Federal Contractor Profile
Wmb Financial Solutions
$14M obligated·199 awards·2 agencies·10 NAICS
Federal Contracts
Showing contracts 201–240 of 240 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Aug 19, 2016 | General Services AdministrationPBS R9 EAST BAY FIELD OFFICE | GSP0916WA7040 | 561210 | IGF::CL::IGF UPGRADE LIGHT FIXTURES IN USBC LOBBY @ 777 SONOMA AVENUE, SANTA ROSA, CA 95404. | $25K |
| Aug 19, 2016 | General Services AdministrationPBS R9 EAST BAY FIELD OFFICE | GSP0916WA7041 | 561210 | IGF::CL::IGF UPGRADE LIGHTING IN PARKING LOT @ 777 SONOMA AVENUE, SANTA ROSA, CA. 95404 | $23K |
| Aug 11, 2016 | General Services AdministrationPBS R9 SANSOME FIELD OFFICE | GS09P16WHC7004 | 238320 | IGF::OT::IGF PAINT BASEMENT WEST CORRIDOR | $20K |
| Jul 28, 2016 | General Services AdministrationPBS R9 EAST BAY FIELD OFFICE | GSP0916WA7037 | 561210 | IGF::OT::IGF PURCHASE MATS | $4K |
| Jul 25, 2016 | General Services AdministrationPBS R9 AMD CAPITAL PROJECTS | GS09P15KTC7002 | 236220 | AWARD DOCUMENT FOR DESIGN-BUILD SERVICES. DESIGN BUILD SERVICES FOR TENANT IMPROVEMENTS LOCATED AT THE RONALD DELLUMS FEDERAL BUILDING AND COURTHOUSE, OAKLAND, CA. THE D/B WILL BE RESPONSIBLE FOR THE PHYSICAL MOVES OF THE DOT AGENCY, THE MARITIME ADMINISTRATION (MARAD), FROM ITS CURRENT SPACE AT 201 MISSION STREET, SAN FRANCISCO, CA TO THE NEW SPACE LOCATED AT THE RONALD DELLUMS FEDERAL BUILDING. THE MOVING REQUIREMENTS ARE DESCRIBED FURTHER OUTSIDE OF THE PREDESIGN DRAWINGS AND SPECIFICATIONS AND INCLUDE OWNER FURNISHED, CONTRACTOR INSTALLED FURNITURE. THE PROJECT IS 135 CALENDAR DAY PERIOD OF PERFORMANCE AND THE GENERAL CONTRACTOR IS WMB GENERAL CONTRACTORS. IGF::CT::IGF | $8K |
| Jul 22, 2016 | General Services AdministrationPBS R9 AMD CAPITAL PROJECTS | GS09P15KTC7014 | 236220 | 50 UNITED NATIONS PLAZA REALIGNMENT PROJECT - SAN FRANCISCO, CA WMB GENERAL CONTRACTORS - D/B CONTRACTOR THE GSA (PBS) HAS A REQUIREMENT FOR SERVICES FROM A SMALL BUSINESS FOR A HIGHLY QUALIFIED DESIGN BUILD GENERAL CONTRACTOR. AS PART OF THE ADMINISTRATION'S "REDUCE THE FOOTPRINT" MEMORANDUM, THE GSA PACIFIC RIM 9 REGIONAL OFFICE IS CONSOLIDATING ITS PERSONNEL FROM FLOORS 1-4 TO FLOORS 2-4 AT THE HISTORIC FEDERAL OFFICE BUILDING, 50 UNITED NATIONS PLAZA (50 UNP), SAN FRANCISCO, CALIFORNIA. THE AGENCY WILL REDUCE ITS FOOTPRINT FROM APPROXIMATELY 122,595 TO 99,882 USABLE SQUARE FEET. THE DESIGN BUILD CONTRACTOR SHALL PROVIDE ALL MATERIAL, LABOR, EQUIPMENT, AND SUPERVISION TO PERFORM THE FOLLOWING SCOPE OF SERVICES: 1. PERFORM MINOR CONSTRUCTION ALTERATIONS TO THE BUILDING; COMPLIANT WITH GSA'S STANDARDS AND POLICIES; 2. IMPROVE THE ACOUSTIC PROPERTIES IN 10 CONFERENCE