Statement of Work (SOW)
USCGC EDGAR CULBERTSON Waterborne Hull Clean and Inspect, Zinc Anode Renewal
Background and Current Observed Issues
USCGC EDGAR CULBERTSON requires a pier-side waterborne hull cleaning, video inspection, and renewal of depleted zinc anodes to remove operational marine growth and restore the vessel's cathodic protection system.
Work Items:
U/W Body (Waterborne), Clean and Inspect, Renew Zinc Anodes
REFERENCES:
Listed within each work item, as applicable. Available upon request.
REQUIREMENTS
See each work item for requirements.
PERIOD OF PERFORMANCE (POP)
The Government has established two potential POPs for this requirement, listed below. The Primary POP is the Government's preferred schedule. The Secondary POP serves strictly as an authorized backup schedule. All required services shall be completed during one of these two specified periods.
Proposal Submission Requirement: Offerors must explicitly state and confirm their availability to perform the required services during either Primary POP or Secondary POP at the time of proposal submission.
Primary: 24-25 June 2026
Secondary: 29-30 June 2026
PLACE OF PERFORMANCE
The primary place of performance shall be at CGC EDGAR CULBERTSON located at below address:
CGC EDGAR CULBERTSON
3000 Fort Point Rd
Galveston, TX 77550
POC: Adrian Lopez-Smith
Cell: 831-207-8084
Email: Adrian.c.lopez-smith@uscg.mil
SECURITY REQUIREMENTS
All contractor personnel requiring access to the place of performance in order to perform work under this contract must possess a valid-state issued REAL ID-compliant driver’s license or identification card, or an acceptable alternative form of identification as defined by the Department of Homeland Security (DHS) [https://www.dhs.gov/real-id]. It is the contractor’s responsibility to ensure that all personnel are properly credentialed to gain base access. Failure to comply with access requirements may result in delays to performance and will not constitute an excusable delay.
U/W Body (Waterborne), Clean and Inspect, Renew Zinc Anodes
1. Scope
1.1 Intent. This work item describes the requirements for the Contractor to clean the vessel’s U/W body and to renew bolt-on zinc anodes, while the vessel is moored pier side.
1.2 Government-furnished property.
MTI
ITEM DESCRIPTION
NSN/PN
QTY
N
Anode, stern tube
P/N: Z0020202H3NIIN: 016445483
28 ea.
N
Nut, Self-Locking
P/N: 90715A145NIIN: 015085774
2 Bx*24 in a bx
N
Anode, Sea Chest Grate
P/N: GA-4
NIIN: 016476179
4 ea.
N
Screw, Prop zinc plate
P/N: 950756NIIN: 016340210
8 ea.
N
Screw, Sea Chest Grate Anode,
P/N: 93190A634
NIIN: 016197182
4 ea.
N
Screw Cap, Stern Tube Covers
P/N: 90585A626NIIN: 016161107
42 ea.
N
Zinc plate, propeller
P/N: 950733NIIN: 016278941
2 ea.
N
Anode, Bow Thruster, Gear Case, Bolt On
P/N: 1081226NIIN: 123561870
1 ea.
N
Anode, Bow Thruster, Tunnel, Bolt On
P/N: CM2000ZNIIN: 200126334
12 ea.
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 154B WPC 111-301, Rev A, Shell Expansion
Coast Guard Drawing 154B WPC 161-301, Rev -, Skegs and Stern Tubes Support Structures
Coast Guard Drawing 154B WPC 562-201, Rev -, Rudder Details
Coast Guard Drawing 154 WPC 565-201, Rev -, Fin Stabilizer System A & D
Coast Guard Drawing 154B WPC 568-201, Rev B, Bow Thruster System A & D
Coast Guard Drawing 154 WPC 997-302, Rev -, Docking Plan
Coast Guard Publications
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements
Surface Forces Logistics Center Maintenance Procedure Card B10015.D (MPC B10015.D), 10/31/24, Insp/Cln U/W Equipment (Hull Plate)
Surface Forces Logistics Center Maintenance Procedure Card B10018.D (MPC B10018.D), 5/31/23, Replace Underwater Zinc Anodes
Other References
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not Applicable.
3.1.3 Protective measures. The Contractor must furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor must remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Requirements. The Contractor must:
3.2.1 Video recording. Submit video highlights of underwater body surfaces (e.g. bow thruster, propellers, rudders, transducers, heavily fouled hull areas, etc.) before and after cleaning.
3.2.2 Clean/inspect. Clean the U/W body surfaces free of all marine growth, debris, and all other surface contaminants in accordance with MPC B10015.D. Remove and replace sea chest grating if necessary to access/clean sea chest suction. Ensure all transducer surfaces are cleaned with only hand held brushes, without the use of power attachments. Ensure that existing u/w body coating system or non-coated surfaces do not incur any damage during cleaning process. Polish propellers. Refer to Coast Guard drawings listed in Section 2.
3.2.3 Renew anodes. Renew Government-furnished components listed below paragraph 1.2. in accordance with MPC B10018.D. Anodes may require slight modification to ensure proper fit (ie., trimming metal tabs, drilling tab bolt holes).