DateAgencyPIIDNAICSDescriptionAmount
Aug 7, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH19F01677238210CONDUCT SITE SURVEY FOR FST INSTALLATION AT FT WORTH, TX (AFW TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF OCTOBER 2019**$5K
Aug 7, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH19F01680238210CONDUCT SITE SURVEY FOR FST INSTALLATION AT DAL-FT WORTH, TX (FLQ TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF OCTOBER 2019**$5K
Aug 1, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH19F01595238210CONDUCT SITE SURVEY FOR FST INSTALLATION AT DUTCH HARBOR, AK (DUT TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF SEPTEMBER 2019**$5K
Aug 1, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH19F01598238210CONDUCT SITE SURVEY FOR FST INSTALLATION AT DULUTH, MN (DLH TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF SEPTEMBER 2019**$5K
Aug 1, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH19F01599238210CONDUCT SITE SURVEY FOR FST INSTALLATION AT DULUTH, MN (DLHB TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF SEPTEMBER 2019**$5K
Aug 1, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH19F01601238210CONDUCT SITE SURVEY FOR FST INSTALLATION AT FORT GREEN, FL (FN7 TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF SEPTEMBER 2019**$5K
Aug 1, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH19F01606238210CONDUCT SITE SURVEY FOR FST INSTALLATION AT FAYETTEVILLE, NC (FAY TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF SEPTEMBER 2019**$5K
Aug 1, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH19F01607238210CONDUCT SITE SURVEY FOR FST INSTALLATION AT FAYETTEVILLE, NC (FAYA TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF SEPTEMBER 2019**$5K
Jul 31, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH19F01566238210CONDUCT SITE SURVEY FOR FST INSTALLATION AT COLD BAY, AK (CDBF TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF SEPTEMBER 2019**$5K
Jul 31, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH19F01568238210CONDUCT SITE SURVEY FOR FST INSTALLATION AT COLD BAY, AK (CDBG TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF SEPTEMBER 2019**$5K
Jul 30, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH19F01559238210CONDUCT SITE SURVEY FOR FST INSTALLATION AT ADAK, AK (ADK TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF SEPTEMBER 2019**$5K
Jul 30, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH19F01560238210CONDUCT SITE SURVEY FOR FST INSTALLATION AT COLD BAY, AK (CDBB TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF SEPTEMBER 2019**$5K
Jul 30, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH19F01562238210CONDUCT SITE SURVEY FOR FST INSTALLATION AT COLD BAY, AK (CDBC TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF SEPTEMBER 2019**$5K
Jul 30, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH19F01565238210CONDUCT SITE SURVEY FOR FST INSTALLATION AT COLD BAY, AK (CDBE TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF SEPTEMBER 2019**$5K
Jul 29, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH18F01724238210CONDUCT SITE SURVEYS FOR FST INSTALLATIONS AT VARIOUS LOCATIONS PER CONTRACT AND ATTACHED SOW.$52K
Jul 29, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH18F01732238210CONDUCT SITE SURVEYS FOR FST INSTALLATIONS AT VARIOUS LOCATIONS PER CONTRACT AND ATTACHED SOW.$64K
Jul 29, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH18F01853238210CONDUCT SITE SURVEY AND FST INSTALLATIONS AT VARIOUS LOCATIONS.$35K
Jul 24, 2019Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS697DCK18C00202236220IGF::OT::IGF$24K
Jul 18, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH19F01412238210CONDUCT SITE SURVEY FOR FST INSTALLATION AT MINNEAPOLIS, MN (MSPL TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF AUGUST 2019**$5K
