Description
Statement of Work (SOW)
For
Air Force Civil Engineer Center
Airfield Damage Repair (ADR) Material
Sources Sought: FA8051-26-R-KB01
-- 1 of 9 --
FA8051-26-X-000X
21 May 2026
Table of Contents
1. Introduction ............................................................................................................................................... 1
2. Scope ......................................................................................................................................................... 1
3. Contract Data Requirements List (CDRL)................................................................................................ 3
4. Shipping and Delivery .............................................................................................................................. 6
-- 2 of 9 --
STATEMENT OF WORK (SOW)
Airfield Damage Recovery (ADR) Repair Material IDIQ
21 May 2026
1. INTRODUCTION. The Air Force Civil Engineer Center (AFCEC) has developed an
updated Airfield Damage Repair (ADR) concept of operations under the ADR Modernization
Program. This program provides capabilities to expeditiously enhance existing airfield surfaces
and to facilitate the recovery of battle-damaged airfield pavement using rapid-setting
cementitious materials. This Statement of Work (SOW) defines the requirements for the supply
and delivery of these materials.
2. SCOPE The Contractor shall provide all necessary management, labor, supplies, tools,
vehicles, and equipment to supply, package, document, and deliver Airfield Damage Repair
(ADR) material kits, sub-kits, and individual items to designated locations worldwide. All work
shall be performed in accordance with this Statement of Work (SOW) and its attachments,
including the detailed material specifications located in Appendices A through BBB. The
Contractor is responsible for complete "door-to-door" logistics. This responsibility includes
providing all manpower and equipment required for the initial loading of all materials at the
origin, and it concludes with the offloading of all kits and materials from shipping trucks or
containers at the destination and final placement at the location(s) identified in each Delivery
Order (DO).
2.1. Contractor’s responsibilities:
2.1.1. The contractor shall supply, package, document, and deliver ADR material kits, sub-kits,
or individual items to selected locations worldwide in accordance with this SOW and appendices
A through BBB (attachment 2) outlined in paragraph 2.2 below.
2.1.2. The Contractor shall load and unload all ADR material kits, sub-kits, or individual items
at their origin and at each destination (door to door). The contractor shall provide all equipment,
manpower, tools, and vehicles to perform all product loading and unloading. The contractor shall
offload all kits and materials from shipping truck/containers at destinations and deliver to the
installation final location(s) as identified in each Delivery Order (DO).
2.2. The specifications for all required items are listed in the appendices below:
Appendix A; ISO Container, 8-ft x 8-ft x 20-ft
Appendix B; ISO Container, 8-ft x 8-ft x 5-ft (Spall Repair Kit)
Appendix C; ISO Container, 8-ft x 8-ft x 5-ft (FRP Grout Kit)
Appendix D; Ratcheting Cargo Bar
Appendix E; Inflatable Dunnage Bag
Appendix F; Desiccant Strip
Appendix G; Supersack Storage Rack
-- 3 of 9 --
Appendix H; Wire-basket, 48-in x 40-in x 36-in (Top Basket)
Appendix I; Wire-basket, 48-in x 40-in x 42-in (Bottom Basket)
Appendix J; Bucket Riser, M/F Channel 3-in x 2.25-in
Appendix K; Tie Down, Cargo, Aircraft
Appendix L; Wood Pallet, 48-in x 44-in, Heat Treated
Appendix M; Snap Hook ratchet Strap, Heavy Duty, 2-in
Appendix N; Bucket Lid Opener
Appendix O; Lock, Combination, Government
Appendix P; 3000 lb. Supersack, Lined, Empty
Appendix Q; 2000 lb. Supersack, Unlined, Empty
Appendix R; Rapid Set Concrete, Material
Appendix S; Rapid Set Concrete, 5-gal Bucket
Appendix T; Rapid Set Concrete, Supersack
Appendix U; Rapid Set Concrete, 20-ft ISO
Appendix V; Flowable Fill, Material
Appendix W; Flowable Fill, 5-gal Bucket
Appendix X; Flowable Fill, Supersack
Appendix Y; Flowable Fill, 20-ft ISO
Appendix Z; Pelletized Asphalt, Material
Appendix AA; Pelletized Asphalt, 5-gal Bucket
Appendix BB; Pelletized Asphalt, Supersack
Appendix CC; Pelletized Asphalt, 20-ft ISO
Appendix DD; Expedient Spall Repair, Material
Appendix EE; Expedient Spall Repair, 5-gal Bucket
Appendix FF; Expedient Spall Repair, ISO QuadCon
Appendix GG; FRP Mortar Material
Appendix HH; FRP Mortar, 5-gal Bucket
Appendix II; FRP Mortar Kit, ISO QuadCon
Appendix JJ; Citric Acid
Appendix KK; Fast Track 246 Training Capping Material
Appendix LL; Fast Track 246 Training Capping Material, 5-gal Bucket
Appendix MM; Fast Track 246 Training Capping Material, Supersack
Appendix NN; Fast Track 246 Training Capping Material, 20-ft ISO
Appendix OO; Joint Sealant, 29-oz Tube
Appendix PP; Expansion Material, 4-in x 0.5-in x 10-ft
Appendix QQ; Expansion Material, 6-in x 0.5-in x 10-ft
Appendix RR; Plastic Zip Strip, 0.5-in x 0.5-in x 10-ft
Appendix SS; Backer Rod, 0.75-in x 100-ft Roll
Appendix TT; Black Airfield Paint, 5-gal Bucket
Appendix UU; Yellow Airfield Paint, 5-gal Bucket
Appendix VV; White Airfield Paint, 5-gal Bucket
Appendix WW; Reflective Beads, 50-lb Bag
Appendix XX; Mineral Spirits, 1-gal
Appendix YY Release Agent, Concrete
Appendix ZZ; Release Agent, Asphalt
Appendix AAA; Curing Compound
-- 4 of 9 --
Appendix BBB; Tack Coat
Table 1 - Material Kit Configurations:
20 FT ISO
5 FT ISO SPALL
5 FT ISO GROUT
CARGO BAR
DUNNAGE BAG
DESICCANT STRIP
SUPERSACK RACK
WIRE BASKET TOP
WIRE BASKET BOTTOM
BUCKET RISER
TIE DOWN CARGO AIRCRAFT
WOOD PALLET
SNAP HOOK RATCHET STRAP
BUCKET LID OPENER
LOCK COMBO
RAPID SET CONCRETE
3,000 LB SUPERSACK
FLOWABLE FILL
3,000 LB SUPERSACK
FAST TRAC 246
3,000 LB SUPERSACK
PELLETIZED ASPHALT
2,000 SUPERSACK
EXPEDIENT SPALL MATERIAL
RAPID SET MORTAR
CIT…