EXISTING BLOCK WALLS SHALL BE REPAIRED AND THE FACILITY EXTERIOR PAINTED.$7K
Dec 27, 2016Agency for International DevelopmentUSAID/LIBERIA236220IGF::OT::IGF NEW AWARD - THE PURPOSE OF THIS RFTOP IS TO PROVIDE CONSTRUCTION SERVICES FOR THE MEIN RIVER HYDRO PROJECT WHICH IS LOCATED 19 KM NORTH-WEST OF THE PHEBE JUNCTION IN BONG COUNTY, LIBERIA.$70K
Dec 6, 2016Department of DefenseW2SD ENDIST EUROPE238990IGF::OT::IGF RAPID DEVELOPMENT CTR. JINJA,UGANDA$506K
Aug 18, 2016Agency for International DevelopmentUSAID/LIBERIA236220IGF::OT::IGF NEW AWARD - THE PURPOSE OF THIS RFTOP IS TO PROVIDE CONSTRUCTION SERVICES FOR THE MEIN RIVER HYDRO PROJECT WHICH IS LOCATED 19 KM NORTH-WEST OF THE PHEBE JUNCTION IN BONG COUNTY, LIBERIA.$22K
Feb 1, 2016Agency for International DevelopmentAGENCY FOR INTERNATIONAL DEVELOPMENT236220IGF::OT::IGF$27M
Dec 14, 2015Agency for International DevelopmentAGENCY FOR INTERNATIONAL DEVELOPMENT236220IGF::OT::IGF NEW AWARD - THE PURPOSE OF THIS RFTOP IS TO PROVIDE CONSTRUCTION SERVICES FOR THE MEIN RIVER HYDRO PROJECT WHICH IS LOCATED 19 KM NORTH-WEST OF THE PHEBE JUNCTION IN BONG COUNTY, LIBERIA.$220K
Dec 8, 2015Agency for International DevelopmentAGENCY FOR INTERNATIONAL DEVELOPMENT236220IGF::OT::IGF NEW AWARD - THE PURPOSE OF THIS RFTOP IS TO PROVIDE CONSTRUCTION SERVICES FOR THE MEIN RIVER HYDRO PROJECT WHICH IS LOCATED 19 KM NORTH-WEST OF THE PHEBE JUNCTION IN BONG COUNTY, LIBERIA.$10M
Nov 12, 2015Agency for International DevelopmentAGENCY FOR INTERNATIONAL DEVELOPMENT236220IGF::OT::IGF THE PUMP STATION UPGRADES COVERED BY THIS INSTRUMENT ARE INTENDED TO ADDRESS PROBLEMS WITH THE PUMP STATION THAT CAUSE INEFFICIENT WATER DISTRIBUTION, HIGH OPERATING AND MAINTENANCE COSTS, ESPECIALLY FOR ELECTRICITY, AND SAFETY RISKS DUE TO STRUCTURAL DAMAGE. THE ACTIVITIES TO BE CARRIED OUT ARE TO REPLACE AND INSTALL SIX NEW PUMPS, REHABILITATE THE ELECTRICAL AND MECHANICAL WORKS IN THE DAKAWA PUMPING STATION; AND REHABILITATE THE DAKAWA PUMPING STATION BUILDING. DETAILED TECHNICAL SPECIFICATIONS AND DESIGN DRAWINGS ARE ATTACHED. USAID WILL FINANCE AND PROCURE ALL CONSTRUCTION MATERIALS AND SERVICES FOR THE COMPLETION OF THESE ACTIVITIES: A. THE SUPPLY AND INSTALLATION OF SIX AXIAL FLOW SUBMERSIBLE PUMPS AND ASSOCIATED STARTERS, SWITCHGEAR AND CONTROL PANELS, TWO POWER TRANSFORMERS, PUMP RISER PIPES AND DISCHARGE PIPING, EQUIPMENT MONORAIL AND HOIST, INTAKE WELL GRATING AND HANDRAILS, RELOCATION OF SLUICE GATE OPERATING STANDS, AND NEW TRASH RACK. B. THE SIX EXISTING PUMPS, MOTORS, ELECTRIC TRANSFORMERS, ELECTRIC CONDUITS AND CABLES, AND DUCT BANKS SHALL REMAIN IN PLACE, ALTHOUGH THEY WILL BE DECOMMISSIONED FROM SERVICE. THE EXISTING PUMP SUCTION PIPING LOCATED IN THE INTAKE WELL, AND THE EXISTING PUMP DISCHARGE PIPING FROM THE PUMP UP TO AND INCLUDING THE EXISTING DISCHARGE ISOLATION VALVE SHALL BE REMOVED INTACT, AND DELIVERED TO UWAWAKUDA AT THE LOCATION DESIGNATED. C. ONLY PORTIONS OF THE EXISTING PUMP STATION ROOF REQUIRED FOR INSTALLATION OF THE NEW MONORAIL SUPPORT STRUCTURE SHALL BE REMOVED. CRACKS IN THE EXISTING BLOCK WALLS SHALL BE REPAIRED AND THE FACILITY EXTERIOR PAINTED.$115K

Top Compensated Officers

From FFATA executive compensation disclosures. Reported when federal contract activity exceeds the statutory threshold.

  • WAIL SADIQ

    Rank 1 · Reported Sep 27, 2022

    $180K
  • MAZEN EL BABA

    Rank 2 · Reported Sep 27, 2022

    $160K
  • ALAA YOUSSEF

    Rank 3 · Reported Sep 27, 2022

    $140K
  • KHALID SADIQ

    Rank 4 · Reported Sep 27, 2022

    $100K
  • KAMAL MUHIEDDINE

    Rank 5 · Reported Dec 31, 2018

    $120K
  • SAMIR HAMAD

    Rank 5 · Reported Sep 27, 2022

    $120K

Related Contractors

Other companies active in NAICS 236220COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION.

Track United Infrastructure Projects Fzco Recompetes Before They Post

Mindy monitors United Infrastructure Projects Fzco's active contracts and alerts you 12 months before they expire — so you can position to compete on recompete.

Get Free Recompete Alerts