Jul 18, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH19F01414238210CONDUCT SITE SURVEY FOR FST INSTALLATION AT MINNEAPOLIS, MN (MSPD TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF AUGUST 2019**$5K
Jul 18, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH19F01416238210CONDUCT SITE SURVEY FOR FST INSTALLATION AT MINNEAPOLIS, MN (MSPG TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF AUGUST 2019**$5K
Jul 18, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH19F01417238210CONDUCT SITE SURVEY FOR FST INSTALLATION AT MINNEAPOLIS, MN (MSPI TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF AUGUST 2019**$5K
Jul 18, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH19F01418238210CONDUCT SITE SURVEY FOR FST INSTALLATION AT MINNEAPOLIS, MN (MSPK TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF AUGUST 2019**$5K
Jul 18, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH19F01419238210CONDUCT SITE SURVEY FOR FST INSTALLATION AT SEATTLE, WA (SZI TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF AUGUST 2019**$5K
Jul 18, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH19F01421238210CONDUCT SITE SURVEY FOR FST INSTALLATION AT TAR RIVER, NC (TYI TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF AUGUST 2019**$5K
Jul 11, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH18F01864238210CONDUCT SITE SURVEY AND FST INSTALLATIONS AT VARIOUS LOCATIONS.$24K
Jul 11, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH18F01865238210CONDUCT SITE SURVEY AND FST INSTALLATIONS AT VARIOUS LOCATIONS.$45K
Jul 5, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH18F01731238210CONDUCT SITE SURVEYS FOR FST INSTALLATIONS AT VARIOUS LOCATIONS PER CONTRACT AND ATTACHED SOW.$35K
Jun 24, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH19F01028238210ADD FUNDS FOR SUPPORT OF AWARD PRICE AND URBAN ELECTRIC INSTALLATION. REPAIR, REPLACE, AND MODERNIZE RO POWER PANEL FOR CAT III RWY, 3 EA. 3R/21L RVR SITES TD, MP AT WAYNE COUNTY AIRPORT IN ROMULUS, MICHIGAN. REPAIR, REPLACE, AND MODERNIZE RO POWER PANEL FOR CAT III RWY, 3 EA.,RW 4R/22L RVR SITES TD, MP AT WAYNE COUNTY AIRPORT IN ROMULUS, MICHIGAN. REPAIR, REPLACE, AND MODERNIZE RO POWER PANEL 2 EA., 3L/21R RVR SITES TD AT WAYNE COUNTY AIRPORT IN ROMULUS, MICHIGAN. REPAIR, REPLACE, AND MODERNIZE RW 27L/9R TD POWER PANEL FOR CAT II RWY, 1 EA., AT THE WAYNE COUNTY AIRPORT IN ROMULUS, MICHIGAN. REPAIR, REPLACE, AND MODERNIZE RW 4L/22R RVR SITES-TD,MP, RO POWER PANEL FOR CAT III RWY,3 EA., AT THE WAYNE COUNTY AIRPORT IN ROMULUS, MICHIGAN. JCN 18061517 IS REGIS 66145667 JCN 18061519 IS REGIS 66145376 JCN 18061518 IS REGIS 66145373 JCN 18061521 IS REGIS 66145383 JCN 18061520 IS REGIS 66145380 ESTIMATED PROJECT COST IS $127,665.00 PRIMARY FACILITY CONTACT: SEAN HENDERSON 734-955-5130 PRISM COR: KAREN BURKES SITE COR: ANDREW POTTER AWARD DISTRIBUTION LIST: M&PA: RACHEL SCULLY BUDGET ANALYST: LINDA CRAWFORD LMS: FELICIA HAWKINS AND KAREN BURKES$871
Jun 10, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS0015238210IGF::OT::IGF WATERLOO, IA (ALO) ATCT JCN:505260 - DESIGN SITE SURVEY FOR EG REPLACEMENT$260K
May 28, 2019Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS697DCK18C00202236220IGF::OT::IGF$6K
