What this opportunity is
The Department of Defense is soliciting bids for the repair or modification of centrifugal pump units. This opportunity is suitable for small businesses that specialize in the manufacturing of pumps and pumping equipment, as indicated by the NAICS code 333914. The solicitation requires bidders to submit a formal bid, indicating a competitive procurement process. Bidders should track the solicitation closely to ensure timely receipt of the solicitation documents and to allow sufficient time for preparation and submission of their bids.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||
STOP-WORK ORDER (AUG 1989)|1||
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|TBD|TBD|TBD|N00104|TBD|TBD|N60138|TBD|||TBD||||||
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS|
MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|Valentino Arena (valentino.p.arena.civ@us.navy.mil)|
INTEGRITY OF UNIT PRICES (NOV 2021)|1||
SAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES (NOV 2023))|9||||||||||
EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4|||||
TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|||
SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2|||
CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEVIATION 2026-O0015)|1||
SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7||||||||
LIST OF AWARD ATTACHMENTS|5||||||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13||x|x|x||x|x|||||||
TYPE OF CONTRACT (DEV 2026-O0045)(MAR 2026)|1|Firm Fixed Price|
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x|
ONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1||
Accelerated and incremental delivery is encouraged and accepted before the delivery date(s) listed in the schedule.
All freight is FOB Origin.
This RFQ is for repair. The resultant award of this solicitation will be issued bilaterally, requiring the contractors written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding.
The Government is seeking a Repair Turnaround Time (RTAT) of: 910 Days
Government Source Inspection (GSI) is required.
Please note freight is handled by the Navy as per the Commercial Asset Visibility (CAV) Statement of Work.
Your quote should include the following information:
QUOTE AMOUNT AND RTAT
Unit Price:__________
Total Price:__________
Repair Turnaround Time (RTAT): _______ days
If your company is not quoting the Government's Required Repair Turnaround Time (RTAT) or earlier, provide your company's capacity constraints?
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition
asset at the contractors facility as reflected in the Acction Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular
business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract.
Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE) ___
Return Material Authorization # (RMA), if applicable:__________
Delivery Vehicle (if Delivery Order requested) (if your company has a current BOA/IDIQ, for example) :__________________
TESTING AND EVALUATION IF BEYOND REPAIR
T&E fee/price (if asset is determined BR/BER):
AWARDEE INFO & PERFORMANCE LOCATION
Awardee CAGE: __________
Inspection & Acceptance CAGE, if not same as ""awardee CAGE"": __________
Facility/Subcontractor CAGE (where the asset should be shipped), if not same as ""awardee CAGE"":__________
IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW
New unit price:__________
New unit delivery lead-time:__________
IMPORTANT NOTE: Any asset for which the contractor does not meet the required RTAT will incur a price reduction per unit/per month the contractor is late - any delay determined to be excusable (e.g. Government Delay) will not result in a price reduction. If a
price reduction is required due to unexcusable contractor delay, the Contracting Officer will implement the aforementioned price reduction via a ""reconciliation modification"" at the end of the contract performance. Price reductions made pursuant to this section
shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default.
In reference to the above important note, the contractor provides the following price reduction amount per unit per month the contractor does not meet the RTAT: $__________, up to a maximum of: $_________.
The complete RFP package must be signed and returned prior to the closing date. Emailed proposals are acceptable. NECO quotes will NOT be accepted and will be determined non-responsive.
1. SCOPE
1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the PUMP UNIT,CENTRIFUG .
2. APPLICABLE DOCUMENTS
2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.
2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.
3. REQUIREMENTS
3.1 Cage Code/Reference Number Items - The PUMP UNIT,CENTRIFUG repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall
be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, appro…
Source: SAM.gov, as posted. Verify the current solicitation before responding.