Federal Contracts
Showing contracts 451–500 of 542 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Sep 9, 2016 | Department of DefenseW071 ENDIST KANSAS CITY | W912DQ16C1087 | 238990 | IGF::OT::IGF- NEW CONSTRUCTION FOR SHOWER BUILDING PAINTING AT POMONA LAKE, KS. | $50K |
| Sep 7, 2016 | Department of CommerceDEPT OF COMMERCE NOAA | DOCT0002 | 236220 | IGF::OT::IGF SUPPLY AND INSTALL SECURITY DOORS AND SIDE PANELS AND TO REMODEL THE REGIONAL DIRECTORS OFFICE AREA FOR THE NATIONAL WEATHER SERVICE, KANSAS CITY, MO. | $74K |
| Sep 2, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0005 | 236220 | IGF::OT::IGF REPLACE WINDOWS AT BLDG.318 - THE CONTRACTOR SHALL FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO REPLACE WINDOWS AT BUILDING 318, IN STRICT ACCORDANCE WITH THE STATEMENT OF WORK, DRAWINGS, SPECIFICATIONS AND THE TERMS AND CONDITIONS OF THEIR AGREEMENT. | $53K |
| Sep 2, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0006 | 236220 | IGF::OT::IGF REPAIR HVAC CONTROLS - THE CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS IN ACCORDANCE WITH THE STATEMENT OF WORK, DRAWINGS, SPECIFICATIONS AND THE TERMS AND CONDITIONS OF THEIR CONTRACT. | $105K |
| Sep 1, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0004 | 236220 | IGF::OT::IGF MISCELLANEOUS BUILDING REPAIRS AT BLDG. 52 - THE WORK CONSIST OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR BUILDING 52. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL SYSTEM. | $672K |
| Aug 29, 2016 | Department of the InteriorMWR MIDWEST REGION(60000) | INP16PC00319 | 236220 | IGF::OT::IGF NOGRN, REPLACE OFFICERS ROW HANDRAIL AT FORT LARNED NATIONAL HISTORIC SITE | $73K |
| Aug 25, 2016 | Department of Veterans Affairs255-NETWORK CONTRACT OFFICE 15 (36C255) | VA25516C0118 | 238210 | IGF::OT::IGF REPLACE PUBLIC ADDRESS SYSTEM 589A5-14-102 IGF::OT::IGF | $25K |
| Aug 24, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0003 | 236220 | IGF::OT::IGF REPLACE VCT FLOORING AT BLDG.61 - THE CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS IN ACCORDANCE WITH THE STATEMENT OF WORK, DRAWINGS, SPECIFICATIONS AND THE TERMS AND CONDITIONS OF THEIR CONTRACT. | $80K |
| Aug 22, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0002 | 236220 | IGF::OT::IGF REPAIR CARPETING AND VCT AT BLDG. 44 - THE CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS IN ACCORDANCE WITH THE STATEMENT OF WORK, DRAWINGS, SPECIFICATIONS AND THE TERMS AND CONDITIONS OF THEIR CONTRACT. | $83K |
| Aug 19, 2016 | National Archives and Records AdministrationNARA CONTRACTING OFFICE | NAMABF16M0013 | 236220 | IGF::OT::IGF HSTRUMAN LIBRARY NORTH ENTRANCE SIDEWALK&BOLLARDS | $9K |
| Aug 18, 2016 | General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION KANSAS CITY NORTH | GS06P16TDC7009 | 236220 | IGF::OT::IGF RICHARD BOLLING FEDERAL BUILDING, 601 EAST 12TH STREET, CONSTRUCTION FOR SSA, 12TH FLOOR PROVIDE ALL LABOR, MATERIALS, AND SUPERVISION FOR STRUCTURAL MODIFICATIONS AND ELECTRICAL IMPROVEMENTS IN THE ROCC IN SUPPORT OF NEW CABINET INSTALLATION. | $56K |
| Aug 15, 2016 | Department of DefenseW072 ENDIST DETROIT | W911XK16C0016 | 237990 | IGF::OT::IGF CONSTRUCTION PROJECT TO REPAIR THE CONCRETE SURFACE SLABS ON THE SOUTH PIER STRUCTURE AT GRAND HAVEN STATE PARK, GRAND HAVEN, MICHIGAN. | $2.7M |
| Aug 15, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0005 | 236220 | IGF::OT::IGF THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR GRUBER GYM EXTERIOR RUNNING TRACK. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL RUNNING TRACK. | $8K |
