DateAgencyPIIDNAICSDescriptionAmount
Jun 5, 2017General Services AdministrationPBS R6 CONSTRUCTION ACQUISITION BRANCHGSP0617GZ0029236220IGF::OT::IGF CHARLES F. PREVEDEL FEDERAL BUILDING, 9700 PAGE AVENUE, OVERLAND, MO. RMO22545 IS AWARDED TO PROVIDE NECESSARY CONSTRUCTION SERVICES TO BUILD AN UNDERGROUND LOADING DOCK AT PREVEDEL.$2.5M
Jun 5, 2017Department of the InteriorFWS MIDWEST REGIONAL OFFICEINF17PC00062237310IGF::OT::IGF SQUAW CREEK CHIP SEAL CONTRACT$229K
Jun 2, 2017General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION KANSAS CITY NORTHGS06P17TDC0007236220IGF::OT::IGF. USACE 5TH FLOOR MODULAR OFFICE, 601 E. 12TH STREET, KCMO. REPAIR AND ALTERATIONS PROJECT.$33K
Jun 1, 2017Department of DefenseFA8101 AFSC PZIOAFA810117C0013236220IGF::CL,CT::IGF ROOF REPAIR B201$6K
May 31, 2017General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION KANSAS CITY SOUTHGS06P17TEC0014236220IGF::OT::IGF - 2306 E. BANNISTER ROAD, KANSAS CITY, MO CONTRACTOR SHALL REPLACE ROOFING SYSTEM AND 2 DRAINS ABOVE THE TRANE PLANT, REPAIR A SEAM APPROXIMATELY 4 FT. NEAR DRAIN ABOVE TRANE PLANT, AND ROOFING SYSTEM AROUND J-BATHROOM EXHAUST SYSTEM. WORK SHALL BE INSTALLED TO ENSURE THE INTEGRITY OF THE ROOFING SYSTEMS AND PROPER DRAINAGE ARE MAINTAINED.$15K
May 30, 2017Department of DefenseFA8101 AFSC PZIOAFA810117C0015238910IGF::OT::IGF DEMO BLDG 2128$19K
May 25, 2017Department of DefenseW6QM MICC-FT LEAVENWORTH0001236220IGF::OT::IGF BLDG #89 INTERIOR REPAIRS - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO RESTORE AND REPAIR INTERIOR OF HISTORIC BUILDING TO INCLUDE CARPET, VCT, DUCTWORK, LIGHTING AND COMMUNICATIONS. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL SYSTEM.$19K
May 23, 2017General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION KANSAS CITY NORTHGS06P17TDC0006236220IGF::OT::IGF. GSA HOLMES ST AND 701 GUARD BOOTH REPLACEMENT$128K
May 22, 2017Department of DefenseW6QM MICC-FT LEAVENWORTH0011236220IGF::OT::IGF BLDG #53 - ACCESS CONTROL$15K
May 22, 2017Department of DefenseW6QM MICC-FT LEONARD WOOD0005238160IGF::OT::IGF BASE PERIOD$14K
May 16, 2017General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION KANSAS CITY SOUTHGS06P17TEC0011236220IGF::OT::IGF - 2306 E. BANNISTER ROAD, KANSAS CITY, MO, INSTALL SELF-CLOSING, SWING, SAFETY GATES FOR FALL PROTECTION THROUGH AT 11 MEZZANINE LOCATIONS THROUGHOUT THE FACILITY.$13K
May 16, 2017General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION KANSAS CITY SOUTHGS06P17TEC0012236220IGF::OT::IGF 2306 E. BANNISTER ROAD, KANSAS CITY, MO. CONTRACTOR SHALL DEMO AND REMOVE FROM PREMISES EXISTING WOODEN PLATFORM AND STAIRS. CONTRACTOR SHALL PROVIDE AND INSTALL A WIDE WELDED BAR, SERRATED GRATED PLATFORM SURFACE APPROXIMATELY 14 FEET IN LENGTH. CONTRACTOR SHALL PROVIDE METAL STEPS WITH A TOTAL RISE OF APPROXIMATELY 22 RISE. STEPS SHALL BE UNIFORM WITH RISER MINIMUM OF 4 INCHES AND A MAXIMUM OF 7 INCHES.$9K