ROOMS PER THE RECOMMENDATIONS PROVIDED IN AN ACOUSTICS STUDY PERFORMED BY CHARLES M. SALTER ASSOCIATES, DATED MARCH 13, 2015; 3. RECONFIGURE EXISTING FURNITURE IN THE BUILDING TO ACCOMPLISH THE GOALS OF CONSOLIDATION; 4. COORDINATE THE PURCHASE AND INSTALLATION OF NEW OPEN OFFICE FURNITURE THAT MATCHES THE EXISTING FURNITURE IN PLACE; 5. COORDINATE AND PERFORM THE PHYSICAL RELOCATION OF 250 EMPLOYEES DURING AFTER HOURS. THE DESIGN BUILD CONTRACTOR SHALL PROVIDE ALL AND ANY OF THE DESIGN SERVICES REQUIRED FOR PROPER EXECUTION OF THE WORK. IGF::CT::IGF | $73K |
| Jun 30, 2016 | General Services AdministrationPBS R9 AMD RECURRING SERVICES | GS09P16KSD7154 | 561720 | IGF::OT::IGF JANITORIAL AND RELATED SERVICES AT THE LEO J. RYAN NATIONAL ARCHIVES AND RECORDS CENTER, 1000 COMMODORE DRIVE, SAN BRUNO, CA 94066. | $255K |
| Jun 29, 2016 | General Services AdministrationPBS R9 SANSOME FIELD OFFICE | GSP0916WH7026 | 561210 | IGF::OT::IGF | $4K |
| Jun 28, 2016 | General Services AdministrationPBS R9 LASC 1ST STREET FIELD OFFICE | GSP0916WL7059 | 238220 | IGF::CL::IGF REPLACE TWO HOLLOW METAL LOADING DOCK DOORS AT COURT OF APPEALS BUILDING IN PASADENA, CA | $2K |
| Jun 27, 2016 | General Services AdministrationPBS R9 LASC 1ST STREET FIELD OFFICE | GSP0916WL7057 | 238220 | IGF::OT::IGF REPLACE LAN ROOM SPLIT A/C UNIT AT SSA, PASADENA. | $8K |
| Jun 8, 2016 | General Services AdministrationPBS R9 LASC 1ST STREET FIELD OFFICE | GSP0916WL7051 | 238220 | IGF::OT::IGF REPLACE COUTROOM #3 CURTAIN ROPES AND TRACK ACCESSORIES AT COA, PSADENA. | $6K |
| May 31, 2016 | General Services AdministrationPBS R9 SANSOME FIELD OFFICE | GS09P15WHC7009 | 236220 | IGF::CL::IGF DOL OIG AREA DOWNSIZING PROJECT@ SFFB | $13K |
| May 23, 2016 | General Services AdministrationPBS R9 EAST BAY FIELD OFFICE | GSP0916WA7033 | 561210 | IGF::CT::IGF REPLACE MAIN CIRCUIT BREAKER @ 777 SONOMA AV/99 S E STREET, SANTA ROSA, CA 95404 | $30K |
| May 17, 2016 | General Services AdministrationPBS R9 AMD RECURRING SERVICES | GS09P15KSD0028 | 561210 | IGF::OT::IGF O&M SERVICES FOR NARA, 1000 COMMODORE DRIVE, SAN BRUNO, CA. | $506K |
| May 5, 2016 | General Services AdministrationPBS R9 SAN FRANCISCO SERVICE CTR | GS09P15KZC7005 | 236220 | CONTRACTOR TO DEMOLISH AND RECONFIGURE EXISTING BUILDING SYSTEMS (PARTITION WALLS, CEILING GRIDS, LIGHTING, MECHANICAL, ELECTRICAL, PLUMBING, ETC) REQUIRED TO CONSTRUCT THE PROPOSED TENANT IMPROVEMENTS. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY SITE INSPECTIONS, DRAWINGS AND SPECIFICATIONS, COORDINATION OF ALL DISCIPLINES, SUPERVISION AND SERVICES. IGF::OT::IGF | $12K |
