Federal Contractor Profile
Warfeather, LLC
$49M obligated·137 awards·8 agencies·27 NAICS
Federal Contracts
Showing contracts 151–172 of 172 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Dec 26, 2018 | Department of DefenseFA3020 82 CONS LGC | FA302019PA004 | 321213 | FLOORING FOR SHEPPARD AFB | $16K |
| Sep 27, 2018 | Department of DefenseFA3020 82 CONS LGC | FA302018P0146 | 314910 | REMOVAL AND REPLACEMENT OF PLAYGROUND FABRIC STRUCTURE (90X50) 12 ENTRY HEIGHT | $24K |
| Sep 26, 2018 | Department of EnergySOUTHWESTERN POWER ADMINISTRATION | 89503618CSW000018 | 236220 | JONESBORO ROOF REPLACEMENT&METAL CANOPY ADDITION | $343K |
| Sep 24, 2018 | Department of EnergySOUTHWESTERN POWER ADMINISTRATION | 89503618CSW000016 | 238110 | BUFORD SUBSTATION FOUNDATION REPAIR | $108K |
| Sep 19, 2018 | Department of DefenseFA3020 82 CONS LGC | FA302018P0127 | 238190 | AIT TOWN CENTER REPAIR: PER QUOTE DATED 4 SEPT 2018, 4 WKS LEAD TIME, 3 WKS TO COMPLETE, 90 DAYS FOR CUSTOM ACRYLIC COVERS 1. MEMBRANE REPAIR: A FABRIC PATCH WILL BE SEWN INTO PLACE OVER THE EXISTING MEMBRANE. TO ACCOMPLISH THIS THE STRUCTURE MUST HAVE THE TENSION RELIEVED AT MULTIPLE POINTS AND BE PRETENSIONED TO ORIGINAL SPECIFICATIONS AFTER COMPLETION OF THE PATCH. 2. MAIN MAST PIN MODIFICATIONS: WELD MACHINED PLATES TO SECURE PIN IN LIEU OF BOLTED CONNECTIONS. PLATES WILL BE WELDED TO PIN ONLY ALLOWING INTENDED MOVEMENT OF THE STRUCTURE. 3. CARRIER PLATE REPLACEMENT: THE EOR RECOMMENDS REMOVAL OF THE STEEL CARRIER PLATES AND REPLACING THEM WITH 1X12 JAW-JAW STYLE TURNBUCKLES. TURNBUCKLES ARE THE CURRENT STANDARD CONSTRUCTION METHOD FOR THESE STRUCTURES AND SHOULD BE UPDATED. THE NEW TURNBUCKLES WILL HAVE BOLTED CONNECTIONS WITH LOCK NUTS INSTALLED IN LIEU OF PINS. 4. REPLACEMENT OF ALUMINUM FABRIC HANGER STRAPS AS REQUIRED. 5. INSTALLATION OF NEW SAFETY PINS AT EVERY CONNECTION AFTER RE-TENSIONING OF STRUCTURE. 6. PROVIDE A LETTER FROM THE EOR STATING ALL REPAIRS HAVE BEEN MADE IAW THE MANUFACTURERS SPECIFICATIONS. 7. ANNUAL INSPECTION FOR THE FOLLOWING YEAR AND MINOR ADJUSTMENTS AS NEEDED. 8. CUSTOM ACRYLIC COVERS MASTHEAD ENCLOSURES TO BE FABRICATED, DELIVERED, AND INSTALLED WITH STRUCTURE. | $91K |
| Sep 5, 2018 | Department of Veterans AffairsNETWORK CONTRACT OFFICE 19 (36C259) | 36C25918C0325 | 238220 | UPGRADE DOMESTIC WATER SYSTEM AT JACK C. MONTGOMERY VAMC IN MUSKOGEE, OK. | $3.0M |
| Aug 23, 2018 | Department of DefenseFA3020 82 CONS LGC | FA302018P0070 | 238190 | REPAIR TO AIT TOWN CENTER CANOPY, DUE TO STRUCTURAL DAMAGE, WELDING REQUIRED. | $4K |