| Aug 15, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0015 | 236220 | IGF::OT::IGF BLDG #90 INETRIOR REPAIRS AND ABATEMENT - CONSTRUCT CONFERENCE ROOM AND OFFICES FOR THE ARI. THIS WILL REQUIRE THE DEMOLITION OF EXISTING COMPUTER LAB AND OBSERVATORY AREA WHICH ARE NO LONGER USED. RENOVATED AREA WILL RECEIVE UPGRADED HVAC APPROXIMATELY HALF OF BUILDING, NEW COMMUNICATIONS MDF, UPGRADED COMMUNICATIONS LINES, NEW FINISHES TO INCLUDE CARPET, CEILINGS, PAINT, ETC., UPGRADED LIGHTING, ELECTRICAL MODIFICATIONS AND UPGRADE FIRE ALARM. | $4K |
| Aug 11, 2016 | General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION KANSAS CITY SOUTH | GS06P16TEC7039 | 236220 | IGF::OT::IGF INSTALL EMERGENCY/EXIT LIGHTING AND REPLACE LIGHTING, 2306 E. BANNISTER ROAD, KCMO | $10K |
| Aug 8, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0007 | 236220 | IGF::OT::IGF INSTALL STAND ALONE HVAC UNIT AT BLDG.314 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO INSTALL HVAC FOR COMMUNICATION ROOMS AT BUILDING #314. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL HVAC SERVER. | $215K |
| Aug 4, 2016 | Department of DefenseW071 ENDIST KANSAS CITY | W912DQ16C1080 | 238390 | IGF::OT::IGF LITTON CENTER PHASE II WINDOW/DOOR REPLACEMENT | $124K |
| Aug 4, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF416P0032 | 561720 | IGF::OT::IGF WINDOW WASHING/CLEANING | $15K |
| Aug 3, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0006 | 236220 | IGF::OT::IGF REPLACE HVAC DIGITAL CONTROLS AT BLDG 127 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPLACE HVAC DIGITAL CONTROLS. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL HVAC DIGITAL CONTROLS. | $1.1M |
| Aug 1, 2016 | Department of CommerceDEPT OF COMMERCE NOAA | DOCWC133W16CQ0041T0001 | 236220 | IGF::OT::IGF ASPHALT SHINGLE ROOF REPLACEMENT AT WFO IN HASTINGS, NEBRASKA | $28K |
| Jul 26, 2016 | Department of DefenseFA4625 509 CONS CC | FA462516C0002 | 237990 | IGF::OT::IGF AWARD REPAIR WSA/MSA DRAINAGE | $10K |
| Jul 26, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0001 | 236220 | IGF::OT::IGF BLDG #89 INTERIOR REPAIRS - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO RESTORE AND REPAIR INTERIOR OF HISTORIC BUILDING TO INCLUDE CARPET, VCT, DUCTWORK, LIGHTING AND COMMUNICATIONS. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL SYSTEM. | $352K |
| Jul 21, 2016 | Department of Veterans Affairs255-NETWORK CONTRACT OFFICE 15 (36C255) | VA25516C0151 | 238220 | IGF::OT::IGF REPLACE AIR HANDLER PROJECT 589A4-15-114 IGF::OT::IGF | $1.1M |
| Jul 11, 2016 | General Services AdministrationPBS R6 SERVICES ACQUISITION BRANCH | GS06P16GXC7025 | 236220 | IGF::OT::IGF FOR OTHER FUNCTIONS - AWARD OF BUILDING AUTOMATION SYSTEM UPGRADES AT THE SAMMY DAVIS BUILDING, 1655 WOODSON ROAD, OVERLAND, MO 63114 | $10K |
| Jul 7, 2016 | General Services AdministrationPBS R6 CONSTRUCTION ACQUISITION BRANCH | GS06P16GXC7026 | 236220 | IGF::OT::IGF REPAIR/PAINT EXTERIOR PERIMETER FENCE AT THE ROBERT J. DOLE COURTHOUSE, 500 STATE AVE, KANSAS CITY, KS. THE CONTRACTOR SHALL PROVIDE THE LABOR, MATERIAL, AND EQUIPMENT REQUIRED TO SANDBLAST AND PREPARE ALL IRON SURFACES FOR REPAINTING OF THE EXTERIOR PARKING LOT FENCING, BOLLARDS, AND RAILINGS AROUND THE DOLE US COURTHOUSE. WORK SHALL INCLUDE APPLICATION OF NEW PROTECTIVE INDUSTRIAL COATING OF ALL IRON SURFACES OF FENCE, RE-CAULKING FENCE RAILING, AND PROVIDING ALL ASSOCIATED PROTECTIVE METHODS AND FINAL CLEAN-UP. THE SCOPE OF WORK DATED 5/25/2016 IS HEREBY INCORPORATED BY REFERENCE. VICTOR CHRISTIANSON IS DESIGNATED AS THE CONTRACTING OFFICER'S REPRESENTATIVE FOR THIS PROJECT. THIS CONTRACT SHALL BE COMPLETED WITHIN 45 CALENDAR DAYS OF RECEIVING NOTICE TO PROCEED. THIS IS NOT A NOTICE TO PROCEED. THIS NOTIFICATION DOES NOT AUTHORIZE YOU TO START WORK ON THIS PROJECT UNTIL THE REQUIRED PAYMENT PROTECTION HAS BEEN ACCEPTED, CLEARANCES FROM GSA HAVE BEEN RECEIVED, AND NOTICE TO PROCEED HAS REACHED YOU. A PAYMENT BOND WILL BE REQUIRED WITHIN 10 DAYS OF THIS AWARD. | $106K |