May 15, 2017Department of DefenseW6QM MICC-FT LEONARD WOOD0010238160IGF::OT::IGF BASE PERIOD$36K
May 15, 2017Department of DefenseW6QM MICC-FT LEONARD WOOD0008238160IGF::OT::IGF BASE PERIOD$264K
May 15, 2017Department of DefenseW6QM MICC-FT LEONARD WOOD0009238160IGF::OT::IGF BASE PERIOD$21K
May 10, 2017Department of DefenseW6QM MICC-FT LEAVENWORTH0021236220IGF::OT::IGF BLDG #73 - RSC GENERATOR TEMPORARY POWER INSTALLATION$14K
May 3, 2017Department of DefenseW6QM MICC-FT LEAVENWORTH0022236220IGF::OT::IGF THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REMOVE AND REPLACE BOILER TUBES AT BUILDING #132. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE FUNCTIONAL BOILER TUBES.$16K
May 1, 2017Department of Veterans Affairs255-NETWORK CONTRACT OFFICE 15 (36C255)VA25516C0126238210IGF::OT::IGF REPLACE PUBLIC ADDRESS SYSTEM 589A6-15-201 IGF::OT::IGF$81K
Apr 25, 2017General Services AdministrationPBS R6 SERVICES ACQUISITION BRANCHGS06P17GXC0004236220IGF::OT::IGF BANNISTER FEDERAL COMPLEX 2312 E BANNISTER RD KANSAS CITY, MO (MO0035ZZ) THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO REPAIR CURBING FROM OLD ROOF VENT BY COVERING WITH TORCH DOWN GRANULAR ROOFING. MASTIC AND MESH TIE IN WITH FIBER MESH 6 INTO EXISTING ROOF. FLASH CURB WITH TORCH DOWN GRANULAR ROOFING, USE MODIFIED WRAP AND HEAT SEAM ALL INSIDE AND OUTSIDE CORNERS. CONTRACTOR SHALL ALSO REMOVE ONE 3 ROOF VENT. AFTER PIPE IS REMOVED PATCH AREA WITH TORCH DOWN GRANULAR ROOFING AND MASTIC AND MESH AROUND THE PATCH. CONTRACTOR SHALL VISIT THE SITE AND PERFORM A THOROUGH SITE INSPECTION. THE CONTRACTOR SHALL INSPECT THE SITE TO BECOME FAMILIAR WITH THE EXISTING CONDITIONS RELATING TO THE WORK TO BE PERFORMED AND THE DIFFICULTIES AND RESTRICTIONS TO THE WORK TO BE PERFORMED. DRAWINGS ARE INTENDED ONLY TO PROVIDE VISUAL REPRESENTATION OF THE DESIGN CONCEPT. CONTRACTOR SHALL FIELD VERIFY ACTUAL CONDITIONS. THE ATTACHED SCOPE OF WORK DATED 3/29/2017 AND THE CONTRACTORS SIGNED PROPOSAL DATED 4/13/2017 ARE HEREBY INCORPORATED BY REFERENCE. BRYAN HUFF IS DESIGNATED AS THE CONTRACTING OFFICERS REPRESENTATIVE FOR THIS PROJECT.$3K
Apr 25, 2017Department of DefenseW6QM MICC-FT LEONARD WOOD0007238160IGF::OT::IGF BASE PERIOD$4K
Apr 24, 2017General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION KANSAS CITY SOUTHGS06P17TEC0008236220IGF::OT::IGF APPLY GRAFFITI COATING TO FLOOD WALL AT BANNISTER COMPLEX, 1500 E. BANNISTER ROAD, KANSAS CITY, MO$169K
Apr 24, 2017Department of DefenseW6QM MICC-FT LEONARD WOOD0006238160IGF::OT::IGF BASE PERIOD$120K
