459 MXS Rotary Air Compressor Replacement

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
FA286026Q0025
NAICS
333912
PSC
J043
Set-aside
Small Business Set Aside - Total
Posted
August 21, 2026
Response due
August 28, 2026
Place of performance
0, MD

What this opportunity is

The Department of Defense is seeking to replace rotary air compressors, as indicated by the solicitation notice. This opportunity is set aside for small businesses, making it suitable for companies classified under NAICS 333912. Interested vendors should note that this is a solicitation notice, which means they will need to prepare and submit a bid rather than simply track the opportunity. The work will take place in Maryland.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Page 1 of 4 HANGAR 10 AIR COMPRESSOR STATEMENT OF WORK ch1 13 May 2026 1. DESCRIPTION OF SERVICES: BACKGROUND: 1.1. This Statement of Work (SOW) defines 1.2. TASK/SCOPE OF WORK: The Contractor will conduct the following tasks under this effort. 1.2.1. This Statement of Work (SOW) outlines the responsibilities of contractor chosen for the supply and installation of two each, air compressors, air dryer and oil water separator. It’s also for the removal and haul away of 2 each air compressor at 3640 Patrick Avenue, Joint Base Andrews. This project includes the replacement of the existing Ingersoll Rand 30 hp rotary screw compressors (2 each), refrigerated air dryer, and oil-water separator with two each of the same spec air compressor, air dryer and oil-water separator. This will include all the piping needed to connect the two air compressors, air dryer and oil-water separator to the existing piping to disperse the air through the building. 1.2.2. This requirement is for two brand new air compressors that meet or exceed performance standards and adhered to specifications contained herein and the salient characteristics sheet attachment. The air compressors must provide a reliable and continuous source of high-pressure, high-volume compressed air, which is critical for all pneumatic operations within the aircraft structural maintenance shop. They will replace our current, failing system, which consists of one inoperable unit and one that consistently overheats, causing severe operational delays. This new system is expected to eliminate work stoppages and significantly improve the efficiency of critical maintenance tasks such as sandblasting, painting, sanding, and operating various pneumatic hand tools. The continuous-duty rating and robust cooling will ensure the compressors can meet our high operational tempo without failure. This directly supports our mission by increasing productivity, reducing aircraft downtime, and ensuring maintenance schedules are met consistently and safely. 1.2.3. Physical characteristics: • Quantity: Two (2) new rotary screw air compressors Meeting or exceeds existing air compressors performance output and specifications • Power Supply: 230/460V 3-Phase industrial power • Configuration: Tank-mounted to ensure a ready supply of compressed air and reduce cycle frequency. • Footprint: Approximate dimensions should not exceed 75" L x 40" W x 70" H to fit within the existing equipment space. -- 1 of 4 -- Page 2 of 4 1.2.4. Performance: Must be a 30-horsepower, continuous-duty rotary screw air compressor. 1.2.5. Equipment Supply and Delivery: Furnish and deliver the specified new compressor system (2 each air compressors, oil-water separator and air dryer) equipment to 3640 Patrick Ave., Joint Base Andrews. (Details of the new equipment are provided in a separate appendix/attachment.) 1.2.6. Removal of Existing Equipment: Remove two each Ingersoll Rand 30 hp rotary screw compressors, refrigerated air dryer, and oil-water separator from their current location at 3640 Patrick Ave., Joint Base Andrews. 1.2.7. Equipment Installation: Set two air compressor systems, refrigerated air dryer and oil water separator in place and connect it to the existing compressed air distribution system. 1.2.8. Control System: Equipped with a microprocessor-based controller for monitoring operating parameters, managing load/unload cycles, and providing service alerts. 1.2.9. Duty Cycle: Must be rated for 100% continuous duty to operate reliably without overheating in a high-demand, non-climate-controlled environment. 1.2.10. Air Delivery: Capable of delivering a minimum of 125 CFM at 125 PSIG to power multiple high-demand pneumatic tools simultaneously. 1.2.11. Moisture Control: The new compressor system must include an automated means of expelling any water and moisture accumulation, such as an auto purge valve, to prevent corrosion and ensure the integrity of the compressed air distribution system. 1.2.12. Air Quality: Must include an integrated air-aftercooler to cool the compressed air and remove excess moisture, protecting air tools and ensuring high-quality finishes in applications like painting. 1.2.13. Piping: Utilize piping to connect the new 2 each air compressors, air dryer and oil water separators to the existing “blue” aluminum compressed air piping system. Contractor will take reasonable measures to minimize disruption to the existing compressed air system during the connection process. When work is complete the contractor along with end user will ensure there aren’t any air leaks in new work. 1.2.14. Electrical Connection: Connect the new equipment to the existing electrical supply. If incorrect power supply is in breaker box. Contractor will run a line to breaker box for correct hook up power. Contractor will follow all Joint Base Andrews, DoW, county, state and federal codes to hook up new equipment to existing power supply. 1.2.15. Equipment Disposal: Upon completion of the installation, contractor will haul away the existing equipment removed and dispose of it in a manner that meets EPA, State of Maryland and Federal requirements 1.2.16. Operational Standards: all work to be performed in accordance with federal, state, and local regulatory requirements and standard operating procedures. -- 2 of 4 -- Page 3 of 4 1.2.17. Project Timeline and Working Hours 1.2.18. All work will be performed during regular working hours, Monday through Friday, from 7:00 AM to 3:30 PM. A detailed project schedule will be provided by contractor following contract award. 1.2.19. Contractor will secure all appropriate badging to get on Joint Base Andrews, Md. 1.2.20. Civil engineering will provide all escorts and end user will not be responsible for monitoring workers at the jobsite 1.3. APPLICABLE DOCUMENTS: The contractor shall follow appropriate format and staff publications in compliance with applicable Air force and DoW guidance. 1.4. SPECIAL QUALIFICATIONS: At a minimum, al

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 333912)