| Jul 7, 2016 | Department of DefenseW6QM MICC-FT RILEY | W911RX16C0006 | 238990 | IGF::OT::IGF MITIGATE BAT GUANO, BUILDING 408 | $71K |
| Jun 28, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0009 | 236220 | IGF::OT::IGF BLDG #120 TEST&BALANCE HVAC SYSTEM | $27K |
| Jun 27, 2016 | General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION KANSAS CITY NORTH | GS06P16TDC7008 | 236220 | IGF::OT::IGF. BOLLING FEDERAL BUILDING 601 E 12TH STREET, PO DOCK, KANSAS CITY, MO REPLACE THE PO DOCK GUARD SHACK WITH ONE THAT MEETS LEVEL 4 BALLISTIC PROTECTION REQUIREMENTS. THIS PROJECT WILL INCLUDE REMOVING POWER AND CONTROLS FROM THE EXISTING SHACK AND REINSTALLING THEM IN THE NEW ONE. | $58K |
| Jun 17, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0016 | 236220 | IGF::OT::IGF REPAIR CDC PLAYGROUND AT BLDG. 62 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR AND REPLACE THE SOFT SURFACE AREA ON 13 PLAYGROUND AREAS AT THE CDC, B-62. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL SYSTEM. | $55K |
| Jun 17, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0020 | 236220 | IGF::OT::IGF BLDG #427 CABINETS - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO CONSTRUCT CABINETS IN TWO EMPLOYEE BREAK ROOMS. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL SYSTEM. | $10K |
| Jun 17, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0018 | 236220 | IGF::OT::IGF BLDG 46 REPAIRS-THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR FIRST FLOOR B-46. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL SYSTEM. | $34K |
| Jun 17, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0017 | 236220 | IGF::OT::IGF THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO RESTORE FINISHED BASEMENT OFFICE SPACE AT BLDG #286. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL SYSTEM. | $95K |
| Jun 17, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0019 | 236220 | IGF::OT::IGF BLDG #120 CARPET - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPLACE CARPET ON THE SECOND FLOOR OF BLDG #120 IN THE FOLLOWING ROOM NUMBERS; G228, G229, G230, G231, G232, G233, G234, AND G235. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL SYSTEM. | $30K |
| Jun 17, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0021 | 236220 | IGF::OT::IGF REPAIR FIRE ALARM - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR FIRE ALARM AT BLDG #62. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL SYSTEM. | $331K |
| Jun 17, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0015 | 236220 | IGF::OT::IGF BLDG #90 INETRIOR REPAIRS AND ABATEMENT - CONSTRUCT CONFERENCE ROOM AND OFFICES FOR THE ARI. THIS WILL REQUIRE THE DEMOLITION OF EXISTING COMPUTER LAB AND OBSERVATORY AREA WHICH ARE NO LONGER USED. RENOVATED AREA WILL RECEIVE UPGRADED HVAC APPROXIMATELY HALF OF BUILDING, NEW COMMUNICATIONS MDF, UPGRADED COMMUNICATIONS LINES, NEW FINISHES TO INCLUDE CARPET, CEILINGS, PAINT, ETC., UPGRADED LIGHTING, ELECTRICAL MODIFICATIONS AND UPGRADE FIRE ALARM. | $438K |
| Jun 17, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0022 | 236220 | IGF::OT::IGF HVAC SHUTDOWN - PROVIDE ALL PROGRAMMING AND STARTUP LABOR TO INSTALL EMERGENCY SHUTDOWN FUNCTION FOR ALL AHUS ON THE BASE WIDE AUTOMATED LOGIC DDC SOFTWARE. PROGRAM TO FORCE ALL EQUIPMENT WITH OUTSIDE AIR CAPABILITY TO STOP AND OUTSIDE AIR DAMPERS CLOSED. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL SYSTEM. | $14K |