| Apr 26, 2016 | General Services AdministrationPBS R9 AMD CAPITAL PROJECTS | GS09P15KTC7002 | 236220 | AWARD DOCUMENT FOR DESIGN-BUILD SERVICES. DESIGN BUILD SERVICES FOR TENANT IMPROVEMENTS LOCATED AT THE RONALD DELLUMS FEDERAL BUILDING AND COURTHOUSE, OAKLAND, CA. THE D/B WILL BE RESPONSIBLE FOR THE PHYSICAL MOVES OF THE DOT AGENCY, THE MARITIME ADMINISTRATION (MARAD), FROM ITS CURRENT SPACE AT 201 MISSION STREET, SAN FRANCISCO, CA TO THE NEW SPACE LOCATED AT THE RONALD DELLUMS FEDERAL BUILDING. THE MOVING REQUIREMENTS ARE DESCRIBED FURTHER OUTSIDE OF THE PREDESIGN DRAWINGS AND SPECIFICATIONS AND INCLUDE OWNER FURNISHED, CONTRACTOR INSTALLED FURNITURE. THE PROJECT IS 135 CALENDAR DAY PERIOD OF PERFORMANCE AND THE GENERAL CONTRACTOR IS WMB GENERAL CONTRACTORS. IGF::CT::IGF | $733 |
| Apr 22, 2016 | General Services AdministrationPBS R9 LASC 1ST STREET FIELD OFFICE | GSP0916WL7041 | 238220 | IGF::CT::IGF LIVE BEEHIVE REMOVAL ON 6TH FLOOR CHIMNEY AT COA, PASADENA | $5K |
| Apr 21, 2016 | General Services AdministrationPBS R9 EAST BAY FIELD OFFICE | GSP0916WA7015 | 561210 | IGF::OT::IGF 3 YEAR ELECTRICAL TESTING | $823 |
| Apr 20, 2016 | General Services AdministrationPBS R9 ACQUISITION MANAGEMENT DIV | GSP0916WH7018 | 561210 | IGF::OT::IGF | $10K |
| Apr 6, 2016 | General Services AdministrationPBS R9 SANSOME FIELD OFFICE | GSP0916WH7016 | 561210 | IGF::OT::IGF REMOVAL OF FALLEN AND LEANING TREES | $10K |
| Mar 30, 2016 | General Services AdministrationSAN FRANCISCO SERVICE CENTER, CONSTRUCTION SERVICES BRANCH | GS09P15KZC7005 | 236220 | CONTRACTOR TO DEMOLISH AND RECONFIGURE EXISTING BUILDING SYSTEMS (PARTITION WALLS, CEILING GRIDS, LIGHTING, MECHANICAL, ELECTRICAL, PLUMBING, ETC) REQUIRED TO CONSTRUCT THE PROPOSED TENANT IMPROVEMENTS. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY SITE INSPECTIONS, DRAWINGS AND SPECIFICATIONS, COORDINATION OF ALL DISCIPLINES, SUPERVISION AND SERVICES. IGF::OT::IGF | $41K |
| Mar 30, 2016 | General Services AdministrationLOS ANGELES SERVICE CENTER, NORTH SPRING FIELD OFFICE | GSP0916WL7037 | 238220 | IGF::OT::IGF PATCH AND PAINT MEZZANINE AREA AT THE COA, PASADENA BUILDING | $8K |
| Mar 18, 2016 | General Services AdministrationSAN FRANCISCO SERVICE CENTER, EAST BAY FIELD OFFICE | GSP0916WA7022 | 561210 | IGF::CT::IGF REPLACE COMPRESSOR @ 620 CENTRAL AVE. ALAMEDA, CA 94501 | $4K |
| Mar 10, 2016 | General Services AdministrationSAN FRANCISCO SERVICE CENTER, EAST BAY FIELD OFFICE | GSP0916WA7020 | 561210 | IGF::CT::IGF WATER INTRUSION REPAIRS @ 777 SONOMA AVENUE, SANTA ROSA, CA 95404 | $5K |
| Mar 3, 2016 | General Services AdministrationSAN FRANCISCO SERVICE CENTER, EAST BAY FIELD OFFICE | GSP0916WA7019 | 561210 | IGF::CT::IGF 3 YEAR ELECTRICAL TESTING AT ALAMEDA FEDERAL CENTER, EAST BAY, 620 CENTRAL AVE. ALAMEDA, CA. | $11K |