| Aug 23, 2018 | Department of Veterans AffairsNETWORK CONTRACT OFFICE 19 (36C259) | 36C25918C0318 | 236220 | INSTALL GLASS WINDOW IN ER AT JACK C. MONTGOMERY VAMC | $18K |
| Jun 4, 2018 | Department of Veterans AffairsNETWORK CONTRACT OFFICE 19 (36C259) | 36C25918P4134 | 811219 | UPS BATTERY REPLACEMENT FOR BUILDING 22 | $28K |
| Dec 12, 2017 | Department of Veterans AffairsNETWORK CONTRACT OFFICE 19 (36C259) | VA25917C0230 | 236220 | IGF::OT::IGF INSTALL SUICIDE DETERRENT DOOR ALARMS AT JACK C. MONTGOMERY VAMC | $10K |
| Sep 20, 2017 | Department of Veterans AffairsNATIONAL CEMETERY ADMIN (36C786) | VA78617C0237 | 236220 | IGF::CL::IGF DESIGN AND ERECT AN ALL METAL, PRE-ENGINEERED, EQUIPMENT SHELTER THAT MEETS THE CONTRACT SPECIFICATIONS AND DRAWINGS | $68K |
| Aug 8, 2017 | Department of Veterans AffairsNETWORK CONTRACT OFFICE 19 (36C259) | VA25917C0230 | 236220 | IGF::OT::IGF INSTALL SUICIDE DETERRENT DOOR ALARMS AT JACK C. MONTGOMERY VAMC | $135K |
| May 31, 2017 | Department of Veterans AffairsNETWORK CONTRACT OFFICE 19 (36C259) | VA25917P5168 | 238210 | IGF::OT::IGF REPLACE UPS BATTERIES | $16K |
| Feb 16, 2017 | Department of Veterans AffairsNETWORK CONTRACT OFFICE 19 (36C259) | VA25917C0104 | 238910 | IGF::OT::IGF EMERGENCY HILLSIDE RESTORATION | $120K |
| Dec 20, 2016 | Department of Veterans AffairsNETWORK CONTRACT OFFICE 19 (36C259) | VA25917C0054 | 238220 | PURCHASE AND INSTALL BACKUP COOLING SYSTEM MRI IGF::OT::IGF | $342K |
| Dec 15, 2016 | Department of Veterans AffairsVBA FIELD CONTRACTING (36C10E) | VA101V17P0033 | 238330 | LAMINATED FLOORING WITH INSTALLATION IGF::OT::IGF | $24K |
| Dec 14, 2016 | Department of Veterans AffairsNETWORK CONTRACT OFFICE 19 (36C259) | VA25917C0052 | 238220 | REPLACE TWO AC UNITS IGF::OT::IGF | $86K |
| Sep 30, 2016 | Department of Veterans Affairs256-NETWORK CONTRACT OFFICE 16 (36C256) | VA25616C0242 | 238160 | IGF::OT::IGF RE-ROOF MULTIPLE BUILDINGS | $570K |
| Sep 2, 2016 | Department of Veterans Affairs256-NETWORK CONTRACT OFFICE 16 (36C256) | VA25616C0181 | 238210 | IGF::OT::IGF EMERGENCY REPAIR OF AIR HANDLER UNIT #24 FOR DIETETICS FOR MUSKOGEE VAMC | $26K |
| Mar 14, 2016 | Department of JusticeDEPT OF JUSTICE | DJJ16PSUS530169 | 238210 | ELECTRICAL SERVICES, IGF::OT::IGF | $25K |
| Feb 5, 2016 | Department of Veterans Affairs248-NETWORK CONTRACT OFFICE 8 | VA24816P0669 | 238210 | IGF::OT::IGF: ELECTRICAL WORK | $3K |
| Jan 11, 2016 | Department of Veterans Affairs248-NETWORK CONTRACT OFFICE 8 | VA24816P0669 | 238210 | IGF::OT::IGF: ELECTRICAL WORK | $77K |
Get Alerted Before Warfeather, LLC's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free