| Jun 17, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0023 | 236220 | IGF::OT::IGF BLDG 85 VESTIBULE - REMOVE RESTROOMS OFF OF THE EXISTING VAV UNITS AND INSTALLING THEM ON DEDICATED VAV BOXES IN ORDER TO CORRECT EXISTING HVAC ISSUES. REMOVING EXISTING EXHAUST FANS FOR THE RESTROOMS AND INSTALLING NEW EXHAUST FANS IN ORDER TO CORRECT EXHAUST DEFICIENCY. PROVIDE NEW CONTROLS FOR NEW HVAC SYSTEM. INSTALLING A NEW ALUMINUM FRAMED GLASS STOREFRONT WITH DOOR AT MAIN ENTRY VESTIBULE. REMOVING EXISTING WOOD TRIM, FINISHING WALLS AND INSTALLING NEW STOREFRONT TO MATCH EXISTING STOREFRONTS STYLE AND FINISH. | $37K |
| Jun 15, 2016 | General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION KANSAS CITY SOUTH | GS06P16TEC7037 | 236220 | IGF::OT::IGF ROOF REPAIRS, 2312 E. BANNISTER ROAD, KCMO | $19K |
| Jun 9, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0005 | 236220 | IGF::OT::IGF THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR GRUBER GYM EXTERIOR RUNNING TRACK. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL RUNNING TRACK. | $106K |
| Jun 3, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0012 | 236220 | IGF::OT::IGF BLDG #268 DODGE HALL INTERIOR REPAIRS. THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO CONDUCT AN ASBESTOS ABATEMENT, REPLACEMENT OF FLOORING, PAINTING, AND RELOCATION OF COMMUNICATIONS ROOM, INSTALLATION OF NEW DATA/COM LINES, CREATING AN ADA RESTROOM, AND REPLACING EXTERIOR DOORS. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL SYSTEM. | $525K |
| Jun 2, 2016 | Department of Veterans Affairs255-NETWORK CONTRACT OFFICE 15 (36C255) | VA25516P3540 | 561210 | IGF::OT::IGF REPLACE CHILLED WATER PUMP | $24K |
| May 24, 2016 | Department of Veterans Affairs255-NETWORK CONTRACT OFFICE 15 (36C255) | VA25516P3063 | 238290 | IGF::OT::IGF RELOCATION OF CAMERA SERVICES | $14K |
| May 24, 2016 | General Services AdministrationPBS R6 CONSTRUCTION ACQUISITION BRANCH | GS06P15GYC7003 | 561621 | IGF::OT::IGF AWARD STAND ALONE 8(A) CONTRACT LOCATION: BUILDING MO0050 CHARLES WHITTAKER COURTHOUSE, 400 E. 9TH STREET, KANSAS CITY, MO 64108-2607 | $2K |
| May 20, 2016 | General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION KANSAS CITY SOUTH | GS06P16TEC7035 | 236220 | IGF::OT::IGF INSTALL DE-HUMIDIFIER AT 2312 E. BANNISTER ROAD, KCMO | $26K |
| May 18, 2016 | Department of Veterans Affairs255-NETWORK CONTRACT OFFICE 15 (36C255) | VA25516C0126 | 238210 | IGF::OT::IGF REPLACE PUBLIC ADDRESS SYSTEM 589A6-15-201 IGF::OT::IGF | $709K |
| May 16, 2016 | Department of Veterans Affairs255-NETWORK CONTRACT OFFICE 15 (36C255) | VA25516C0118 | 238210 | IGF::OT::IGF REPLACE PUBLIC ADDRESS SYSTEM 589A5-14-102 IGF::OT::IGF | $552K |
| May 16, 2016 | General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION KANSAS CITY SOUTH | GS06P16TEC7031 | 236220 | IGF::OT::IGF ELECTRICAL VAULT COVERS, 2312 E. BANNISTER ROAD, KCMO | $80 |
| May 10, 2016 | General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION KANSAS CITY SOUTH | GS06P16TEC7033 | 236220 | IGF::OT::IGF ROOF REPAIRS, 2312 E. BANNISTER ROAD, KCMO | $18K |
| May 10, 2016 | General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION KANSAS CITY SOUTH | GS06P16TEC7032 | 236220 | IGF::OT::IGF INSTALL STAIRS AND RAILS, 2306 E. BANNISTER ROAD, KCMO | $10K |
| May 9, 2016 | General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION KANSAS CITY SOUTH | GS06P16TEC7031 | 236220 | IGF::OT::IGF ELECTRICAL VAULT COVERS, 2312 E. BANNISTER ROAD, KCMO | $4K |