Apr 24, 2017Department of Transportation697DCC SOUTHWEST REGION, LOGISTICSDTFACN16C00201236220ROOF REPLACEMENT AND FALL PROTECTION AT TRACON (T75), WELDON SPRINGS, MO IGF::OT::IGF$3K
Apr 20, 2017Department of CommerceDEPT OF COMMERCE NOAADOCT0004236220IGF::OT::IGF COMPLETE REMOVAL OF THE EXISTING ROOF ON THE WEATHER FORECAST OFFICE WFO AND THE INSTALLATION OF A NEW ARCHITECTURAL SHINGLED ROOF WITH A MINIMUM OF AN ADDED 4 INCH ADDED RIDGED INSULATION AT THE GAYLORD, MICHIGAN WEATHER FORECAST OFFICE$968
Mar 28, 2017General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EASTGSP0617TH0032236220IGF::OT::IGF - REPLACE FIRE PUMP ASSEMBLIES @ THE THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH ST., ST. LOUIS, MO 63102-1125.$15K
Mar 27, 2017Department of DefenseW6QM MICC-FT LEAVENWORTH0021236220IGF::OT::IGF BLDG #73 - RSC GENERATOR TEMPORARY POWER INSTALLATION$115K
Mar 16, 2017Department of DefenseW6QM MICC-FT LEONARD WOOD0004238160IGF::OT::IGF BASE PERIOD$59K
Mar 13, 2017Department of DefenseW6QM MICC-FT LEAVENWORTH0001236220IGF::OT::IGF BLDG #89 INTERIOR REPAIRS - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO RESTORE AND REPAIR INTERIOR OF HISTORIC BUILDING TO INCLUDE CARPET, VCT, DUCTWORK, LIGHTING AND COMMUNICATIONS. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL SYSTEM.$34K
Mar 13, 2017Department of DefenseW6QM MICC-FT LEAVENWORTH0009236220IGF::OT::IGF REPAIR BASEMENT WATER DAMAGE AT BLDG. 314 - THE CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO REPAIR BASEMENT WATER DAMAGE AT BUILDING 314 IN STRICT ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT, DRAWINGS, SPECIFICATIONS AND THE TERMS AND CONDITIONS OF THEIR AGREEMENT.$2K
Mar 6, 2017Department of DefenseW6QM MICC-FT LEAVENWORTH0009236220IGF::OT::IGF REPAIR CHILLERS AND COOLING TOWERS AT BLDG 77, 95, 628, 225, 801&1098 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR CHILLERS AND COOLING TOWERS AT BLDG 77, 95, 628, 225, 801&1098. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL CHILLERS AND COOLING TOWERS.$733K
Feb 28, 2017Department of CommerceDEPT OF COMMERCE NOAADOCT0009236220IGF::OT::IGF TASK ORDER TO MOVE AND RELOCATE ELECTRICAL METER$8K
Feb 27, 2017Department of DefenseW6QM MICC-FT LEONARD WOOD0001238160IGF::OT::IGF BASE PERIOD$59K
Feb 27, 2017Department of Transportation697DCC SOUTHWEST REGION, LOGISTICSDTFACN16C00201236220ROOF REPLACEMENT AND FALL PROTECTION AT TRACON (T75), WELDON SPRINGS, MO IGF::OT::IGF$12K
Feb 24, 2017Department of DefenseW6QM MICC-FT LEONARD WOOD0003238160IGF::OT::IGF BASE PERIOD$23K
Feb 24, 2017Department of DefenseW6QM MICC-FT LEONARD WOOD0002238160IGF::OT::IGF BASE PERIOD$12K
Feb 22, 2017Department of Veterans Affairs255-NETWORK CONTRACT OFFICE 15 (36C255)VA25516C0086238290AUTOMATIC DOOR MAINTENANCE IGF::OT::IGF$12K