| Mar 1, 2016 | General Services AdministrationLOS ANGELES SERVICE CENTER, NORTH SPRING FIELD OFFICE | GSP0916WL7032 | 238220 | IGF::OT::IGF REPLACE INDOOR EVAPORATOR UNIT IN CSO GUARD SHACK AT COA, PASADENA | $4K |
| Feb 24, 2016 | General Services AdministrationDESIGN AND CONSTRUCTION DIVISION | GS09P15KTC7014 | 236220 | 50 UNITED NATIONS PLAZA REALIGNMENT PROJECT - SAN FRANCISCO, CA WMB GENERAL CONTRACTORS - D/B CONTRACTOR THE GSA (PBS) HAS A REQUIREMENT FOR SERVICES FROM A SMALL BUSINESS FOR A HIGHLY QUALIFIED DESIGN BUILD GENERAL CONTRACTOR. AS PART OF THE ADMINISTRATION'S "REDUCE THE FOOTPRINT" MEMORANDUM, THE GSA PACIFIC RIM 9 REGIONAL OFFICE IS CONSOLIDATING ITS PERSONNEL FROM FLOORS 1-4 TO FLOORS 2-4 AT THE HISTORIC FEDERAL OFFICE BUILDING, 50 UNITED NATIONS PLAZA (50 UNP), SAN FRANCISCO, CALIFORNIA. THE AGENCY WILL REDUCE ITS FOOTPRINT FROM APPROXIMATELY 122,595 TO 99,882 USABLE SQUARE FEET. THE DESIGN BUILD CONTRACTOR SHALL PROVIDE ALL MATERIAL, LABOR, EQUIPMENT, AND SUPERVISION TO PERFORM THE FOLLOWING SCOPE OF SERVICES: 1. PERFORM MINOR CONSTRUCTION ALTERATIONS TO THE BUILDING; COMPLIANT WITH GSA'S STANDARDS AND POLICIES; 2. IMPROVE THE ACOUSTIC PROPERTIES IN 10 CONFERENCE ROOMS PER THE RECOMMENDATIONS PROVIDED IN AN ACOUSTICS STUDY PERFORMED BY CHARLES M. SALTER ASSOCIATES, DATED MARCH 13, 2015; 3. RECONFIGURE EXISTING FURNITURE IN THE BUILDING TO ACCOMPLISH THE GOALS OF CONSOLIDATION; 4. COORDINATE THE PURCHASE AND INSTALLATION OF NEW OPEN OFFICE FURNITURE THAT MATCHES THE EXISTING FURNITURE IN PLACE; 5. COORDINATE AND PERFORM THE PHYSICAL RELOCATION OF 250 EMPLOYEES DURING AFTER HOURS. THE DESIGN BUILD CONTRACTOR SHALL PROVIDE ALL AND ANY OF THE DESIGN SERVICES REQUIRED FOR PROPER EXECUTION OF THE WORK. IGF::CT::IGF | $14K |
| Feb 23, 2016 | General Services AdministrationFACILITIES MANAGEMENT&SVCS PROGRAM DIVISION, CONTRACTS SECTION | GS09P15KSD0011 | 561210 | IGF::OT::IGF OPERATIONS AND MECHANICAL MAINTENANCE&VTE MAINTENANCE SERVICES - JOHN SHEA FEDERAL BUILDING - SANTA ROSA, CA AND ALAMEDA FEDERAL CENTER - ALAMEDA, CA | $50K |
| Feb 9, 2016 | General Services AdministrationSAN FRANCISCO SERVICE CENTER, EAST BAY FIELD OFFICE | GSP0916WA7015 | 561210 | IGF::OT::IGF 3 YEAR ELECTRICAL TESTING | $4K |
| Feb 4, 2016 | General Services AdministrationSAN FRANCISCO SERVICE CENTER, CONSTRUCTION SERVICES BRANCH | GS09P15KZC7005 | 236220 | CONTRACTOR TO DEMOLISH AND RECONFIGURE EXISTING BUILDING SYSTEMS (PARTITION WALLS, CEILING GRIDS, LIGHTING, MECHANICAL, ELECTRICAL, PLUMBING, ETC) REQUIRED TO CONSTRUCT THE PROPOSED TENANT IMPROVEMENTS. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY SITE INSPECTIONS, DRAWINGS AND SPECIFICATIONS, COORDINATION OF ALL DISCIPLINES, SUPERVISION AND SERVICES. IGF::OT::IGF | $2K |