May 3, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH19F01028238210ADD FUNDS FOR SUPPORT OF AWARD PRICE AND URBAN ELECTRIC INSTALLATION. REPAIR, REPLACE, AND MODERNIZE RO POWER PANEL FOR CAT III RWY, 3 EA. 3R/21L RVR SITES TD, MP AT WAYNE COUNTY AIRPORT IN ROMULUS, MICHIGAN. REPAIR, REPLACE, AND MODERNIZE RO POWER PANEL FOR CAT III RWY, 3 EA.,RW 4R/22L RVR SITES TD, MP AT WAYNE COUNTY AIRPORT IN ROMULUS, MICHIGAN. REPAIR, REPLACE, AND MODERNIZE RO POWER PANEL 2 EA., 3L/21R RVR SITES TD AT WAYNE COUNTY AIRPORT IN ROMULUS, MICHIGAN. REPAIR, REPLACE, AND MODERNIZE RW 27L/9R TD POWER PANEL FOR CAT II RWY, 1 EA., AT THE WAYNE COUNTY AIRPORT IN ROMULUS, MICHIGAN. REPAIR, REPLACE, AND MODERNIZE RW 4L/22R RVR SITES-TD,MP, RO POWER PANEL FOR CAT III RWY,3 EA., AT THE WAYNE COUNTY AIRPORT IN ROMULUS, MICHIGAN. JCN 18061517 IS REGIS 66145667 JCN 18061519 IS REGIS 66145376 JCN 18061518 IS REGIS 66145373 JCN 18061521 IS REGIS 66145383 JCN 18061520 IS REGIS 66145380 ESTIMATED PROJECT COST IS $127,665.00 PRIMARY FACILITY CONTACT: SEAN HENDERSON 734-955-5130 PRISM COR: KAREN BURKES SITE COR: ANDREW POTTER AWARD DISTRIBUTION LIST: M&PA: RACHEL SCULLY BUDGET ANALYST: LINDA CRAWFORD LMS: FELICIA HAWKINS AND KAREN BURKES$128K
Apr 18, 2019Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS697DCK18C00202236220IGF::OT::IGF$37K
Apr 17, 2019Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS697DCK18C00202236220IGF::OT::IGF$14K
Apr 17, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH18F00267238210CONDUCT SITE SURVEYS FOR FST INSTALLATIONS AT VARIOUS LOCATIONS PER CONTRACT AND ATTACHED SOW.$23K
Apr 8, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH19F00885238210LPGBS INSTALLATION$291K
Mar 28, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS0017238210IGF::OT::IGFC CONDUCT SITE SURVEY FOR FY18 FST INSTALLATION AT MINNEAPOLIS, MN (MSP TANK) PER CONTRACT AND ATTACHED SOW.$236K
Mar 27, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH19F00181238210UPS SITE SURVEY$47K
Mar 8, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH18F00268238210CONDUCT SITE SURVEYS FOR FST INSTALLATIONS AT VARIOUS LOCATIONS PER CONTRACT AND ATTACHED SOW.$7K
Mar 7, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH18F01967238210SITE SURVEY FOR LAREDO, TX (LRD) ATCT - FLS EG REPLACEMENT SPEND PLAN #18-F130300-1032 DESCRIPTION: SITE SURVEY VENDOR: URBAN ELECTRIC CONTRACT TASK ORDER: DTFAAC-16-D-00018$17K
Mar 7, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH18F02192238210LPGBS SITE SURVEY AT DTW$879K
Mar 6, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH18F00654238210CONDUCT SITE SURVEYS FOR FST INSTALLATIONS AT VARIOUS LOCATIONS PER CONTRACT AND ATTACHED SOW. CONDUCT FST INSTALLATIONS AT VARIOUS LOCATIONS PER ATTACHED SOW AND BASELINE COST PROPOSAL.$8K
Feb 7, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCSDTFAAC16D00018CALL0001238210POWER SYSTEMS INSTALLATION&UPGRADE IGF::OT::IGF$3K
Jan 3, 2019Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH18F00654238210CONDUCT SITE SURVEYS FOR FST INSTALLATIONS AT VARIOUS LOCATIONS PER CONTRACT AND ATTACHED SOW. CONDUCT FST INSTALLATIONS AT VARIOUS LOCATIONS PER ATTACHED SOW AND BASELINE COST PROPOSAL.$56K
Dec 20, 2018Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH18F01719238210CONDUCT SITE SURVEYS FOR FST INSTALLATIONS AT VARIOUS LOCATIONS PER CONTRACT AND ATTACHED SOW.$129K
Dec 20, 2018Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH18F01722238210CONDUCT SITE SURVEYS FOR FST INSTALLATIONS AT VARIOUS LOCATIONS PER CONTRACT AND ATTACHED SOW.$129K
Dec 20, 2018Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH18F01724238210CONDUCT SITE SURVEYS FOR FST INSTALLATIONS AT VARIOUS LOCATIONS PER CONTRACT AND ATTACHED SOW.$129K
Dec 20, 2018Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH18F01726238210CONDUCT SITE SURVEYS FOR FST INSTALLATIONS AT VARIOUS LOCATIONS PER CONTRACT AND ATTACHED SOW.$129K
Dec 20, 2018Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH18F01728238210CONDUCT SITE SURVEYS FOR FST INSTALLATIONS AT VARIOUS LOCATIONS PER CONTRACT AND ATTACHED SOW.$129K
Dec 13, 2018Department of Transportation6973GH FRANCHISE ACQUISITION SVCS6973GH18F01732238210CONDUCT SITE SURVEYS FOR FST INSTALLATIONS AT VARIOUS LOCATIONS PER CONTRACT AND ATTACHED SOW.$129K