Feb 16, 2017Department of DefenseW6QM MICC-FT LEAVENWORTH0020236220IGF::OT::IGF REPLACE COOLING COIL - B.52 SHERIDAN$73K
Feb 2, 2017Department of DefenseW6QM MICC-FT LEAVENWORTH0009236220IGF::OT::IGF REPAIR BASEMENT WATER DAMAGE AT BLDG. 314 - THE CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO REPAIR BASEMENT WATER DAMAGE AT BUILDING 314 IN STRICT ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT, DRAWINGS, SPECIFICATIONS AND THE TERMS AND CONDITIONS OF THEIR AGREEMENT.$55K
Feb 1, 2017Department of DefenseW6QM MICC-FT LEAVENWORTH0019236220IGF::OT::IGF REPAIR VESTIBULE - B.87$65K
Jan 31, 2017General Services AdministrationPBS R5GS05P17SCC0006236220IGF::OT::IGF - HISTORICAL WINDOW RESTORATION - MELVIN PRICE FEDERAL BUILDING AND U.S. COURTHOUSE, 750 MISSOURI AVENUE, EAST ST. LOUIS, ILLINOIS$526K
Jan 25, 2017General Services AdministrationPBS R6 SERVICES ACQUISITION BRANCHGS06P17GXC0002236220IGF::OT::IGF 2312 E. BANNISTER RD, KANSAS CITY, MO. ASSESS AND CORRECT AS NECESSARY, THE EMERGENCY POWER OFF (EPOS) (FIKE AND MANUAL EPO) FOR ROOM 1129A TO SHUT DOWN THE EXISTING HVAC AND TWO SHUNT TRIP BREAKERS LOCATED AT THE WEST WALL OF THE ROOM WHICH CONTROL THE POWER TO THE STAR LINE BUSWAY SYSTEMS. CURRENTLY THESE DO NOT SHUT DOWN ANYTHING WHEN ACTIVATED. ASSESS AND CORRECT AS NECESSARY, THE EPOS (FIKE AND MANUAL EPO) FOR ROOM 1129B TO SHUTDOWN BOTH POWER MANAGEMENT MODULES (PMMS) SUPPLYING POWER TO THE STAR LINE BUSWAY SYSTEMS IN THAT ROOM ALONG WITH SHUTTING DOWN THE HVAC SYSTEM FOR THAT ROOM. CURRENTLY THIS ONLY SHUTDOWN THE HVAC, ONE PMM AND ITS ASSOCIATED UPS FED FROM THE A-SIDE (325 UPS) POWER STREAM. THE PMM AND ALL DOWNSTREAM POWER SHOULD SHUT DOWN WITHOUT AFFECTING THE OPERATIONS OF THE ASSOCIATED UPS SINCE IT SUPPLIES POWER TO A COUPLE OF DIFFERENT AREAS. CONNECT EPOS IN ROOMS 1088, 1129A, 1129B AND 1221 TO BUILDING GENERATOR POWER SO THAT WHEN HOUSE POWER IS LOST AND THE ENCLAVES ARE RUNNING ON GENERATOR POWER, THE SENSORS FOR THE EPOS HAVE POWER TO BE ABLE TO PERFORM THEIR FUNCTION. VALIDATE THAT THE EPOS ASSOCIATED WITH ROOM 1221C AND ROOM 1341 ONLY SHUT DOWN THE PMM AND HVAC FOR THE RESPECTIVE ROOM AND NOT THE UPS SUPPLYING POWER SINCE IS IT IS A SHARED UPS.$31K
Jan 24, 2017Department of DefenseW6QM MICC-FT RILEYW911RX16C0014236220IGF::OT::IGF BLDG 805 DEMO CARPET&APPLY EPOXY SEALER. BLDG 1792 REMOVE ONE DOOR AND INSTALL TWO DOORS.$16K
Jan 19, 2017Department of DefenseW6QM MICC-FT LEAVENWORTH0001236220IGF::OT::IGF BLDG #89 INTERIOR REPAIRS - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO RESTORE AND REPAIR INTERIOR OF HISTORIC BUILDING TO INCLUDE CARPET, VCT, DUCTWORK, LIGHTING AND COMMUNICATIONS. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL SYSTEM.$2K