| Feb 4, 2016 | General Services AdministrationSAN FRANCISCO SERVICE CENTER, EAST BAY FIELD OFFICE | GSP0916WA7014 | 561210 | IGF::OT::IGF WATER INTRUSION INVESTIGATION | $15K |
| Dec 31, 2015 | General Services AdministrationSAN FRANCISCO SERVICE CENTER, EAST BAY FIELD OFFICE | GSP0916WA7009 | 561210 | IGF::OT::IGF SYNVC FIRE ALARM&REPLACE CARPET RUNNERS | $8K |
| Dec 1, 2015 | General Services AdministrationSAN FRANCISCO SERVICE CENTER, EAST BAY FIELD OFFICE | GSP0916WA5004 | 561210 | IGF::OT::IGF CONTRACTOR SHALL PROVIDE LABOR, MATERIALS, EQUIPMENT AND SUPERVISION TO REMOVE FIRE ALARM MONITORING FROM BUILDING 3&7. | $5K |
| Nov 30, 2015 | General Services AdministrationSAN FRANCISCO SERVICE CENTER, EAST BAY FIELD OFFICE | GSP0916WA5003 | 561210 | IGF::OT::IGF THE CONTRACTOR SHALL PROVIDE LABOR, MATERIALS, EQUIPMENT AND SUPERVISION TO REPLACE TWO BROKEN WINDOW. | $5K |
| Nov 10, 2015 | General Services AdministrationSAN FRANCISCO SERVICE CENTER, EAST BAY FIELD OFFICE | GS09P15WAC0003 | 236220 | IGF::OT::IGF PRIMARTY CONSTURCTION CONTRACT A/E SERVICES FOR DESIGN BUILD | $895 |
| Nov 9, 2015 | General Services AdministrationSAN FRANCISCO SERVICE CENTER, EAST BAY FIELD OFFICE | GSP0916WA5001 | 561210 | IGF::OT::IGF THE CONTRACTOR SHALL PROVIDE LABOR, MATERIALS, EQUIPMENT AND SUPERVISION TO REPLACE BROKEN WINDOW. | $3K |
| Oct 15, 2015 | General Services AdministrationSAN FRANCISCO SERVICE CENTER, CENTRAL CA FIELD OFFICE | GS09P16WBP7000 | 236220 | IGF::OT::IGF FOR OTHER FUNCTIONS | $33K |
| Oct 15, 2015 | General Services AdministrationSAN FRANCISCO SERVICE CENTER, CENTRAL CA FIELD OFFICE | GS09P15WBM0012 | 236220 | IGF::OT::IGF FOR OTHER FUNCTIONS | $7K |
| Oct 6, 2015 | General Services AdministrationSAN FRANCISCO SERVICE CENTER, CONSTRUCTION SERVICES BRANCH | GS09P15KZC7005 | 236220 | CONTRACTOR TO DEMOLISH AND RECONFIGURE EXISTING BUILDING SYSTEMS (PARTITION WALLS, CEILING GRIDS, LIGHTING, MECHANICAL, ELECTRICAL, PLUMBING, ETC) REQUIRED TO CONSTRUCT THE PROPOSED TENANT IMPROVEMENTS. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY SITE INSPECTIONS, DRAWINGS AND SPECIFICATIONS, COORDINATION OF ALL DISCIPLINES, SUPERVISION AND SERVICES. IGF::OT::IGF | $2.1M |
| Oct 1, 2015 | General Services AdministrationSAN FRANCISCO SERVICE CENTER, SANSOME FIELD OFFICE | GS09P16WHC7000 | 236220 | IGF::CT::IGF BUILD OUT OF SOL OFFICES @ SFFB | $112K |
Get Alerted Before Wmb Financial Solutions's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free