Jan 19, 2017General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION KANSAS CITY SOUTHGS06P17TEC0004236220IGF::OT::IGF RELOCATE BADGING OFFICE, 150 SPACE CENTER LOOP, LEES SUMMIT, MO$2K
Jan 18, 2017Department of DefenseW6QM MICC-FT LEAVENWORTH0002236220IGF::OT::IGF REPAIR CARPETING AND VCT AT BLDG. 44 - THE CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS IN ACCORDANCE WITH THE STATEMENT OF WORK, DRAWINGS, SPECIFICATIONS AND THE TERMS AND CONDITIONS OF THEIR CONTRACT.$8K
Jan 5, 2017General Services AdministrationPBS R6 SERVICES ACQUISITION BRANCHGS06P17GXP0001236220IGF::OT::IGF THE CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT, MATERIALS, AND SUPERVISION TO INSTALL 18 LONG BY 10 TALL SIMPLEX STRIP COLD CONTAINMENT CURTAIN WITH ALUMINUM TRACKING AROUND THE SERVER RACKS IN THE US DISTRICT COURTS SERVER ROOM. CONTRACTOR SHALL MOVE DIFFUSERS AND DUCT WORK AS NEEDED TO ADJUST THE HVAC SYSTEM IN THE ROOM TO WORK WITH THE CONTAINED AREA IN ACCORDANCE WITH THE ATTACHED SCOPE OF WORK. THIS WORK WILL BE PERFORMED IN THE BOND COURT HOUSE 80 LAFAYETTE ST. JEFFERSON CITY, MISSOURI. THE ATTACHED SCOPE OF WORK AND THE CONTRACTORS SIGNED PROPOSAL (1442) DATED 12/28/2016 ARE HEREBY INCORPORATED BY REFERENCE. BRYAN HUFF IS DESIGNATED AS THE CONTRACTING OFFICER'S REPRESENTATIVE FOR THIS PROJECT. THE CONTRACTOR MUST COMPLETE AND SUBMIT THE FOLLOWING: INVOICE W/PDN NUMBER GENERAL SERVICE ADMINISTRATION ATTN: FANNIE NELSON P.O. BOX 419205 KANSAS CITY, MO 64141.$4K
Dec 22, 2016General Services AdministrationPBS R6 CONSTRUCTION ACQUISITION BRANCHGS06P15GZC7009236220IGF::OT::IGF OTHER FUNCTIONS CONSTRUCTION AWARD CONTRACT GS-06-P-15-GZ-C-7009 VAZQUEZ COMMERCIAL CONTRACTING, LLC EMERGENCY GENERATORS (RMO00480) CHARLES F. PREVEDEL BUILDING 9700 PAGE AVENUE ST. LOUIS, MO 63132-1555 PERIOD OF PERFORMANCE - 150 CALENDAR DAYS TO INCLUDE 30 DAYS FOR DESIGN NOTICE TO PROCEED (NTP) AND 120 DAYS FOR CONSTRUCTION NTP.$10K
Dec 22, 2016Department of DefenseW6QM MICC-FT LEAVENWORTH0018236220IGF::OT::IGF THE CONTRACTOR SHALL FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO INSTALL COMMUNICATION DATA DROPS AT BUILDING 472, IN STRICT ACCORDANCE WITH THE STATEMENT OF WORK, DRAWINGS, SPECIFICATIONS AND THE TERMS AND CONDITIONS OF THEIR AGREEMENT.$5K
Dec 20, 2016Department of CommerceDEPT OF COMMERCE NOAADOCT0002236220IGF::OT::IGF SUPPLY AND INSTALL SECURITY DOORS AND SIDE PANELS AND TO REMODEL THE REGIONAL DIRECTORS OFFICE AREA FOR THE NATIONAL WEATHER SERVICE, KANSAS CITY, MO.$4K
Dec 15, 2016Department of Veterans Affairs255-NETWORK CONTRACT OFFICE 15 (36C255)VA25516C0118238210IGF::OT::IGF REPLACE PUBLIC ADDRESS SYSTEM 589A5-14-102 IGF::OT::IGF$80K

Get Alerted Before Vazquez Commercial Contracting, LLC's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free